September 14, 2026 Rockingham County Planning Board Meeting AGENDA 1. Call to Order 2. Invocation 3. Adoption of the Agenda 4. Approval of Minutes a. August 10th, 2026 5. Review of Procedures for Public Hearings a. Zoning Map Amendment 2026-16: a zoning map amendment has been requested for the property denoted by Rockingham County Tax PIN 8902-04-93-0169 located at 310 Elm Grove Church Road in the Reidsville Township. The request is to rezone the property from Light Industrial (LI) to Residential Agriculture (RA. b. Zoning Text Amendment 2026-18: a proposal to amend the Rockingham County Unified Development Ordinance (UDO) to establish specific development standards for the use of data processing facilities. 6. Other Business 7. Adjourn ###
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Good evening. I would like to call to order the September 14th meeting of the Rockingham County Planning Board. First order of business is our invocation. If, of course, Scott would lead us in that.
Speaker 2Let's pray. Our Father in heaven, we are grateful together in this planning board meeting of Rockingham County. We're grateful. for the trust that the county has in us, in this board, to serve this community and serve this county. And we pray that that will bless this meeting, that we'll be kind and courteous with each other, that we'll communicate effectively, and that we will understand the needs of both the state, the applicants, and the citizenry of the
Speaker 2county and bring those together into a good solution that benefits that benefits all people. We pray for thy spirit to be with us and help us in all that we do. In the name of our Savior, Jesus Christ, amen.
Speaker 3Next order of business is the adoption of the agenda.
Speaker 1Do I have a motion to adopt the agenda?
Speaker 4I move.
Speaker 3Is there a second?
Speaker 2Second.
Speaker 3All in favor, please raise your hand and signify by saying aye.
Speaker 5Aye.
Speaker 1Any opposed, likewise saying nay. The agenda is adopted. Next order of business is approval of the minutes from August 10th. Is there a motion to approve the minutes?
Speaker 6I move.
Speaker 1So moved.
Speaker 4Second.
Speaker 1There is a motion and a second. All in favor, please raise your hand and say aye.
Speaker 7Aye.
Speaker 1Any opposed? Likewise, say nay. The next order of business is I will review the procedures for our cases tonight so that you will have an idea. The following is information for public use. All Rockingham County Planning Board meetings are held in accordance with state law and adopted bylaws. Meeting dates, agendas, and meeting minutes are posted on the county's website, along with the bylaws and the county's land
Speaker 1use plan. Planning board meetings are open to the public, live streamed, and videos of this meeting and previous meetings are also posted on the county's website. Zoning map changes are legislative matters. These map changes are reviewed for reasonableness and consistency with the North Carolina General Statute 160D, the Rockingham County Land Use Plan, and the Unified Development Ordinance, among other adopted plans. This board considers recommendations from planning
Speaker 1staff and public comments. When applicable, this board reviews potential land use requests from the applicant. The planning board decisions are recommendations to the Rockingham County Board of Commissioners. The Board of Commissioners will hold a public meeting before making final decisions whether to approve or deny a zoning map change. Zoning cases will be considered using the following procedure. Staff will present the case to the board. After the staff presentation,
Speaker 1the applicant may come forward to offer information about the request. A period of public comment will then be opened. Likewise, text amendments are legislative matters. The procedure for text amendments will be considered using the following procedure. Staff will present the text amendment language, staff will answer questions, from the planning board. Although public comment is not required by law for text amendments, the chair will open public comment before discussion and a vote by the board. Those who wish
Speaker 1to speak must register on the sign-in sheet at the door. Comment is limited to three minutes per person. Before addressing the board, all speakers shall state their name and address for the record. Comments or questions must be relevant to the case and be solely directed towards the planning board. Speakers will address the planning board only. No speaker may directly address applicants, staff, or members of the audience. The board may seek answers from the applicants, staff, or members
Speaker 1of the audience.
Speaker 3Respect for this.
Speaker 1Board, staff, speakers, and general decorum during this proceeding will be maintained during this time. Thank you very much. And I would like to ask staff to present zoning map amendment 2026-16.
Speaker 7So this is the Rockingham County Planning Board case 2026-16, the Simpson rezoning. This is a request to rezone a parcel from light industrial to residential agricultural. The tax spent for the record is 890204930169. It's located at 310 Elgrim Church Road in the Reidsville Township, and this is a conventional rezoning. This is a vicinity map of the parcel. As you can see here, it's located kind of in between US 29 and US 29 Business in the southeastern
Speaker 7part of Rockingham County. This is a current zoning map of the parcel. As you can see here, it's primarily surrounded by residential agricultural, although it has some RP to its north and east and RM surrounding the RA. This is an aerial map of the parcel. It's currently just wooded as Adam and I went and viewed. It does have two driveways and it's just trees on the parcel. The land use plan does suggest this parcel is located in the O2 or the rural lands transect. This suggests
Speaker 7that this characterizes the county's areas for relatively undeveloped including prime agricultural and or forestry lands and low density residential land uses. Our land use plan also suggests that this area is rural and should generally be zoned RA, but a PUD may be appropriate depending on the area in general. I'll be glad to entertain any questions from the planning board, and we do recommend that you approve this rezoning.
Speaker 3Are there any questions for staff?
Speaker 2Is there any buildings or anything like that, or is it just all wooded?
Speaker 7It's primarily all wooded. Now, there was a lumber mill on this property. but all the structures were removed in 2018, or by 2018.
Speaker 2Okay, good, thank you.
Speaker 6Adam, is this a down zoning issue?
Speaker 5It is kind of like by the lay term, a down zoning, but as far as the statute goes, pretty much any kind of rezoning that comes before us is going to be. With the applicant's consent. So that's kind of like one of the requirements for that. So we would be completely fine as far as that statute goes.
Speaker 2Okay.
Speaker 7Is there a request for this rezoning?
Speaker 4Thank you.
Speaker 1So it was LI4 because of the.
Speaker 7Well, it was zoned LI in 1988 when we did zoning, but yes, probably for the lumber.
Speaker 1For the lumber, yeah, okay. And now they're not doing that anymore, so they want it to go back.
Speaker 8Okay.
Speaker 1Okay.
Speaker 3Any more questions? Okay, let's open up the floor. Is there a Mr. David Simpson here?
Speaker 8Mr.
Speaker 1Simpson, would you like to address us?
Speaker 3Wait, I'm sorry. Come forward and give us your address, please.
Speaker 9My name is David Simpson, and my address is 1928 Old Mill Forest Drive in Raleigh, North Carolina. And the 310 Elm Grove Church Road is a property that I purchased. I grew up at 380. It was right beside my parents' house. I grew up with the sawmill there beside me. And so when the sawmill went out of business, I had an opportunity to purchase that 17 acres. So I purchased it so that another sawmill could not come out there, nor a salvage yard.
Speaker 2Or anything like that.
Speaker 9But I would like to thank the planning department for its initial approval for the rezoning from light industrial to RA.
Speaker 1So does anybody have any questions of Mr.
Speaker 8Simpson? Nope. Thank you.
Speaker 3Is there any discussion?
Speaker 1If there's no discussion, do I have a motion?
Speaker 10Madam Chair, I motion to recommend approval of this request based on the consistency and reasonableness of determination statements that are included in the agenda packet as may be amended during the zoning reprocess.
Speaker 1Second. I have a motion and a second. All those in favor, please signify by raising your hand and saying aye. Aye. Any opposed, likewise saying nay. Motion carries. This will be reviewed at the which county commissioner's meeting?
Speaker 11It will be the October 19th.
Speaker 1Okay. This will go for final approval on October the 9th. So, Mr. Simpson, you might wanna come back up here. Okay. All right, our next case is zoning text amendment 2026-18, a proposal to amend the Rockingham County Unified Development Ordinance to establish specific development standards for the use of data processing facilities.
Speaker 3Yes, may we have staff presentation?
Speaker 5So this one might be a little bit of a long one. Uh, there's a lot here. Uh, so, um, strap in with me. Uh, I think I'm gonna try to go through the whole thing really quickly. Cause I think if you have questions at the beginning, I think there's some pieces at the end that might kind of answer them kind of thing. So, um, take notes if you gotta, uh, and we can go through questions at the.
Speaker 4End, I think.
Speaker 5Um, so as we all may know, uh, data centers have been kind of a hot topic. They've been around for a while generally, but I think, um, Recently, there's been an increase.
Speaker 11In size and scope of them for the most part.
Speaker 5So a lot of local jurisdictions are trying to get ahead of the game, write some regulations to put in place. Not a whole lot of places in North Carolina so far have extensive regulations on them so far. So there's kind of a lot of scrambling going on kind of across the state, probably across the country, to be quite honest, so. we've spent the past several months again, trying to get ahead of the curve on it, go ahead and put regulations in place. Um, so far we do not have any kind of applications that have ever come before us
Speaker 5or anything. Uh, this is really just to get ahead of the curve, go ahead and try to get these in place, preferably as soon as possible. So we can make sure we do have clear processes, clear language in place on how to actually deal with these. Um, Otherwise, if we were to get an application, say, relatively soon, then they wouldn't have any kind of regulations to kind of have to contend with.
Speaker 11So let's see here.
Speaker 5Like I said, no definition, nothing in the table currently. And just as a kind of general thing, we're not necessarily... We're looking at this as a land use specifically. I know there's probably going to be kind of all kinds of more broader philosophical political questions about the use of them and things like that. But in this context, for the ordinance specifically, we're looking at this in the context of as a land use. So we're trying to look
Speaker 5at like comparable different land uses. How is it similar to some? How is it different from others? And our regulations here aren't necessarily to say, yes, we want data centers or no, we don't necessarily want them.
Speaker 11Again, it's mostly just.
Speaker 5To have clear particular processes in place for when they do come and to make sure that we can regulate them to make sure that they don't have negative impacts on property owners where they took come through. Um, this little bit here at the very beginning is basically what kind of process do we want this to go through?
Speaker 11Um, We are specifically.
Speaker 5Putting it in the highway industrial zoning district. Heavy industrial, I've been doing this all day, calling it highway industrial. Heavy industrial zoning district as a conditional use-free zoning. So, so far we actually have not, don't have any specific uses that outline specifically that it goes to a conditional use-free zoning. And just as a quick reminder, it's very similar to like the conventional use-free zoning that we kind of just went through. However, with the conditional use rezoning,
Speaker 5that's where we are going to have site-specific, a site plan involved, and that is where we can get into the details. If we have concerns as a board, if we hear concerns from the public, we can place, with the consent of the property owner, particular conditions on it. That first table is doing in some of that legwork just to put in conditional zoning as a process in the table. Then that bottom one is going to be looking at data processing facilities specifically. Here is a little
Speaker 5bit of a preamble to it. We're just listing in whatever purpose and intent with this ordinance generally. And it's, for the most part, kind of our purpose and intent with all zoning is to maintain public health safety while at the same time encouraging responsible development. This applicability section is more of a dot and I's, cross and T's kind of paragraph here. We're mostly looking to just kind of say, you know, we have these particular regulations that
Speaker 5But there's also other sections of the ordinance that can potentially apply, like landscaping, lighting, things like that. We do outline some particular things here, but those other sections are going to apply as well. The other thing here is also just any state federal laws. Also going to make sure that those are definitely going to be applying as well.
Speaker 2Can I ask you a question on that?
Speaker 4Yes.
Speaker 2In the case of lighting, you don't necessarily have to be specific in this component. to cover that because it's covered somewhere else and you're going to reference that? Is that the plan? Where the rules apply generally on heavy industrial, you're just going to reference those same requirements?
Speaker 5Yeah, it's basically like unless otherwise stated explicitly here, there are other sections of the ordinance that generally apply kind of thing, if that makes sense. here's just stating basically the same thing. Here we have our definitions that we've added. Some very particular use specific definitions. That's why we're including them here and not just kind of in our general definitions. The main things, and we can touch on these a little bit later, we do define different types of cooling systems.
Speaker 5We define air cooled. We define open loop and closed loop as well. But the main thing here is the the actual definition for data processing facilities. Um, so our main definition here is kind of intended to be broad. There can be a whole bunch of different uses for data processing facilities.
Speaker 11Um, It could be used for crypto mining.
Speaker 5AI, just general like say bank information and data, just general data processing. So our intention is to kind of be broad in scope there while at the same time we do carve out a few exceptions just to kind of make sure that every office that has a server in it isn't necessarily getting caught up in those particular things. I mean, we probably have a couple of servers in our IT department, right? So we're trying to make sure that something like that isn't going to getting caught up in that same definition because it's very different in scope, scale, intentions,
Speaker 5things like that. Next here is just going to be our requirements along with the application. As you can see, this is quite a bit and most of these are kind of covered for the most part when we get to the other sections, you'll kind of, if you, we get to the other sections and you can go back and look at it and be like, okay, that's, you know, this section here is going to necessitate, this part of the application kind of thing. But this is just a list of everything that would be required with the application
Speaker 5for conditional rezoning. One thing we are adding here, and so far we do not have this generally in our ordinance. Some places for a host of different, like rezoning, special use permits, things like that, require what's called a neighborhood meeting. These are generally on the onus of the applicant themselves to set up a meeting in the neighborhood and then other ordinances will kind of set up how that process
Speaker 5should look. Generally, it's to get for the applicant to kind of get ahead of the curve, talk to the people in the area, have that kind of more detailed, more nuanced conversation before it kind of gets to something a little bit more official in front of us. just so they can kind of answer questions about their proposals a little more candidly. So far we're not doing this generally across the board just for this particular use. Kind of the main highlights here is they are going to be required to do one and then we kind of just detail that process a little bit. So they will
Speaker 5have to have the meeting no less than 30 days before the planning board meeting. So they have to do that kind of on the front end of the process and And then we kind of outlined how they should be notifying. So we've kind of so far matched kind of our process with letters especially. So we do a 1,000-foot buffer around the property for our notifications. So that's so far kind of mirrored right there. And then kind of lastly,
Speaker 5they go, they have the meetings, they then have to provide as part of their application, a summary of the meeting, what was discussed, how did you go about notifying kind of thing. Um, and that will be kind of sent, brought to the packets, uh, for y'all to be able to see as they go through that rezoning process.
Speaker 4Here.
Speaker 11We're looking at that.
Speaker 2That was a great, I thought it was a great idea.
Speaker 4Yeah.
Speaker 5Um, Here, just kind of general zoning meat and potatoes kind of thing. We're looking at setbacks and things like that. We did include a minimum lot size of 25 acres. Most of these projects are going to be larger in scale, so we did feel the need to have a fairly substantial minimum acreage requirement. A lot of that is to just make sure that that facility can fit on a property comfortably and that they can then meet a lot
Speaker 5of the other setback landscaping requirements, things like that So we're doing 25-acre minimum. We're doing 200 feet from any property line, lot line, and then 500 feet from any residential zoning district. Our building height is 50 feet. That's pretty standard across all of our industrial zoning districts. And just put a little bit of a pin in the setbacks a little bit in your brain. One of the very last things we'll talk about.
Speaker 5There's an aspect that can kind of change that a little bit based on scale that we'll get to.
Speaker 11At the very end.
Speaker 5Landscaping is pretty straightforward for the most part. Here's the language here and then here's some kind of bullet points for it. So our typical landscaping for the most part is going to be a 15 foot parcel perimeter buffer. So that's all the way around the parcel, a 15 foot landscaping buffer. That's already a requirement. So we're keeping that essentially. We're also adding in if they have any outside mechanical equipment, so think like generators, HVAC equipment, anything
Speaker 5like that. If they've got those outside of the structure itself, they then have to do an additional 15 foot around that. We looked at a lot of different ordinance generally throughout this whole process, but on a lot of these they were showing much higher landscape buffers. Our thought process here is one, we do the two, right?
Speaker 11To have it.
Speaker 5And that probably gets kind of close to like what have a lot of ordinance are showing, but also that if it ends up being a concern in the meeting, this ends up being a great, you know, particular site specific condition that we can add if we ever want to increase those. So that's, And that's honestly anytime you have a conditional rezoning special use permit. Always something good to keep in mind that landscape buffers is usually a pretty easy thing to increase. But if we make that
Speaker 5too substantial on the front end, maybe that ends up being a harder ask a little bit later through the process. Noise is one of the really big ones that's going to be super specific to data centers. Here's the language here. my notes here are going to be that, um, the main thing is that noise specifically, we're putting a very hard and fast limit at 60 decibels measured at the property line. Um, from kind of our understanding, I'm by
Speaker 5no means some sort of sound engineer expert, and this is mostly kind of accumulated from looking at a lot of different ordinances on this kind of picking a middle-ish ground on this. Um, One of the main additional things is tonal frequencies has been cited as a concern with data centers. The way I've kind of been thinking about that is almost think of like a dog whistle, right? Like it's registering at a much higher frequency. You can't quite hear it. You maybe kind of can, but it's
Speaker 5at a weird different register. And if a dog whistle was going on all the time, you'd probably develop potential things like headaches or something along those. That's one of the concerns with data centers, except instead of a high pitch, just a lower pitch. So we do include some language there, kind of the same thing for those tonal frequencies as well. We are requiring at the beginning with the application that they do an initial noise study. So Obviously, they can't
Speaker 5give us too much information with a noise study at this stage because it hasn't been built yet.
Speaker 11So there's not too much.
Speaker 5To study, but it does give us a really good baseline. What is the current noise levels? What are your projections that you're expecting in the future? And that's going to be mostly just kind of information for y'all to help make a decision and for the commissioners to make a decision as well. We're also requiring a noise study after it has been built. So they can then come through, get a licensed engineer to do a study once the
Speaker 5facility is actually operating before we issue their final permits. And then from an enforcement end of it, we're also saying that say it were to get approved, built, noise studies were all fine, year or two goes down the line and we start getting complaints about the noise. It then gives staff the ability from an enforcement end to verify that complaint, and then we can require additional noise studies.
Speaker 5And if they're not following that from third-party license engineer, showing at a later time that they can't follow that, that's when we can kind of get into further enforcement action, but doing so with kind of hard.
Speaker 11Data in our hands.
Speaker 5Generators is the next thing and for the most part when we looked at regulating generators our main kind of concern was emissions. Generators are often used in data centers as a emergency backup kind of situation. The other thing that's important is just they do have to be operated occasionally for a maintenance perspective.
Speaker 11So oftentimes data.
Speaker 5Centers will have several generators mostly for backup emergency situations. So our main requirement here is we are requiring what's called a tier four generator. The EPA has different sets of standards for, and these are emission standards.
Speaker 11Tier four is the highest that they have.
Speaker 5And we also kind of have language in there that, you know, if EPA comes out with a higher tier or something, it does automatically revert to that. And the other main thing is generators can't be the main source of power. there would not be kind of an option to, hey, we're not going to be able to have our full normal power situation for another year. Can we operate on generators temporarily? That's something that we'd kind of like to avoid, just a full data center with potentially dozens or hundreds
Speaker 5of generators operating on a regular continual basis. The other thing that we have in there is just kind of the schedule for maintenance. We do include a little bit of constraints, Mostly just Monday through Friday. But we are encouraging them to submit what their schedule is before y'all. And that can be kind of one of those things that hopefully they negotiate with those neighboring property owners to kind of come up with what best times would be. And that can be something that y'all can kind of verify and discuss and potentially look to change as it
Speaker 5comes before y'all of when those particular best times would be. Have y'all talked to neighboring property owners about when those best times would be because that would probably be the best way to go about it. Vibration is another concern that we've kind of learned in our research from data centers specifically. And a lot of this is going to be very similar to how we've set up noise. We do have a hard limit of two inches per second at the property line, and then a study submitted along
Speaker 5with the application, and then enforcement kind of works the same way, that after it's built, we get complaints.
Speaker 11We can go out, try to verify that.
Speaker 5And then potentially require more studies from third-party engineers to confirm. Lighting for the most part is going to be really quite similar to what we already have in the ordinance. We did just kind of add in some particulars to the ordinance for this, just a maximum height in vehicular areas. The general gist of our lighting ordinance generally and here
Speaker 5is mostly we don't want extra light flooding into neighboring property owners. So we've already got in there that they're going to have to have cut off light fixtures. You can't have open light that just goes anywhere. They do have to be cut off, pointed down. They do have to not flood on the neighboring property owners. They will have to submit a lighting plan, things like that. Here's another one that's a little specific to data centers, and that's going to be electrical usage and capacity. We have
Speaker 5a good bit of constraints here because Where they get power from ultimately comes from Duke. Counties are a little bit constrained in our authority to kind of like regulate that a little bit. So our main approach here is mostly to get information from them through that rezoning process. So included in the application, they'll be providing mostly just kind of basic information. What are their electrical demands going to be generally? What are they expecting them to be during peak hours, low hours, things like that? And then
Speaker 5Trying to get some sort of preliminary sign off from their energy provider of do they think they're going to have capacity for this and then oftentimes for large projects which these likely will be my understanding with you know companies like Duke for a project of larger sizes they might have to go through a very lengthy process called a large load study So that can be something that
Speaker 5we can just kind of ask of, you know, are you needed to have a large-load study? Where are you at in that process if it has been completed at this point?
Speaker 4You know.
Speaker 5What kind of information are you able to share at that point in regards to that large load study? So again, mostly on the electrical demand, because it's a little weird with the, it's all kind of a third party situation. It's mostly going to be information basically for y'all because we're probably inevitably going to get a lot of questions about, you know, what is their electrical demands, things like that. So a lot of this is to put information into y'all's hands while y'all make a decision. So some of
Speaker 5water is going to be a little bit the same way. So they're going to be showing some information, like how is your water going to be coming through?
Speaker 11Can they get.
Speaker 5Verification preliminarily for their capacity from their water provider? Oftentimes that's going to be us, I would imagine, since we are a water provider ourselves. But there's also other companies as well, like Dan River. and then also if their usage is over 10,000 gallons a day, they're essentially required to include a lot more information. Kind of the reason for kind of that is we are, and this is where we get a little bit into the cooling system aspect of it that's kind of specific to data centers,
Speaker 5I mean, as well as other manufacturing and things like that. The three main types of cooling systems, there is air-cooled, there is the open loop, and then there.
Speaker 11Is the closed loop.
Speaker 5With air-cooled, a lot of the concern, so we are requiring them to use just a closed-loop cooling system. With air-cooled, a lot of the concerns there is predominantly noise. Most of the cooling comes from large fans, so there's noise. There's potential concern for air quality. as well as there's some concern for the way it impacts like heat and temperature around the fans and around adjacent property owners. The
Speaker 5other one, the open loop system, those are often using like evaporative cooling techniques. So those are the ones that are often using large amounts of water to cool the servers. And they're often doing things like misting water onto them and letting it evaporate. And that's what uses quite a bit of water. Closed loop, from my understanding is, using a solution predominantly water with some extra things in it, in a, in a system that cools it and then
Speaker 5goes back outside from the server to get cooled by the air, but not using a fan system. So these typically there's once they put that in the system, there's really no need to ever top it off to add more. They're very low intensity in regards to their water usage. So we're requiring that off the bat, and that's kind of why hopefully the rest of the 10,000 gallons per day aspect hopefully won't even come into effect. But if
Speaker 5it does, that's when we just kind of like require some more information of what is your water usage actually going to be? Do you have plans to mitigate that and things like that? Here we've got discontinuation of use. otherwise like decommissioning plans. This is something that we already kind of have in the ordinance for other uses like cell towers, solar farms, things of that nature, that when the use has been discontinued, say they are not using
Speaker 5this as a facility anymore, but there's still equipment inside of it. Perhaps the the applicant or property owner was negligent in cleaning it up and things like that.
Speaker 11First, they're requiring.
Speaker 5A plan to how are they going to actually remove all that equipment, how are they going to restore the site. That's going to be included as part of the application. And then before zoning permits are ever issued, they're also putting up a financial guarantee.
Speaker 11And essentially....
Speaker 5That financial guarantee, whether that's with a bond, a letter of credit, that's kind of given to the county, remains open for the life of the facility. If for whatever reason it's not, we can get into enforcement action. And mostly the way that works is there's a multiplier of 1.25 times the estimated decommissioning cost minus basically scrap value. or $ 75, 000,
Speaker 5whichever one is going to be greater. No matter what, they have to put up $ 75, 000 for decommissioning. Then if it's a much larger facility, it's going to take quite a bit of money to get it back to its original state. That's when it potentially goes more based on that 1.25 times number.
Speaker 2What do you mean by original state?
Speaker 5Mostly get the equipment specifically out. It wouldn't necessarily be the structure itself because that would be quite common to have. That would be something that probably would be generally valuable as maybe another use wants to come in there and utilize that structure. Any of the equipment, the servers in particular, generators, the systems for cooling and things like that, potential Particularly
Speaker 5if they're outside, there's potential over long-term, after it's ceased operations, that it could lead to general unsafe practices and have negative externalities. So that's kind of mainly what that's focused on. It's going to be more like the outside equipment and things like that. Lastly, we have two things here. As
Speaker 5far as traffic and access, the more we thought about it, the more and looked into it and researched, there really wasn't going to be too much in regards.
Speaker 11To this particular use as far as traffic.
Speaker 5Potentially could be kind of up front in regards to construction, but once the facility is up and operating for the most part, They're fairly low traffic uses, especially when compared to other industrial uses like manufacturing and things of that nature. So we went a little light here, mostly just requiring that they're coming off of a public street and then if there's any kind of improvements that need to be made for like construction management traffic and things like that, that we kind of have open flexibility to do that.
Speaker 5And then lastly, we have the high impact use classification. This is kind of what I was talking about a little bit before in regards to setbacks. So basically if it meets any of these three criteria, if it's over a hundred thousand square feet and growth floor area, if it's over a hundred megawatts or if its own substation is needed, if it hits any one of those three or any of them together, it triggers its classification as a, what's called a class three in the high impact use. This is something that's already in our ordinance. And I've
Speaker 5got here, just for reference, this is not part of the text amendment. This is already part of the ordinance. But as you can see, that first bit is kind of going and defining what's called a protected facility. So it has additional setbacks from protected facilities. And as you can see, it includes a whole host of different things from nursing homes, medical centers, places of worship, and single-family, multifamily dwelling units. Um, so with class three, it's set
Speaker 5back from the property line doesn't actually change. It's 200 across the board, but with class three, it does increase. We have a 500 setback from a residential lot. This increases it to 1000 and it's not just from residential zoning. It is the actual structures themselves at this point. Um, so that's just essentially if it gets to a certain size, to a certain scale, um, we then kind of get triggered into increasing some of those setback requirements.
Speaker 11And I think that is it. So if y'all have any questions.
Speaker 10Adam?
Speaker 6Are we constrained by statute to these figures here?
Speaker 11In regards to setbacks?
Speaker 10Yeah.
Speaker 11Not necessarily.
Speaker 5I mean, we're certainly constrained by statute in a whole number of ways, generally and as it relates to this. But specifically for setbacks, I mean, we could. theoretically make them whatever we want.
Speaker 8Generally.
Speaker 11I don't.
Speaker 6Like that 200-foot figure at all. Just generally.
Speaker 11Property line?
Speaker 8Yeah.
Speaker 5I mean, that can be something that y'all maybe think about and consider potentially increasing. we could bump it up into a different class category as well. Bunch of different ways that we could potentially go about that if that's something that gives you heartburn.
Speaker 2Okay.
Speaker 1Can you note that one? Let's come back to it. I think probably the best way to proceed is, since this is draft language, Let us go ahead and get our questions out, and then we'll mark them if we need to tweak language.
Speaker 3Whoever wants to go first is fine.
Speaker 8I have a couple.
Speaker 12I had a little bit of time to research on a few things, but the noise... I noticed that a lot of the counties, because we're in a rural area, so if we were talking about putting this in industrial area in Greensboro, I think 60 decibels is doable because you already have so much noise, it kind of bleeds it out. But in the rural areas, I noticed the counties usually put it around 40 to 45. And even then, neighbors still kind of complain about at night being able
Speaker 12to Open up doors and windows at that 60 decibel. So I noticed like Kent County and a couple others, they're more around 40 with some larger setbacks.
Speaker 5In regards to noise, and again, I'm not, super like a super good expert on explaining exactly kind of, so I do know it's kind of a multiplier kind of effect. So when you go from like 50 to 55, uh, that's not just like a small increase. That's actually like a large multiplier of what, what sound is.
Speaker 8Right.
Speaker 5Um, so those are going to be fairly significant when we're talking about just even five increments in these. Um, in my kind of understanding, um, of what does 60 decibels kind of sound like, it would probably be about the level of speaking that I'm at right now. So that was something that we thought, one, was kind of generally appropriate at a property line, and then two, just
Speaker 5kind of at least in our research, there were several that were looking at like 70. And probably on the lower end, we were seeing more, a lot along the lines of like 50 decibels But, I mean, that's certainly something that, you know, y'all could decide to potentially, hey, let's bump that down a little bit.
Speaker 1So I just asked AI what's a reasonable outdoor noise level for a rural neighborhood, and it's generally 55 dB or less during the daytime and 45 dB or less at night. So I'm thinking if we're not real sold on the 60 dB range, then maybe we can drop it to, like you say, to 50, because that sort of splits the baby a little bit.
Speaker 4I had two things.
Speaker 8Yeah, of course.
Speaker 7The buffer is going to absorb a lot of the sound from, because you think about it, a very dense tree. You ever seen those reflectors on highways? The sound will be absorbed or bounced backwards, and it's going to be so far from the property line, a lot of that. It'll be 60 when it's coming out at first, but then as it propagates outward, a lot of the trees and buildings will absorb most of that sand.
Speaker 1Would 50 be.
Speaker 2So it's already gone through the buffer.
Speaker 11That is true.
Speaker 5So it is 60 measured at the property line specifically, but kind of to his point, I mean, most of the time, if you're a neighboring property owner, for example, then... you're probably not just going to be standing exactly at your property line attempting to see what kind of noise levels.
Speaker 11That you get from it.
Speaker 5Um, so kind of like to your point about like 55 being normal for residential areas, uh, this is still going to be a rezoning to industrial, right? So this is probably going to go in places that hopefully our land use plan is calling for industrial.
Speaker 1There's not a lot around it anyway.
Speaker 5Um, I don't, I, I lean towards thinking that the idea of expectations for being something next to something that is classified as industrial maybe does give it at least a little.
Speaker 11Bit of a bump in decibel.
Speaker 3And you may not know this, but what's the difference.
Speaker 1To the vendor or the developer between keeping your noise level at 50 and 60? What does it require them to do?
Speaker 5I mean, ultimately, I think it will really depend on the facility and kind of where their starting place is, right? I would think if they are using something like a closed loop system to begin with.
Speaker 11Because that's already a pretty hard, fast, straightforward.
Speaker 5Requirement, there really shouldn't be a lot of things on the property that generate noise except for maybe generators, which are That.
Speaker 1Would be temporary anyway.
Speaker 4Exactly.
Speaker 5That's going to hopefully be very temporary situations either for maintenance. They do have to let them run periodically throughout the week. I've generally heard maybe like an hour. Like each generator gets run for like an hour or so once a week kind of thing.
Speaker 11And then during emergency situations.
Speaker 1We can drop this to 50 so that we feel more comfortable running.
Speaker 3Staying within, you know, guidelines.
Speaker 1And it's not going to be that much of a burden on the manufacturer or the vendor.
Speaker 5And if it is high, that's kind of where we didn't put anything outside of landscape buffering generally.
Speaker 8Okay.
Speaker 5We didn't put any specific requirements like you have to do soundproofing and stuff like that because we didn't want to get into those weeds. We already have the hard, fast decibel measurement at the property line. So if they can't meet that with their facility, that's when they on their own will then have to look into potential soundproofing and things like that.
Speaker 1I don't know about y'all, but I feel pretty comfortable dropping it to 50. Are y'all okay with that?
Speaker 11Definitely.
Speaker 8Well, is it on decibels? or sound because I'm going to change the subject.
Speaker 11No, it's kind of changing it.
Speaker 12I know you were saying with the decibels using the closed unit, right?
Speaker 4Yes.
Speaker 12Yes, I know it will bring down sound a little bit because they're not using some of the bigger stuff.
Speaker 2Yes.
Speaker 12But to loop in, I mean, most of the servers, they're going to.
Speaker 4Hum, right? There's just all that going in. But it is.
Speaker 12Kind of changing the subject. With the closed loop and it's not... If I'm reading this correctly, we're banning air and the rest of it.
Speaker 1Correct.
Speaker 12I agree, but then also my concern is the tradeoff is high energy to run those closed-loop systems. So they're going to be pulling twice the energy to run a closed loop than they would be like open air, the evaporation.
Speaker 5I mean, at least in our research of it, there wasn't huge amounts of difference in energy consumption based on the systems. It was mostly, particularly with closed and open, mostly a water thing.
Speaker 12You were trading off water for energy because you've got to cool the water off, which is pumping it out, pumping it back in. That's the only thing I had a question about. Is it worth, I guess, banning the other two to.
Speaker 5And to specify, from my understanding of the closed loop, it is still kind of air-cooled.
Speaker 11It's just not air-cooled in the sense that they need... That's not their only meaning.
Speaker 5The air-cooling is for the solution that's doing the actual cooling of the servers. And the air-cooled, the air is cooling the servers itself.
Speaker 2Yeah.
Speaker 11Right?
Speaker 4So.
Speaker 5With the solution in a closed loop system, it goes outside and is air cooled, but it can be done over the length of time. So there's not like a huge amount of energy consumption needed for that particular aspect of the process in comparison to the other two per se.
Speaker 7Direct-to-chip system, it actually doesn't use any water. It uses a solution that they bring in and it uses no... Until the solution is gone and they have to fill it back up, there's no water being utilized.
Speaker 2It reduces the water need for the facility.
Speaker 12The trade-off is we're not using the water capacity, but we are using more energy. So your energy consumption is going to be much higher than using the other two.
Speaker 4Systems topic i agree with what sean's saying is addressing we want to not be you know frivolous with our water resources and we're not wanting to make a lot of noise with the systems but we have two other issues in this ordinance to address that so i feel like we're maybe over regulating there may be some technology that comes out later on that's is a open loop system that's quiet and doesn't use as much water that we're saying you can't use. I mean, If that's the
Speaker 4two objectives we're trying to achieve, I think we're achieving it by the direct noise issue and the direct water issue.
Speaker 1Well, and two, we're answering the question because we've seen communities get caught out because they don't have any regulations at all.
Speaker 3And therefore, they're having to.
Speaker 1Create their vision on the fly without a good base. And they're catching themselves in the dilemma of having to approve maybe systems that they didn't want to do in the first place. So what Requiring the closed-loop system. Yeah, it's it is it's tight regulation. It's pretty tight regulation however, if we If we start with them with the more
Speaker 1robust regulation then we can always back it down if there's another technology over time. Cuz the technology will change over time, it absolutely will. But if we set the precedent of we're putting in place the highest standard possible for protection, protecting our water, our resources, all the things that we are in this county. I think we're better
Speaker 1off taking that attitude and moving that way than just, okay, well, we're gonna look at everything. If we can write this ordinance so that every type of system is considered. And this sort of goes back to my question, it's only closed loop. So if somebody comes in, and usually what we do is we try our best when an application, submitted, we try to fit that application. You do work with
Speaker 1the applicant to make sure that what they're asking to do, you just don't say no automatically. This office has always been really good at trying to craft the application and what the use is so that it fits the UDO. and the land use plan. So y'all have been wonderful about that. But what this does is it will, you know, if somebody comes in with any other system than closed loop,
Speaker 1it's just going to be denied, and we'll never know it, right? You will reject the application.
Speaker 11Outright.
Speaker 5With the conditional rezoning process specifically, and we've kind of, in a very different context, right, seeing these with subdivisions, right, where We have particular regulations in place for subdivisions, things like setbacks. With the conditional rezoning process, you can lift some of those conditions on a site-specific basis.
Speaker 11So say a.
Speaker 5Data center developer were to look at our regulations and be like, okay, this is something we want to proceed with, but we've got this slightly different technology. I think generally our process on this was the negative externalities on AIR and open loop systems seem incredibly high compared to closed. So if they want to show, come in and put their application and request specifically, we've got this other slightly
Speaker 5different technology or maybe it is kind of open loop, but this is how we're mitigating.
Speaker 11They can do that.
Speaker 5Specifically ask one of the conditions be that and then the onus is kind of on them To show during that rezoning process that hey, we're trying to meet the intention of the ordinance but for the most part that makes the general kind of going regulation to be something that diminishes the largest things that we can think of that have large impacts to neighboring property owners and And then if there is something that's kind of different, a little specific, then the applicant can be the one to
Speaker 5try to show that. And then if something completely revolutionary happens in the technology of how they do this in five, ten years, this is a very growing field with a lot of technological improvements. Things can change. We can certainly just revisit that aspect of the ordinance.
Speaker 1We're not looking to have something here that's absolutely permanent and long-lasting, because we do know the technology will change.
Speaker 2This has to be flexible. We have to have the ability to rethink this, and if we have to do it every two years, rethink it based on the advances in the technology.
Speaker 5If anything, definitely keep that in mind, because it's kind of staff's position generally that we would like to go ahead and try to get this in place as soon as possible. just to make sure that we have clear processes and regulations in place were an application to ever come through. We have a little bit of wiggle room in the conditional rezoning process on a site-by-site basis, and then if we have one come through, we get a little bit more experience. Maybe we don't get one for two or three years and things happen, change with the field, technology,
Speaker 5anything like that, we can revisit it.
Speaker 1And to that point, Spencer, you've got a couple. Oh, are y'all... I have.
Speaker 8A few points. My first, I guess, question is kind of just how we kind of came up with some of the determinations. Because I've looked into a bunch of them and it's kind of a mix between light industrial, heavy industrial. So I kind of like the aspect that's heavy industrial. I kind of looked at some other ordinance just to try to get an idea of what a proper appropriate acreage would be um for instance uh another
Speaker 8ordinance i looked at their class three which class three is their most strict so it'd be like our class five um they had 40 acres and then if you drop down to their class two it's 10 acres so i was kind of looking at the 25 acres is that reasonable um so i you know for me that seems somewhere in the the middle um.
Speaker 5That was kind of our approach with it, too, was we were seeing similar figures, so we decided to kind of go in the middle a little bit with that.
Speaker 8Okay. I kind of am in agreeance, though, with the 200, you know.
Speaker 1The 200-foot setback.
Speaker 4Right.
Speaker 8Some other things that I was looking at is, so what if the data center comes in and says, you know, we have a green energy initiative, So we're going to put in solar facilities or some sort of renewable energy. Would that mess up the zoning at all? Because some places have different ideas of what should be zoned heavy industrial and then if it has its own energy infrastructure, should that be something else? That was just a question that I just was wondering if that had been thought about.
Speaker 8Another one is what if it's a multi-use area and there's a term called edge data centers. So they take up one spot of a multi-use area. And the other one would be like, what if it's a micro data center and smaller scale? Obviously that would be more municipal, more in the city, not necessarily out in the county. But those are just some of the questions that I had if they had been considered.
Speaker 5So take like the micro scale one. for example, if it's super small, it's probably going, there is a particular exemption in our definition of under 5,000 square feet. So if it's at that level of size, it probably wouldn't get counted in this, at least as it's currently written. But if it's hitting above that in any way, shape, or form, then that's where that minimum acreage does come in,
Speaker 5and then they do have to meet all of these particular regulations. And I feel like I'm already blanking on all of your other questions already.
Speaker 2So when he's talking about if they add additional renewable energy solutions, for example, batteries and solar, stuff like that, does that include in the 25 acres, meaning that they wanted to build a 25-acre facility But then they wanted to put another 25 acres in for solar. So, you know, is the place where they're putting the solar have different applications because our regulations are for solar farms is already defined.
Speaker 5So more than likely with particularly like renewable and it will very much depend on exactly how they want to go about it. There's nothing in here that really. says or regulates differently when it comes to them using some sort of renewable energy source.
Speaker 11In my opinion.
Speaker 2Classified as a substation or something like that.
Speaker 5No, so I mean, there's multiple different ways I can go about something like that. I mean, they could get their own substation, for example. And like I said, with electrical power a lot of that's kind of out of our own control to regulate renewable is a little bit differently and it depends on exactly on the modem that they end up using take solar for example often times that we would probably just treat that as accessory to this So all of these regulations are still going to apply.
Speaker 5They're still going to have to have landscape buffers, any kind of lighting or anything like that. If they were to do something off-site, that's probably winter. Full regulations for solar farms are probably going to kick in, if that makes any sense.
Speaker 8When they propose their plan, will it be a complete build-out? So they would have to come back if they want to build out further?
Speaker 5Yes. And I'm probably always going to encourage... if you think that you're, and this is for anything, not just this, if you think that you're going to expand anything down in the future, go ahead. When you apply for a conditional rezoning, go ahead and show everything that you think you're going to do. Uh, ask for all of it up front.
Speaker 11Um, kind of thing.
Speaker 5Because if they go beyond the scope of it, um, in conditional rezoning, our, our processes, we go over like 10% of the square footage.
Speaker 11Of what was approved.
Speaker 5So they do, say, easy math, 100,000 square foot facility. If they do anything more than 110,000 square feet, they have to go back through this process for conditional rezoning.
Speaker 8Last one. So if there's additional equipment, I see, I understand the landscaping buffer would be pushed out. Would that also apply to the buffers or is that only the building itself? Say, for instance, they had generators that were offset from the building. Would the buffer then go from the generators, or would it be... And same thing, say if they had a cooling system that went out, would the buffer be from the end of the cooling system,
Speaker 8or would it be from the building itself?
Speaker 5A secondary buffer is intended for outside storage of equipment. So if they had generators, they had cooling systems that's not internal to the building, but stand alone off from the structure. that's when a secondary ring of a 15-foot buffer would be required around that, if that makes sense.
Speaker 8A 15-foot buffer, is that just the building itself?
Speaker 5Oh, you're talking about for setbacks? For setbacks, yes. So for setbacks, that would include accessory.
Speaker 1Okay.
Speaker 2Everything, generators and whatever, the structure of the building and everything all around it, all have to be included in that, then you have the buffers.
Speaker 4Okay, are you ready?
Speaker 11Okay, just five more to go. Get your pencil warmed up.
Speaker 6I'm going to go page by page here and just I'll give you the section number on the page and so you can look at the language there and pencil that in minimize adverse impacts associated with noise vibration so so and so so and so forth protected adjacent residential neighborhoods I would would feel better with some language in there that was about protecting an endangered wild endangered or
Speaker 6protected species or other natural elements in the environment that may be of some particular Economic or social interest.
Speaker 5Okay There is language under B for environmentally sensitive areas If that helps and to be fair at least in this particular, I don't I don't see this as very like hard regulations This.
Speaker 6Really knows why I'm putting it what I'm putting that in there so that we don't we're saving time later on arguing over protecting tree frogs and owls and stuff like that.
Speaker 5Most of that is going to be handled by state and federal agencies anyway, for the most part.
Speaker 8I mean, I think we can go.
Speaker 5Fairly general in regards to our language there, for the most part, is what I'm trying to say.
Speaker 8All right.
Speaker 2One of the things I think we have to remember is we're deciding about zoning.
Speaker 1Right.
Speaker 2And we're not establishing regulations yet. Around all the.
Speaker 5Stuff like wildlife is really kind of out of our purview for the most part I mean there are other agencies that handle that so if they do end up disturbing some sort of Wildlife habitat or something those agencies would kick in at that point.
Speaker 2The only ones that are talking about a permit There's other permits that they have.
Speaker 1But could we? You know environmentally sensitive areas That doesn't exactly include things that could have an impact.
Speaker 3Like if.
Speaker 1The noise and vibration are going to cause the barn owls to leave, that is the environmentally sensitive area, isn't it?
Speaker 11If habitat is an environmental sensitive area. That's correct.
Speaker 1This isn't really regulation. This is really just to get a.
Speaker 5General gist of like What are we trying to do here? So it helps with interpretation a little bit later on. If there is, I mean, it's written by a human hand. There's always going to be, and read by other humans, there's always going to be possibilities of different interpretation. This can hopefully help kind of.
Speaker 11Clarify interpretation a little bit.
Speaker 3But in the ordinance, we've given.
Speaker 1A nod to concerns that people may have about Whatever, whatever thing.
Speaker 2But trying to get that definitively would be impossible to do because, you know, well, I got a barn owl. Well, I mean, the noise around my house doesn't stop the deer.
Speaker 7So, I mean, that's... That's good, then.
Speaker 11All right, thank you.
Speaker 6Page 3, Section B. Potable water is used only to initiate the system or to replace incidental losses. Could we have some kind of a stop-loss language on there to say what's a... You know, we go back there and find their water's been running 24-7. You know, we don't want to do that.
Speaker 11I'm not sure. What is an incidental loss?
Speaker 5So that would be like a spill. So like in a closed-loop system... like I said, they're usually doing some sort of a solution, right? That's what's doing the actual cooling of the servers. So it's probably predominantly water, but there's maybe like other substance like propylene glycol or something like that. So that's in the system. And hopefully none of that ever needs to come out of the system. It's like oil that runs through your car, but they don't even need to change the oil on something like this. So that incidental loss would be like And this is
Speaker 5something I'm sure the data center, this would be like a disaster scenario for them kind of thing. If for whatever reason there was a breach, there was a leak kind of thing in that system, the only time you're really using any type of potable water sources to potentially refill that system in the case of either starting the system off or in the case of instant leak or something along those lines.
Speaker 4All right, thank you.
Speaker 11Page four, item C.
Speaker 6Number four, water usage and capacity verification even in severe drought conditions. The word drought conditions doesn't appear there.
Speaker 4I think it should.
Speaker 11You said under C for water usage and capacity verification?
Speaker 6We're in drought conditions now.
Speaker 1Isn't that part of the report that they would need to project water usage and capacity verification even during drought conditions?
Speaker 4Yeah.
Speaker 5So what, what this, this is just generally, Hey, if you, if you hit the requirement to need this additional information to be submitted with the application that at least in this section, that's all that's saying is you need to include that water usage information, either preliminary approval stuff along those, whatever the requirements are. Um, so there are, if it's utilizing a good amount of water back kind of in the section on water usage, it is talking about, you know, um, what are all your water consumption timetables going to be?
Speaker 5What are your leak protection? What are your water reuse methods and things like that? So I would imagine that would definitely kind of get included in an analysis of what their water usage is.
Speaker 11Going to be now. What is it going to be estimated? What is it going to be during different types of conditions?
Speaker 2All right, that's good.
Speaker 11Thank you.
Speaker 6I want to We've already handled the report. The meeting is going to be held, and the report is going to be given to you, the staff.
Speaker 11Yep, that's part of the application for you all to look at.
Speaker 6So you will see that at some point.
Speaker 1Okay.
Speaker 6And I'm sorry, I'm on page five now. I'm still back at 200 feet set back here. I still don't like that. But you said we can deal with that, right?
Speaker 11Yeah, I mean, we can hash that out now. We can. Hold off a little bit, Up to you.
Speaker 1I say we go ahead and agree on a number.
Speaker 11Okay.
Speaker 2We've already agreed on the 50, right?
Speaker 1Mm-hmm.
Speaker 250 decibels.
Speaker 1Yes. Yep, we did that. So if we don't like 200... What are some suggestions?
Speaker 11We're getting into an auction here. Do I hear 300? Do I hear 400?
Speaker 1Well, so what's the difference?
Speaker 3What would the difference say if.
Speaker 1We had a 500-foot setback?
Speaker 3What would be the difference between two and five?
Speaker 11About 300 feet.
Speaker 1I'm looking for.
Speaker 3That's not the.
Speaker 11Answer I'm looking for.
Speaker 1It's been a long day already.
Speaker 5I'm with the setbacks that there is the 500 on residential, right? So if it's next to anything residential at all, that's RA, that's RP, that's RN.
Speaker 11It is 500 foot on that. Okay.
Speaker 5So we're talking 200 feet from something that's zoned commercial or industrial.
Speaker 12Yeah.
Speaker 2So I'm a dollar general.
Speaker 8And the verbiage to put non-residential or is any lot kind of better?
Speaker 1So the poor people going to the Dollar General do not get the benefit of that 300 feet.
Speaker 5The fact that we've specified for residential in that other setback kind of does that work for us?
Speaker 4When we were talking about that, I maybe got the impression incorrectly, but I thought it was only if it was a certain size that that kicked in.
Speaker 8The 200 setback is also in the high impact.
Speaker 11Yeah, you're talking the high impact use.
Speaker 4Yes.
Speaker 5So these here on page five are the setbacks across the board.
Speaker 1The general ones.
Speaker 11The general ones.
Speaker 5And then if it is a certain size, it does get kicked up more from those. And this is something that's already in our language or in our ordinance, but it does it from protected facilities. So that's where it gets into details about, like, dwellings, hospitals, churches, things like that.
Speaker 4Well, let's just say we have something that's not zoned that way, but there is a house or a church on it. Will it still apply? Because this is just a residential zoning district.
Speaker 11Correct.
Speaker 5So if, say you had a home in an industrially zoned district, one, that would be a non-conforming use. So typically homes are not permitted.
Speaker 11in.
Speaker 5Industrially zoned properties. So someone has intentionally done that to their property, has a home, and then at some point requested their property to get rezoned, more.
Speaker 11Than likely, to get that.
Speaker 5Churches, for the most part, they are in residentially zoned properties. They are permitted a little bit more across the board. I'm actually not sure off the top of my head. Are churches permitted... In commercial and industrial? I'm pretty sure commercial, but I don't think industrial.
Speaker 7I just wanted to say one thing about y'all stone decibels. This is from my college days. When you go from 60 to 50, you're reducing the sound by 90%. It's really like mathematically, because it's a logarithmic function, that is a, it's going to be really, really, really hard mathematically for them to get it, because you're reducing it 90%. That's what he was talking about earlier. Like, it is very hard to reduce it that much. Because you're going from, like, I'm currently talking at 70 decibels to mic. Now I'm
Speaker 7at 50. If you were to, I mean, 60. If you were down to 50, it's like, it's a 90% reduction in the noise.
Speaker 5Yeah, that is a good point. I didn't have that particular percentage off the top of my head.
Speaker 12To the lot line, correct?
Speaker 4So.
Speaker 11Yeah, it's measured at the lot line.
Speaker 4All right, so.
Speaker 12I mean, the 200 in industrial, 200 I kind of agree with. But if you increase residential to 750 to 1,000, I think you should state residential and agriculture. If you're setting those setbacks, 750 to 100, then if they're at the facility at 60 decibels, with also increasing that landscape buffer, I think.
Speaker 4Then, I mean, I don't think you have a problem meeting that 50 decibels.
Speaker 5That's actually one thing that we've kind of generally had conversations about in regards to the high-intensity portion of it is perhaps it would just kind of be cleaner to just take out that high-intensity portion. Because that way you have this weird kind of tiered approach of, okay, you've got this normally, and then you hit this certain thing, and you get hit with different setbacks, and it's slightly different how it's calculated.
Speaker 11I'd rather go ahead.
Speaker 3The conversation was just.
Speaker 5To take that out, and then maybe we just look at increasing setbacks generally or just reexamine them.
Speaker 1I think that's the answer to this because I'm— And answer me this, so there could potentially be a care facility in a heavy industrial area?
Speaker 11I don't know off the top of my head about a care facility specifically. I doubt it. I don't think they're permitted.
Speaker 3Or a daycare center.
Speaker 1I know that daycare centers exist in industrial.
Speaker 11I don't think that they're permitted in industrial.
Speaker 5Whether or not there are some edge cases that there is one that happens to be in industrial, again, that would probably be a nonconforming use.
Speaker 1Okay.
Speaker 11All right. Take that with a grain of salt. I don't know that use table off the top of my head.
Speaker 2I feel comfortable with 500.
Speaker 4Okay.
Speaker 2I'm good with that.
Speaker 8Just to kind of, again, looking at other ordinances, again, going back to this is Class 3. It has a 500-foot setback. Class 2, it drops to 10 acres and has a 150-foot setback. It's still heavy industrial, but it's just different classes. And just to kind of give an idea of what their idea of the classifications, the Class 3 would be like your mining, quarrying, racetracks, asphalt plants. Class 2 would be like automobile salvage, storage facilities, chemical manufacturing.
Speaker 7A racetrack, I mean, you're clocking 100 decibels.
Speaker 8That's class three. That would have your 500 foot setback. Another option would be instead of having minimum setback any lot, if we can all get to a consensus of whether or not care facilities are within the heavy industrial. You could do something as like minimum setback for heavy industrial or likely zone or compatibly zoned industrial facilities as 200 foot and then all others 500 foot. That could be
Speaker 8something that.
Speaker 3That might get complicated.
Speaker 2But what you're kind of getting at is why would we have a requirement for data centers that would be more egregious or tighter than we would if somebody was building some other kind of manufacturing facility? I mean, one of the challenges with data centers, and I'm glad you talked about crypto mining and banking and stuff like that, because everything you see about data centers, it's always about AI. And so we have to kind of divorce ourselves from
Speaker 2the political or the strong emotional feelings people have. We're sitting in here and she goes into AI and looks up stuff. So You know, why, you know, should we be more, have much tighter requirements for a data center than we would for any kind of other manufacturing plant that could generate a bunch of noise and stuff like that?
Speaker 6And, Corey, that's a great point.
Speaker 5It's like just kind of in our approach and our philosophy and deal, and this is for any land use, right? Not just for this, but that is exactly kind of a huge part of our approach for exactly that is we do, different uses can have different characteristics, right?
Speaker 11And we, if they have negative.
Speaker 5Impacts on property owners that are specific to that use, we want to address those. And that's where we get super specific, but we don't necessarily want to single out a particular use.
Speaker 11If it fits in a general kind.
Speaker 5Of like industrial category or a commercial category, we don't want to just arbitrarily and capriciously, um, regulate a particular thing so far outside of the bounds of how we're treating other similar type uses.
Speaker 11We can address the specific things.
Speaker 2We put a 50 decibel limit on an asphalt.
Speaker 3But we do.
Speaker 7This thing.
Speaker 11That's always an important fine line to consider.
Speaker 1This thing is so new and we've seen how it has caused community problems community impacts that That I would rather out of the gate Give us a little bit more regulation and we can always come back and if you know if we get applications and people are not and and the applicants are not able to fit any of these then we should come back and go and This ordinance does not serve our purpose.
Speaker 2Because our intent here is not to discourage people from building data centers.
Speaker 1Or maybe it is.
Speaker 2I mean, if our intent is to discourage that business development, then that's a very, and I don't think the planning board has any authority for that kind of a decision. That's a county constitution. issue. They need to define how important it is for that type of business development in our community.
Speaker 1But if we want to manage something that a technology and an industry that is so new and so.
Speaker 3Has already had.
Speaker 1Impact in other communities. I think we want to make sure that we're not being cavalier about it.
Speaker 2And I agree, but I'm wondering how many of those communities are having problems because they didn't have the regulations well thought out in place already, and it kind of snuck.
Speaker 8Up on them.
Speaker 11And that is the case.
Speaker 2And it snuck up on them. In this case, you know, we, you know, We're being very proactive here, and I think we have an opportunity to say, well, you know, so let's set a standard that we'd like that we can all agree on, and I think we got a pretty good link here.
Speaker 3I do like the 500.
Speaker 1I personally like the 500 feet. I think that gives us.
Speaker 4Some.
Speaker 1Do we want to do 50 and 500 feet?
Speaker 2No, I'd do one or the other.
Speaker 3I mean, yeah, no, I'm sorry.
Speaker 1I would do both. Because, like, I mean, when you get that far back, they're going to comply with the 50 to begin with, right?
Speaker 11When you say 50, what are we talking about?
Speaker 2Okay. We're talking about 50 decibels and 500 setbacks.
Speaker 1When you get that far back, you're going to comply with it. That's not going to be difficult to comply.
Speaker 8That depends.
Speaker 7I'm just going to say mathematically, it's... I wanted 50 just like you actually. You can ask them.
Speaker 4We were talking.
Speaker 7I wanted 40. Seriously, but, I mean, mathematically, 70 is the lowest that we've seen in our research. We're actually going 90% lower than a lot of ordinances are in the first place. So even going even more, it's just going to be really, really hard for them to do that. That's the only reason I'm trying.
Speaker 4To, you know.
Speaker 1But if the starting point is the edge... If it's at the edge of the property and your setback is 500 feet, I mean, do we, I don't.
Speaker 8It may not. So some of the articles that I've read, one of them said don't, they actually advise doing a decibel limit because 500 foot doesn't, like 500 doesn't necessarily mean 500 with the sound. So like for instance, like think of if you're up in the northwestern part of Rockingham County, And it's hitting just right in that holler. You can hear a normal conversation 1,000 feet away.
Speaker 1To your point, in Stoneville, in the fall, you can hear the cars running in Martinsville.
Speaker 4Yes.
Speaker 8So some of the articles definitely advise going towards the decibel limit just because in every circumstance, 500 foot does not necessarily mean a reduction in sound.
Speaker 2Yeah, I would agree with that.
Speaker 11Again, it's important. This is measured at the property line, right?
Speaker 5So if the thing is generating sound 500 feet away from the property line, it could be louder where it's generating sound, but that's on the property, right?
Speaker 11I mean, you're.
Speaker 5Expected to make noise on your own property, right? The issue is when that sound goes to other properties. At 60, we're looking at a conversation like this.
Speaker 7Actually, a little lower, but yeah, like a generalized, no microphone conversation.
Speaker 5Again, compare it to other uses in industrial, right? Take a UPS packaging plant, for example, where you have tractor trailers operating on a regular basis. I have no doubt in my mind that they would be operating at a higher decibel level. Onto another property line. If you were a neighboring property owner, you could feasibly hear a tractor trailer just idling. For example, this likely wouldn't have that level of noise loudness on a regular basis. I think
Speaker 5the general issue is more the continual nature of it.
Speaker 1Right, and that's the thing that it doesn't, it won't necessarily go away. It's constant.
Speaker 2We use two types of sounds. One is tonal.
Speaker 1Yes.
Speaker 2So, I mean, one of the things I've heard is that there's a vibration or there's a tone that is lower than we can hear that creates physical discomfort to people. And is that included in the decibel limit? Because you've identified tonal as a separate item.
Speaker 5It's a metric that goes off the decibel.
Speaker 7Sound has two properties. It is an amplitude and a frequency. And if you read here, it talks about the C-weighted and the A-weighted sound. Those are your low frequencies that you're referring to. The ones where, you know, the hums that for, I mean, for me, it drives me nuts to hear a low frequency hum. But, I mean, if you're at the property line and it's a 60 decibel frequency, it's going to be very, very, very quiet compared to a racetrack. Like Adam said, transfer trailers. But, yes, your
Speaker 7frequency could be different because sound has two properties, like I said.
Speaker 2Yeah, because if it's running at 10 hertz, you know, and it's loud, and a decibel meter may not pick that up, would it?
Speaker 1Okay. So are we– we're kind of going round and round here.
Speaker 10Wait, let me ask a question. Can you go back and reiterate a little bit why you decided on 200 feet? I think if I remember, you said you looked at some that were more and some that were less, and you kind of fell in the middle.
Speaker 11That's pretty much the case with the 200 feet.
Speaker 8I actually have an article right here, too. Like Fairfax County, there's this 200 feet. So obviously, this is definitely a more populated county. But going back to the point earlier, and I think this was a good point because I didn't think about this earlier, these are going to go in more industrial areas. So if this was up in the outskirts, then yeah, maybe the 200 is not sufficient. But if it's in an industrial area, it's more likely going to get knocked down.
Speaker 2And we can decide that on a case-by-case basis, that if it's going to go into a rural area where there's nothing around, they're just going to, I've got 200 acres, I'm going to go put a data center in the middle of it.
Speaker 12It shows the difference between your communities and industrial. The industrial is at 200, residential is at 500. 500, yeah.
Speaker 8Okay.
Speaker 5You take somewhere like along 220, for example. I mean, that's an area that we've... I.
Speaker 4Can hear that.
Speaker 5Yeah, but I mean, that's a place that we've generally, in accordance to our land use plan, that's where industrial is going to be appropriate anyway. That's probably where I would see a larger likelihood of just generally them being approved because of that. Our land use plan has it... Our utilities already exist off of 220. That's going to be one of the main things that they're going to be looking for in regards to siting. So you take an area like that, there's probably a good bit of commercial in the area in which that 200 is going
Speaker 5to apply, but there's still plenty of residential that still just happens to be zoned residential. So, I mean, that's where like a 500 can fit in there. And to Corey's point, which is a very good point about like if it were to come in to another area that's specific, that's like, man, I don't know if 200 is going to cut it right there.
Speaker 11You're going to see that on the site plan.
Speaker 5You're going to see that specifically in our reports of what that surrounding zoning is going to look like, what those aerials are going to look like. And that's something that y'all can decide as a board that, okay, in this particular scenario, this one might be a little bit more egregious. Maybe we increase it to 300, whatever it might be, right, in that specific scenario.
Speaker 12That's where I think it's coming, like, in those areas coming off of the 220. That's exactly where I'm thinking of because I do have the highway that's close, and I still hear it at night. Now, it's not as bad as, you know, when I lived over in Jamestown, right? Way more quiet. But those are still adjoining residential. So that's where I came into place earlier. I feel like increasing when they are closer to those residential and you do have those factories that are over there because they're right out there off of the Highway 65. increasing maybe
Speaker 12setbacks to maybe 750 or 1,000, and increasing those land buffers or the landscape buffers when they're closer to those residential areas to help out. Because, I mean, along 220, I know in a lot of areas they put those walls going up.
Speaker 4Down the highway to kind of buffer that.
Speaker 12We don't have that, and the cost of putting that down 220 is expensive.
Speaker 4So I think....
Speaker 2And they would have to put those up.
Speaker 8And another point, the decibel, I looked up a bunch of different decibels. A car is roughly 70 decibels. So I'm sure it's louder going up and down 220.
Speaker 7It is 90% louder to be.
Speaker 8So you're more likely to hear the car than the actual.
Speaker 3Have we come to a consensus? I thought the.
Speaker 1Decibel level was sort of... We had agreed on that.
Speaker 4To specify a decibel level at the lot line, we're in a way dictating what the setbacks have to be because they're going to have to move farther away to meet those requirements.
Speaker 5Other things to mitigate it. If site-specific things... The.
Speaker 7Wall things as well to balance.
Speaker 2That 500-foot setback may not reduce the noise at all.
Speaker 4It doesn't do much dissipation of sand.
Speaker 10But also, we have the option... whether we set it at 200 or 500 or 1,000 or whatever, we have the option of making that a condition. That's correct.
Speaker 1So let's just leave it at 200, Dave.
Speaker 10But what I'm looking at is if you get it 500 feet, I wonder specifically if that is a deterrent to somebody, and we're not trying to say yes or no to a data center of any kind, But why would you put a higher setback if it potentially discouraged somebody.
Speaker 4From doing it?
Speaker 2Yeah, I think your point is that we come up with a reasonable view of regulations around decibels and setbacks and stuff like that.
Speaker 10And then.
Speaker 2We always have the opportunity to look at each individual situation and say, yeah, no, it's got to be more. Or maybe it's okay because there's a plant. They want to put it next to a plant that's already generating 80 or something like that. And then the 60 takes on a different.
Speaker 1So then our conditional, we could actually, if we leave it at 50 as a general guide. If the application comes in and they are right beside, and that could be part of their hearing, is our neighbor emits 80 decibels, can we get consideration?
Speaker 3Can we go up as well as go down?
Speaker 2Yeah, so do we want to make it really tight, or do we want to be somewhere in the middle and then we can be tighter if we need to, or we can be.
Speaker 1I'd like to leave it at 50 to make them. To let applicants know that we mean business.
Speaker 7I do not mean to interrupt you. If you go to 50, you are essentially saying we do not want them here because it is going to be virtually, I'm not going to say it's going to be impossible, but it is going to be extremely stringent. I think 60 is a very well-balanced number based on what we've done the research on. And then if you want to make it a condition later at 50 when someone comes before you, then you could do that.
Speaker 12Can we write it in the verbiage depending on the surrounding.
Speaker 8Zone?
Speaker 1No, I think it needs to be more generalized.
Speaker 5I do think having like one across the board is kind of the.
Speaker 2Way to go for the most part.
Speaker 5Most importantly, like we can get initial sound studies and kind of see what's already being produced in the area as is, right, and then kind of make determinations from there.
Speaker 11Because that will be dependent too, right?
Speaker 5Like if it's a super quiet area and the decibel level is already really low initially, that's maybe where you put condition to go lower, right? If it's already going into an area with you get that initial sound study as part of the application and it's already pretty high, then 60 is probably too low in that instance.
Speaker 4Are you guys able to pull this? Because I know they have Microsoft.
Speaker 1We have gone down there.
Speaker 11Microsoft put in.
Speaker 2We can go for an hour. Yeah, we can go for an hour.
Speaker 11This has created regulations yet.
Speaker 5I know they've had a proposal come through, but I don't think they've drafted and gone through the process to create regulation. They did an initial vote for moratorium. I think that got turned down. So I don't think they've kind of begun that process for crafting any specific regulations.
Speaker 1They have not begun it. You've got another question.
Speaker 8So this is my last question.
Speaker 1Okay.
Speaker 8Part of their proposal will have, will they do that study for the decibels prior to construction?
Speaker 1They'll do the SAM study.
Speaker 5With the application. And obviously, like, they don't have the equipment out. There's only so much they can measure. But a lot of the logic of that one is, what is the baseline level for this area?
Speaker 11And then, like, what would your projections be?
Speaker 8Proposal, that would be our guidance.
Speaker 1Yeah. So in the interest of getting something on the books, I'm okay with that. Does that help?
Speaker 10Look, I trust these guys that have done all this research on this, and if this is the numbers that they've come up with, the 60 and the 200 feet, and we have the ability to adjust both of them up or down, I don't see a problem leaving like it is.
Speaker 1I'm okay with that, too.
Speaker 2I agree with that.
Speaker 8Okay.
Speaker 1Because we went down a rabbit hole.
Speaker 11I love a good rabbit hole.
Speaker 1We went down.
Speaker 2I think we had an opportunity to explore the nuances that we might run into. And we've thought through it so that when we actually are confronted with it, I think we're going to be more informed.
Speaker 5And believe me, we've had this exact conversation half a dozen times.
Speaker 2I'm sure you did.
Speaker 11Not just with us.
Speaker 5Lance was involved heavily in this process. Lee in economic development was heavily involved in this process. We have gone round and round on exactly these exact conversations several times.
Speaker 3Did you have anything else?
Speaker 11Oh, yes. Okay.
Speaker 4On page seven.
Speaker 1Page 7, item K.
Speaker 11Is all one item.
Speaker 6It doesn't mention, it says the applicant is going to provide a detailed electrical demand analysis, as you just mentioned.
Speaker 11They don't have the equipment out there.
Speaker 6They don't have the building up and running, so they're not going to know what that is.
Speaker 11But they do know.
Speaker 6There are things that they do know, and that is If they're gonna they're gonna have this study done by Duke power probably You mean I think earlier in the in the potential in the draft. It's mentions something about Duke power doing something How much electric how much power these systems need They got they ought to.
Speaker 2Look really well. There's already data centers in North Carolina. So Duke's Yeah, you know there are other other facilities.
Speaker 6That Operating now that couldn't provide that kind of data if they're allowed to do that or Duke power can provide it or but anyway in the language here if we can include some other language just say it should come should include comparisons with other similar sites Can we do that?
Speaker 13Part of the application process is them providing Electrical usage and capacity When.
Speaker 4They do the design of the systems, they know what usage they're probably going to incur.
Speaker 2They have to in order to get the equipment. Is there anything in here that.
Speaker 1Would cover the comparison of like, or would there ever be a like comparison? Or are all of them really unique?
Speaker 4A lot of them are unique. The technology's changing daily.
Speaker 1So that might not be... That might not be feasible.
Speaker 2But if you're going to have to spend the millions of dollars to build one of these, you're going to know exactly how much energy you're going to need.
Speaker 5Our logic that we were falling upon is that's going to be needed information that they're going to have of what do they need.
Speaker 11Because they wouldn't.
Speaker 8Start the process.
Speaker 2That's the decision factor. Can I afford to do this?
Speaker 1Which they ask for the conditional. That's when we can ask them, have you done any comparisons? That's the point at which we can catch them on that because they've got to provide testimony.
Speaker 4Thank you.
Speaker 11Okay.
Speaker 10Yeah.
Speaker 2That's good.
Speaker 11I'm good on that one.
Speaker 4Okay.
Speaker 6I'm going to jump ahead to page nine.
Speaker 4Page nine.
Speaker 2Last question.
Speaker 11Page nine, item four.
Speaker 4Item four.
Speaker 6Amount of financial assurance shall be 1.2 times blah, blah, blah. 50% $ 75, 000 that is the number that that jumps out to me because of its minuscule size yes, I Mean I can't imagine that that is the minute that $ 75, 000 when you start Remediating and restoring and cleaning up a facility that has been probably abandoned by a company that
Speaker 6doesn't Doesn't give a squat about it anymore $ 75, 000 is a pittance, so that number needs to go way, way up.
Speaker 5To clarify that, $ 75, 000 is the minimum. No matter what, they've got to put $ 75, 000 up, right? But with that, they have to include estimated costs of how much, by an engineer, of how much it would cost to restore the site.
Speaker 11And so if we go by that.
Speaker 51.25 times number, right, and that cost provided by an engineer times 1.25 is higher.
Speaker 11Than that, that's what we go with.
Speaker 5So the 75 is the absolute floor on that. By the way these are written, they will probably most assuredly, if it's a decent-sized facility at all, be doing quite a bit more.
Speaker 3And they'll have to submit a decommissioning plan.
Speaker 8Correct.
Speaker 2All the constant in there would be in there.
Speaker 1And that's where that calculation will come in.
Speaker 2Okay.
Speaker 6I'm done.
Speaker 8One thing.
Speaker 4So.
Speaker 12And I could be completely wrong about this, but I want to be protected. I guess that's to be protected from, I know we have a minimum of 5,000 square feet. What's to say somebody doesn't do the bare minimum in multiple locations close together? Is there any way, because you said anything under 5,000, none of these regulations. So can we drop this minimum square footage? but also I'd like to see, and you can tell me the pros and
Speaker 12cons of this, dropping this down, but taking away the band of all the other systems, but categorizing them. If you're at this amount of square footage for this system, then you have to go with closed loop, right? But if you're at a 4,500 square foot, closed loop is going to be an expensive system to install than open air or something like that, right?
Speaker 5I mean, one of the biggest things that we've kind of, seen in our research is that most of the facilities.
Speaker 11That are catching headlines are bigger facilities.
Speaker 4To begin with.
Speaker 5Almost all the things that the industry is driving towards is larger facilities to begin with. For instance, I do expect that if we ever were to get proposals, they're probably hitting all those requirements that we put out for the high-intensity use, for instance. So that's kind of like one of our main fallback kind of like processes of thinking about it in that regards. But the under 5,000
Speaker 5was mostly there to just consider something that's like just so small that it's not really going to have the type of impact that something that we all kind of have in mind with a facility like this in it. More is just kind of a catch-all for something that is that small. But, yeah, I mean, if there's particular issues with it, we can certainly look at that particular aspect if, you know, the board wanted to strike that
Speaker 5or to change it or.
Speaker 11That was kind of our thinking there.
Speaker 5It was like the biggest one is to make sure anything accessory, right?
Speaker 8Yeah.
Speaker 13It's pretty unlikely for someone to obtain the 25 acres and put a facility that's less than 5,000 square feet on it.
Speaker 4Yeah. Yeah. The next topic, well, what I was going to mention was along those lines.
Speaker 11Yes.
Speaker 4I remember, that was like a year or so ago, but reading an article of, People up in the mountains of North Carolina and Tennessee complained about cryptocurrency mining facilities. How would that fall into this? Because they're like modular type containerized systems, but a lot of noise.
Speaker 5Completely fits into this. In our definition, crypto mining is... fits into data processing generally as a definition. So all of the same kind of categorizations apply. That if you're building a standalone facility for something like that, right, if you're doing an accessory, that's fine. Like if you've already got a different use, you've got some servers doing that on the, okay.
Speaker 11But if you're doing.
Speaker 5Standalone for that particular use, you've got a large amount of servers, this kicks in.
Speaker 4So which aspect would kick in? Because I know a lot of those that I was reading about were pretty small. They're less than 5,000, like what Sean was saying.
Speaker 12Yeah.
Speaker 5Yeah, I mean, in that instance, this would not kick in if it's under 5,000. But, I mean, our thought process on that would be that as a small, at that scale, the level of negative impacts that it's going to have on neighboring property probably does not, fit to the kind of regulations that we've kind of put forth here.
Speaker 4I hear what you're saying, but I remember reading this article, and it was like national news that the neighbors were really upset of how much they were being disturbed by those facilities.
Speaker 2They would still have to come to the planning group and would have to ask for, and we would end up having to adjust the, because There would be nothing in RA or RP that would allow that kind of a facility.
Speaker 1Even HC.
Speaker 2They would have to come in and ask for a light industrial or something that would fit into that, and we would have those conversations, right?
Speaker 11More than likely, it would kind of... Like, we currently have a.
Speaker 5The way I've gone ahead and like kind of preliminary looked at our ordinance, the way our, our use table, the rules of it is set up. Like obviously we have a whole bunch of different uses in the table, but in an instance and every ordinance is going to treat the situation a little bit differently in the instance of, okay, there's a use in here.
Speaker 11It doesn't quite fit any of the things that we have in here.
Speaker 5Um, it gives us a staff the ability to, we find the closest use of, Maybe it doesn't make sense, but we find the one that's most comparable, not necessarily just a name or definition, but an impact character and make that determination from there. A bunch of different ways ordinance can kind of address, you know, what do you do with uses that aren't specifically in the table? The way we've kind of been looking at these so far for data processing facilities is has been kind of putting
Speaker 5it into a use that we have of other industrial, and that is special use permit in light and heavy industrial. So more than likely, a use like that, even at a smaller scale, would probably fit in a category like that, if that makes sense. That was a long preamble to get there.
Speaker 2But the point is that then we can pull this up and say, okay, there are pieces of this I mean, basically.
Speaker 11We would.
Speaker 2Think through in order for us to decide what would be the most appropriate solution.
Speaker 5Basically, if it's under that 5,000-square-foot threshold, if it's super small, it's still going to have a process to go through, but it wouldn't be this process.
Speaker 11It wouldn't be this set of regulations that hit it, but it would have a process to go through.
Speaker 3And to piggyback on what Dwayne asked.
Speaker 1I like that.
Speaker 3Is flock technology.
Speaker 1I'm bringing it up.
Speaker 11Don't do that.
Speaker 1Is flock technology data collection in the same way?
Speaker 11I know only a little bit about flock.
Speaker 5The main thing that I can think of of how it would interrelate with this, right, is that there's probably quite a.
Speaker 4Bit of data.
Speaker 5that a company like Flock would have to process. So if they're doing off-site processing of that data in some capacity and they're trying to look for standalone places to do it, that could possibly fit into this.
Speaker 1But that's not in our jurisdiction. That wouldn't necessarily be in our jurisdiction. What is collected is not in our jurisdiction. What is collected and housed is in our jurisdiction.
Speaker 11We're looking at land use, right?
Speaker 5We don't, I mean, we go with the general, what are you doing with the thing? But as far as like what actually occurs in the building outside of the general usage of the land, that's where it stops.
Speaker 1That answered my question.
Speaker 11Yeah.
Speaker 4Okay.
Speaker 3You got any more? You got any more?
Speaker 4I do. One thing on the noise verification.
Speaker 11In our.
Speaker 4Article G noise, it talks about doing a noise study where Prior to getting a CO, yes. I think that they're not going to be up and running at full capacity at that point, not generating for sure the full noise that they're going to do. I think we should change that portion that somehow, someway a study is done when they're at full capacity and not wait until people complain down the road.
Speaker 2Well, there was two components to that. One was the preliminary... And then there was the one that, in order to get the final permit to go into full operation, they have to have it up and running and have to validate that, right?
Speaker 3Does it say that? No, it's at CO.
Speaker 1So they don't necessarily have to be at full capacity when they get to CO.
Speaker 7That's great.
Speaker 5If they want to start operation and start inhabiting the building, that is the point in which they would.
Speaker 11Have to do it.
Speaker 5And it would be at that time in which that situation second there's the noise study at the beginning as part of the application nothing's been built and then the second one what's required comes in everything the rezoning has been approved building permits have been approved they've gone through all of their inspections they're pretty much done That's when they do the second noise study, before we allow them to, hey,
Speaker 5you are completely okay to start operations. So to his point, if they were to say they had plans for a larger facility, 300,000 square foot facility, and they're only doing it in phases, 100,000 square foot, 100,000 square foot, 100,000 square foot, They're only trying to get that first 100,000 square foot online now when they try to get their CO. That is when a noise study would be required. It
Speaker 5wouldn't necessarily encompass the future 200,000 square foot down the line.
Speaker 4I think a third study really needs to be done. You can make them do it before the CO, but I guarantee you, They will not be operating at anywhere near full capacity, not even half capacity.
Speaker 2That's a really good point.
Speaker 4And then, you know, because they can't have the people in there. They don't have a CO. They can't bring the people in to operate the facility. But once they're up and running.
Speaker 1Is our fallback on that code enforcement?
Speaker 4Yes, number four.
Speaker 7If there's a verified noise complaint, they have to do another study.
Speaker 4I'm just saying be proactive and not wait until you piss off the neighbors.
Speaker 5I'm just trying to think of how would we even word that.
Speaker 3That's how code enforcement works.
Speaker 2Well, they have to have all the servers running and everything before they.
Speaker 4It's a chicken and egg issue we're asking them to do.
Speaker 2They do that.
Speaker 8Date when they have to be fully operational? I don't.
Speaker 4Know.
Speaker 6Do that.
Speaker 11Like in the situation of like kind of thinking of like phases, right?
Speaker 4I agree with your point on that 100% as well.
Speaker 5With a phase, especially say you were to do a separate structure, there would be a secondary CO issued. So it would be logical of an interpretation of this current language.
Speaker 4And just not built out all the infrastructure within it with the.
Speaker 13Servers.
Speaker 4They could have the shell building all built at once.
Speaker 13Yeah, if they're not meeting the requirements prior to the CO, they'll know they have to add some more, some kind of sound buffers or whatever they need.
Speaker 4But my point is they're not going to be generating the noise prior to a CO that they will be a week or two afterwards.
Speaker 13They should have some general idea at that point. with both of those studies done, like I said, if they don't have that first one that, I'm.
Speaker 1Sorry, the second one.
Speaker 5Most of the noise really isn't the servers. Oftentimes it's like the generators, right? So if you were a developer of data centers, oftentimes that is not always the case. But it can generally go kind of two ways. You can have a company that... builds out the infrastructure they make the structure they make they put in the generators they put in the cooling systems they run all the infrastructure to it and then they sell out spaces to
Speaker 5different companies hey come put your servers here we've got your infrastructure and they play pay rent other times you've got full meta amazon they're building their whole thing they own all of it they run all of it um i forget where i was trying.
Speaker 11To go with that.
Speaker 1So if the fail safe is code enforcement, isn't it our responsibility almost? Because if we're the ones that are worried about this, and we should be because we're kind of the front line here. If we're the ones that are most concerned, we can activate code enforcement anytime we want to.
Speaker 4True.
Speaker 1That meaning that any one of us, or any other citizen for that matter, can say, I'm afraid that they're too loud. Can code enforcement ask them to do.
Speaker 4And.
Speaker 1Any citizen can do that.
Speaker 11I remembered where I was going.
Speaker 5So that infrastructure is probably already going to be in place kind of in either scenarios. Even if they want to open and operate before they've even gotten a server in there, the server's probably not going to... The servers in itself is probably not going to contribute too much to the noise aspect of it.
Speaker 11It's probably the other infrastructure. And that aspect is going to be in place.
Speaker 4I agree that cooling and stuff is going to, but they're not going to be running that cooling system if they don't have a heat or demand that requires it.
Speaker 11Well, they'll have to for the noise study. I'm in construction.
Speaker 4You can't just run a system without a load to apply to. You can't just.
Speaker 11I'm just trying to think of what other... What other mechanism?
Speaker 5Like, the reason that we tied it before CO, right, is because we have super strong teeth.
Speaker 11If you do not comply with that noise ordinance, we do not give you that CO.
Speaker 4Right.
Speaker 11I agree with you. That's a super direct. So, like, I'm trying to think of, like.
Speaker 1I'm not sure.
Speaker 4What would we give ourselves a false sense of security that they pass that test?
Speaker 3I'm not sure there is a mechanism other than code enforcement.
Speaker 11Yeah.
Speaker 4Make it clear that they have to pay for the third-party engineer if there's a complaint. It may already say that.
Speaker 11It does, definitely.
Speaker 13We also have access to a decibel reader as well.
Speaker 11That's how we'll verify the complaint.
Speaker 2The sheriff, the deputies are going to be going around with their decimeters, right?
Speaker 4On the generators, we're tying them to the Tier 4 emission standards. It's my understanding that Tier 4 only applies to diesel generators.
Speaker 7Yes.
Speaker 4So what if they bring one and hook to a natural gas system or propane system?
Speaker 11That is a very good question.
Speaker 3Why don't we just put the word any?
Speaker 1Any.
Speaker 4The other ones, Tier 4 won't apply to them is my understanding.
Speaker 11I don't know if you heard that, Ben.
Speaker 2It would actually be good if they didn't actually.
Speaker 5He was saying Tier 4 applies to diesel generators.
Speaker 11What if they use a generator that is not diesel?
Speaker 3Do we catch that at the conditions?
Speaker 11We certainly can.
Speaker 3Can we ask them what kind of generators they are?
Speaker 11Certainly.
Speaker 1Okay.
Speaker 4I think we need to go ahead and tell them.
Speaker 5I don't think I'd ever seen any of looking at any of them. I just don't think it ever even came up.
Speaker 11They almost all use diesel generators.
Speaker 1But you're correct. There are other applications.
Speaker 4I've installed them before. That's why I'm asking.
Speaker 11Yeah, I mean, that's a really good point.
Speaker 13We do have that sentence right below it.
Speaker 11Like they still wouldn't be able to be utilized.
Speaker 4Standard that are equal. Two or more stringent.
Speaker 11Anything other than maintenance.
Speaker 1Oh, okay.
Speaker 4I'm saying that the... Tier 4, I don't think, applies to those type generators.
Speaker 11To non-diesel?
Speaker 5Yeah, that tier system from the EPA specifically applies to diesel.
Speaker 1Can we take tier.
Speaker 3There's probably.
Speaker 4Some other standard we should probably reference in here for that.
Speaker 3Let's take that out and to a higher standard of.
Speaker 5No, I mean, honestly, I mean, that's a good, like, we can definitely try to look into if there are other.
Speaker 11Yeah, something that can potentially catch that.
Speaker 5Because I'm trying to think, like, if the logic is mostly for emissions, diesel is probably going to be your most serious contributor to emissions, right? So if it's natural gas generator, for example, I would think your emissions are generally going to be lower in the first place.
Speaker 7This requires a diesel generator because it says it has to be Tier 4. Like, if he's saying that a Tier 4 generator is a diesel generator, that is requiring that to be a... actual diesel, so they couldn't do gas at all. Because it says that it must meet a Tier 4 emission standard, so it has to be a diesel generator. You see what I'm saying?
Speaker 4I see what you're saying, yes.
Speaker 13But facilities would be using anything other than a diesel generator.
Speaker 1But we are requiring them to have a diesel generator instead of anything else.
Speaker 7Yes, that's what it.
Speaker 4There's a natural gas pipeline running through this whole county.
Speaker 9Mm-hmm.
Speaker 4So I could say it would be smart for me to put one here because I can tap into that.
Speaker 5Honestly, I really don't have a good answer for that. I mean, that's something that we can definitely look into.
Speaker 2What we can do is approve this, and then if we can go back and readjust it, tweak the language based on your further research.
Speaker 5This and Board of Commissioners, we can double-check if there's any kind of like logical things that we could add in relationship to that.
Speaker 7Well, Adam, I think it does because it says, or any subsequent federal emission standards that are equal to or more stringent than Tier 4. So if there's any standard that would apply to a natural gas generator, it would have to be equal to or more stringent.
Speaker 11It's really an apples or orange thing.
Speaker 5If Tier four applies to diesel, I mean, I just don't know enough about it, right?
Speaker 11Like I don't know if like.
Speaker 5Tier, if diesel is for diesel.
Speaker 11Emissions, I don't know if it's even logical.
Speaker 4Let's just look into it. Absolutely.
Speaker 11That's a very good point.
Speaker 1As we go down the rabbit hole.
Speaker 4Anything else? We've talked about my other things. I want to send you guys a few more comments, but a lot of it's just clerical stuff.
Speaker 255 decibels.
Speaker 155 decibels.
Speaker 3Is that it?
Speaker 2You know, I agree with you. I think they've done a good job. I think we've got a good framework. We're not locking this in stone. And and I think we have an opportunity to come back, you know And because the technology is going to change we're gonna have an opportunity We're gonna have to come back and look at this probably every couple of years to say hey, you know based on the changes in technology We need to reword this, you know, so I think it's you know,
Speaker 2let's let's get something on the books so that we don't get caught unprepared and then then Then let's go from there.
Speaker 11And then we've got the flexibility to add stuff later on.
Speaker 2And we have the ability to, because it's all conditional anyway, we have the opportunity to tweak those requirements based on the individual.
Speaker 11Case-by-case basis, yep. Bernie, do you have anything?
Speaker 4I have one other thing.
Speaker 1Okay, go right ahead.
Speaker 4It was mentioned earlier about having different standards. I don't want to make this overly complicated, but if somebody comes in and wanted to do a smaller... data center. Is 25 acres really applicable? You guys researched it and there was a wide range of what it was. I'm wondering if we should tie a megawatt size to a acreage requirement versus just a blanket 25 across the board.
Speaker 5So you're thinking of a scenario of someone doing like a smaller 20, 30,000 square foot and that 25 acres being too much?
Speaker 4I don't know what they would do but I'm just saying it's a.
Speaker 1Well is it megawatts or is it Is there a measurement of, like, yes, there is a measurement of actual data being stored on site?
Speaker 12Oh, God.
Speaker 11I mean, I'm sure there is, but I have... It's more on a megawatt.
Speaker 1It's how much resources they're taking.
Speaker 3It's applicable. So megawatt is applicable.
Speaker 5Because that's something that's going to scale more on technology... than anything, like what is the computing power of the server?
Speaker 11And that can, in 10 years, that's gonna be different, right? And maybe make them make.
Speaker 2I mean, more efficient. And their usage is gonna go down as time goes on.
Speaker 5To Sean's point, probably as far as like resource consumption, its uses as a land use, something like the resources that it's consuming is probably gonna be better.
Speaker 11Or just general size and scalability.
Speaker 1Are you good?
Speaker 11I have one.
Speaker 1I've waited a long time.
Speaker 3On the neighborhood meeting.
Speaker 11Yes.
Speaker 1You and I have discussed this. The applicant shall provide notification of the neighborhood meeting via first class mail to no less than 15 days prior. I think that this is an antiquated definition way to get people information about the neighborhood meeting only. The zoning request, we can use what we can continue like the law is with postcards
Speaker 1and placards. But the neighborhood meeting, I would like to see language included so that using either approved or other than a newspaper because there are no newspapers in Rockingham County. And we can, like, say news source. I'll leave the language,
Speaker 1the wordsmithing up to you. But I would like to see that. Or either social media because, you know, the county has a Facebook page. No, they wouldn't know. We wouldn't use the county. If you throw that on social media, then.
Speaker 11Everybody's... I think maybe something along the lines of like.
Speaker 8We have the.
Speaker 4The whole county will know because of social media.
Speaker 2That's true.
Speaker 11At one point, the whole county will probably already know because of social media.
Speaker 1But if we can include one other news outlet, i.e. Rockingham update, which.
Speaker 11It's like the use of other media to get this is encouraged. One other media source.
Speaker 1Just one other media source.
Speaker 2When we've had these meetings where we've talked about cell towers and stuff, and they've had meetings with the neighborhood and stuff like that, those processes included everybody that was in the area.
Speaker 5So far, the way we have it where it's just We already have us, a staff, when we do these, particularly with the rezonings, we do letters out to 1,000 feet from the property. So we're already creating that. Like, we do that from GIS. We get a spreadsheet. And that can be something we just pass along. They can send those letters out to the exact same people that we would be notifying. And then to Julie's point, we can add in some language that, you know, Other means of reaching out with other media sources are going to be highly encouraged, and that can be something they include
Speaker 5in that summary of that neighborhood meeting, and y'all can kind of make a determined Determination from there is like, do y'all think that was really adequate?
Speaker 1Yeah, and this is just the neighborhood meeting. This is not.
Speaker 11Correct, yeah.
Speaker 1Yeah, this is just... We don't control the neighborhood meeting. They have to provide it. So all we're asking them to do or requiring them to do is to provide it through at least one media outlet. Like, yeah. Mm-hmm. Not just, I mean, we're not even requiring them to send out the letters to 1,000 feet, are we?
Speaker 11That's us.
Speaker 1That's our process.
Speaker 5We were requiring that as well for the neighborhood meeting. So we're going to do that for our public hearings, both of them. For here, but we're also for the neighborhood meeting. They've got to do their own set of letters. To the exact same people.
Speaker 1And one other media outlet, I think that will be the easiest thing for them to do. So they'll send the letters and one other media outlet. Okay, and I actually have a procedural question that I need to ask. So we've talked about a lot of details here. What will the TRC catch for us, like water noise? And will the TRC review these reports, the required reports? And will we need to invite specific experts to the TRC
Speaker 1meeting who will then have the ability to deny or approve the permit?
Speaker 5Well, a lot of the specific things that we're asking for, like the noise studies, most of those are required by a licensed engineer. So we're kind of banking a little bit on that, right? Engineers are going to have very strict standards to uphold their license. If that engineer is willing to put that stamp on there, then there's usually at least a little bit of a surety with that.
Speaker 5TRC typically process-wise would usually come after the entire rezoning process. So they've gone through the process and they've taken probably even more detailed levels.
Speaker 11Of their plans than what y'all have seen.
Speaker 5And they'll go kind of even more fine-grained into it.
Speaker 1That's my question, is that we are... So here we are, you know, we're looking at the overall and the land use. Some of the things that the... The details that we're getting like bogged down, not bogged down, but that we're interested in will be handled at the TRC level.
Speaker 4Yes.
Speaker 5I mean, some of it certainly, right? I mean, obviously like NCDOT, huge part of it. Planning staff is going to review more of the planning components to it at that point.
Speaker 1And nobody's building the thing without a permit.
Speaker 5Fire marshal is definitely going to be included. Those are probably going to, and the other main one will probably be like Caleb with engineering and public utilities on the water end of it. So like a lot of like the utility component, most of that is just kind of information for y'all for the most part. They're going to then handle their business with Duke. They're then going to handle their business with either us or.
Speaker 11Um, Dan river. Am I thinking the right?
Speaker 10Okay.
Speaker 11Dan river.
Speaker 5Um, And so that aspect of it, unless it's Caleb specific, they're getting county water.
Speaker 11Caleb's going to be reviewing that after. aspect of it.
Speaker 5So there are different aspects of it that's handled by TRC. Some aspects of it, this is mostly here for information for y'all. Other aspects of it, they're getting state permits, things like that.
Speaker 8Okay.
Speaker 1With the... with the change in from 60 to 55 and the one, the only thing that I'm hearing that's changed that we've asked to change any of the language that you presented to us tonight, it's, um.
Speaker 5So, so far it was my understanding. We're keeping it at 60. Um, so, and then the only other things.
Speaker 12Is change it, do, or we're allowed to vote on changing per based off of the permit and we're going to keep it at 60.
Speaker 8Correct.
Speaker 4Yeah.
Speaker 7I just don't want someone going for, From 60 to 55, you're not– like, don't think about it.
Speaker 11I'm thinking 5% off.
Speaker 7Like, I'm going down by 5. Well, no, you're not. You're going down by 50% at that point.
Speaker 11So it's a lot.
Speaker 7Mathematically, it's a lot more than– That.
Speaker 11Was just my understanding by the end of the conversation.
Speaker 7If you want me to do it for you on a calculator, when they come to office, I'll explain how the logarithmic function works.
Speaker 4You're not going– it's going to be hard to go down once we've got this in the plan, in the ordinance.
Speaker 8Is it?
Speaker 3Will it be difficult to go down?
Speaker 11In like a.
Speaker 3In the permitting?
Speaker 5In the conditional rezoning process or in a, like, let's change the regulations like a year from now kind of process?
Speaker 11Because in either one, I think.
Speaker 1The rezoning. The conditional rezoning. We can go down in conditional rezoning.
Speaker 5I mean, I've kind of taken the assumption that anything that happens with this is going to be a hot issue. that most of the public is probably going to generally be focused on, let's regulate this more. I would be inclined to think that going in a more restrictive way would probably be kind of easier.
Speaker 11But I don't know. That's kind of my thought process on it.
Speaker 4At least.
Speaker 1Okay, so I think tonight, because we will get bogged down here. I think that we need to... Find a number that we're all happy with, whether it be 60 or 55. I don't care which. And leave it at that. And the only other change was adding one other media outlet.
Speaker 11Media outlet and then look into the generator.
Speaker 10Exactly.
Speaker 11With those three things, do we feel comfortable with.
Speaker 1A motion or have we agreed on, is it 55 or 60?
Speaker 12I agree with the 60 because we're allowed to base it off of a case-by-case scenario, whether we restrict it more or leave it at the 60 based off of whether.
Speaker 1Okay, 60 it is.
Speaker 1160 it is. Generators in the neighborhood meeting stuff. Okay. Got you.
Speaker 2I motion.
Speaker 11Okay.
Speaker 2I motion to approval on this text based on the consistency determination standards. that are included in the agenda packet and may be amended during the text amendment process.
Speaker 11Now I second it.
Speaker 1There is a motion and a second. All those in favor, please raise your hand and signify by saying aye.
Speaker 8Aye.
Speaker 3Any opposed?
Speaker 1Likewise. Saying nay. Motion carries. And this will be presented to the commissioners at their next meeting, will it?
Speaker 5I think we've kind of already talked a little bit with Lance, and I think we're all kind of trying to get this quick. So we were thinking if this goes well, we get approved, probably going to the first commissioner meeting in October.
Speaker 1Okay.
Speaker 2All right.
Speaker 1That's cool.
Speaker 2Yep.
Speaker 1All right.
Speaker 3So is there any other business?
Speaker 2Who are those people that were going to speak?
Speaker 1Nobody signed up?
Speaker 8Nope.
Speaker 1Nobody signed up?
Speaker 7Nope.
Speaker 2It should be parties because they were paying close attention.
Speaker 1They were paying close attention. They did not sign up to speak.
Speaker 2See what we're going to do.
Speaker 6Yep.
Speaker 10Yep.
Speaker 1And we went too long. They can watch it on TV.
Speaker 6Right.
Speaker 3So any other business? Motion to adjourn?
Speaker 10Motion.
Speaker 1Second. All those in favor, please signify by raising your hand and say aye. Aye.
November 23, 2026 Rockingham County Commissioners Special Called Meeting AGENDA 1. Meeting Called to Order 2. Lance Metzler, County Manager Request consideration of the Resolution for Approval of the Bonding of County...
November 18, 2026 Reidsville Planning Board Meeting AGENDA 1. CALL PLANNING BOARD MEETING TO ORDER 2. ROLL CALL 3. ADOPTION OF THE AGENDA FOR NOVEMBER 18, 2026 4. APPROVAL OF MINUTES - JULY 15, 2026. 5. ITEMS FOR...
November 17, 2026 Eden City Council Meeting AGENDA 1. Meeting called to order by: Neville Hall, Mayor 2. Invocation: Pastor Samuel Moriarty, Kings Highway Christian Church 3. Pledge of Allegiance: Liam Sutton, Central...
November 17, 2026 Rockingham County Board of Elections Meeting AGENDA 1. Welcome / Call to Order 2. Pledge of Allegiance 3. Invocation - Pastor Rick Gore Victory By Grace Church, Eden 4. Approval of Agenda 5. Consent...
November 16, 2026 Rockingham County Board of Commissioners Meeting AGENDA 1. Call to Order 2. Invocation 3. Pledge of Allegiance 4. Request approval for the November 16, 2026 Agenda. 5. Recognition A. Daniel Crews, PIO...