Alongside your irregularly-scheduled Green Tape programming, we will also be posting Right of Way episodes and transcripts here. If you prefer to listen on Spotify or Apple Podcasts, click the links here or here.
In this episode, we discuss:
* How transmission fits into the broader power system
* The “3 P’s” that make transmission buildout difficult
* Past efforts at reform and why they came up short
* The politics of transmission reform today
Right of Way Ep. 3: The 3 P’s
w/ Daniel Palken
Thomas: Welcome to Right-of-Way, a podcast about energy policy, energy politics, and above all the upcoming permitting reform negotiations. I’m Thomas Hochman, director of infrastructure policy at the Foundation for American Innovation, and I’m joined by Pavan Venkatakrishnan, an infrastructure fellow at the Institute for Progress.
Pavan: During this episode, we’re going to be talking about transmission. Everyone knows that the grid is important: It’s the way that we move electricity around the country, and thus it’s critical to energy reliability, industrial competitiveness, and definitely the AI arms race. And as most people working in energy policy know, the US is really, really bad at building out the grid.
Last year, we built out just 322 miles of interstate transmission capacity. For context, DOE’s conservative estimates say we need to be building out 5000 miles a year - so we’re about 94% short of where we need to be.
Practically, this now means that a, say, geothermal developer can run through the permitting gauntlet, build out a project, and still have to wait through a multi-year interconnection queue to actually begin delivering electricity to consumers. That’s in the context of a moment where the risk of brownouts and rolling blackouts is rising, including in DC, where just earlier this year government buildings were forced to limit AC usage due to a lack of electric capacity. And in the context of our national competitiveness, hyperscalers, struggling to find a spot on the grid for their gigawatt-scale data centers, are already starting to look abroad to build their cutting edge AI infrastructure.
Thomas: So, it’s clear that we need to change something. But, in the already-complicated world of energy policy, grid and transmission policy stands out as some of the most arcane. To quote journalist Robinson Meyer, “In energy circles, the people who work on transmission are feared and respected in the same way a shriveled and reputable local mage might be. They are sorcerers who understand one of the most powerful, corrupted bodies of knowledge in existence - American electricity law - but it has prematurely aged them and led them to scuttle around, muttering incoherent spells: “Ferck and nerck, ferck and nerck, ferck purpa noper.” Strange - lunatic, even? No question. Yet the town would surely be overrun without their protection.”
Thankfully, we are fortunate enough to have one of those feared and respected transmission experts with us today in Daniel Palken. Daniel is the Director of Infrastructure for Energy and Permitting at Arnold Ventures, where he works to address barriers to achieving a lower cost, more reliable, and more sustainable US energy system. Prior to his role at Arnold, Daniel worked as a Professional Staff Member on the Senate Energy and Natural Resources Committee primarily covering electricity sector issues. He has been a lead negotiator on several high-profile bipartisan energy packages, and most recently was the leading voice on transmission during the Energy Permitting Reform Act of 2024 negotiations.
Daniel, welcome to Right-of-Way.
Daniel: Thank you, Thomas and Pavan, and it's great to be on the program.
Pavan: Thanks for coming on. So, that quote from Rob Meyer speaks to just how complicated transmission can be, even for those of us in energy policy. So let's do an overview: How does electricity get delivered from, let's say, a wind farm in the middle of the desert to a household? Who are the different players involved in getting that electricity to the end consumer?
Daniel: Yeah, it's a good place to start. The power system that we have breaks down into three components - of which transmission is the middle child. So you have generation - for example, that wind farm you referenced or a nuclear plant or a gas plant. We really have six or seven generating resources that are at scale on the U.S. grid today. Then you have transmission, which are the big power lines. A transmission line is just a wire. It just is a piece of metal that conveys energy in the form of electricity from where it's generated to near where it's consumed. And then those last miles are taken care of by the distribution system, which are lower voltage, smaller wires that kind of go from the substations to your houses and businesses within cities. So those are the three parts of the system. We have a bit of a hybrid system from a regulatory perspective where generation and distribution - the two ends of the sandwich - are the domain of the states to regulate and govern.
In transmission, this middle part of the system is separate from that. It's the domain of the federal government, primarily regulated by the Federal Energy Regulatory Commission, or FERC, an independent five-member agency that is based in Washington, D.C., and has jurisdiction over transmission across the entire country - other than Alaska, Hawaii, and Texas, which mostly sits on an electrical island of its own.
Thomas: So how did we get to this system - this disaggregated system where there are different levels of control and authority over different parts of the grid? Was it planned to be this way, or did it happen more organically over time?
Daniel: It grew up somewhat organically, then there were big laws and big policies that had major influences. In the 1880s, you had Edison and the invention of electric generation at scale in the United States. You had the Pearl Street station, and you had low voltage direct current wires piping electricity to people's homes and businesses - or really just businesses at that point. Then over time, there was a fight between AC and DC power, and the system we ended up developing was primarily based on AC - alternating current - which is beneficial because it allows you to step up and down voltages more easily. I can get into why that's an important feature of the grid. And over time, the grid grew out and it was decided, for very good reason, that you didn't want this to be a fully competitive space. It was viewed as a natural monopoly.
You didn't want dozens of duplicating wires. You can look at photos from the 1900s where there are dozens of wires strung up practically on top of each other from all the competing companies. That was not viewed as an environmentally or economically desirable outcome. So utilities established territories of their own, and they all sat adjacent to each other all over the country. They grew up that way across the whole country. Some of them were better interconnected than others.
Right now in the US, we have a situation where we really have three distinct grids, which are nominally but not really connected to each other by any significant amount of power flow. So there's the Western Interconnection - picture a line down the middle of the country at roughly the longitude of Colorado, the eastern border of Colorado. You have the Texas Interconnection, which I already mentioned, ERCOT as it's called. And then you have the Eastern Interconnection, which is by far the biggest of the three.
And there's only about a gigawatt or less of power that can flow mutually between each of those three. Then within those, there are regions that also tend to have pretty limited power flow between each other. The system really changed and morphed in the way it was regulated over the course of the late 1900s and early 2000s, where you had these organized market structures called RTOs. This gets into some of the arcane knowledge that Rob was mentioning in his piece. We don't need to …
This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit www.greentape.pub
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_01Thomas Hockman Welcome to Right of Way, a podcast about energy policy, energy politics, and above all, the upcoming permanent reform negotiations. I'm Thomas Hockman, Director of Infrastructure Policy at the Foundation for American Innovation, and I'm joined by Pavan Venkatakrishnan, an infrastructure fellow at the Institute for Progress.
SPEAKER_02During this episode, we're going to be talking about transmission. Everyone knows that the grid is important. It's the way that we move electricity around the country, and thus it's critical to energy reliability, industrial competitiveness, and definitely the AI arms race. And as most people working in energy policy know, the US is really, really bad at building out the grid. Last year, we built out just 322 miles of interstate transmission capacity. For context, DOE's conservative estimates tell us that we need to be building out 5,000 miles a year,
SPEAKER_02so we're about 94% away of where we need to be. Practically, this now means that a geothermal developer can run through the permanent gauntlet, build out a project, and still have to wait through a multi-year interconnection queue to actually begin delivering electricity to consumers. Obviously, that applies to other energy technologies as well. That's in the context of a moment where the risk of brownouts and rolling blackouts is rising, including in DC, where just earlier this year, government buildings were forced to limit AC usage due to a lack of electric capacity. And in the context of our national competitiveness,
SPEAKER_02hyperscalers, already struggling to find a spot on the grid for their gigawatt-scale data centers, are already beginning to look abroad to build their cutting-edge AI infrastructure.
SPEAKER_01So it's clear that we need to change something. But in the already complicated world of energy policy, grid and transmission policy stands out as some of the most arcane. To quote journalist Robinson Meyer, in energy circles, the people who work on transmission are feared and respected in the same way a shriveled and reputable local mage might be. They are sorcerers who understand one of the most powerful, corrupted bodies of knowledge and existence, American electricity law. But it has prematurely aged them and led them to scuttle around, muttering incoherent spells. Ferk and nurk. Ferk and nurk. Ferk perpenoper.
SPEAKER_01Strange? Lunatic even? No question. Yet the town would surely be overrun without their protection. Thankfully, we're fortunate enough to have one of those feared and respected transmission experts with us today in Daniel Palkin. Daniel is the Director of Infrastructure for Energy and Permitting at Arnold Ventures, where he works to address barriers to achieving a lower cost, more reliable, and more sustainable U.S. energy system. Prior to his role at Arnold, Daniel worked as a professional staff member on the Senate Energy and Natural Resources Committee, primarily covering electricity sector issues. He's been a lead negotiator on several high-profile bipartisan
energy packages, and most recently was the leading voice on transmission during the Energy Permanent
SPEAKER_01Reform Act of 2024 negotiations. Daniel, welcome to Right of Way.
SPEAKER_00Thank you, Thomas and Tom, and it's great to be on the program.
SPEAKER_02Thanks for coming on. So that quote from Rob Meyer kind of speaks to just how complicated transmission can be, even for those of us in energy policy. So let's do an overview. How does electricity get delivered from, let's say, a wind farm in the middle of the desert to a household? Who are the different players involved in getting that electricity to the end consumer?
SPEAKER_00Yeah, it's a good place to start. So the power system that we have breaks down into three components of which transmission is the middle child. So you have generation, that wind farm you referenced, or a nuclear plant or a gas plant. We really have six or seven generating resources that are at scale on the US grid today. of different kinds and then transmission which are the big power lines you know a transmission line is just a wire it just is a piece of metal that conveys energy in the form of electricity from where it's generated to near where it's consumed and
that those last miles are taken by the distribution system which are lower voltage smaller wires that kind of you know they go you know from the substations to your houses and businesses within cities and so those are the three parts of the system We have a bit of a hybrid system from a regulatory perspective where generation and
SPEAKER_00distribution, the two ends of the sandwich, are the domain of the states to regulate and to govern. And transmission, this middle part of the system, is separate from that. It's the domain of the federal government, primarily regulated by the Federal Energy Regulatory Commission, or FERC, an independent five-member agency that is based in Washington, D.C. and has jurisdiction over transmission across the entire country other than Alaska, Hawaii, and Texas, which mostly sits on an electrical island of its own.
SPEAKER_01So, I mean, how did we get to this system, sort of this disaggregated system where there are sort of different levels of control and authority over different parts of the grid? I mean, was it sort of planned to be this way or did it sort of happen randomly over time?
SPEAKER_00It grew up somewhat organically, and then there were big laws and big policies that had major influences. In the 1880s, you had Edison and the invention of electric generation at scale in the United States. So you had the Pearl Street Station. And you had low voltage direct current wires piping that to people's homes and businesses, or really just businesses at that point. And then over time, there was a fight between AC and DC power. And the system we ended up developing was primarily based on AC.
SPEAKER_00That is alternating current, which is beneficial because it allows you to step up and down voltages more easily. We can get into why that's an important feature. of the grid and over time the grid grew out and it was it was decided for for very good reason that you didn't want this to be a fully competitive or even particularly at all competitive space you would you would have these you would it was it was viewed as a natural monopoly you in effect didn't want You know, dozens of duplicating wires. You can look at photos from the 1900s where there's, you know, dozens of wires strung up practically on top of each other from
all the competing
SPEAKER_00companies. And that was not viewed as an environmentally or economically desirable outcome. So you had kind of utilities established territories of their own and they were, you know, they kind of all sat adjacent to each other all over the country. And they grew up that way across the whole country. Some of them were better interconnected than others. You know, right now in the US, we have a situation where we really have three distinct grids, which are nominally but not really connected to each other by any significant amount of power flow. So there's the Western interconnection, which, you know, is, you know, picture a line,
SPEAKER_00you know, down the middle of the country at roughly the longitude of Colorado. The eastern border of Colorado, you have the Texas interconnect, which I already mentioned, ERCOT, as it's called. And then you have the eastern interconnection, which is by far the biggest of the three. And there's only about a gigawatt or less of power that can flow mutually between each of those three. And then within those, there's regions that also tend to have pretty limited power flow between each other. And the system really changed and morphed in the way it was regulated over the course of especially the late 1900s and the early 2000s,
SPEAKER_00where you had these organized market structures called RTOs. And this gets into some of the arcane knowledge that Rob was mentioning in his piece. We don't need to get, I think, deep into that for the context of this discussion. But now you have a really diverse set of actors. You have independent developers of power. You have transmission that is, you know, built by, you know, still vertically structured monopoly utilities and then other transmission that has been out competitively. And then these, you know, upstart merchant actors that try to come in and voluntarily subscribe people to
SPEAKER_00transmission. And so you have all sorts of different business models, all sorts of different regulation. It varies by parts of the country. We already mentioned the interplay of the states and the federal government kind of who who regulate different overlapping parts of the system. And so, you know, and it all works. I mean, we have a system that, you know, it provides power 99.9, whatever percent of the time, you know, more than that, that we need it. It keeps the lights on. America still has some of the lowest cost, most reliable power in the world. And that's something to be very proud of.
But it is simultaneously true that as we seek to grow our power grid because of,
SPEAKER_00you know, economic growth, in the form of the AI revolution, in the form of new manufacturing, in the form of electrification, in the form of just population growth. You are going to need to grow out that power system, both the generation, the transmission, and the distribution. And we have really, transmission is one of these things that we've forgotten how to build in this country. And we have this problem, you know, oftentimes in the generation space too. It's become very hard to build plants like nuclear plants. At least when you forget how to build a generation technology,
you can relearn to build that generation technology while still building other
SPEAKER_00generation technologies. There is no substitute for transmission. There is, I mean, you know, there is kind of just one technology. It is just transmission. It comes in different flavors. And so if we forget how to build large-scale transmission, we're really... I think the technical term is hosed from a perspective of we just can't get the power from where it's generated to where it's needed, whatever the source of generation and whatever the source of need.
SPEAKER_02Right. So we've established that we're pretty bad at building this now. But was there a point in time where the U.S. was pretty good at building transmission? What were the key ingredients there? If so...
SPEAKER_00Yeah, I mean, there was an earlier era where America was better at building a lot of large scale infrastructure projects. I don't think transmission is unique. You look at everything from the large hydroelectric dams we used to build to nuclear plants, really impressive monuments to kind of man's ability to undertake and build massive, complex projects. You know, there was an era in the 1900s when we were churning out the transmission lines that, you know, today you can drive all around the country and you can see them
everywhere.
SPEAKER_00And they're evidence to the fact that we were able to build them. Transmission lines last, you know, 50, 70, 100 years, depending on where they're located and how well they were built and designed. So we still have a lot of that first generation of transmission lines around the country. But part of what's driving the need, in addition to the load growth and the demand growth we talked briefly about, is the fact that a lot of the transmission infrastructure we have is aging and is going to need to be updated and replaced.
SPEAKER_00And so we have a falling off of the stuff we have. on the system today. And we have an increase in need for new stuff that is coming exogenously. And that is kind of creating this perfect storm where transmission is really in the spotlight as something that it is an energy imperative for the US to get its act together on.
SPEAKER_01Yeah, so, I mean, you know, it's obviously we need to build a lot more transmission, but it also seems like we did, in fact, used to build it faster. And so I'm just trying to drill down into, like, what is, have there been policy changes that have made it more difficult to build transmission? Is it that there are sort of, you know, economic conditions have changed? Like, what is it that makes us so bad at building it now? so you know as in that earlier era uh you know and and and you're very both of you are very expert on this we had a we had a simpler system of you know environmental regulations nipa reports you know for example once famously 20
pages can now span
SPEAKER_00you know orders of magnitude more than that there you know and and There are good reasons for the environmental laws we have, but it's about striking an appropriate balance. And then there are other barriers that have kind of come into the field of view and transmission. You know, remember I said earlier that in the simpler times, and I'm simplifying here slightly, but you had, you know, a bunch of vertically integrated utilities siloed kind of next to each other, tessellating the country. And in that system, it's not hard to imagine who builds the transmission lines. It's whichever utility the line is situated in.
SPEAKER_00Now we live in a much more complicated world. world with those, those actors are still there, but some of them are not vertically integrated anymore. Some of them have been required by various state laws or policies to spin out their generation assets. And so you have utilities that own transmission or own transmission and distribution and not generation. And then you have these competitor businesses, these people that come in and try to bid competitively on transmission lines where there's regulatory and market frameworks that support that. And then you have kind of these actors that are the merchants
that come in and try
SPEAKER_00to build things on their own initiative. And so the fact that there's all these competing factions, I think makes everybody look around and be a little nervous that somebody else might eat the lunch that they want to eat. And this is just the reality of competing business models. I think this is a good thing. It's good to have multiple business models constantly contesting with each other for who can deliver the best and lowest cost power. My personal view is I don't think we would want to collapse into a system where we only have one type of provider of transmission. But what it also means is that especially in the era we were
just coming out of,
SPEAKER_00which is this era of 20 years of flat load where we had economic growth, but the electricity demand increases were really offset by somewhat miraculous gains in energy efficiency think of the the switch to to leds and lighting which use you know almost an order of magnitude less power than than previous generations of incandescent and fluorescent lighting you you know you were coming out of this era where the pie was not really growing and so especially in that era and and right as we went into that era right that was you know in the the early
2000s was when we made a lot of big regulatory shifts that introduced all kinds of new flavors of
SPEAKER_00competition you Not primarily even in the development of transmission, but in generation and in how markets were run into the transmission space.
SPEAKER_01It sounds like the summary here is that there are a few things. One, we have the sort of conventional permitting laws that we've heard a lot about, right? The NEPAs and the Endangered Species Acts and the like. Two, there's market liberalization, where in a sense, the vertically integrated utilities had the benefit of just being able to have total control over their domain. And thus, in some senses, that actually made the building out of transmission in those areas easier. And then the third piece, of course, is load growth. Wonks like to refer to the three Ps when characterizing the regulatory process and
SPEAKER_01barriers facing transmission. So what are these three Ps? Why do they matter? And what's the state of the conversation about how to improve them?
SPEAKER_00Yeah, the three Ps that famously kind of stand in the way of transmission development are permitting, paying, and planning. And I'll discuss each of them in turn because they're each pretty distinct barriers. And I think to realistically achieve the transmission build-out we're going to need, you're going to have to make sure each of them are addressed in a way that is... is mutually satisfactory to all parties involved in the sector. So permitting to start with is probably the most familiar to a lot of your audience. It comprises a lot of the conventional types of permitting that
you're used to
SPEAKER_00talking about on this show. So that's everything from going through NEPA, which a lot of transmission lines, especially in the Western interconnection where there's a lot of federal land have to deal with. It comprises all the other environmental laws and land use laws that you're going to have to comply with, and it also comprises state and local permitting. And then often lumped in with this P is the problem of siting transmission lines, which is somewhat distinct from permitting. It's determining where they go and securing the land rights and all of that. So that on its own is a big barrier.
You have some really famous examples of transmission lines that have stumbled on
SPEAKER_00the permitting hurdle. And many, but not all of them are, again, as I mentioned, in the West. So you have lines like the Sunsia line, which famously, if it were a person, it would have been old enough to vote. By the time this happened to it, it got hit with a National Historic preservation case that has yet again tied this line up in litigation and red tape. You have lines like TransWest, which are about as old as that, verging on two decades or a little more at this point, that only recently got their final permits from the Bureau of
Land Management to
SPEAKER_00proceed across the checkerboard that is the West. You have countless examples out West. In the East, the way I would put it is that you know, permitting as a whole, especially federal permitting, which is what we're talking about when we're, you know, talking about federal permitting reform. You know, laws like NEPA pose, you know, a significant amount of their burden falls on technologies like transmission. Like I think if you, there was a study out of Stanford that looked at every NEPA EIS that was completed
SPEAKER_00in the, you know, over like 2010 to 2018. And it found that of every EIS, every environmental impact statement completed by any energy project, fully 33% of them were on transmission. And about 20% of the litigation on all the EISs completed over that nearly decade-long period were on transmission. And about 20% of the project cancellations were transmission. So that is a high burden of environmental laws falling on transmission. But it is also true that... in the eastern interconnect which is where you know only 20
percent of our electrical demand is in the western interconnect and texas is not really germane to the transmission conversation so most of the problem and most of the opportunity
SPEAKER_00falls within the eastern interconnect in the eastern interconnect it is simultaneously true that a lot of the burn-in of nipa falls on transmission, but it is not the case that NEPA is the primary thing that is burdening transmission. And those two statements might seem contradictory, but if we're good Bayesians, we'll remember that the opposites of the conditional probabilities do not imply one another.
SPEAKER_01Let me ask one quick question, Dan. So, you know, obviously, you know, the vast majority of the load is in the East, and thus, you know, when we talk about transmission challenges, we should be thinking quite a bit about, you know, the challenges of building transmission on the East Coast or in the Eastern Interconnect. Maybe this is a naive question, but isn't it also true, though, that you know, a huge amount of our energy potential is out West. And thus, you know, if we want to be able to move that energy across the country or deliver it to the Eastern interconnect, then there sort of is this like outsized role of making sure that we can actually build the transmission through federal lands.
SPEAKER_00Yes, I think that's exactly right. Like, and I'm not saying anything to dismiss that, you know, the role of the West and the role of environmental permitting in holding back transmission. I think that's very real. But if you take cases from the East itself, and by the East, I mean, you know, half of the country geographically, so not just the East Coast or anything like that. You have the famous MISO multivalue projects, which are one of the most successful, probably the most successful example to date of a large scale portfolio of transmission lines built out by one of the FERC regulated markets.
MISO in the 2000s decided it was going to spend several billion dollars building
SPEAKER_00what ended up being a portfolio of 17 transmission lines. As of 2023, which is the last time I saw a formal cost estimate for those lines, they were slated to cost, they were originally proposed to cost $6.573 billion. At the time, they were on pace to be completed at $6.570 billion. All of them were on time and on budget on average, except for one, the famous Cardinal Hickory Creek line, which was tied up in Clean Water Act and NEPA litigation. So, you know, it would definitely have been a better outcome if we had a more
rational permitting
SPEAKER_00system where that line could have got to the finish line quicker. But at the same time, you have this dynamic, especially in the eastern interconnection, of these charismatic megafauna that attract a lot of the attention, but are not the full story. The full story is actually not even really exemplified by MISO MVP. And this gets into these other two barriers of planning and paying. The full story is really that, you know, I've heard you refer to the dark matter of NEPA. You know, I did my PhD on dark matter. So this is like, this is the, I love that. I love that.
SPEAKER_01My work on dark matter is, of course, far more complicated than whatever you're doing in the field of physics, but...
SPEAKER_00Yeah. So, you know, what you have, right, is that you have when a paradigm gets bad enough for infrastructure development, you have a situation where it is a deterrent to infrastructure coming online in the first instance. And, you know, the MyCell MVP lines, as successful as they were, are the exception, not the rule. Very few other regions have managed to build portfolios of lines on that scale. And what is often the case, and this gets to the second of those barriers, the planning barrier, is that there is not a credible mechanism for developers or utilities to
SPEAKER_00systematically propose transmission lines Have them evaluated by regulators or some mechanism to say, are these going to be good for the customers of the electric system? And then have them built. And so I really think, you know, planning kind of connotes a top down, you know, you have some organized system that's doing the planning. I think that is one very good and effective way to generate and... you know, propose and approve transmission lines. But I would generalize the planning problem into what I would call proposing. So a different P. There is just not a credible pathway to propose transmission
lines in the first
SPEAKER_00instance, whether it is top down or whether it is industry actors bottom up. We just we just really don't have it in much of a systematic way that has proven successful nationwide. And then paying is, every transmission line that gets built has to be paid for full stop. And it's always paid for by definition by the customers of the electric system. And the customers are who the system exists to serve. We should be doing everything we're thinking about in the electricity space with the ultimate customers in mind. What is going to lower costs for them?
SPEAKER_00What is going to improve reliability and improve the resilience? of the system for those customers and so you have you build these transmission lines you plan these transmission lines they come with a dollar figure you know those dollar figures can be in the the millions tens of millions hundreds of millions billions of dollars depending on the scale of the project or portfolio of projects and then somebody has to pay for it and for the bigger lines these are lines that often traverse multiple service territories and so there's an open-ended question of well how do you do the math and how do you calculate you know who who
who pays and, you know, who gets to build the line and charge the people who have to pay.
SPEAKER_00And the system has evolved around that, starting with, you know, it really evolved out of case law. This isn't governed by the existing Federal Power Act. It's governed by court decisions. There's a really seminal one called Illinois Commerce Commission that happened around 2007. Judge Posner, quite prolific at the time, appellate judge, set up the standard that the costs of these transmission lines have to be allocated roughly commensurate with the benefits. So if you are benefiting from the transmission line, you are the one who is responsible for paying the cost.
And not only that, you are responsible in proportion to how much you are benefiting.
SPEAKER_00And not only that, if you don't benefit as a corollary or if you benefit by a trivial or very little amount, you shall not be made to pay. So these are kind of the governing principles today. around transmission cost allocation and and my view is that those are good principles we would not want to abandon a principle of essentially user fees where whoever is benefiting is responsible for paying that just i think you know incentivizes greater accountability but because we lack a mechanism for transmission lines to get proposed and approved in the first place we therefore
SPEAKER_00also lack a mechanism that has been you know systematically and robustly deployed for actually cost allocating large amounts of these projects. And so there's a discussion that crops up around cost allocation. I think an often somewhat poorly understood discussion in Congress that you have to address almost necessarily as part of any Transmission proposal that is going to, you know, soup to nuts, get, you know, create a new mechanism or improve an existing mechanism for
transmission to get
SPEAKER_00proposed, approved and ultimately built in a way that is fair and just to ratepayers. So I count myself among the people who don't understand cost allocation that well.
SPEAKER_01Is one of the challenges here that for the lines that, you know, one of the challenges comes with the lines that cross different service territories, because maybe within service territories, they have their own methodology for doing cost allocation. Like, does this sort of work at a local level? Or is it just kind of broken across the board? And even within an individual service territory, they can do cost allocation or they can't or they can't do it.
SPEAKER_00Yeah, the answer is it's complicated. Even within service territories, if it can be shown that a transmission line has significant benefits outside of that service territory, there is case law that indicates that the people who are benefiting by a non-trivial amount from those transmission upgrades are made to pay for that. And that is Democratic and Republican appointed judges are actually in fairly good agreement and actually very good agreement across multiple multiple circuit courts about that.
SPEAKER_00So it's, you know, the cost allocation problem, I think it's often talked about as something that is new in the context of transmission, but it is, at its core, it is a tragedy of the commons, you know, problem. You know, we're gonna build these transmission lines, everybody, you know, acting in their own, you know, fiduciary interest to their constituencies. as an incentive to minimize the amount that they benefit on paper so that they pay less of the cost. And there's nothing wrong or malicious about that.
But it's recognizing that we need a system that does that with legal clarity and
SPEAKER_00does that fairly. And I think the right answer is honestly to just stick with the guiding principles we have rather than to try to open up a debate about should we change those principles to something new? Because I just don't think the principles we have are broken. I think the beneficiary pays principle or the cost causation principle, which have kind of been interwoven in the context of cost allocation, are the right ones. And it applies to lines that are built locally, it applies to lines that are built regionally and
interregionally.
SPEAKER_00We don't need to go around changing a bunch of that, but it is better to have it clearly spelled out in statute than to have it just existing in case law across dozens of appellate court cases spanning a decade or two.
SPEAKER_02All right. So there was a point where Congress actually realized that our build out of the grid was not commensurate with need. And that was in the Energy Policy Act of 05. Right. So it provides for these national interest electric transmission corridors, NEETSIs. I see why they came up with the acronym. It's a mouthful. So what are they? Are they working? And if not, why?
SPEAKER_00Yeah. So the NHTSI corridors, as they're called, as you mentioned, were created in 2005. They were actually one of three policies that were created in EPACT. And we can circle back to that point. And they have not been successful to date. So what these corridors are is they were designed as part of a two-step system that Congress kind of cleverly architected in order to solve the problem that even at the time we were doing a a poor job at building out the large-scale transmission system
commensurate with
SPEAKER_00what was needed. The first step in that two-step dance was that the Department of Energy would designate these areas, so-called corridors, where they're national interest corridors. They're areas where there's a lot of congestion or where there's a lot of need to bring on new supply and demand. And then once those corridors were designated, a developer could apply to FERC, the federal energy regulators, and FERC could approve or deny based on a national interest test, whether the transmission line was in fact in the national interest and should be cited in that corridor.
SPEAKER_00So immediately, you can probably see some problems here. You're involving multiple agencies in a complicated sequence. There's a third actor who I haven't even said at this point, which is that in order to even be able to go to these corridors, and this was a crucial piece, the developer first had to apply to a state. for a permit. And only if the state withheld approval, those were the words used in the 2005 law, could the developer then try to access the FERC authority. That's why it's called a backstop authority. It was only there for use in the case where a state said no,
but there was a good reason to think that the transmission line would be broadly
SPEAKER_00beneficial in any case. So this was passed in 2005. In 2000, I'm going to say seven, there was a case decided by, or maybe it was 2009, a case decided by the Fourth Circuit that litigated what was actually meant by withheld approval. You might hear those words and think, oh, that means to deny a transmission line. But it was actually decided that withholding approval meant not giving an answer. If a state gave an answer and that answer was no, that was not viewed as withholding approval,
SPEAKER_00that was viewed as denial, which is something different under, you know, according to that Fourth Circuit ruling in 2009. So the NHTSI authority was essentially, you know, made moot. To add insult to injury, The Department of Energy then stepped in, had proposed to designate two NHTSIs. One was like the entire state of New Jersey. Another one was like Los Angeles down to like Tijuana, you know, the border with Mexico. The Ninth Circuit, in a case where a bunch of environmental groups and national historic preservation groups and state agencies had litigated the designation of the
specific NHTSIs,
SPEAKER_00nullified those and said, actually, Department of Energy, you asserted that you don't have to do a second NEPA review because FERC is going to do a NEPA review on any specific transmission line. But you do have to do a NEPA review just for designating the corridor, even though you're not building any infrastructure in it. So this created the infamous double NEPA problem with the NITC. So aside from the fact that they didn't even work legally, you had a problem where if they ever were made to work, you were going to have to do not one but two whole NEPA reports, which were very likely to be EISs given kind of the large scale
and potential
SPEAKER_00impact of what was being discussed for a single transmission line. I don't know of any other single piece of infrastructure where just to build the same piece of infrastructure, you have to do not one, but two NEPA EISs. So in 2021, we revisit this issue, as Congress does, and fixes the problem by taking out the word withhold approval, which the court said wasn't going to count denials and very clearly put in something to the effect of does not respond within a year or denies the application.
And so then that fixed the problem that the Fourth Circuit had identified. The DOE went back to the drawing board on proposing new NHTSIs and doing whole NEPA
SPEAKER_00environmental analyses. But as you can see, if you actually game out the full process that exists in statute, it's a nine-year process start to finish. There's a three-year study cycle. There's a year at the States. There's two years apiece for two separate EISs. There's a second year. There's another year buried in there. So you have this very long process. And that's been the history of the NHTSIs to date. So that's 20 years since 2005. And I mentioned that there were two other policies. in EPACT05. There was the section that came right after the NHTSIs, which was section 1222 of EPACT, which created an authority through the power marketing administrations,
SPEAKER_00the PMAs, to cite, develop pretty much every verb you could use in conjunction with the transmission line. Those transmission lines even find ways to help finance them. That authority was once almost used, and then through a complicated bureaucratic rigmarole, was essentially cast aside on a transmission line in the 2010s. So that authority, also 20 years, also zero transmission lines. And then the third policy was a permitting policy, which is the Section 216H of the Federal Power Act.
SPEAKER_00It's a Consolidated Environmental Review Authority, where what was supposed to happen was you were supposed to have nine different agencies that are involved in one form or fashion, not on every transmission line, but on any transmission line. sign a memorandum of understanding and FERC or the, sorry, the DOE to be the lead agency in getting these lines permitted. There's this whole saga with that authority where like in 2006, there was a Bush administration MOU that, you know, kind of missed the mark. And then there was another MOU from the Obama administration in 2009.
SPEAKER_00And then there was an executive order in 2013 on it and an RFI in 2016. And it was kind of set aside for the first Trump administration and then the Biden administration did some more RFIs and a new MOU. And finally, it is up and running as what's called the CIDAP program. So that's also been 20 years. Also hasn't seen a single transmission line permitted to completion to date. So three policies, 20 years apiece, that's 60 policy years, zero transmission lines was the result of ePact05. This is what I call the round down to zero problem. It's when you pass transmission policy,
SPEAKER_00You often pass something that looks kind of good on paper, looks like it moves the ball forward on paper, but in the presence of real world factors, rounds down to getting zero actual transmission lines built. And I think that is the thing, and this has also happened with FERC regulation that has tried to drive more transmission planning and build out. This is the thing that policymakers, I think, need to be most cognizant of is, are we passing policy that will look good on paper, but in the real world will round down to zero new transmission lines getting built?
SPEAKER_01Yeah, I mean, it's funny. I'm always struck by how much of the world that we're living in, at least with regards to energy policy, was created by the 2005 Energy Policy Act, whether it's sort of the things that were functional, the Loan Programs Office being one example, or the things that are dysfunctional, like basically all of the provisions relating to transmission. But that's great history. So you played a key role in negotiating transmission provisions during the EPRA negotiations, the Energy Permit Reform Act of 2024. I think the thing that might be helpful to do is take a step back here and think about the different buckets of transmission reforms that we
have on the table,
SPEAKER_01or at least we've had on the table in recent years. The ones that stand out in my mind are interregional planning. We've talked a little bit about where the challenges are right now. A FERC backstop for siting or some form of backstop. And cost allocation reforms. Maybe adding clarity to the cost allocation process or just adding sort of additional details. It would be helpful to run through these. We sort of talked about what's broken, but it would also be helpful to talk about what the reforms or what the shape of the reforms have been like thus far. And also, are there any categories that I'm missing there beyond the three that I just mentioned?
SPEAKER_00There is another category, which is kind of minimum transfer policy. So those have been discussed when I was a staffer for Senator Hickenlooper. I worked on a proposal that had to do with that. They were not what was moved forward with in a bipartisan fashion in the Energy Permitting Reform Act. But that is that is a bucket that has has come under under recent attention. But the categories you broke down, I would just make a slight distinction, which is that cost allocation is not like a separate policy that one enacts. It is something that one provides legal clarification on who is
going to get to file the tariff.
SPEAKER_00You know, the costs are going to be allocated in a way that needs to protect ratepayers and make sure that, you know, the costs are allocated in accordance with benefits that that that standard we were talking about from Judge Posner earlier. But, you know, I don't view it as something that is set up separately outside of a policy framework. into something that whether you're doing planning or whether you're doing a backstop authority or an applicant driven process is clarified in a way that is, you know, at its core designed to avoid the round down to zero problem, avoid creating some new legal ambiguity that will delay us for
another 20 years. And, you know, engineered in a way to first and foremost protect rate payers.
SPEAKER_00So, you know, that leaves the two policies you mentioned, which are planning and a backstop authority or applicant-driven process. And those, you know, those were what were at the core of the Energy Permitting Reform Act, which was from Senator Manchin of West Virginia and Senator Barrasso. of Wyoming. The bill was very successful within the Energy and Natural Resources Committee. It received in July of last year a vote of 15 in support and four opposed and passed out of committee. But kind of the clock ran out on the end of the last Congress,
and it was never taken up for full consideration by the senator of the House.
SPEAKER_00So it was kind of, you know, left off where it was. I want you to think about those two policies, kind of planning and the applicant-driven process. One is a top-down and the other is a bottom-up. The top-down process of planning is each of these regions of the country, there's about 10 of them, get together and collaborate with each other on transmission lines or portfolios of transmission lines, where the instruction of the bill is to prioritize meeting the reliability and affordability needs, essentially, of the nation.
And this is all the more relevant in the presence of the load growth we're seeing
SPEAKER_00today, and we can talk about that. So this is really the engine of the EPRA bill, right? You have a lot of things happening in parallel. You have a lot of regions planning portfolios of lines in parallel. They're doing so under all these best practices. They're repeating the process every four years. They're considering a set of reliability and affordability benefits, which capture the kind of benefits of transmission to the electrical system and leave aside things that the two parties don't agree on.
politically, you know, with respect to kind of what we're looking to get out of transmission.
SPEAKER_00But then supporting that is this revised backstop authority, which solves this double NEPA problem I was talking about earlier in the existing backstop. Remember I said that transmission is the only class of infrastructure where if the federal government permits it, it needs to do two NEPA EISs, right? That's because it does one for the NHTSI. These NHTSIs in practice, the way they're designated today, is they're just wide enough to be useless for considering the environmental impacts of a specific transmission line that goes through them.
SPEAKER_00They might be 5, 10, 15, 20 miles wide. That's not going to narrow it down enough to know where you're going to be placing the towers and structures and disturbing land and water. and what have you. And they're just wide enough that you're covering a large area and you're going to have to do this big comprehensive analysis and frighten a lot of people in the process who don't know, is this going to be built in my neck of the woods or in that
neck of the woods?
SPEAKER_00So it's kind of a worst of all worlds. The bill solves that in a really elegant way by just taking the Department of Energy who, you know, doesn't really belong in the space, you know, in other respects out of the process and leaving it just to the states and to FERC. And so you then have a backstop authority that actually works. And the design of EPRA, you know, we tried to design it intelligently such that the planning was the engine of getting transmission built, but the backstop authority was a check on that. If the planning was kind of, you know,
SPEAKER_00becoming a paper exercise that people repeated every four years. The backstop authority was meant as a recourse for the utilities, for the developers who are struggling to get their lines approved and built, who could then, you know, have an independent third party FERC they could go to and say, hey, take a look at this line. Is it helping the reliability of the grid? Is it helping lower costs for rate payers? If so, you know, go ahead and approve it and we'll build it.
SPEAKER_01So in short, EPR gets rid of the NEAT-C model altogether, right? And it replaces it with this. DOE is not involved. It's FERC in the States, right?
SPEAKER_00Yeah. It's FERC looking at whether transmission lines themselves are in the national interest, not whether they fit into some ill-defined corridor that nobody has really liked and hasn't been really workable is in the national interest.
SPEAKER_01Okay, so let's talk about the politics of this a little bit. You know, we're in the midst of, at least at the beginnings of permanent reform negotiations, sort of what's shaping up to hopefully be a broader package that will include transmission, it'll include NIPA reform, it may include some other things as well. I think to start here, you know, you mentioned that cost allocation is not really a separate policy bucket. It's sort of a, you know, it's an adding of clarity to an existing policy. But at the same time, when I talk to folks, it seems like cost allocation often ends up being sort of a
sorely contested
SPEAKER_01discussion when it comes to legislation. You know, who are the people who are getting implicated broadly in these transmission reforms, right? Who are the people who come out and support? Who are the industry interests who come out against? And, you know, what did we learn from EPRA on that front?
SPEAKER_00When it comes to the sorts of reforms we're seeing, there's a bunch of different actors in the space, and the answer is not a simple one. So at a high level, what we saw with EPRO was a lot of customer groups, groups like the Electricity Customer Alliance, SEBA, the data center folks, and a lot of individual companies in the business of consuming large amounts of electricity, send letters of support and voice their support for the sorts of transmission policy being put forward.
SPEAKER_00That to me is a very positive indication because at the end of the day, transmission policy exists to support the customers and they're the ultimate litmus test because they're the ones who are either going to pay more or pay less, depending on everything else. Then you have the kind of the developer landscape and you have the utility landscape. And, you know, the utility is also a developer, right? The utilities also generally develop transmission lines, but they're ones who might do so on a different model or who might also have a regulated, you know, service territory.
SPEAKER_00And the short answer is that the... sorts of reforms being put forward in EPRA divide to different degrees both of those communities. The secret about permitting reform is we talk about it for political purposes as if it's one thing, but really it's about a thousand different problems faced by a hundred different industries. And in any given permitting reform bill, and this was certainly true of EPRA, you're going to solve 50 of those problems. And then it's incumbent upon you to figure out a politics that
gives assurance to the other 950 problems and the actors behind them that their
SPEAKER_00solutions, that the train is not leaving the station without them. And in fact, that there will be more efforts to fix in fair ways the problems they are dealing with. So there were some developers who came to the table and said, hey, this isn't fixing the specific problem we're dealing with, with our transmission line or with the transmission line we were considering building. So we don't want this and we're going to, you know, quietly say it's not our thing. And then in the utility space, there were some utilities who, you know, have big lines that they're building,
SPEAKER_00particularly in the West, where they saw this as a big advantage and about a dozen or so large, you know, mostly investor owned utilities came out in support while others were more skeptical. And the fear, which I think is understandable, is that these are big, expensive transmission lines. It is a change in how we do things in a country where we haven't been able to build large numbers of these lines recently. And the costs are going to ultimately be allocated to those who benefit. And if their systems are found to benefit,
SPEAKER_00you can have a situation where somebody else is building a line. And your rate payers are ultimately going to be on the hook for it. And you want to make sure that they are getting an absolutely fair shake. And that is something that we worked really hard to put in in five or six different ways to the language of effort. And I think we were making progress and building an understanding around that. But I think especially in the world we were in at the time, which was kind of the world where we were just seeing the early glimmers
of load growth on the horizon was a world where that sort of more zero-sum thinking
SPEAKER_00could take hold. Now we're in a very different world. We're in a world where demand is growing. And I think there's a pretty clear case that if we enact reforms that we'll get more transmission built. every business model that's out there will have a meaningful increase in opportunities, not decrease, to build more transmission lines, to get more of infrastructure on the system, and to do so in a way helps customers. And so I think the politics is improving and has improved even in the short time since that bill was under consideration last Congress in a
favorable way for these
SPEAKER_00sorts of discussions.
SPEAKER_02That makes sense. I mean, I'm curious here because we were talking about bottom up, then top down approaches. It seems to implicate many of the disagreement, basic disagreements between the two political parties. But like, what is the role of government in doing a wide variety of things? Right. And, you know, Republicans traditionally like would like a more limited government role for national government here. Is that a part of why you kind of see Republicans being less willing to talk about transmission policy? Is it related to, and I think it's an unfair characterization that it's just a
renewable problem,
SPEAKER_02right? Like transmission is important for clean firm assets as well. But is it a perception maybe that this is just for renewables or are there kind of other problems at play here?
SPEAKER_00Yeah, I think there has been that perception. And I think it's important to unpack that, because I think that is an inaccurate perception. But I think it has kind of dogged the transmission debate. I mean, to be clear, transmission is going to help primarily the resources that are getting built. So when you have new resources coming online, almost by definition, those are the resources helped by transmission. Transmission really helps new resources in three ways. One, like this is going to sound really simple, it connects stuff.
SPEAKER_00So when you systematically upgrade the transmission grid, it's not just that you have a new transmission line that can go access a piece of generation. It's that you are systematically upgrading the transformers, the substations, whatever else that is needed to bring things online, and you are doing so in a systematic rather than a serial way. If every transmission line you build is a one-off project, and then you realize you need something bigger the next time, and then you have to go back out to the transformer, which may have cost you millions of dollars and replace it with
a slightly bigger
SPEAKER_00one, you are paying an incredibly inefficient overhead to do the same thing you could have done by building it systematically in the first instance. So this is the first thing transmission does. It just systematically upgrades, transmission here being shorthand for policy that systematically upgrades the transmission grid. It allows you to connect more stuff by making a grid that is larger and more robust. Second of all, it smooths out the idiosyncrasies of the grid. In the case of the variable resources like wind and solar, they're variable. They're on when the wind is blowing and the sun is shining.
SPEAKER_00And over larger areas, you can make them behave more smoothly. They're never going to be as smooth as a perfectly baseload nuclear plant, but it's a question of degree. They also do this, though, for the baseload resources. Because if you think of it, you know... In a world where demand were perfectly flat, then you could just meet it with perfectly flat supply. But demand is actually quite spiky throughout the day, throughout months, throughout the year, seasonally, certainly. And so the storage is a very analogous technology to transmission.
And if you look at the storage that came on the grid through the 1900s and most of
SPEAKER_00the 2000s, it was all pumped hydro. And a lot of it was built for large baseload nuclear plants because those large baseload nuclear plants were very well equipped to supply the nearby cities and industries with power during the day. But they didn't want to have to ramp down to, you know, 20 or 40% of their output when everything was off overnight. So you would power up a storage facility and shift it there. Transmission does the same thing for space that storage does for time. It allows you to move the power other places. You know, so that's the second thing. There's a story with gas,
SPEAKER_00too, where gas is uniquely vulnerable to these extreme hot or cold events. We've seen two in recent years with Winter Storm Uri and Winter Storm Elliott, where gas wells, gas compressors, gas pipelines, and gas plants all had freezing issues, as did wind. This is not one resource's problem or another's. But what transmission does is it diversifies you over space so that you can just have a more reliable, resilient system, whatever your resource mix is. And then the third thing it does after connecting stuff and smoothing variability is it accesses remote resources.
SPEAKER_00So, you know, this is often talked about in the context of renewables because resources like wind are geographically concentrated and are very high quality in certain parts of the country. But this is equally true. with a lot of other resources, right? I mean, shale is famously developed, you know, in areas where we have it. You're going to need pipelines or transmission lines to get that power elsewhere. And, you know, again, diversification being the cornerstone of resiliency, the optimal world is probably to have some of both. Geothermal, especially, if you look at the potential for like hot rock geothermal and
enhanced and advanced
SPEAKER_00geothermal in this country, it's all in the West, right? which, as we discussed, is 20% of the nation's electrical load. So if you are ever going to have any ambition of having geothermal not be, you know, ceilinged at a 20% solution for the US, but really is something that can be an engine of 21st century growth, you're going to need more than the pittance of 1.3 gigawatts that we can currently transfer across the east-west seam. And that's going to be achieved by definition into regional transmission, you know, Same with nuclear plants, which can be hard to cite because of all sorts of local
opposition. You're going to need transmission to get them from point A to point B and spread
SPEAKER_00out the often large amounts of power they generate over areas. So it's this connecting of stuff, just the raw capacity of the grid. It's the smoothing of variability, and it's the accessing of remote resources. Each one of those, I think in a naive telling is a story that was imagined to be and is imagined in some of the popular narrativizing to be about wind or solar. In actuality, I think the arguments across resources, especially as we see the resource mix shifting to something that has more different
technologies being built and more potential ones like advanced nuclear and
SPEAKER_00geothermal coming on in the not so distant future, something that is going to benefit whatever resource needs needs to be built. And we need to start building the transmission now in order to be ready, especially for some of those resources like geothermal and nuclear that we really want to start coming on at scale in the next 10, 15 years.
SPEAKER_02Right. I mean, what I'm hearing here is obviously what we've talked about, the different political moment that we are in, even relative to APRA and policy moment. You have increased strain on the grid. People are demanding more power. The administration, Republicans have outlined an interesting vision, which implicates kind of clean, firm resources as well as like core two. to kind of their ambitions of what energy needs to look like in the US. And obviously transmission is key for that too. So maybe it avoids or gets around kind of that traditional like
limited government
SPEAKER_02perception of how the grid needs to be built, which I think is more of a national asset and in the public interest. And obviously the president's AI action plan identifies the need to build out transmission to meet this data center demand to win the AI race. So those are key observations for sure.
SPEAKER_00Yeah, and I think, you know, you look at the rhetoric of the administration, and they've been increasingly, you know, they were already being clear on this. I mean, you know, Chris Wright, in his confirmation hearings, talked about the importance of transmission for resilience and reliability. But it's really coming from the White House as well, where you had Jared Agin, who's the director of the NEDC, the National Energy Dominance Council, a few days ago, at the time of recording this, was quoted in Politico saying... Pipelines and transmission lines, those are probably our top two priorities in getting those built. And again, as you mentioned, it features heavily in their AI action plan.
SPEAKER_00So I don't think this is a small government or big government question. I don't think it's transmission is something that when you really drill into it, it doesn't neatly tracked along the fundamentals of the issue don't neatly track along either party's partisan preferences. And I think that's a good thing. I think this is something where, you know, transmission is not a trade-off-free zone. It's large infrastructure that comes with environmental trade-offs to build and has an upfront cost. But it's also something that we see a strong clarity on.
increasingly from from you know all chambers of government all branches of government both parties that there's going to be a significant need to build more of this stuff you know otherwise we're leaving the the the generation and the the demand side of the picture which are both so obviously important to everybody
SPEAKER_00involved stranded literally stranded from one another So we like to end our show by asking our guests for an energy policy hot take.
SPEAKER_01So Daniel, what's your energy policy hot take?
SPEAKER_00Energy policy hot take. So I was musing the other day that if you look across the landscape of energy technologies in the generation space, every technology that we actually deploy at scale today is monopartisan and often opposed by the other party. Every technology that we haven't figured out how to deploy at commercial scale today is broadly bipartisan and widely popular. you know you can probably sense from the way i'm saying this that this is not a good thing we you know you even have longitudinal case studies
right nuclear you know back when we used to build it in large quantities you know had become a partisan technology but now that we've gone a while without building it has become you know widely adored and and broadly bipartisan so it's it's it's not even just a coincidence of what's being built now i do think it is a feature that once things
SPEAKER_00start getting built They attract controversy and there becomes a natural politics of the two sides wanting to figure out, you know, who wants more of it and who wants to pump the brakes a little. But I think that if we're going to, you know, achieve, you know, an energy system that can really meet the needs of the 21st century and make America, you know, competitive and outcompete, you know, our peers and rivals, China. we are going to need a system and need a politics where both,
SPEAKER_00you know, where all sides can see technologies that are actually getting deployed at scale and say, we support that. And so I think that is, you know, that is something that transmission helps enable, but it is also my hot take.
SPEAKER_01That is an excellent hot take. We've had a lot of good ones on the show. Okay, we will end it there. Dan, thanks so much for joining right away.
Alongside your irregularly-scheduled Green Tape programming, we will also be posting Right of Way episodes and transcripts here. In this episode, we discuss: * Why this round of permitting feels different * What the...
Alongside your irregularly-scheduled Green Tape programming, we will also be posting Right of Way episodes and transcripts here. In this episode, we discuss: * Permitting horror stories * The history of Clean Water Act...
Alongside your irregularly-scheduled Green Tape programming, we will also be posting Right of Way episodes and transcripts here. In this episode, we discuss: * How the Senate permitting deal speaks to affordability...
Welcome back to Right of Way. In this episode, we discuss: * Why DOE is financing reactor parts before reactor builds * The nitty-gritty of the recent EDF loan - the SPVs, funding splits, and beyond * What Congress...
Alongside your irregularly-scheduled Green Tape programming, we will also be posting Right of Way episodes and transcripts here. If you prefer to listen on Spotify or Apple Podcasts, click the links here or here. In...