Why Your Contractor's Estimate Isn't the Final Price | #46

Sep 15, 202624 minAudioEpisode 46
ShareXLinkedInFacebookWhatsAppEmail

That construction estimate might look great on paper - but do you actually know what you're getting for the price? In this episode of Return On Design, Rachel Niederhofer and Justin unpack one of the most misunderstood parts of construction budgeting: allowances. Cabinet allowances. Tile allowances. Lighting allowances. Plumbing allowances. These numbers can make a renovation or new build appear comfortably within budget - until it's time to make real selections and you discover that what you actually want costs significantly more. Rachel and Justin explain why allowances aren't inherently bad, but why misunderstanding them can lead to blown budgets, unexpected change orders, shrinking investment margins, and a lot of frustration. In this episode, you'll learn: What a construction allowance actually represents - and what it doesn't Why allowances are often based on historical averages rather than your specific design What “starting at” really means when pricing a new construction home Why the beautiful finishes in a model home may not be included in the advertised price How to determine exactly what your cabinet, tile, countertop, lighting, and plumbing allowances will buy Why comparing contractor bids requires more than comparing the final numbers How changes in material, quantity, layout, and installation can dramatically affect costs Why labor can increase even when the square footage stays exactly the same The difference between a traditional contractor estimate and a design-build approach How defining your design before construction can reduce expensive surprises and change orders Why material price fluctuations can still impact even a carefully planned budget How investors can use detailed planning to better protect their profit margins Rachel and Justin also explain an important distinction: an allowance is an estimate, not a guarantee. A $5,000 countertop allowance means very little unless you understand what material, quantity, application, sourcing, and labor assumptions were used to create that number. Change those assumptions, and the budget can change with them. That's why communication and design development matter so much before construction begins. The more decisions you define upfront, the tighter your numbers can become - and the less likely you are to discover halfway through the project that the budget you thought you had doesn't actually support the design you expected. Whether you're renovating your home, building from the ground up, or protecting the margin on an investment property, don't just ask: “What's my allowance?” Ask: “What exactly does my allowance buy?” Follow Return On Design for more conversations that bring together interior design, construction, real estate, and investment strategy to help you plan smarter, protect your budget, and create a stronger return.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show.

speaker-0: And understanding that there is a very big difference between a design build firm structure and a general contractor structure, because you're getting that design first. And that is how builders in new constructions specifically can create, you know, spec homes that start at a certain point. It's because there's already a substantial amount of design under their belt. So they know what the floor plan is, they know where what the electrical layout is, they know what the plumbing layout is, they know all of these. primary very important pieces to get to that price of eight hundred thousand that it's gonna cost with their margin in it. And then the allowances they're deploying for purely aesthetic.

speaker-1: aesthetic or upgrade materials.

speaker-0: Welcome to Return on Design, the podcast where beauty meets strategy and interiors become assets that perform. I'm your host, Rachel Niederhofer, designer, investor, and builder of high-impact spaces that deliver real results. Alongside my husband, I run both a design firm and a real estate investment company, where I live at the intersection of creativity and ROI every day. Each week, I'll be unpacking what most people overlook. How strategic design decisions can grow your investment, elevate your lifestyle, and unlock the full potential of your property. You'll get real tools, proven strategies, and unfiltered conversations with industry experts who are doing it right. So if you're ready to invest with purpose and leverage design as a powerful tool, this podcast is for you. If you have ever received a builder or a contractor estimate for a project, you've probably seen a section called Allowances. This can be cabinet allowance, lighting, appliance, tile allowance. And at first glance, it can seem very reasonable, but once you start the process of making real selections, you often run into something frustrating, which is this doesn't actually cover the cost of what I want.

speaker-1: Today we're talking about one of the most misunderstood parts of construction budgets, allowances, and why they so often lead to dis

speaker-0: Because allowances can make a project look really affordable at first glance, but then you find out later it's not what you thought it was. So Justin, tell me, what are allowances?

speaker-1: Allowances are generally just a placeholder estimate budget. They're based off of historicals, off of past jobs, and some generalities of what you're looking for, but they're not specific to what you've got.

speaker-0: How are allowances typically established? I mean, I know you said based off of historicals, but let's go a little deeper.

speaker-1: I mean, looking at past jobs that have been done, what are what are typically my cabinet's costs. So I have an estimate of what a cabinet costs per foot. You've got ten feet of cabinet we're gonna redo here. So that cost times your your footage. It's a it's a general rough guess estimate, but it doesn't give you the specifics of material, quality or the necessity.

speaker-0: Specifics that come when you actually define a design. So from the perspective and the process of an interior designer, we're gonna go through and first establish a very detailed design before we start throwing out defined numbers of what it's gonna cost. Versus the allowance is basically, to your point, giving an estimate without a design. Which is why.

speaker-1: Exactly.

speaker-0: it can lead to frustration because you might show a picture to somebody, a contractor, builder, and say, This is what I want and they're making an estimation without having that definition. I mean

speaker-1: It goes to a lot of it goes to just again, that average number. Flooring is a great one for specifics. An average range of tile being two to four dollars a square foot. Yeah. Okay. And you have two thousand square feet of tile.

speaker-0: And this is something you you'll see very, very common in new construction too. And finished selections matter. So let's say you decide to, you know, go through a building process for with a new a new house, new development. That builder is gonna give certain allowances for that price point. So you might walk into a show, not a showroom. Well, it could be a showroom, like a finished house.

speaker-1: The showroom.

speaker-0: No, I'm thinking like if if I'm going into a new development as a buyer and I want to see what does this builder provide, they usually have a house that kind of functions like a showroom. Yeah. And you can see, ⁓ this is what I can get. And you'll say, Well, how much is this going to cost me? And they'll say, This floor plan starts at maybe 800,000 as an example. And that's that's the key word you have to pay attention to is starts at. So that's Starting point has a baseline of finish allowances. Yes. So you might think, okay, great. This is floor point I want. Let's do this lot. And the land may affect it and et cetera. And now you get into your allowance section, and let's say they've given you, I don't know, $3,000 for plumbing fixtures. And you get to the point of now I want to select my plumbing fixtures and you start. actually shopping and you realize what $3,000 can get you. And maybe you like, you know, more expensive or more luxury finish items. And now instead of 3,000, what you want is going to cost you $8,000.

speaker-1: Yeah, and one of the things you have to go back and remember is walking through that model home that model home. There you go. Yes. And it functions, yes, it does function as well. Most of the time they build that home with some of the highest end products that they're gonna put in. Yeah. So yeah, it you look at it and you're going, Wow, this is great. I can get this for that eight hundred thousand. No, that one because of the finishes, the touches that they did, the higher end plumbing fixtures, the higher end lighting.

speaker-0: Don't worry.

speaker-1: ⁓ no, that one's a million. ⁓ they're, you know, that's a big jump. And that that's where this starts is, yeah, that that 800 number came with an allowance of a certain level of selections. And this is where people get into the get into trouble with it. Is I thought it was going to cover that, but it does it covers this. Yeah. And that's a different, those are two very different products.

speaker-0: And your expectations may not be aligned. We see this a lot with contractor bids specifically for remodels where you might be, you know, wanting to do a renovation, let's say, on a property and you start bidding out the work. And that's what the contractor is essentially gonna do too, is give you an allowance or they'll have a general allowance for how they're coming up with that. Which is not unrealistic. I mean, because again, we talk about this all the time. Until you have an actual design defined, it is impossible to know exactly what the cost is going to be. Yeah. So when you're giving a general, ⁓ I want to redo this kitchen and I want it to look like this, the only thing they're really able to do is give an estimation based off of the historicals. Or a lot for the allowances, which can also include in a kitchen. We've already mentioned appliances, lighting, but you've got countertops, you've got tile. Well, I think we mentioned tile, but also application of tile.

speaker-1: Plumbing fixtures. ⁓ wait. Yeah, I gave you a look of what I kind of want, but your estimation, the the allowance I gave you didn't account for I wanted the sink to go from this wall to this wall. ⁓ so now I've got plumbing rerouting and I've got electrical rerouting. And that wasn't in the in the estimate because the estimate was really kind of built on we're gonna leave a lot of it the way it is. We're just changing the aesthetic look.

speaker-0: Mm-hmm. And so oftentimes people will agree to hire somebody, put down a substantial amount of money to get started, and then realize, ⁓ well, they're presenting me a change order now. They're telling me it's gonna be another twenty thousand dollars. What happened? What happened to this allowance budget? What happened to the price you you told me it was gonna be? And that's where people can get incredibly frustrated.

speaker-1: And I also want to say that's also where a lot of people get lost in looking at the estimates too between contractors, because every contractor bids it a little bit different. Some bid a little higher in ⁓ finished work, some take into account the I may have to move this. So I'm gonna go ahead and throw it in there. Or even ⁓ you know, just being prepared for I know what it I can get a better sense of idea for what the scope is gonna be here. Mm-hmm. And how what level you want to go into. So I I throw in a little bit more. And I'm taking care of the extra design aspect here. You know. And so when you're looking at the bids, you gotta make sure you're comparing apples to apples. Right. Because if you're apples and oranges are two different numbers and two different bids. Yeah.

speaker-0: And you also need to make sure to your point, apples to apples, like that the expectation is the same. If someone's saying, ⁓ I'm gonna give you a five thousand dollar allowance for countertops, yeah. You need to now ask, okay, what type of countertop does that cover? What exactly, what you know, grade or level is that going to provide? Because there is also a discount typically provided. So it's You know, if you're working with the builder as an example, they're probably gonna pass through their discount for certain products or materials, allowing you to get maybe a level three.

speaker-1: Instead of a level one. Yeah.

speaker-0: So those are good things to to hone in and get more details. A few other specifics around how allowances can get, you know, blow up, so to speak, is not defining quantity too. So for example, you kind of mentioned this with the application. Yeah. But let's say, you know, initially you're ballparking 20 square feet of backsplash. And now you maybe you pivot or you go from a full cabinet to a floating shelf or something that requires the material to change. You know, any any change in the quantity is also going to dramatically affect the allowance quickly.

speaker-1: I think this is again back to the point of like where, you know, you have to have your design. Yes. And knowing, okay, I estimated for twenty square feet of backsplash. But that's in a s that's in a typical brick pattern. That includes my extra waist for cuts and pieces to to fit this area of the backsplash. But ⁓ wait, if you want to go with a herringbone, you know, a s a much more complex layout. That requires more material because there is a more a higher waste factor to it because of the added cuts and the added things. And that changes. So now you've just added to your material cost because you've got to go up in material instead of 20 square foot. ⁓ now I've got to get 30 to cover the same area. ⁓ and the labor charge that went up. So now my budget got hit on two aspects. Yeah.

speaker-0: That's good example. Cause oftentimes allowances are focused on material, not labor or application.

speaker-1: And they are a lot of times situated and estimated based on the standard basic applications. Yes. Which is also why I say look at some of the the bids of how was that budget allocated and where some guy some contractors, some craftsmen go ahead and tell you, hey, I'm looking at it for this maybe a little bit. I'm I'm gonna overestimate on my labor for this because in case you want to go with a different

speaker-0: layout. Yeah. And even down to the point of electricians as an example. If I buy a very elaborate chandelier that includes a tremendous amount of crystals that they have to apply by hand, they usually charge more to install that because it takes more time.

speaker-1: Yeah.

speaker-0: Those are things that allowances don't don't capture. So making sure you understand that, you know, what what does this allowance cover? Is this material only or labor? What type of labor?

speaker-1: Yeah, so I mean a lot of times when when you're looking at those budgets and you see that allowance, you know, there are a lot of times that, ⁓ that allowance looks like that's gonna be a realistic number a realistic cost. And in some cases it may actually be a realistic cost. But some cases it's not. And you need to understand what that number truly includes. Like the get down to the details. And this is where you know, having a designer, having, you know, a design build firm that Over overseason looks at the full scope and aspect comes in to to such a tremendous play here because to give you that number, there's a lot more detail that's already gone into your budget. Yeah. And understanding what you're actually getting.

speaker-0: Right. And understanding that there is a very big difference between a design build firm structure and a general contractor structure. Because you're getting that design first. And that is how builders in new constructions specifically can create, you know, spec homes that start at a certain point. It's because there's already a substantial amount of design under their belt. So they know what the floor plan is. They know. Where what the electrical layout is, they know what the plumbing layout is, they know all of these primary, very important pieces to get to that price of 800,000 that it's gonna cost with their margin in it. And then the allowances they're deploying for purely aesthetics.

speaker-1: Aesthetic or upgrade materials. Yeah. You know, because they're they're saying, Okay, yeah, if you want to go your finished elections, yes.

speaker-0: Like this 800 may get you one paint color throughout the whole house. ⁓ you want two paint colors or you want wood grain or wood stained cabinets instead of paint grade cabinets. Like all of these little things are going to affect the price. Exactly. So being able to fully capture that design to a T of what is all included and what are the allowances allowed for. Yeah. It's gonna help. minimize that frustration of misaligned expectations and ultimately disappointment when you go to actually pick stuff out and you're like, wait, this isn't what I thought it was going to be. To be totally fair, I mean, there is a valid time and use for allowances in some instances. Yeah. It's not always just to land the deal immediately. There can be certain unknowns that maybe even in a a full design firm situation, you don't

speaker-1: Absolutely.

speaker-0: have everything lined up just yet where you might have to put an allowance. Because when you're doing a construction project, I mean you're talking a relatively long period of time, depending on the s the scale.

speaker-1: But I think that that's part of the communication aspect of it too. I'm gonna estimate that your countertops are gonna be five thousand dollars. And that's based upon this material. Right. And and having this amount. If we change the design of what we have proposed and started, you have to understand that is going to create a change. But it it was c it's communicated, not just ⁓ you know, you you got five grand for your countertop.

speaker-0: Another thing that's really important should be discussed with whoever you're working with is the cost of supplies. Cause a lot of times, you know, you're talking like a com like lumber. Yeah, lumber commodity, right? So the price can fluctuate. There's all kinds of influences. We were doing a building project where lumber prices soared at the time. We ended up going sixty thousand over. What we originally estimated. And that wasn't because we changed anything. Yeah, that was just that was purely the cost of material at the time, which was also

speaker-1: Very difficult. Yeah. That was a tough one to to swallow, but it's also one that that's that is a change that no contractor builder can actually predict.

speaker-0: Yes. And sometimes I bring that up because even though lumber isn't really an allowance category, there are the same type of fluctuations that can happen on material that would be defined in the allowance section. So if if you're getting an allowance for tile and then tariffs change and you were trying to import a tile. Well, now that budget may not cover what you were originally expected it to cover. But again, this is why design build firm structure can help mitigate a lot of this because once you define this is what I want to do, this is the tile, this is how much, you can secure the material and kind of hedge some of those other risks that can affect the allowance.

speaker-1: I think I think it's just more defining that scope actually helps you to keep a tighter rein on what your cost is gonna be. Yes, you start with some estimations, but I think a difference in the the communication of what that estimation is based upon. You know.

speaker-0: Yeah. Cabinets is another kind of

speaker-1: And it's a huge one because when you get into the different materials and ⁓ I want stain grade versus paint grade.

speaker-0: I want my doors to be, you know.

speaker-1: Shaker versus

speaker-0: Whatever or or completely flush or not. There's all kinds of little things, soft close hinges, you know, things that begin to make s little modifications that may not be that original allowance estimation. Yeah. The more customized you get.

speaker-1: Yeah, those those things a lot of times are not captured in in a lot of original ⁓ estimation allowances. They are those estimations a lot of times for, you know, contractors and even in some of the normal building is this is the kind of average.

speaker-0: And I think it is really a communication focus because sometimes people are interpreting an allowance as like a c a defined guarantee versus an estimation.

speaker-1: I I will say like I know I've even been surprised by some ⁓ tradesmen that we've worked with too and like this this was the budget number they gave or you know, this is I'm gonna have these this cabinet built. You're gonna remember this. And when he came back to install, I was like, wait, you did all the soft clothes and all that. I honestly thought you're I honestly thought his original budget included a regular and we and he no, he he was he was above and beyond with it and it was great. It was that was actually a really nice touch to have.

speaker-0: Yeah. Yeah. Sometimes it works in your favor.

speaker-1: Sometimes it does.

speaker-0: I think this is, you know, just something that you need to make sure you understand throughout the process. And if you are in a situation where you're having to move forward before you fully solidified your design, you know, make sure there's very clear expectations around what the allowance is, what is that gonna get me? And then maybe even add yourself an extra buffer to overspend. And that can help mitigate some of that disappointment of, you know. overspending or thinking you're getting something you're not. But again, having your design solidified before construction begins is always the most ideal.

speaker-1: Yeah, and understand yeah, understanding like within your allowances, what allowance you've been kind of went to this budget, like what is that what is that sourcing me? Because if it's sourcing, you know, what I can generally go down and buy at Home Depot versus what ⁓ you know, the custom cabinet builder is doing, right? That's a huge difference. You know.

speaker-0: Yeah, and knowing what you're getting. Because allowances are not necessarily wrong. No. I mean, it's they're necessary and they're useful. But when we're specifically talking about how allowances can be disappointing or not meet those expectations, these are the reasons why. And this is also why what you pay the designer for and understanding like when do I need a designer to help with a project? And what is the designer actually doing? Where's that value coming from? What am I actually paying for? You know, you're you might be paying up front for that service, but you're mitigating it on the back end. Yeah. So that your cost is secured and you're not going over based off of unrealistic expectations or undefined design goals before you actually start executing.

speaker-1: Yeah, because the designer, what you're really paying the designer for is to help mitigate and understand the selections and the applications so that your your budget, your allowance already has a tighter rein on it. And then they're also there to help ensure that it's done the way that you planned and thought and wanted. And it's not a change order on the back end that threw my cost over. Exactly. It's already been accounted for up front. Mm-hmm. And it hopefully, you know. Any any changes or minor changes that should come from, ⁓ that product did go up, you know, twenty five cents a foot or a square foot, I should say, you know, and not ⁓ well, ⁓ the the application was three times more expensive today.

speaker-0: Yeah. And for our investor friends out there, having this defined plan when you're even getting your bids and estimate is going to protect your margin on the back end. Exactly. Same situation where you might do a quick walkthrough, you're bidding out to contractors, you think you're getting one thing, and then you get these changers on the back end. And now all of the profit margin on your project has essentially been dissolved. And now it's like, ⁓ well, you overpaid at the beginning because it costs more than you originally expect. Expected. But if you have that plan, that design, that strategy defined before, you're going to avoid the disappointment on the backside. So if you're planning a new build or a renovation or you're looking to hire somebody to come in and help you, these are things that you need to understand, think about, and definitely have discussions with the people that you're bringing into your team. But if you like what you've heard today, make sure you follow along at Real Return on Design, where we are unpacking real strategy and insights that actually help move the needle for you and your project. Thanks for listening today. And until next time.

speaker-1: We'll see you guys next time.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Why Your Home Never Feels Finished | #54

    Nov 17, 202617 minAudio

    You finally redesign your space, buy the furniture, and create the look you've been dreaming about. So why does something still feel off? In a world of perfectly styled Instagram interiors, Pinterest inspiration boards,...

    Credit the people on this episode

  2. Stop Using AI. Start Building With It. | #53

    Nov 10, 202630 minAudio

    Most business owners are using AI. Far fewer are using it to its full potential. If you're only using artificial intelligence to answer questions, write emails, or brainstorm ideas, you're barely scratching the surface...

    Credit the people on this episode

  3. When to Walk Away From a Real Estate Deal | #52

    Nov 3, 202635 minAudio

    Sometimes the most profitable real estate decision is knowing when to say no. Getting a property under contract can feel like a major win. You've found the opportunity, negotiated the price, and started imagining its...

    Credit the people on this episode

  4. What Your Home Appraisal Really Tells You | #51

    Oct 27, 202630 minAudio

    Just because you spend $60,000 renovating your kitchen doesn't mean you've added $60,000 to your home's value. And that's exactly why understanding appraisals matters long before you're ready to sell. In this episode of...

    Credit the people on this episode

  5. Renovation Burnout Is Avoidable. Here's How. | #50

    Oct 20, 202639 minAudio

    Renovating your home shouldn't feel like survival mode. Yet for many homeowners, the excitement of a renovation or new build quickly turns into decision fatigue, budget anxiety, and overwhelming stress. But what if the...

    Credit the people on this episode