Redefining Energy

Redefining Energy artwork

254. GW-scale batteries: the battle of Britain - Nov26

Nov 9, 202627 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Battery Energy Storage Systems (BESS) were traditionally developed as portfolios of relatively small, MW-scale projects, reflecting the experience of renewable energy funds rooted in solar and wind. But a new generation of GW-scale projects is entering the market, led by developers with different backgrounds, industrial expertise and a fundamentally different view of scale: bigger is better. Statera, Copenhagen Infrastructure Partners (CIP), Zenobē and Fidra Energy are emerging as major players, backed by infrastructure investors such as EQT, Ares and KKR. Fidra Energy is one of these new titans. Backed by EIG, with $27 billion in assets under management, and the UK National Wealth Fund, Fidra is pursuing an ambitious strategy in Great Britain, with just three projects in its pipeline, but on an unprecedented scale: the 1.45 GW / 2.9 GWh Thorpe Marsh project, the 500 MW / 1 GWh West Burton C project, and Enderby, a 1 GW project potentially offering four hours of storage. A single project can occupy an area equivalent to around 40 football pitches. These are not simply larger versions of conventional battery installations. Their teams bring extensive gas industry experience and a different approach to engineering, project delivery and infrastructure development. They are also strategically located on brownfield sites, often former coal-fired power stations or gas plants, benefiting from existing grid connections, lower connection costs and shorter permitting timelines. Laurent and Gerard welcome Chris Elder, CEO of Fidra Energy, to explore what sets this new generation of projects apart and why scale is becoming such a competitive advantage. Despite their size, these projects can be highly bankable. Around 50% of future revenues can be secured through capacity payments and tolling agreements, providing the long-term visibility lenders need. Thorpe Marsh demonstrates this: a consortium of 13 banks has committed £600 million in debt financing. We also examine one of the most critical decisions in delivering projects of this magnitude: battery supplier selection. Following a year-long tender process, Sungrow's PowerTitan 2.0 was selected for Thorpe Marsh. More than 600 twenty-foot containers will be installed on site, creating a significant logistical and construction challenge. Yet, as Chris explains, building a battery storage facility can be considerably simpler than delivering a gas-fired power plant. Finally, we explore an energy system increasingly shaped by gigawatt-scale batteries. As these assets become central to grid stability, flexibility and renewable integration, Chris anticipates significant sector consolidation. Will a handful of large-scale developers come to dominate the market? And are GW-scale batteries set to become the backbone of tomorrow's electricity grid? It is a conversation about the people, capital, technology and industrial thinking driving the next chapter of battery energy storage.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Speaker 1With Laurent Seguelin from London and Gerard Reid from Berlin, this is Redefining Energy.

Speaker 2Today on Redefining Energy, we're going to talk about gigascale batteries, Laurent.

Speaker 1And I call that the Battle of Britain. And at the end of the day, we need to answer a simple question. Is bigger better?

Speaker 2That's a very, very good question, Laurent. What's your gut reaction?

Speaker 1My gut reaction is simple. Because the early developer of batteries were coming from wind, solar, they put megawatt-scale batteries. What was your first transaction, like 5 megawatt? It was like, whoo! And then we went to 50. And now we're going to talk about gigawatt-scale batteries.

Speaker 2Yeah, and I'm still a little bit torn on this. And that's why I'm really interested to have this conversation, right?

Speaker 1So our guest is Chris Elder. and he's the CEO of Fidra Energy, a company nobody probably heard about, but I can tell you is one of the four horsemen of the gigawatt scale play alongside Statera, Copenhagen Infrastructure Partners, and Zenobi. Those four are the major players in this new landscape of gigawatt scale batteries, and they're hauled back by very deep-pocketed infrastructure investors.

Speaker 2The reason I'm looking forward to this as well is because I think you said it earlier on. Batteries up to now have been built really by renewable people. But these are not renewable people. What these are is they're coming from the gas area. They're coming from the trading area, the flexibility area. And that's a change. It's changing the way things are done, the way you think about energy, the way you think about running these assets, hedging them, et cetera, et cetera. So I'm really looking forward to this conversation.

Speaker 1Well done. Let's bring Chris on the show. Chris, welcome to the show. Thanks for having me.

Speaker 2Well, Chris, from my side as well, it's great to have you. And I'm looking forward to this conversation on large-scale batteries. Maybe just kick off and just actually, we'd love to hear your view on the role of large-scale batteries in the power system.

Speaker 3We've definitely reached an inflection point in the market over the last 12 to 18 months where The idea of batteries as a 50 megawatt type asset module has really changed significantly. Not just Fidrob, but a number of other businesses have sort of taken that leap, if you want to call it, into the core infrastructure market of building very, very large batteries. In order to deliver the level of growth that most governments are looking for now in storage and use our existing infrastructure as efficiently as possible, We

Speaker 3really need to build sites of this scale. We can't just keep building 50 megawatt batteries. And to use the UK as an example, the target for the UK government is to build around somewhere between 22 and 27 gigawatts of battery storage by 2030. So in order to do that by building lots of 50 megawatt sites, it simply won't be achievable. So you need big sites. You need sites that are of 500 megawatt plus size.

Speaker 1Chris, when we started looking into batteries, they had three characteristics. So number one, they were fund manager. So when you're fund manager, you like to have little assets everywhere. And the second, they were all coming from the wind and solar industry. Now you, you come from the gas industry. So you come from a totally different angle. But interestingly, you choose the main technology. So what do you think your approach is different from the legacy battery developer?

Speaker 3In some ways, the history goes back even further. I was at Intergen for 15 years, which was the classic sort of independent power producer and gas generation business. And the legacy of the strategy, like many strategies, was a failure. We at Intergen developed a number of large CCGT, combined cycle gas turbine, 2010 to 15. And unfortunately, those sites were just not economic to build in the latter part of the last decade. But what we realized was that batteries were an emerging technology that those sites that were

Speaker 3designed and consented for gas turbines could be re-consented into large battery sites using existing infrastructure. And actually, once the capex curve had come down, the sort of cost curve had come down a bit, batteries would be incredibly economic relative to peaking plants, for example. So we started that work when we were at Intergen back in sort of 2017, 18. And then as West Burton Energy was growing, acquired by EIG, who are our principal investor in FIDRA, we were able

Speaker 3to persuade them that this was really the right point in the market to go out and buy and develop our own development site in the UK off a significant scale, because ultimately, like any other renewable technology, economies of scale is important. So if you put more megawatts in the ground, you will get economies of scale through lower grid connection costs, lower civil works. But I think we always had the mindset of we were looking at this as a flexible asset. In many ways, in a very similar way to a gas asset, it depends upon volatility. It depends upon the

Speaker 3ability to access multiple revenue streams. And I think I've probably offended a lot of people in the sort of renewables industry by saying that battery storage is really no different to a gas plant in many ways. And the way you trade it, the way you think about optimizing it, those are all things that we thought about when we ran gas plants.

Speaker 2So, Chris, can I just talk about small versus big? I understand what you say, which is there's economies of scale. You go large. But one of the things that I see about small is the fact that small, you can solve other problems as well, which you can't do at large. In other words, you might have a bottleneck in a distribution grid. You might have a data center that needs backup. So how do you look at that? And how should we look at it as investors? There's a few fold advantage going large. So I think the first one, as you mentioned, economies of scale. So it's just cheaper to

Speaker 2build on a pound per megawatt, pound per kilowatt basis, probably in our view, sort of 20 to 30% cheaper than what we've seen in the market. It allows people to deploy large tickets. The difficulty with smaller batteries, it typically wouldn't attract the large infrastructure investors and others to put that sort of money into a project. So you had, as you talked about earlier, A lot of the fund managers, the smaller developers building these smaller assets because the equity ticket was smaller. The other advantage with these large assets

Speaker 2is that you can go and get project financing. So again, very similar to gas plants. These are typically project finance for 65% to 70% gearing. That allows us to optimize the returns. The scale gives us flexibility and offtake. So yes, we're going to need to secure some contracted revenues, but ultimately when you can realize those capex savings, You can still put in contracted revenues. You can gear the project up. And ultimately, that gives a good return for investors. And Chris, can I ask you to talk a little bit about

Speaker 2the revenue side? Because one of the things that I see that's very difficult about batteries is it's the revenue side of it, is to predict it. Because what we tend to see is that as the volatility goes down, revenues go down.

Speaker 1How do you do that?

Speaker 2And then how do you persuade the project finances to put capital into that?

Speaker 3We start with a sort of magic number of trying to contract about 50% of our revenues over the debt tenor. There's no magic to that. It's really just a target that we think about, and that could be through the capacity market. So if you think about our first two projects at Thorpe Marsh and West Burton, about 10%-ish of revenue comes through the capacity market in the UK. So that's a 15-year index-linked contract. overlaying that we then have either tolls or floor contracts which sort of get us

Speaker 3to roughly the 50% on those projects and in that we know where a sort of low case might outturn so an important thing particularly for infrastructure investors is understanding as a minimum that they will get their money back and it's very important to demonstrate that sort of over a period of time we know that the returns are going to be We have various merchant projections. We give those to the banks in a typical way, whether we use Beringa, but it could be Aurora, it could be Afri, it could be Modo, whoever it might be. Banks will

Speaker 3take some comfort for that, but ultimately they'll look at the low case and understand what they can sort of size accordingly. So from our perspective, it's more have a baseline of contracted revenue, get comfort that the merchant forecasts which make up the balance are relatively robust. but understand there's going to be some volatility of cash flows over that period of time.

Speaker 1When it comes to size, I put FIDRA in the category of the titan. So I would say there are two other titans, the CIP and the Statera, and the rest are kind of smaller. Now, the interesting thing with your equity backers, so you've got EIG, which is a large US infrastructure investor, but also the National Wealth Fund of the UK. And that's really... wonderful endorsement of the security of supply you bring. So can you explain why

Speaker 1they chose you?

Speaker 3It's an interesting story. So when we started trying to finance Thorpe Marsh in 2024, the first thing we were concerned about was actually the liquidity of the debt market. That was our number one concern because to finance a project of this size, we were going to need to raise 500 million plus of debt financing. And we had some initial conversations with the National Wealth Fund as a lender What became clear quite quickly was actually that the liquidity in the debt market for a well-structured, highly contracted

Speaker 3battery project was very much there. We were two times oversubscribed on Thorpe Marsh for our debt credit approved approaches from banks. What was a little bit harder was actually finding an equity partner to come in alongside EIG and But the National Wealth Fund at the time, one of their clear strategic priorities was to invest in battery storage. And so when they heard about our project, they heard about their investment really being into a business with an experience management team alongside a very well regarded sponsor in EIG.

Speaker 3And I think importantly, with projects that they were investing into FID, you know, they weren't investing necessarily into development pipelines. They were coming in at FID for the project that really made it quite a compelling case. And so we were delighted that they invested at the platform level rather than at the project level, because that gives us flexibility to go and build future projects as well. You see, they've also invested in the lights of yield power, which is another UK battery storage platform. They're very focused on

Speaker 3ways in which they can catalyze private capital. I would also say anecdotally, it helped the fact that the site was on the constituency of the Secretary of State at the time for energy. It was an old coal station. There was a good job creation story behind it as well. So I think all those things made it a really compelling investment for them. They've been a great partner to work with so far.

Speaker 1You talk about Thorpe Mart. That's a ginormous project. 1.4 gigawatts, 3.1 gigawatt hour. And it's under construction, so it's going to be operational next year?

Speaker 2Yep.

Speaker 1What did you learn so far?

Speaker 3We come from a gas background. So construction of a battery project in some ways is quite different to a gas project. Gas project is more complex because you have multiple different things coming into a gas project. The battery project is really a logistics exercise. It's in essence the way of getting things to site at the right time and when we need them to be there. So certainly the logistics are the key element to it. And we're only, I would say, in the sort of mid-phase of that. We've got our first Battery skids arriving in the next couple of weeks at site. We've done all the civil works.

Speaker 3We've done all the foundation work. So the challenge of construction, I think, is still going to come in the sense of just the logistics. But in essence, you've not got the same challenges of putting a turbine in, connecting it, running. Those things are not there. You're really just putting existing pre-built systems onto the site. Something of the scale of Thorpe Marr, one of the key differences in that is just the scale of the civil works. So just to give you an overview of the site, it's about a 50 acre site, about 500,000 tons of pulverized fuel ash,

Speaker 3which was on the site, which was an old coal site, basically. And that's where the ash was stored. So we had to flatten that whole site, which took us about four or five months to do that. Really an incredible exercise to do. It also helps to elevate the site. As somebody once joked to me, I can't believe anyone's building a battery on a place called Thorpe Marsh. It seems quite odd to build a battery in the middle of a marsh. But the good news is it is elevated from sea level. But that was a huge construction challenge for us at the outset. But now that we're into

Speaker 3the more delivery of the batteries, it's just a logistics exercise, really.

Speaker 2And Chris, what do you see? Are you a flexibility player? Are you an independent power producer? Are you a battery player? What do you see as I've gone forward as?

Speaker 3Our model is build on, operate, maintain. So that's ultimately what the business wants to be. I don't see us as particularly different to what an Intergem was or a Drax was in the 2000s, 2010s. We are an IPP or an IFP, whatever you might want to call it. We won't do our own trading today. because frankly, we don't have the scale to do it. And again, I think there's such a competitive optimizer market out there that it just doesn't justify building today our own trading capability. But,

Speaker 3you know, we'll look again at that in a few years time. But today, I think really what we'll focus on in being is we'll keep doing some development. We think our real sort of secret sauce is the ability to take projects from ready to build through to COD. We can do greenfield development. But frankly, the bit that we think we can do very well is the structuring in terms of commercial, financing, construction, and then ultimately coming in to manage the asset after COD.

Speaker 2If I look in the UK market, what you've got is a whole pile of the wind and solar market in the UK. There's a lot of rock assets which had PPAs in place from 10 years ago, whatever, and that And what they're doing is they're coming out of PPA, which means there's merchant risk there, which I would have thought is a huge opportunity for the likes of yourselves in terms of batteries.

Speaker 1How do you look at that?

Speaker 2Do you look at it as an opportunity or you say it's not for us?

Speaker 3We've talked to a number of off-takers who have, I would call it long wind exposure or long solar exposure. And that's one of the things that they look at in terms of whether they're interested in tools or floors or like just to sort of balance out their portfolio. But generally, I see the growth in intermittent renewables as a fantastic opportunity because it will create volatility coupled with sort of gas price volatility as well. But specifically on those coming out of rocks and the like, I think it's just going to drive more people to look for more contracted structures going forward and looking to firm some

Speaker 3of their exposure. If you think about the GB as a battery market, the thing that differentiates GB to other markets is just the depth and maturity of the off-take market here. That's why we've got to 8 gigawatts operational. That's why we'll probably get to 20 gigawatts operational by 2030. There is a mature market. There's lots of people interested in providing those types of financeable products. And I think that's absolutely key. And if you look at that relative to other markets in Europe, that's the key differentiating factor

Speaker 3of scale of batteries and markets.

Speaker 1Gerard, you remember a few years ago, we went to see Vattenfall and we told them the most precious part of your portfolio are your brownfield assets.

Speaker 2Yeah, yeah.

Speaker 1You remember? Yeah, I do indeed, of course. Yeah. And they were like, huh? So 50 acres. So for our listener, that's roughly 30-ish football. A bit more than that.

Speaker 3Depends how big your football pitch is.

Speaker 1And so your supplier of batteries is Sunrode. So you're going to use the Power Titan 2.0. How did you make that choice? What was really interesting in their proposal?

Speaker 3So we ran an extensive tender process, took 12 months. What was fascinating about that tender process is in the space of 12 months, the cost of the battery systems roughly halved. This was over sort of 2024, 2025. It was an incredible reduction. Some of that was just the price of lithium. Some of it was technology evolution. and some of it was just a competition. For a project of the scale, people were, as you can imagine, were very keen to get involved, particularly when they knew that our sponsor was EIG and that there was credibility behind

Speaker 3the project. We chose Sungrow. Price was one element. I think another really important element was the long life batteries. So when we look at it from a sort of financial modeling perspective or from a debt sizing perspective, the longer we can get warranted life and batteries, the longer we can size the debt. And ultimately, the longer it is before we have to repower the asset and look at the sort of returns from that. So SunGrow's batteries were particularly good there. To give you an example, when we started the tender, we probably assumed that we would

Speaker 3get sort of for a two hour, two cycle a day battery, we might get sort of 12 to 15 years out. And we've got a warranty from SunGrow that stretches from 15 to 20 years. And that makes a material difference in the economics. So As a whole package, and given their bankability and insurability, we just felt, at the time, they were the best auction.

Speaker 1That's for Thorpe March, or that includes West Burton Sea?

Speaker 3West Burton Sea as well, yes. So we're using SunGrow batteries there.

Speaker 1Okay, and then you get, what, a third site, Enderby?

Speaker 2Enderby is our third site.

Speaker 3We expect to get to financial close at some point next year, subject to connection offers, which I'm sure we can have a long discussion on it at some point. there we've not made any technology choice yet for that project. We're considering different battery providers and we're also looking at duration again. The projects at Thorpe Marsh and West Burton were both 2.2 hours. That was probably the right duration at the time but now you could argue that a slightly longer duration might be more economic depending on the capex and the revenue curves. So we're looking at duration

Speaker 3again and Enderby fortunately is of a size similar to Thorpe Marsh, not quite as big as Thorpe Marsh but similar. that we could extend the duration to the four hours if we needed to.

Speaker 1When I look at your banking pool, so you have 13 banks and collectively they lended you £ 600 million. I have the name ABN AMRO, China Minsheng, CIBC, Deutsche Bank, Investec, MUFG, NatWest, NordLB, Santander, Siemens Bank, SMBC, Societe Generale and Standard Chartered. Is there anyone that kind of led the whole pack?

Speaker 3For Thorpe Marsh, because it was a bit of a first-of-a-kind project, we appointed Santander as our financial advisor. But we were also keen that they sort of backed the deal with their balance sheet as well. They were probably the one that we had in our mind that were sort of not only doing the advisory work, but also would come in with their balance sheet. But they were all very keen to come in. It was a club. It was a large club, but it was a club of banks that we were able to coordinate. Some of them were perhaps more active than others in the UK sector. The likes of MUFG and ABN have done a number

Speaker 3of deals now in the battery sector, including follow-ons on West Burton for us. I wouldn't say there was any one particular bank leading, but certainly Santander were our financial advisor and sort of driving the whole process.

Speaker 2Chris, just from my side, given that you come from the gas background, what's your view on the future of gas in the system? And I'm talking about really, I'd love to hear your view. You've gone from gas to batteries, which says something. But just dig into that. Secretly, and it won't be secret after this broadcast, but I still love gas. Gas has really got an important role in the system to play because ultimately you need somebody to do that last 5-10% of work in the system. And gas will always be a critical part of it. And gas generation assets we need to utilize them to their

Speaker 2full life in the uk i've seen a number of assets with their life extended i think they're relatively low cost and building other forms of new technologies personally i think gas has got a long way to go a long way to run it'll certainly run less in the uk but provided it's remunerated properly through the capacity market or through a strategic reserve or however it might be i think these plants will be around for a long time and If you look at the UK market as a whole, we still have 30 to 40 gigawatts.

Speaker 3Of gas in the UK. Now, we might not have as much of that in 20 years' time. I think we'll still have quite a lot of it. And I think the case for gas is still pretty strong across the UK and, frankly, across some European markets as well. Italy, Germany, Poland, those types of markets.

Speaker 1So there is, according to the plan, another 15 gigawatts of batteries to install in the UK. And that's not even counting if we have data centers and, you know, the demand starts to go up. That's not even counting the pump hydro, if they're done one way or another. How do you see the competitive landscape between the big titans and the guy who spray and fray?

Speaker 3It's a fascinating thing. Coming again from the gas generation world, when there was maybe five or six key players in the market back in sort of 2010s, what's happened in the battery sector is you've got the early fund managers, the Greshams, the Gore Streets, who focused on those smaller assets. Then you've got the large platforms backed by infrastructure investors, so ourselves, Stateras and Obi Field, other people in the market. And the utilities are dabbling. if I can call it that,

Speaker 3with batteries, but not really making a big play to it. So you have this incredibly fragmented market for battery storage, which at some point feels like it's ripe for some level of consolidation in the sector, particularly because most of these platforms, if they're owned by infrastructure investors, are probably on five to seven year type horizons anyway, in terms of sort of equity hold timelines. What's going to be really interesting come the end of this decade is the level of consolidation in the market. And whether we see this move from being very, very fragmented, lots of different players,

Speaker 3some with small projects, some with large projects, some utilities, into something that's more like the UK market for other forms of power generation, like offshore wind and gas, where you've got the very big players dominating that sector. I think that's going to be a really interesting one to watch and see who decides that they're going to be that consolidator in the markets. I'm not putting us up for that challenge yet, but I just think there's an interesting dynamic to play out there.

Speaker 1Well, Chris, thank you so much. And it's great to have some smart gas guy enjoying our family.

Speaker 3Oh, you're more than welcome.

Speaker 1Great having you, Chris. Thank you very much. Thank you, guys. Well, Gerard, I really enjoyed this one because hands-on, no nonsense. And their ambition, come on, I mean, like 40 football pitchers, 600 batteries next to another. I mean, it's the triumph of modularity. Repeat, repeat, repeat. And he said himself to build a one gigawatt battery is much simpler than to build a one gigawatt turbine.

Speaker 2I get that. It's clear in my head. Like if you're talking about battery versus gas, the simplicity of these batteries is really unbelievable, right? I suppose I'm not convinced in this whole thing of, would you compare a decentralized battery to a centralized? Now I'll take his point, which is it's the economies of scale. Yeah. But where I'm coming from is we're going to have massive flexibility in the system, which is what I call behind the transformer. You know, whether that is EV batteries or large scale

Speaker 2batteries and industrial park, I can see the batteries being much more towards the low because And that also from a risk management point of view, I just, I prefer to own a battery in those locations rather than the large scale ones. Now, you always call me Mr. Equity and you're Mr.

Speaker 1Debt.

Speaker 2So I'm now saying to you, I prefer the small ones.

Speaker 1Because they're less risky.

Speaker 2What's your reaction to that?

Speaker 1Look, it's an industrial approach, which is transformational because those people are are looking at brownfield sites, former coal plants, former gas plants, and we have a lot in Europe in general. And the fact that they can bring another cycle of life by using, honestly, some sites which are extremely dirty now and some connection which already exists, some permit that already exists, for me, that's a great approach. Now,

Speaker 1are they going to make money or not? As you said, they have hedged 50% of their future revenues. And they've been able to raise debt without a problem. So I don't know what's the potential of those gigawatt scale batteries, but what is for sure, and especially because you said that, okay, so the first two, Thorpe March and West Burton, they are two hours, but for the third one is already looking into four hours, which means there's a lot of plan, like long duration energy storage, a lot of those pump hydros.

Speaker 1I don't think they're going to cycle a lot. And in my opinion, if you do a four-day pump hydro, yeah, okay, fine. But if you want to do a 10-hour pump hydro, it is financial suicide because those batteries will eat their lunch every day.

Speaker 2Yeah, no, this is clear for me is that there's no doubt about that. They're more flexible and they're quicker. I suppose the approach that I like from these guys is they come from the conventional world. Just said as well is when you come from that world, you... finance projects in a different way and you manage projects in a different way than a lot of the renewables infrastructure people. So I do like that. And I also realize as well is that what's very clear for me across Europe and I'll start in the UK is that peak demand

Speaker 2is going to go through the roof in the next few years. It's the peaks that will kill you. And that's where these guys will make the money going forward is the peaks.

Speaker 1Well, Gérard, we'd like to thank Chris Elder. I really like what they're doing.

Speaker 2Yeah, and Chris, just want to wish you all the best with this and keep in contact.

Speaker 1And I talk to you next week.

Speaker 2Looking forward to it.

Speaker 3Thank you for listening to Redefining Energy.

Speaker 2Don't forget to rate the show and subscribe on Apple Podcasts, Spotify, or the platform of your choice.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. 255. Digital Twins for Grids - Nov26

    Nov 16, 202632 minAudio

    Geographic Information System (GIS) are used by all Infrastructure managers to map where physical assets are. But they are mostly a glorified version of Google Maps. Here come digital twins, where new systems seemingly...

    Credit the people on this episode

  2. 253. Carbon vs Electrons: The Great Schism? - Nov26

    Nov 2, 202630 minAudio

    For almost two decades, the environmental movement has repeatedly announced the demise of fossil fuels. The headlines have been dramatic, but the results have been less convincing. As COP31 is about to begin, the world...

    Credit the people on this episode

  3. 252. Lazard, LCOE and the real cost of power - Oct26

    Oct 26, 202629 minAudio

    Founded in 1848, Lazard is one of the world’s most prestigious investment banks. But in energy, its influence goes well beyond Wall Street. For twenty years, Lazard’s Levelized Cost of Energy (LCOE) report has shaped...

    Credit the people on this episode

  4. 251. Fission Impossible: the SMR Gamble - Oct26

    Oct 19, 202636 minAudio

    Last year, the nuclear industry experienced something close to a gold rush. SMRs - Small Modular Reactors - became the hottest story in energy. Private capital poured in, valuations exploded, and the industry produced...

    Credit the people on this episode

  5. 250. Inside the US Datacenter exuberant buildout - Oct26

    Oct 12, 202628 minAudio

    The current datacenter buildout is the biggest GDP bet in America since the railroads 150 years ago. We have never seen a frenzy quite like this. The system is running on overdrive - and the cracks are starting to show....

    Credit the people on this episode