Skip to content
PodSubs
ShowsPeopleGuestsJobsNewsEvents
More
BlogPodCred
Menu
ShowsPeopleGuestsJobsNewsEventsBlogPodCredNetworksSign in
Join nowSign in
  • Shows
  • People
  • Jobs
  • News
  • More
    • Guests
    • Events
    • Blog
    • PodCred
    • Networks
    Join nowSign in

Rebuild:LA

Rebuild:LA artwork

Rebuild:LA Episode 099: How to Build a Resilient Home...FAST!

Nov 3, 202634 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Send us Fan Mail Altadena has always been an alternative community. Historically, a place where people of color could escape racist redlining in LA County, Altadena has brought a small-town feel to one of the most populated counties in the country. When the Eaton Fire killed 19 people and destroyed 9,418 structures, some of them beloved historic landmarks, the residents vowed to rise up and reclaim their magical community. But rebuilding and recovery in Southern California's wildfire-plagued foothills can be overwhelming. This week, Cameron Barrett sits down with a local architect who has created the Foothill Catalog Foundation, a non-profit that has streamlined the design and permitting process for families facing the hard realities of rebuilding their homes. And David Barrett meets with Enrico Bressan, a local builder bringing new, wildfire-resilient building techniques to Altadena. CORRECTION! At 27:27 in our podcast, Enrico Bressan misstates the heat tolerance of a cement house at 6,000 to 7,000 degrees Fahrenheit. The actual tolerance is 1,000 degrees Fahrenheit. Resources: Foothill Catalog Foundation Time Magazine Trailblazers Rebuild:LA Episode 74 - Why Are The Palisades and Altadena So Slow to Recover with Politico’s Liam Dillon Rebuild:LA Episode 075 - The Next Few Months Will Tell Us If The Palisades and Altadena Will Come Back with POLITICO’s Liam Dillon Artecnica Support the show

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_01What came to our mind like in those first hours, those first days, was how difficult it is, even as professionals, to really build anything. Especially in California in Los Angeles in 2025, 2026.

SPEAKER_03I started building and converting to a different construction system and kind of abandoned the conventional wooden stick construction system.

SPEAKER_02I'm Cavern Barrett. Do you know how many structures were lost in the January 2025 firestorms? Well, according to the latest experts, all the structures lost in the Palisades, Malibu, and Altadena total 18,189. Wow. Last May on episodes uh 74 and 75 on Rebuild LA, we talked to politico journalist Liam Dillon. He had just finished a lengthy research article on permitting and uh building starts in the burn scar of uh the Palisades and the Eaton fires.

SPEAKER_02Uh we'll link to his article in our show notes. But what he was looking at was why the rebuilding was taking as long as it was. And he found uh a lot of interesting things. One of them was that Aldedena was the community that was outpacing all others when it came to permits submitted and buildings under construction. He also found out that if those numbers hold true through the entire rebuilding process, Aldedena will have more structures after the Eaton fire than they had before it.

SPEAKER_02He credited the popularity of ADUs in those permits for those numbers on the rise. Our next guest might also have something to do with that robust rebuild taking place in Altadena. And that's because he founded a nonprofit that has streamlined home construction, the design, the permitting process, all kinds of elements of the difficult process of rebuilding. His name is Alex Athenson.

SPEAKER_02He's a licensed architect, and so is his wife, Cynthia Ziegler. They're both licensed architects, and they founded the Foothill Catalog Foundation. We talk to him next. Founder of the Foothill Catalog Foundation, Alex Athenson. Welcome to Rebuild LA.

SPEAKER_01Yeah, thanks for having me.

SPEAKER_02We met at a wildfire leadership summit uh a couple of, well, several weeks ago now. And um, I was pretty overwhelmed by the work that you're doing and the foundation that you and your wife founded. And apparently so is Time Magazine. Yep. Um, you are a, I want to make sure I get this right. You are a Time magazine trailblazer designing and making the future list. Wow. I I know I'm gonna ask you all about your incredible foundation, but tell us, tell us about what that honor meant.

SPEAKER_01Yeah, that was uh an unexpected recognition for myself and Cynthia, uh, my wife. I mean, we're two architects that started this organization out of a desire to help our own community. Um and just the spotlight that um time recognition brings um is great for our organization, is great for our communities here on the ground in Los Angeles. Um, and it was really incredible. You know, we had an event um kind of celebrating the honor out in Las Vegas with a lot of the other honorees.

SPEAKER_01And meeting some of these uh incredible people, uh, thinkers, creatives, uh, other architects, other engineers, uh was incredibly inspiring too. So it was humbling to be not only in their presence, but then uh to be recognized for our work by time, which is yeah, awesome. And and again, just brings more spotlight to the work that we're doing here and to the need that's still very much present here in Los Angeles.

SPEAKER_02It's one of the reasons why I love to do this podcast. I get to surround myself with really smart-driven people who um understand the mission and commit to it. And that's you. Your mission is to bring affordable architectural plans and um permitting to your neighbors. And now you're expanding out. So tell us about the Foothill Foundation.

SPEAKER_01Catalog Foundation. Yeah, the Foothill Catalog Foundation, um, we were founded in the aftermath of the LA Wildfires in January 2025 uh by myself, uh my wife, who are both uh licensed architects and a small group of other professionals, uh, with the mission to utilize pre-approved plans or catalog homes as the mechanism to make, uh, like you said, Cameron, to make the rebuilding process, to make construction more accessible and accessible in every sense of the word, in terms of uh making it less complicated, making it um less expensive, less time consuming, uh, and ultimately lowering that floor of accessibility, um, which is really going to be necessary to meet the needs and to meet all these diverse families in order for them to successfully recover and rebuild in their communities.

SPEAKER_01And uh with the focus, our focus is really specifically uh not sacrificing quality, design and construction quality in terms of sustainability, in terms of resiliency, fire hardness, safety, uh, but then of course beauty too, and and building back these really amazing communities, Altadena and Pacific Palisades, uh, in a way that is fitting for uh these uh these towns, these places, and then fitting for the people that we're trying to keep in these communities.

SPEAKER_02You're an Altadinan. Are you? Yes, yes.

SPEAKER_01Well, so I live, Cynthia and I live a block south of the Altadina border. Okay. So we're technically Pasadena's.

SPEAKER_02Okay.

SPEAKER_01But it's actually a really great um place to be at the at our home where we are. We feel like we really have a foot in both communities, uh, and they're very tight-knit communities too. So it's been great to see that outpouring of support for Pasadena for its um, you know, its sister community, Altadena. And uh the block that we live in, you know, that was about a block away from the edge of the Eden Fire, is very much an Altadena block. And um, in terms of its diversity, it's it's kind of uh the people that live there, and you know, it's a lot of modest homes and families of all different means, backgrounds, and ethnicities.

SPEAKER_01And um so it's something that we thought of immediately once, you know, the day after the fire of our block, our neighbors, and of what the need was really going to be for thousands of people just like that to be able to access this really complicated process that is construction.

SPEAKER_02Yeah. You know, that process, um, when I started empathizing with the thousands that would need to rebuild, I imagined that they would have to slog through cleanup. And then I imagined they would have to go through really tough times to get the materials they needed and to get the labor they needed to start rebuilding. I skipped an entire section of that in my mind. But of course, an architect wouldn't skip that.

SPEAKER_02And that's the step that you're helping people with, isn't it? Can you tell us more about that? Yeah.

SPEAKER_01Yeah. So I mean, I think as a member of this community, but also as an architect, you know, you what Cynthia and I really what came to our mind like in those first hours, those first days, was how difficult it is, even as professionals, to really build anything. Uh, especially in California, in Los Angeles in 2025, 2026, that process is incredibly difficult, incredibly time-consuming and expensive. Um, and it's not a process that's set up for, like I said, this diverse group of families that have just lost everything they know and who know nothing about the process to be able to access.

SPEAKER_01Um, and also it's about you know, the the heritage and the history and the identity of Alpadina is so special. Just as it's special in every community, that unique sense of place is why people love their hometown and why people uh you know will fight to stay there. So to be able to preserve that uh character and that quality through design was also very important to us, too. And not only building back the community, but how are we going to build it back? What is it gonna look like, what it's gonna feel like, um, and how is it gonna stay lovable and stay cherished by the next generation of families that are going to be here.

SPEAKER_02We're going to link to the catalog in our show notes because the the designs truly are cherishable. They truly are beautiful. I also. Yeah, they really, and they really uh I think it's fascinating that you now it you started with that Altadina catalog, but now you have also expanded out to the Palisades. And those catalogs are quite different, aren't they?

SPEAKER_01Yeah, yeah, as they should be, really. Um, you know, they're communities that are 30 miles apart, but have totally different histories, uh different heritage, different architectural, uh typological um manifestations of what makes up their community from the built environment. Um and that's representative of the people that have lived there too, the history of those families. So our goal, and I think you know, this work that we're doing in Altadina and the work we're doing in Pacific Palisades is a great example of where this system could lead to in terms of efficiency beyond just LA.

SPEAKER_01Um and having this very streamlined, very efficient, very predictable process that is uh the pre-approved plan or the catalog home. That way of developing, of designing, permitting, and building uh housing is very standardized and very efficient, but can be um can be laid out in a way that is fitting for what a community needs. And not only it's in terms of architectural style, but in terms of scale and typology of housing that's needed and the people that ultimately you're trying to serve, whether that's uh after a natural disaster, after mass displacement, or if you're just looking for making quality affordable housing easier to develop.

SPEAKER_02A catalog home is not new, but it's new to Al Tadena and the Palisades. Can you maybe explain that a little bit more for our viewers?

SPEAKER_01Yeah, sure. Well, new probably in the 21st century. So if uh you know catalog homes uh was uh a very common kind of way of building housing uh in the 20th century. And this started with Sears Roebuck uh back in 1908 who really popularized this model through their famous Sears catalog. Um so Sears could um what they started in 1908 was a program called Sears Modern Homes, where they would publish uh full architectural plans for homes of different styles, sizes, configurations in their catalog.

SPEAKER_01And families all across the country could literally order that set of plans, but also the kit of parts to build that home directly to their door. So it represented an incredible efficient way of accessing, like I said, a quality, affordable housing. And you know, back then when uh regulations and jurisdictional uh, you know, kind of unique aspects of building in every region were uh less prevalent. A lot of times you would just hire your local contractor to build your house, or sometimes you would even just you know get your neighbors and build it yourself.

SPEAKER_01So um that kind of efficiency was a part of a lot of families' histories, um, even just with Sears. Sears built 75,000 uh homes across the country in just their 30-year program. So um it was something that, yeah, definitely is not a uh a new model, but it is something that has not been kind of made successful as building and regulation has gotten more complex in the 21st century.

SPEAKER_02If somebody's listening to this and they're getting ready to rebuild, how do they go about taking advantage of the foothill catalog foundation's work? Um take us through the process.

SPEAKER_01Yeah, so you know, we when we started the organization, we had a very clear mission and a clear resource that we were trying to develop, which is the catalog, you know, the foothill catalog in Altadena and the Palisades catalog. So this resource that is these pre-approved architectural floor plans. And you know, we can get into the work we did with the county and the city of Los Angeles to actually make catalog homes possible. But that's essentially what we've done is we've created these resources of pre-approved home designs.

SPEAKER_01Um what we realized very quickly, though, is that families, especially after a disaster, need that navigational support in order to even take advantage of how beneficial a pre-approved plan, a catalog home, can be. So our organization is split into two kind of core programs. One is architects, designers, and um the technical expertise and staff that actually develops these plans and maintains them and helps execute the builds.

SPEAKER_01But on the other side is a homeowner engagement team, a team that actually works as navigators for families that goes step by step through a very predictable, streamlined, and linear process of assessing feasibility, of assessing kind of what um designs or what needs of the family are specific, and then working step by step to make that home a reality. So the first step is always having a conversation. And uh yeah, well, maybe the first step is going on our website and scrolling through the catalog and seeing kind of what speaks to you.

SPEAKER_01But um, we try and be as accessible as possible throughout the community, or um, anyone can set up an initial um, you know, phone call, Zoom conversation, uh, or in-person meeting to kind of just learn more. And that's where we always recommend to start. So going to foothillcatalog.org, um, there's a book a consultation button, just uh setting up a conversation with our homeowner team, and then we can provide a lot more information and trying to fill the gaps of families who don't know what they don't know, right?

SPEAKER_01And um, especially in this very complex process and all these different lanes you could take of what construction looks like. Um, what we're trying to do is mitigate risk, but also mitigate uncertainty in this process. And for families who have never done this before and hopefully will never have to do this again, make it very clear and predictable step by step of where they're going and where they've been.

SPEAKER_02As someone who is unlucky enough to have never built her own home, or perhaps lucky enough to have never had to build it. Exactly. It can be look at it both ways. Um, as someone who hasn't done that, what part of this process streamlines the um all of the paperwork?

SPEAKER_01Sure. So um, and I'll talk a little bit about how we work with a county, Los Angeles County, and Los Angeles City as a crucial part of this efficiency that we've created. So typically, you know, if you're working with a custom home, if you start with an architect, a team of engineers, um, with a blank sheet of paper, you know, high level, you're looking at a process um of design and engineering and um and compliance to create a set that is prepared to be able to permit.

SPEAKER_01Um, that can cost you know north of$100,000, a lot of times more, to develop that full set of documents to go through that process. And it can take, you know, typically a minimum of six months. Sometimes it goes 12 months, 18 months. It can be a very iterative, very slow process of custom design. So that time and cost on the front end, even to get to a set of permeable plans, is a huge burden that I don't think many families are prepared for or understand until they get into it.

SPEAKER_01Um, and then the the typical permitting process, how that would work before the fire, especially in Los Angeles, uh, which is uh, you know, very stringent building codes, for better or for worse, right? That we have a high standard of quality that we mandated here in California, but often that to show compliance is a very long and rigorous process as well, back and forth with the authority having jurisdiction with the county or the city in this case. So that process could often take six, nine, twelve months alone as well.

SPEAKER_01Um and so you know, you're looking at a, you know, if you look at high-level what this typical custom home building process is, you're typically in for hundreds of thousands of dollars and maybe years of time before you are even prepared to get a shovel in the ground. Wow. And then that construction process with a custom home, you know, you have to find a builder who is gonna provide you a custom quote. And um, you know, that's also a kind of very fraught, very risky endeavor, too, is to find the right contractor who's gonna build for a predictable time and cost.

SPEAKER_01Yeah. Um, so that design permanent construction, like we were trying to create efficiencies of time, cost, and process in all three of those buckets with pre-approved plans with catalog homes. Um so catalog homes, essentially what we do as a nonprofit organization and as architects, we design and permit these homes uh in advance of families having to start their rebuilding journey. So we work with the county and the city to pre-review a full set of construction documents that allows a home to be buildable, except for a site plan.

SPEAKER_01So a site plan is the last step of actually being able to get a final building permit and then getting shovels in the ground. So it cuts down this two-year time span, this uh this incredible burden of just getting to construction that might cost hundreds of thousands of dollars. What we've seen is now a timeline of being able to work with families, and then if we're ready to make decisions, getting a site plan into the county or the city and getting a building permit in four weeks, and then being able to start building in a matter of weeks and months as opposed to years.

SPEAKER_01Wow. And then drastically mitigating the cost that it takes to get to that point. And then in construction, you have so much more predictability. You know, we help families, we guide them over what building solution, what contractor is going to be the best fit for them. Um, whether that's a nonprofit builder, a local builder, a larger production builder. Uh, we're able as architects to work with anyone. Um, so that flexibility also allows us to work in the best interest of the family and um really mitigates uncertainty with a pre-approved plan uh as we're through construction, helps bring down costs there.

SPEAKER_01So um it's we've this was our vision at the beginning, and now we're seeing it really play out in reality. And uh we feel like we're we're building that momentum, even less than two years into the rebuild, uh, that hopefully will continue on and continue to reinvigorate progress and bring these communities back.

SPEAKER_02How many families have gone through the process? How many, how many families are are working with you and and starting to rebuild?

SPEAKER_01Yeah, so we've had about 330 families start that consultation process that I mentioned, who have actually set up a meeting, have come up in person. Uh most times it's many more than just a first meeting. Um and then to date, we've uh moved forward with 104 of them. Might be 105, depending on when this air is, but uh it um yeah, so uh 104 families have selected their design and are at various stages of um selecting their, you know, figuring out who what contractor they're gonna work with, figuring out any site conditions they need to work through.

SPEAKER_01Um to date, uh as we're speaking here, we have about 52 designs under construction and five families who have actually moved back in fully. So um we're seeing that progress accelerate. Yeah.

SPEAKER_02Is that what you wanted? If you could look back on when you and Cynthia first put the foundation together, are you ahead of schedule? Are you behind schedule? Are you happy with the progress?

SPEAKER_01Um, I think we're we are very pleased. I think when we started the process, honestly, Cameron, it was like if we can help one family with this, right, that will be a win. And I think to the point that we've um we've kind of catalyzed both of these communities to kind of really have a sense of optimism and hope that different types of pathways of resources will be available. Like there there is hope that this is possible for everyone, has been so valuable. And then for those 330 families. We've met with whether we're rebuilding with them or even just provided more clarity into their situation has been uh incredibly beneficial.

SPEAKER_01So I'm super proud of where we've been so far. Um, you know, there's so much need still remaining in the community, so there's a long way to go. Um, but it's a really hard thing to estimate, uh, estimate or kind of like forecast where we'll go. But I think I'm I'm really pleased with what we've done so far, and I'm really pleased with this process as we envisioned it, actually working and actually showing those time cost process efficiencies, translating that to families now being able to return to their communities much sooner, and and many times, you know, this being their pathway of actually being able to get back at all.

SPEAKER_02Wow. Five years from now, what do you want Altadena and the Pacific Palisades to look like?

SPEAKER_01Um it's uh five years seems like a long time, but um, you know, I I hope I I think from this probably this acceleration of progress that we we see now and the momentum that we can maintain throughout the next one, two, five years. Um I not only want to see Altadina and the Palasites built back uh you know to a completion percentage, uh, you know, as close as possible to 90, 100%.

SPEAKER_01But I think what we are ultimately trying to do, what our goal is, you know, from a very high level as an organization, is to allow for families to have return that ownership to the individual families who are trying to return of their rebuild, of being able to do what they want on their own property and express their self themselves in their own way in terms of what they want, what they need, and what they want their home of the future to look like. And so when I drive around Al Tadina or the or Pacific Palisades in five years, I not only want to see this variety and this individuality expressed on every block, but I want those original families who wanted to stay in those communities to be able to have the ability to remain in their hometown, to remain in their home community.

SPEAKER_01So as an architect, seeing that diverse array of beautiful architecture, a resilient, a sustainable architecture present is a huge reward. But for us as an organization, it's also seeing the families that we helped being placed in those homes and continuing their journey of wealth building, uh, of raising their families in these really special communities. So that is kind of the big picture goal of where I'd love to be in five years.

SPEAKER_02I'm in. I I I'm fully bought into this. This sounds like exactly uh exactly what LA needs to recover from uh these two devastating uh wildfires. So, Alex, thank you so much for the hard work you, Cynthia, and your entire team are doing. Um, it is a terrific mission-driven work, and uh it's so impressive to be able to uh talk to you face to face and and hear all about it. So, time trailblazer. Alex Atkinson, thank you so much for joining us on Rebuild LA.

SPEAKER_01Yeah, thanks everyone.

SPEAKER_02Check out that link to the catalog in our show notes. Uh you've seen some of those images that we put up during the interview. The houses that Alex and his fellow architects have designed are really stunning. As we've said a whole lot on this show, and as almost all of our guests have uh said as well, is that disaster doesn't just leave terrible devastation in its wake, but it also opens a door for opportunity.

SPEAKER_02And that has happened in the building trade. In fact, there are a lot of designers and builders who are taking advantage of this moment in history to come up with new ways to build houses, to make them more wildfire resilient. And that is who we talk to next. David Barrett went to Altadena to a building site and met with Enrico Brasan from Architecnica, who has a new way of building a home that he says is far more wildfire resilient.

SPEAKER_00Enrico, here we are in Altadena, almost two years after the disaster's January 25 fires, and a lot of reconstruction or construction to rebuild is taking place. I see a lot of it is conventional. It's like wood stick construction, right? Wood frame construction. But there's some alternatives, and you're kind of one of the experts in the alternatives. Explain to everyone what that's all about.

SPEAKER_03I started thinking about uh this type of problem maybe five, six years ago. So I started building and converting to a different construction system and kind of abandon the conventional wooden stick construction system. So my proposal at this time is to construct in basically reinforced concrete as much as possible the whole house. The construction system is not really very different than has been done a lot in commercial projects and is applied to residential projects because it makes more sense.

SPEAKER_03Because it's going to be a lot more fire-resistant. I mean, this type of concrete will go up to six, seven thousand degrees as opposed to a wood house, which would be in the few hundred or less. So here is the forming system where you pour the concrete. The concrete is poured from a regular concrete truck that pours the concrete. We build the wall to the full height and we'll pour the concrete from the top with a boom. So it's very easy to pour straight, uniform.

SPEAKER_03And on the exterior, we decided for this, the aesthetics of this house, that we have an exposed concrete. So we don't use the foam on both sides while we could, because we want to have an exposed concrete on the outside. Because of the concrete, and because of this foam system, which is used for forming but remains in place and becomes also a thermal insulation system for the structure. Here is the system with the foam on the inside and the forming system on the outside.

SPEAKER_03So that's an example of this example as is being built. As you can see, the whole system is in place in these conditions. We generally build this in stages, you know, because we don't pour the whole concrete structure at once, we pour it in like two, three levels, two, three over stacking systems. So the one is on top of each other. The concrete foundations and the flooring is done as any other kind of conventional on-slab grading house.

SPEAKER_03So here you see an example of a simple interior partition that is dividing the open area to the bedroom area. So that's an interior partition. We decided to also do that structurally for support, but also for further fire resistance. Sometimes we can use a metal stud or we use a concrete stud, depending whether we need structural support or not. But both are very resistant to fire. So this is an example of a finish of the in a concrete finish.

SPEAKER_03Of course, any of these surfaces are done in concrete. Sometimes we use a finished concrete, a smooth finished concrete as an aesthetic look, or we can affix onto the concrete both on the inner and outer side, drywall, stone, masonry, bricks, any kind of finish you want on top of the existing. We decided to use a concrete finish on the exteriors here. As you can see, this had the surfacing material that you see here on both sides, and we poured the concrete, has a very clean, smooth finish.

SPEAKER_03We're not going to put any finished material on top of this. The owner is very happy with the concrete look.

SPEAKER_00How do you pre-plan and integrate plumbing and electrical pre-wiring, pre-completion? Because I see, for example, here's a J-box, right, that is in concrete, so you can't really move it. No. So you gotta get it right to start. Right, right.

SPEAKER_03Yeah, so the plumbing and the electrical import-in-placed concrete is generally done this way, pre-planned, pre-done, ready to go. However, with the foam system, uh we have a way to put the plumbing and electrical in the foam system itself. So we don't do the pre-plumbing and pre-electrical when we have a finished surface on the inside. We can simply cut through the foam, install the electrical conduit, the plumbing, and everything else we need low voltage, as you would do generally inside a wooden stick framing system.

SPEAKER_00Is this form of construction faster, the same, or slower than conventional construction?

SPEAKER_03Well, if we're comparing more of a middle to high-end construction and we're looking at big windows and more expensive framing, because when you do very big openings, you're dealing with wooden steel construction and structural steel construction. So now you're combining the less expensive wood construction with the more expensive metal steel construction, then that construction for us is more expensive than a concrete framed house.

SPEAKER_03This whole idea of building a different way has to make it through the politics, the economics, the insurance companies acceptability. So we are still in a process after the fires of two years ago to adjust as a society. I see several clients are more interested in building this way. They don't want to repeat the mistake of building in the same construction system as in the past.

SPEAKER_00Absolutely fascinating what you're doing. And I'm sure that there are some other people who are doing similar kinds of concrete-based framing. I think it would be fantastic to come back in four or six months and see what this home looks like completed.

SPEAKER_03Yes, absolutely.

SPEAKER_02Now, all this episode we've been talking about the permanent shelters that we call home. Next week, we're going to be talking about the temporary shelters we go to in an emergency. We're going to sit down with the head of the LA chapter of the American Red Cross and talk to her about how shelters are set up and what to expect if you need to go to one of their shelters. Let's face it, there is no one in the world like the ARC that knows more about emergency shelters.

SPEAKER_02We're also going to visit the Los Angeles Equestrian Center, 75 acres part of Griffith Park, and they took in hundreds of horses during the firestorms and kept them safe from the flames. It's all next week, so don't miss it on Rebuild LA. Thanks for listening to Rebuild LA, a production of the Safe Community Project. Cameron Barrett directs, produces, and hosts. David Barrett produces, including our field reports. Greg Vanderveld and Eddie Sandoval handle lighting, cameras, production design, graphics, and post production.

SPEAKER_02And our original music is composed by Michelle Suth.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Rebuild:LA Episode 101 - Returning Home to the Palisades

    Nov 18, 202644 minAudio

    Send us Fan Mail This week on Rebuild:LA, host Cameron Barrett chats again with Erin Kyle and Caroline Nick. Both women escaped the Palisades Fire with their families and lost their homes. And both are returning to the...

    Credit the people on this episode

  2. Rebuild:LA Episode 100 - Gimme Shelter

    Nov 10, 202640 minAudio

    Send us Fan Mail When a disaster strikes, there's complicated, mission-driven work to care for survivors. In the immediate aftermath, it’s all about the basics, and one of those basics is shelter. This week, host...

    Credit the people on this episode

  3. Rebuild:LA Episode 98: Can a Native Garden Save Your Home From Wildfire?

    Oct 27, 202643 minAudio

    Send us Fan Mail This week, we’re wrapping up our series on native plants by bringing you two experts who can help you plant a native garden. First, we meet Erik Blank, the head gardener at the Theodore Payne Foundation...

    Credit the people on this episode

  4. Rebuild:LA Episode 097: Is LA Doing Brush Clearance All Wrong?

    Oct 20, 202634 minAudio

    Send us Fan Mail On this week's episode of Rebuild:LA, host Cameron Barrett continues our series on native plants when she asks biologist and Loyola Marymount professor Dr. Demian Willette if LA is doing brush clearance...

    Credit the people on this episode

  5. Rebuild:LA Episode 96: Could Micro Forests Save LA from the Next Wildfire?

    Oct 13, 202634 minAudio

    Send us Fan Mail This week's show is a visual feast for anyone who loves native plants or wants to learn more about them. Host Cameron Barrett tours a micro-forest in Northeast Los Angeles, located in Ascot Hills Park,...

    Credit the people on this episode