Episode 68: A New Road Ahead - Inside I-25 Construction Projects

Nov 3, 202624 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Amber Shipley & Patrick Vigil with CDOT join Dave Moore on the podcast. Vigil is the Resident Engineer with the Colorado Department of Transportation (CDOT), overseeing the I-25 and Highway 50B project. Shipley is the Public Information Officer for CDOT Region 2, covering southeastern Colorado. CDOT in partnership with SEMA Construction began reconstruction efforts on the Interstate 25 and US Highway 50 intersection in December 2024. This project is located in Pueblo on I-25 (MP 99.7 to MP 101.4) and on US 50 (MP 315.9 to MP 316.6). The I-25 and Highway 50B construction project in Pueblo is making significant progress, with completion expected by mid-summer 2027. Major improvements include new concrete pavement, bridges, sound walls, and redesigned traffic patterns. Drivers should expect several traffic switches and changes to 29th Street access during the coming months. CDOT reports that speed cameras have helped reduce speeding and improve construction-zone safety. The completed project will feature a new diverging diamond interchange designed to improve traffic flow and reduce accidents. CDOT encourages motorists to slow down, follow posted speed limits, and use caution through construction areas.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_00This episode of Pueblo's podcast is presented by Montgomery and Stewart Funeral Directors. For more than 100 years, Montgomery and Stewart Funeral Directors has been locally owned and operated. Gary and Diane Montgomery are constantly giving back to the Pueblo community. They are huge supporters of the arts, such as the San Grote Cristo Arts Center, the Levy Project, the Rosemont Museum, San Grote Cristo Hospice, and many others. Their focus has always been thoughtful, caring, professional, personalized service to families. They promise to go above and beyond for each family they serve.

SPEAKER_00Whether you have an immediate need or questions about the many options available, they encourage you to visit or call Montgomery and Stewart Funeral Directors at 14th and Maine in downtown Pueblo, 719-542-1552. Montgomery and Stewart Funeral Directors. I'm Dave Moore, and this is Pueblo's Podcast. My guests today are Patrick V.

SPEAKER_00Hill, resident engineer for Colorado Department of Transportation, and Amber Shipley, the public information officer for Region 2. Thanks for being on the podcast today.

SPEAKER_01Yeah, appreciate it. Thanks for having us. Yeah, hi.

SPEAKER_00Absolutely. And uh it's uh kind of uh part two or part three. We've had uh this is our third third podcast talking about the I-25 and Highway 50B project. And Patrick, you're the resident engineer, and I understand there's some some big changes coming, but let's get back to when it actually started. When did the project begin?

SPEAKER_01Yeah, so the project actually began in December of 2024, is when we kicked off construction. And uh since the last time you and I talked, uh we've had some pretty good milestones in the project. So um, like we've like we're just talking, you know, the project's been going on for about two years now, and December it'll be two years. So it's been awesome to see a lot of that progress coming up. Both directions of I-25 have been shifted in a temporary configuration. We were able to put northbound, uh shift it to the east a little bit, and then southbound, we were able to put them uh to the west a little bit and put them on that collector distributory road we have right now.

SPEAKER_01Um we've been also able to do a lot of concrete pavement, which is gonna be the uh driving surface for the new I-25 alignment and US-50 alignment as well. Um we got a lot of concrete pavement done up on US-50 as well, and uh with us getting a lot of that done, we're gonna be able to do some good switches coming up here with the US-50 traffic. Um we got all of the uh bridges over the Fountain Creek and the UPRR, uh that's the Union Pacific Railroad. Right. We got all that um with the bridge decks placed, waterproofing membrane, and then got the uh hot mixed asphalt placed on those bridges as well.

SPEAKER_01And then we are starting to do the abutment in the walls for the uh uh for the bridge that's gonna span over I-25. We got those abutments in those walls, are going up for that. So that's gonna that's some awesome progress on that as well. And then the sound wall, I'm sure everyone's been kind of seeing that go up as well.

SPEAKER_00Right, yeah.

SPEAKER_01Yeah. So we got about over halfway of that installed and uh expecting to get that completed by the uh end of November. Um and then working on some 20 street uh tie-ins and uh 29th Street exit tie-ins from the uh interstate. And then the big thing, one of them is that speed enforcement cameras have been installed, and uh I know Amber's got a lot of information about that.

SPEAKER_00How's that uh been coming along? I know for there was a period of time where there was warnings sent out.

SPEAKER_03Well with the warnings, um actually from June 30 through uh July 30 this past summer, uh we had 50, almost 53,000 warnings that were sent out.

SPEAKER_00Aaron Powell Really? Oh my gosh.

SPEAKER_03Yeah, so that's going 10 miles or more over the speed limit that was posted. Um but those have dropped back uh since July 30. There have only been 18,549 citations. So people have slowed down. It's um pretty much eliminated, not completely eliminated, but um work zone crashes, and um I think people feel a little safer going through that corridor, especially with the shifts that we see from you know, month to month, we'll see some traffic shifts, and that keeps people safer.

SPEAKER_00Sure. And do you find that it's uh Pueblo and Colorado residents or are there a lot of out-of-state folks uh getting the letter in the mail?

SPEAKER_03I don't have the specific stats on that, but it's it's kind of across the board. Um, I've seen the posts online where people were frustrated, but really it's about keeping not only our workers in the construction zone safe, which obviously that's part of it. Sure. But um honestly, most of the crashes and um deaths that occur in work zones across the country um are typically drivers in their cars. So, you know, it's those shifts, the narrowed lanes, you've got those um concrete barriers that are a little closer to your car than it was before.

SPEAKER_03And so all of those things propose a little more danger um if you're exceeding the speed limit and can't respond to a crash in in an appropriate time.

SPEAKER_00And CDOT's kind of giving speeders a break by the speed limit's 50, but you're not sending out tickets unless they're 60 or over.

SPEAKER_03That's right. That's right. Yeah, we we want to give them a break. We understand that you know you're not always going spot on. Cars vary a little bit, but when you're going 10 or more over, that's when um things get a little more uh scary in a in a work zone like that.

SPEAKER_00Aaron Powell Sure. Are there uh plans uh down the road to install maybe some uh speed cameras in other areas where speeding and accidents are more prevalent?

SPEAKER_03Well, right now CDOT is focused on high-profile uh work zones that are problematic. And so obviously they do studies prior to installing these in those areas, um, but they are looking at whether it's something that might go into general roadway or highways across the state, but nothing's been determined yet. It's really where we see consistent issues with speed affecting crashes and traffic patterns.

SPEAKER_00Okay. All right, very good. We we probably need some speed zones here on North Elizabeth by the radio station. But I know that's a city thing, but we'll let the city take care of that one.

SPEAKER_03There you go.

SPEAKER_00Patrick, you were talking about uh that uh there's a lot of concrete being laid. Is that uh a longer lasting uh type of uh material rather than uh asphalt?

SPEAKER_01Yes, it is. Yeah, so with concrete pavement, so when we do our projects, we do a like a lifecycle cost analysis just to kind of see, you know, the benefits and the the cons of what if we did concrete pavement as opposed to HMA pavement. Concrete pavement will last longer than HMA pavement, although the upfront cost is a little bit more expensive than HMA. But over time, concrete pavement is the the better alternative if you got the funds and the capabilities to do it.

SPEAKER_00Okay. And uh you gave me a map that shows what it's going to look like in when when the project is completed, and you said there's an end date coming that is sooner than I thought it would be.

SPEAKER_01Yes, sir. So we're looking mid-summer of 2027. So yeah, that's gonna be awesome to see this one finally get done. And yeah, it's it's it's uh been making some great progress. You know, it's it's a great project because people actually get to see the actual work get done. You know what I mean? There's there's some areas where we're having to do work that's kind of out of sight, but majority of the work is within sight of the the driver. So it's awesome. And I just I've been getting a lot of good feedback from the public about you know the progress that the contractor's been making and just you know the big changes that we've been seeing coming.

SPEAKER_00So yeah, they the construction folks have been rocking and they're even working uh some weekends and evenings. It's like, wow, they're working tonight, okay.

SPEAKER_01Yeah, yes, sir. Yeah. So when you see us, well, I guess like we're when we do weekend work, it's you know, we're trying to take advantage of a lot of the good weather that we have, especially you know, with summer coming to an end and then not knowing really how the uh winter's gonna play out. But um as far as when we do night work, that's you know, when we're knowing we're gonna make impacts to the traffic, we fall within our lane closure strategy and what our specifications allow us to have lane closures, and when we have to do some of those big uh lane closures, that's when we do them at night, so that way we don't impact the public as much.

SPEAKER_00Okay. And there's going to be some uh major additions to the uh the project here coming shortly, right?

SPEAKER_01Yeah, yes, sir. So some big traffic switches we have coming up will be uh so for westbound US 50, we're now gonna be utilizing the new concrete pavement and they're gonna be put on the uh Fountain Creek Bridge and then also the Union Pacific Railroad Bridge. So that's gonna be awesome, and that's happening this Friday. Um and but another big thing that it comes with the switch is 29th Street, so the exit. So right now we're 29th Street Exit, it's just a little bit north of where the old uh uh overpass bridge was. Right. But now it's gonna be south to where you get onto US 50 now to if you're going northbound I-25 and you exit to get onto eastbound US 50, that's where you're gonna go off, and then you'll take that and then follow down a little bypass road that goes along the railroad, and then it'll take you into uh 29th Street there.

SPEAKER_01And that's what the ultimate configuration is gonna be. So we're kind of trying to get the public prepared for what the ultimate configuration is gonna be to so that way when they want to access 29th Street, this is how you're gonna do it off the interstate.

SPEAKER_00That would be the um 23rd.

SPEAKER_01Yes, right? Okay.

SPEAKER_00Oh my gosh. And then you have some other additions as well.

SPEAKER_01Yeah. So then then the next switch that we have planned would be northbound I-25 will be put on the proposed southbound I-25. So w how we had the how we have northbound I-25 and southbound I-25 kind of split around the middle of the project right now. That's where we were able to get a lot of that concrete pavement done, and that's why we did those switches. But now that we got a lot of that concrete pavement done for the the permanent I-25 alignment, we're gonna put northbound I-25 on the southbound part of it for now and still keep southbound I-25 traffic on that collector distributor road.

SPEAKER_01Okay. And that's gonna happen October 30th. And then we'll also be doing uh eastbound US-50. We'll get um switched onto the new US-50 alignment as well. And we're looking to do that in uh mid-November.

SPEAKER_00Okay. And then the uh I'm sure people are wondering when do the girders for the new overpasses arrive.

SPEAKER_01Yeah, so the girders for the the bridges over I-25 are set to be um in place in early November. Okay. So yeah, and with that, you know, drivers can expect, and it'll be night work as well. So, but what we can expect is what we're gonna do is we're gonna have northbound I-25 get pushed onto that bypass road that I was talking about that's gonna go along the ro uh along the railroad underneath right there. Um so we're gonna technically it's called kind of ramp surfing, is what the term is kind of what we use, but it's not really ramp surfing, it's just kind of the way it is, because you're gonna get on you'll be northbound I-25, you'll get put on the bypass road, and then it'll put you back on northbound I-25 once you get around the girders there.

SPEAKER_00Okay. And Amber, this project has probably kept you busy, people with questions and media bothering you and like me and uh asking about this. Uh it's uh it's one of the biggest projects Pueblo has seen for a long time, I think.

SPEAKER_03It is financially, it's the biggest project Pueblo has ever seen as an investment from CDOT and the state. So it's an exciting um part of the I-25 overall freeway project that has, you know, it started with the ILICs down towards, you know, where the Sonic is, just off of I-25. Right. Um, so this is the next biggest thing. Um we've got the whole north end of town pretty much taken care of. We got the resurfacing through town last year, and then the next big project will be exit 108, which is just a hop, skip, and a jump from the Pueblo city limits.

SPEAKER_03But the people who use Purcell to access I-25 will be appreciative of a new interchange there. So lots of investment in Pueblo.

SPEAKER_00And are we eliminating the one-lane tunnel underneath the interstate?

SPEAKER_03No, we could keep it for good. No, yes, we are we are gonna get it. It's so much fun. It is fun. Um, you know, but no, we're gonna get rid of that. So actually, there'll be um, as Patrick can tell you, there'll be an elevation change to the interstate through that area to raise it high enough to make it a full interchange to where traffic can pass um from in both directions at the same time. Uh there'll be a roundabout, and then there's a rest area that will be going in just west on Per se off of Purcell, um, which will accommodate both north and southbound traffic uh to um kind of accommodate for those closures that we had several years ago.

SPEAKER_03Uh just uh north of town.

SPEAKER_00Okay, and when does that project uh kick off?

SPEAKER_01Yeah, so that project's gonna advertise look in like early summer of next year. So then once we advertise it, we'd usually do about like a for that type of project, it'll be like a four to six week advertisement period. And then after that, then we'll get an uh awarded bidder, and then it'll probably be another month. So I'd say probably late summer is when that one might actually start and kick off.

SPEAKER_00Okay. So that'll be just uh right at the end of the I-25 Highway 50B project.

SPEAKER_01Just in time for me to jump on another one.

SPEAKER_00There you go.

SPEAKER_02We don't want people to miss the construction too much.

SPEAKER_00I find it funny people say they need to fix this road, and then when the roads are being fixed, it's like, why are they fixing the roads? You wanted the roads fixed.

SPEAKER_03You can't have it both ways, right?

SPEAKER_00Right. Yeah, and that's uh it's an exciting project. And so you're talking about what are the kind of the final the final pieces of uh I-25 and highway 50B that are going to be uh kind of finalize the uh the project.

SPEAKER_01Yeah, so once we get the girder set over um I-25, then they'll start to get that bridge deck put together and everything, and then we'll get the concrete poured there. And then once we get the tie-ins at the north and south end of I-25 of the project, once we get those tie-ins done, then we could switch um northbound and southbound onto the permanent configuration, and then that'll allow us to figure uh finish up the west side of the project, get that intersection complete on the west side and everything west of the bridge that's over I-25, get that whole thing completed. Because right now we have a part where it's concrete pavement on the collector distributor road, and then there's a a little piece of uh HMA pavement that's there, and we're gonna have to get that um replaced and put in with concrete pavement as well.

SPEAKER_01So yeah, it's those are kind of the big pieces coming. Once we get that bridge in place, get our signals implemented. Um, you know, it's it's just a lot of that tie-in work that's we're gonna we're gonna start to see happen and take place. But sure.

SPEAKER_00Now we'll at when it's finalized, will there be a from 29th Street, will there be an on-ramp for uh northbound traffic? Or what what will they have to do to do that?

SPEAKER_01No. So how 29th Street's gonna work now? So if you're going southbound, there will no longer be um that off-ramp from I-25 that we have there existing now. So if you want to get onto 29th Street going southbound, you'll have to exit up to where the the 50B interchange is, and then you'll basically do a big, in a sense, big U turn all the way through the interchange, and it'll take you down to the 29th Street right there. Okay. And if you're going um if you're on 29th Street and you want to go northbound, you'll have to do that.

SPEAKER_01You'll have to get in the interchange and then go around in that same U-term configuration, get back and head that way.

SPEAKER_00Okay. Yeah. And that's uh the thinking of that as just a little safer situation?

SPEAKER_01Yeah. So the the prox it's the proximity of our interchanges that are within Pueblo, the rets c that's one of the big reasons why we're closing that that southbound off ramp is because with uh how the interstate and federal um roles, you can't have those interchanges a little bit too close. So then bec then it causes issues, then it could cause congestion and other things. So that's the the reasoning of why we're having that change.

SPEAKER_00All right, very good. Um anything else that we need to know about uh that might be uh coming soon or coming uh after the first of the year?

SPEAKER_01Um No, I think and I think another big thing that we're gonna see is that once we get both westbound and eastbound um uh US50 traffic switched over to the the uh permanent configuration, uh we're gonna see a lot of demoing happening. So we're gonna demo the the bridge that's over the Fountain Creek, the existing one that's there, and then also the demo those bridges that span over the Union Pacific Railroad as well. And then all that fill that is there, that's gonna get moved out as well. So they're gonna see a lot of a lot of things that have been there for years gonna be going away here soon.

SPEAKER_00So if you've if you've not been to Pueblo for moved away or and are coming back for the holidays or whatever, it's gonna look completely different than it did years ago.

SPEAKER_01Definitely, yeah. And we've been doing a lot of uh planning and work with our environmental group to make sure, you know, once we demo these bridges, especially like specifically over the Fountain Creek, we're following our nationwide permits and everything that we're supposed to once we're working in waters like that. And then working closely with the Union Pacific Railroad as well. So that way when we do our demos, we're we're within the railroad guidelines and everything.

SPEAKER_00Aaron Ross Powell So you have to not only coordinate traffic, but you have to think about the railroad and the trains that are coming through Pueblo all the time.

SPEAKER_01Aaron Powell Yeah, absolutely. Yep, yeah, definitely. Yeah, you got to coordinate everything, whether it's, you know, when with our projects, it's whether it's right-of-way concerns, environmental concerns, um, utility concerns. There's just a whole plethora of things that come into play once you're building a project. And um I mean, and unless you're in the in the mix of it, you really don't see it or understand that really. But yeah, I mean, I know personally when I was growing up, I'd see construction. I'm like, oh man, all they have to do is this. But since I became an engineer and started working at CDOT, it just opened my eyes to a whole source of things of what what we have to go through with our project.

SPEAKER_03There's always a lot going on under that you don't necessarily see as the finished product. So that's why things take a little longer than you might think they should.

SPEAKER_00Aaron Ross Powell And you mentioned the fact that you have to um align yourself with the federal requirements that they have. You can't have off-ramps so close. We used to have a lot of off-ramps that are really on and off-ramps really close in Pueblo, but they've kind of spread those out.

SPEAKER_01Yeah, exactly. Yeah. So when we do our projects and design, we do things called uh the acronym is called MIMER, but it's minor um interchange modification requests. So basically when we're doing design of our interchange projects, we send that to FHWA, which is Federal Highways Administration, and we let them, you know, help us determine, you know, is this is this a good fix? Is this within federal guidelines? And then if we get there, okay, then we know that we're able to make these changes to our interchanges that that adhere to all of the laws that we have with the feds.

SPEAKER_00Okay. And has the public um kind of embraced the uh the project and d has it made your life any more difficult, Amber?

SPEAKER_03I wouldn't say this project has. I think the um the fact that people see the transformation in the area, I think that's made it a much more positive um, you know, outlook from the public. Sure. But obviously there's an inconvenience to it. You are going slower through the area. Um, it gets a little more congested right now, so it's a little frustrating to people. Um, I think the next phase is we'll share a link with you to have on your website if you want. Sure. Uh to share with your listeners that the Diverging Diamond Interchange.

SPEAKER_03So we don't have a lot of, we don't have any here in Pueblo. There's a few up in Colorado Springs they may be familiar with.

SPEAKER_00Um there's one at Fillmore. You probably makes it 145, yeah.

SPEAKER_03This one's a little simpler because there aren't so many roadways coming into it. It's a much simpler version of the Diverging Diamond. Um, it's it's a little bit different, but it runs very smoothly. I know when I went to the Buckeys up north, you don't even recognize it. You just you come to a light and you cross over to what is the other side of traffic and you flow, but it keeps traffic flowing more smoothly. It eliminates a lot of crash points that um conflict points that can occur in a traditional intersection. So yeah, we think it's gonna be a good change for Pueblo, but it is obviously a learning curve for people using it.

SPEAKER_03It's kind of like roundabouts. They it takes a while, you find out they're wonderful, but for a while it's a little scary and different. So sure.

SPEAKER_00And uh the thing about the diverging diamond is uh as I understand it, you don't cross oncoming traffic when you're turning left. Is that right?

SPEAKER_01Yeah, so it kind of helps eliminate those left turn accidents that you see, a lot of those T-bones and those those bad accidents like that. This allows that kind of eliminates those left turns, so it allows more free free turning movements as opposed to sitting there at a light and then trying to make that left turn and then you know creating that conflict point of getting hit from the side swipe there.

SPEAKER_00Okay, very good. Um, anything else that we need to know, Amber, that uh you'd like to share with the public and let them know they're doing a great job? Just slow down through that area?

SPEAKER_03I think just remember the speed limit is 50 through the work zone. And so as long as you're going 50 or 52 or 47, you're probably pretty good. We know that a lot of people probably become frustrated because some people are going much slower than the posted speed limit. We really encourage people to try to go the speed limit to keep traffic flowing through the work zone more smoothly and allowing people, allowing a little bit of space for those people on those on ramps uh to merge into traffic.

SPEAKER_00So stalled vehicles in the tight construction zones.

SPEAKER_01Yeah, we have seen quite a bit of stalled vehicles for some reason. I don't know what it is about the work zone, but we have seen quite a bit of them. And it would that, you know, once we get stalled vehicles, we make sure we get in touch with local authorities. We get our traffic control supervisors out there to help out with some traffic control, you know, to kind of give a little bit of a warning to the public, like, hey, there's there's something happening up here. This lane's gonna be closed until we could get this vehicle moved. But yeah, it's um, you know, we haven't seen too many crazy bad things happening throughout the project, throughout the the work zone. So I just want to say I appreciate everyone that's been, you know, being cognizant of everything and driving through and being safe.

SPEAKER_01And so, yeah, it's just very appreciative of it. And you know, we're almost done. We're gonna make a few more switches, but yeah, once we get into this ultimate configuration, I think everyone's gonna be very happy with with the the uh the project and the end result.

SPEAKER_00And summer of 2027.

SPEAKER_01Yes, sir.

SPEAKER_00Wow, that is unbelievable. I'm so impressed. I mean, I I drive through there pretty much every day, and you see the project, and it's just how quickly it got started and how quickly it was moving along. It's just it's unbelievable.

SPEAKER_01Yeah, oh yeah, it is. And and uh yeah, the CEMA's been doing a good job of, you know, we've we've been doing a good job coordinating with them, like as far as CDOT and the contractor, and just doing some good coordination with each other, trying to identify issues before they become big problems, you know, doing things that we can to um eliminate issues that we see coming in the future. But yeah, it's been it's been a great project thus far.

SPEAKER_00Oh, very good. Very good. We usually have a uh fun personality question. We can do that if you'd like at at the end of at the end of the uh podcast. Um what uh we'll ask Amber first. Amber, what comes on your perfect pizza?

SPEAKER_03Perfect pizza? Well, I would say pepperoni, pineapple, and jalapenos.

SPEAKER_00Oh, okay. How about you, Patrick?

SPEAKER_01Yeah, mine is pepperoni sausage and uh uh green chilies.

SPEAKER_00Meat lover guy, yeah, right? Yeah. Okay. How about uh dog or cat?

SPEAKER_01Dog. Dog for sure. Yeah.

SPEAKER_00Hamburger or hot dog?

SPEAKER_03A hot dog if it's cooked right.

SPEAKER_01Me, I like hamburgers for sure.

SPEAKER_00All right, and finally, uh mountains or beach? That's a tough one.

SPEAKER_03Oh, beach.

SPEAKER_01It depends. Um, but I'd say probably beach is probably my favorite too, to be honest.

SPEAKER_00All right, very good. You guys have been great. I really appreciate you uh uh being here on Pueblo's podcast. Uh Patrick V. Hill, who is the resident engineer of the I-25 and Highway 50B project, and Amber Shipley, who is the public information officer Region 2, the that's essentially the southern half of the state, right?

SPEAKER_03It's the southeast corner. Southeast corner? 14 counties, yeah.

SPEAKER_0014. Only 14. Only 14. Wow, that that should keep you busy.

SPEAKER_03Some days it does.

SPEAKER_00All right. Amber Patrick, thank you very much for being on Pueblos Podcast.

SPEAKER_01Yep, appreciate it. Thanks for having us.

SPEAKER_00Sure thing. That's Pueblo's Podcast. I'm Dave Moore. Be proud, Pueblo.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Episode 67: When crisis calls the United Way answers

    Sep 18, 202618 minAudio

    Dave Moore speaks with Chris Segura and Mario Genazio of United Way of Southern Colorado about the organization’s response to the devastating Aspen Acres fire. They discuss how United Way quickly brought together local...

    Credit the people on this episode

  2. Episode 66: Where Creativity Takes Root

    Jun 16, 202626 minAudio

    Dave Moore sits down with Karen Foglesong, the Manager of Collections and Curation at the Sangre de Cristo Arts & Conference Center/Buell Children's Museum. In the heart of southern Colorado, the Sangre de Cristo Arts &...

    Credit the people on this episode

  3. Episode 65: Community Spaces, Great Places

    May 15, 202620 minAudio

    Dave Moore chats with Lindsay Martin & Tamara Moore with Pueblo Parks & Recreation Department. The City of Pueblo has a variety of parks and recreation facilities, attractions, and amenities to including: 32 Miles of...

    Credit the people on this episode

  4. Episode 64: Inside the Leonardo da Vinci Museum

    Mar 7, 20261 hrAudio

    Take a peek inside a museum where Leonardo da Vinci’s ideas take shape. Dave Moore gets a preview of the new Leonardo da Vinci Museum of North America with tour guide Craig Eliot. This entire exhibit is made possible by...

    Credit the people on this episode

  5. Episode 63: Roadwork Rundown

    Feb 1, 202625 minAudio

    Dave Moore welcomes Patrick Vigil to the project. He is the resident engineer at CDOT working on the I-25 and Highway 50B project. If you've driven the highway through Pueblo recently, no doubt you've seen the changes....

    Credit the people on this episode