No Doubt, Let's Go!

No Doubt, Let's Go! artwork

No Doubt, Let's Go! - Positive Padberg

Jan 6, 202623 minAudioSeason 2, Episode 5
ShareXLinkedInFacebookWhatsAppEmail

Marc Padberg, also known as “Positive Padberg,” is a “forever student” on a constant quest for knowledge and improvement. His Season 2 interview highlights his pragmatic and disciplined approach to managing an e-commerce development team through agile methodologies. Marc’s approach to work is like navigating by a compass rather than a rigid map; while he has a disciplined 5 AM start and a “relentless” physical routine (the compass), he uses “iterative” sprints and “pragmatic” adjustments to weave through the changing terrain of e-commerce (the journey). Core Philosophy and Getting Stuff Done • Three Pillars of Productivity: Marc describes his method in three words: Pragmatic, Iterative, and Relentless. He moves from idea to action through trial and error and seeking quick feedback. • The “5 AM Planner”: Marc gets his best work done early in the morning. He supplements his mental productivity with an intense physical routine, often problem-solving while running with a 20 lb sandbag strapped to his back. • Planning and Retrospectives: He plans his day the night before by reviewing his calendar and incoming tickets. To ensure continuous growth, he conducts mini-retrospectives at the end of every day to assess progress and adjust for the next. Agile Team Management • Hybrid Frameworks: Marc utilizes a hybrid of Scrum and Kanban, tailoring the framework to the specific team’s needs. He uses Kanban for support groups handling ticket-based work and Scrum for development projects. • Sprint Cadence: His team transitioned from one-week to two-week sprints to improve work-life balance and better manage velocity. He experiments with unconventional sprint endings, such as Tuesdays, to avoid holiday disruptions. • Value Over Points: He emphasizes value delivery over strict adherence to story points. His definition of “done” remains flexible to accommodate “alpha” states - production canary testing used to maintain high customer ratings across channels like Amazon and Shopify. Innovation and Tools • AI for Research: Marc is an early adopter of Notebook LM, using the AI tool to generate custom podcasts on new topics which he listens to during his morning runs. • Data-Driven Decisions: Because standard tools like Jira were less effective for tracking their unique “alpha” workflow, Marc uses Power BI to monitor metrics like “time from new to development” and “merge times”. • Getting Unstuck: When a project hits a wall, Marc re-orients by asking himself specific questions: “What do I want to achieve today, tomorrow, and in the future?” and “What do I need to do to get there?”. This is a public episode. If you'd like to discuss this with other subscribers or get access to bonus episodes, visit rvhoss.substack.com/subscribe

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_00Welcome to No Doubt Let's Go, where we dive deep with movers and shakers to uncover their unique and no doubt method. The secret sauce they use to embrace an agile mindset and actually get stuff done. This is Reggie Valentine, and this is the No Doubt Let's Go podcast. We talk about getting stuff done and finding where a framework may fit. Ideally, the No Doubt framework. The underlying concept of the show is that everyone is agile. They just don't know it yet.

SPEAKER_00Tired of procrastinating? Ready to get stuff done? This is No Doubt Let's Go, the show for doers, dreamers, and everyone in between. Marky Mark, how you doing? I'm doing well, man.

SPEAKER_01Ah, you're not wearing the same outfit. There's going to be a continuity issue.

SPEAKER_00Yeah, it really is mostly going to be audio, but when we do the video, it's going to be close-up of heads. You don't like how they do it on the interwebs these days. I know. So, looking forward to it.

SPEAKER_01We got cut off last time. You were about to kind of sum it up, and how do you want to do this? It's your call. How do you get stuff done? How do I get stuff done? Depends upon what I'm doing, but if it's going to be something like research, I use notebook LM and create a podcast and learn about it and actually do it. If I'm working like on a day-to-day job, I basically take a look at with the current backlog workload and apply agile practices, daily scrums.

SPEAKER_01standup meetings, DevOps, the whole nine.

SPEAKER_00I have this approach called the no doubt approach or no doubt framework. I'm still working through the titles, you know, because it's going to be a book. But the thing is, the first two things is know your know, the N and the O, know your know, needs and objectives. Do you have an approach to find out your task needs or objectives?

SPEAKER_01On a daily basis, my needs may shift. We take a look at what It's coming in from an operation standpoint, so yes. And then from a long-term standpoint, it's more planning. I look at everything from a daily, weekly, and monthly perspective. So yes, I know my nose by taking a look at my incoming tickets, my incoming calendar, my requests, my meetings, and I plan my day from there. In fact, I'm planning my day before the day even begins. I'm usually planning my day the night before.

SPEAKER_00When do you get the most of your thinking done? Midnight? Early morning? Midday? What time do you get the most of your getting shit done thought?

SPEAKER_01Most of my thinking is done around 5.30 in the morning. Early riser. Love early rising. Throw in the backpack. Take a look at the email and go for a three-mile run listening to my podcast prepared the night before. When you prepare your podcast, are you preparing them the way we're all in our AI land doing it? Are you creating a podcast from scratch or selecting podcasts off a shelf? Typically, there are a few podcasts I listen to religiously. Those are news-related. BBC has a great one. NPR has a great one. What I also do is create my own podcast with notebook LM, right?

SPEAKER_01And those are the ones that, or I'm doing some kind of research, or if I, if I want to learn something new or a new skillset, create that podcast with AI, pop it on the iPhone, put in the earbuds and just take a run. Yeah, because I think Notebook LM has been my favorite of the language models, I guess.

SPEAKER_00I don't think I'm going to call them language models, but I think the term everyone's throwing around is large language models. You know, ChatGPT is a large language model. Jim and I are a large language model. But I think I didn't notice it when I first saw the title of it. It was called Notebook LM. I was like, there's something missing. What does that mean? Because I used it way early. I was trying to do the feature where it will create a fake podcast for you based off the content that you're having. Is that what you're using? Exactly. That's exactly what I'm using. I got turned on to that during an advanced scrum master class and I love it.

SPEAKER_01Just, I'm not going back. That's definitely the way to go to actually pull in a lot of grid rich data. You ask the question, prompt it, and then you get a whole detailed podcast that you can listen to, or you get an output that you can take a look at, say, no, this is what I want. And then you can actually go back, revise it, and then create the podcast based upon that first revision without actually having to listen to it. So yeah, love it.

SPEAKER_00Let's talk approaches. We talked about needs and objectives. Do you have a favorite framework, agile framework, Scrum, Kanban, or less? It's predominantly a Scrum and Kanban or a hybrid approach between the two.

SPEAKER_01It depends upon which group I'm working with. Like if it's a support group, I'm going to do Kanban. You know, tickets come in, they go shift through. But if it's development or a feature work, I typically use Scrum. No doubt. And you let the team decide because you go to your left or you go to your right. I go to the left or to the right. A tool is a tool. It's whatever framework works for the group. I don't want to enforce a framework that may not be right for the type of work they're doing. It depends upon the team itself.

SPEAKER_00And so you work with a lot of teams, but are you ever the go-between between the team and the leads? You find yourself only working with leads sometimes and only working with teams in some engagements. Where are you in most of your engagements? Are you a go-between or on a team?

SPEAKER_01In this last two-year gig, I was working with a team, a 10-person team. And then I was a go-between between that team and another set of, I want to say, three teams that totaled about 15. And I was interacting and exchanging information and making sure and facilitating that communication between those teams. And I was running those daily operations meetings where we would go through everything and kind of figure out what was the priority of the day historically i've basically always been

in the go-between role managing multiple cross-functional teams not even managing it's more like facilitating the communication and breaking down the boundaries and the barriers that are stopping us from actually being an effective cohesive system we are in a system system is the overarching organization broken into different

SPEAKER_01product lines so working with CLM product lines, CCW, so a contingent workforce product line, and then maybe a risk product line. And seeing how all of that fits into the overarching platform that supports the entire thing.

SPEAKER_00No doubt. And you touched on, I'm going to call it the positive Padberg approach, where you have multiple teams and multiple operation meetings throughout the day. And I think you touched on Scrum, you touched on Kanban. So when we talked before, you had a morning meeting, an afternoon meeting, and at the end of the day, can you describe the positive Padberg framework that is the combination of Scrum and Kanban for multiple teams? Like what's your, let's start from the top. Do you have a backlog refinement?

SPEAKER_01The backlog refinement session is on Mondays. We do that with the teams and the stakeholders and also the lead developer. And we basically go through everything. We've managed to cut that backlog down from over 3000 tickets to like down to 250. So like in a match, but we, we cut a lot. We, we, we got a lot done over the 18 months. We've managed to whittle it down and now this planning is done weekly at Monday. Right. And then After that, we have an 11 o'clock meeting on the East Coast like you.

SPEAKER_01And that's the whole operations team. It's about 15 people figuring out which items are coming in on this day that we need to interrupt our flow. We always have about 20% to 30% buffer for these incoming items.

SPEAKER_00When you say buffer, it's like when we say capacity, right? You carve out capacity for this work.

SPEAKER_01Yes, we're carving out capacity. And then... Once that meeting is done, we roll into the actual daily scrum. Our development staff is East Coast, West Coast. We want to accommodate the West Coast. So that's why we do the noon o'clock and that's 15 minutes. Get them on, explain what they're working on. And then say, what's blocking you? It's not even what did you do yesterday anymore. We know what you did yesterday. We could check the ticketing system. We want to know what your plan is for the day and see how that

plan fits into the

SPEAKER_01tickets or the issues that might have been arisen in the meeting before.

SPEAKER_00Yeah, and the meeting before was the escalation meeting. That was the escalation, that was the operations. The escalations tend to come in on the East Coast, and that's why it's easier to just check them real quick, or because the East Coast is awake first. Is there anyone on the West Coast in the 10 a.m. East Coast operations?

SPEAKER_01There's one person, our EDI specialist. She's phenomenal. She's got an early rise. We're based East Coast, Minnesota, and West Coast. It's three time zones, but we're working all together. At the job before this, I was working with India, Australia, and the east coast my day would start on sunday to get those guys working in australia and get those guys working in india and then sunday night sunday night actually sunday sunday it's six six o'clock well i get up early i take a look in the afternoon go through everything get planned prepared for

the meeting and get those guys running then i can enjoy the rest of sunday night with the fam if you do that on sunday does that mean don't work on friday god no but that would be nice

SPEAKER_01All right. A five-day work day is a myth. Especially when you're handling flow, managing escalations, and dealing with people's capacity. Exactly. When I was a full-time employee at the time, when you're a consultant, you're basically working 24-7, right? All the time. Yes. All right. And when you have downtime, you have downtime. And when you have downtime, you take that out. When you've got downtime, you serve it up, you train up, you do your notebook. You're basically studying, always keeping yourself busy, using the same methods when you're work you're setting your achievements for today what am i

trying to do today tomorrow in the next week or weeks to come right yeah yeah and then you're refining it constantly did i get everything done do many retrospectives myself did i get everything done what is outstanding planning for what's going to be done tomorrow

SPEAKER_01right done what's going to be worked on tomorrow yeah exactly okay quick question on time box i'm a time boxaholic i love time boxes they're the best do they you know in the no doubt method i speak to cycles because i'm a scaled agile framework the team can work how they want on the bottom level but up above it's flow flow flow right i tend to work in quarterly big room plannings you know where safe would have the pi plannings but i have my sprints

SPEAKER_00because we're all agile here my sprints are generally two weeks but i do something every week backlog refinement wise in your situation the most current one and maybe the previous one did you use sprints or smaller cycles and how long were they good question the support ticket kanban is a one-week sprint monday to friday we also do support on the weekends we get a rotating schedule the development sprints are two weeks when i first started they were doing one week

SPEAKER_01Monday to Friday and butting up against Friday and then, you know, just folding into Saturday and Sunday to try to close everything out. And that was no bueno. So I got them to two weeks because it allowed us to actually figure out what the velocity and capacity was. And then I pivoted and I got some really good advice. I might have actually been you at, you know, mid midweek sprints and on a Tuesday, start on a Wednesday, get your planning in on Monday, close the sprint and then roll into the next one.

SPEAKER_00Yeah, I found that. That accommodates. Holidays, almost every holiday is a Monday or a Friday. People like to leave early on Friday. You don't want to be the one that shows up at 4 p.m., whether it's India 4 p.m. or California 4 p.m. Okay, you said they were one week when you got there, and you got them to two weeks. Can you tell us about how you were able to convince them to go from one week to two weeks?

SPEAKER_01I asked, how do you enjoy your Fridays, right? And it was unilateral. It was like, negative, negative. I was like, okay, let's fix that problem. How do you think we can fix that problem? Maybe if we expand the sprint, right? That's the reason why it was kind of an evolution. We went from one week to two weeks. And then we're like, okay, are your Fridays getting better? Are your Fridays getting better? No. Well, let's shift the actual sprint. There's no rules saying it's got to end on a Friday. Let's make it end on Wednesday or Tuesday. So then we tried Tuesday,

Wednesday, Thursday, and we ended up settling on Tuesday.

SPEAKER_01We went through a couple sprints, changed the day. We got feedback in our retrospectives, and we do micro-retrospectives daily, right? Yep. And also, when I first started, they weren't meeting daily from a development standpoint. They were just assigning work in planning sessions or the 11 o'clock meeting. That dissolved the ownership issue. So we got that dev stand up every day on the calendar and get them talking. And the most important thing is just getting people to talk. And then once they start talking, they start actually figuring out what they're going to work on

and what's blocking

SPEAKER_01them. Then everything opens up and the opportunities are huge.

SPEAKER_00Everyone talks about how Scrum is meetings, meetings, meetings. There's so many meetings. There's so many meetings when we do Agile. There's so many meetings we do Agile, and we always say the reason there's so many meetings is because you're not replacing the other meetings. So let's talk about the meetings that you are putting on there to see if they're able to replace the other meetings. And you said you had a backlog of five minutes on Mondays. Is that weekly or every two weeks with the Sprint? Is that a weekly backlog?

SPEAKER_01That's a weekly backlog refinement, our planning session. That's where we get the stakeholders. We do the backlog refinement in that 11 o'clock meeting too, where we handle incoming tickets. That first meeting, something might pop up to the top of the queue. And then on the 12 o'clock meeting, we're like, all right, this just popped up. We need you to take care of this. And usually those things are quick. I can get this done in a couple of hours. Always say. Yeah. It takes a couple of hours. But if I look back at it statistically, I can estimate that if it's going to take more than half a day,

SPEAKER_01we've got to reconsider. We might do a swarm. Get two or three people working on it at the same time as opposed to just the specialist.

SPEAKER_00Yep.

SPEAKER_01And that all depends, right? Did I answer the question?

SPEAKER_00Yes, you did. All right. Let's move on. Let's go. That meeting, that daily 11 o'clock, backlog requirements on Monday. How long is that for? An hour.

SPEAKER_01I tried to do 30 minutes. 30 minutes didn't work. It needed to be an hour. I'd rather put the time and not use it than... constantly bought up against it.

SPEAKER_00Yes, exactly. You always want to end a meeting early because ending a meeting early has the endorphins. I want to go back to the meetings, but I'll do a quick aside. You were talking about how something new comes in at 11 o'clock, and we carve out capacity. Usually with my teams, we never carve out enough, but what we would do is at the end of the sprint, we would be like, we're going to do 20 things. 10 of these things aren't going to be done. We're going to roll them over.

SPEAKER_01Yes. What I would do is as something came in, I would pull something out without them on it.

SPEAKER_00Do you do that? Do you pull out a day or two of work or does your team wait till the end and then

SPEAKER_01work to wait to the end? The whole concept of alpha definition of done is slightly skewed. Our done items cross sprints because we test certain things in production. Key things always go across multiple sprints and get done two or three sprints later. We're not really concerned about getting everything to closed, more about getting it to alpha, getting it in production so that we can do our production canary testing for that and then figure out what the fallout is.

SPEAKER_01and then turning around and actually getting it done.

SPEAKER_00That's a great point. Every team should define their definition of done. Definition of done for one team is different. Some data teams, where the definition of done isn't all the data is there. The definition of done is we think all the data might be there based off our testing. So, you know, for a feature team, done is the feature actually works to be tested. For some teams, it's pushed to pre-production. So getting that definition of done in place is very important. It sounds like you guys came to an agreement of what the definition of done was, which helps the sanity.

SPEAKER_01We are not a pure scrum team. We are an agile based team using most scrum meetings and touch points. We don't do a system review at the end because our review literally is on that 11 o'clock meeting with the actual operations team with our lead architect basically saying this is now in the build. You can use this. Let's apply the override. Let's get it working. Let's get that feedback. We want constant feedback to get items out of alpha into PR submitted and then from

SPEAKER_01PR submitted into actual close. So we're typically closing, I want to say 20 to 25% of our tickets every sprint. Maybe 50% are in alpha. So 25% new work coming in, additional work on top of that alpha work isn't always time consuming just throws off the ticket count so we do it by original estimate as opposed to story point and we can kind of just figure out it's

been an alpha for

SPEAKER_01one or two sprints It only probably needs an hour's worth of work for the next sprint. Just checking to make sure that works.

SPEAKER_00I love it. I have so many more questions. We're going to have to get together again later. Let's continue with the number of meetings. Your backlog refinement replaces the dailies because that's what you're using to do the backlog refinement on Monday.

SPEAKER_01Yeah, planning is backlog refining. And then the dailies were something they didn't have. We put that in at 12 o'clock every day.

SPEAKER_00So 12 o'clock every day, how long is the dailies? 15 minutes, and then the one-hour backlog planning replaces the daily 11 a.m. That's still an hour with a different team. It's a totally different team, right? The backlog of five minutes is everybody. The backlog is all stakeholders and the lead developer. What about end of the two-week period? Do you have a sprint review per se, but a time when you look to see how many tickets we did, do you do that at all or is it just a report? How do you handle shifting from sprints?

SPEAKER_01So that's handled daily during the 11 o'clock call. We look at how many sprints, how many tickets we're doing. and how many we've done or how many are outstanding so that we can actually figure out if we can get something into that mid sprint. Everything is dashboards. They can look at the velocity of the sprint. We don't do a formal review, which we probably should do. That's actually something I'm going to take away after this conversation and approach the team about it. We're getting to the point where we have the metrics, but because we have this alpha, it makes using JIRA very difficult.

I've pulled everything out, and now I'm doing everything in Microsoft Power BI. And now I'm able to show the difference in time from new development to alpha,

SPEAKER_01how long it stays in alpha, and before it goes to PR. Once it gets to PR, it's almost instantaneous. Within a day, it gets merged, and now it's in the main trunk. you got to think about when we do if you think about scrum the reason scrum has the ceremonies that scrum has is because they're looking to build something finite within that time box so they can see what they finished finite and it sounds like you're using combine because the same thing happened to me because it's about flow of work the work is going they're seeing it and testing it and viewing it and then stakeholders know about it along the way it's almost like

release on demand plan on

SPEAKER_00a cadence The time box is really about the planning portion. Your two weeks isn't so much a two weeks for a planning because you plan every week and daily, it seems almost. It's just a way to time box the metrics, right? It's the time box metrics and the total amount of work we're trying to accomplish

SPEAKER_01within that two week period. Just to see what you can do. See what we can do. Yeah, exactly.

SPEAKER_00It's really about value. We're sticking to value delivery to keep us sane.

SPEAKER_01It's 100% value delivery. For those listening, we integrate into e-commerce channels like Amazon, Walmart, Shopify. You're constantly trying to sell. And that interaction with the customer on those channels changes dynamically. That's why we have these tickets to actually handle those Those nuances to make sure that nobody ever loses their Amazon Marketplace rating. Because if you lose your Amazon Marketplace rating, value goes down. Got to make sure we're keeping our customers with the best rating.

SPEAKER_00All right, so there's Kanban, there's Scrum, there's the no doubt method, and there's Positive Padberg. We're going to keep the Positive Padberg out. We may have to create a whole separate collection of episodes. I've done many approaches and mixed frameworks to get to a framework. You have to see where they are currently, the journey towards a specific framework. We usually have to break teams up, but I like the Positive Padberg approach, keeping everything together, using the time box, using the sequences of tasks. But not in a two-week time. It sounds like you do it every day.

SPEAKER_00You have your plan for the day. You handle any escalations, your daily stand-ups. Review how well you did and the mini retrospective at the end of the day. Always finding ways to remain Kaizen. Relentless improvement.

SPEAKER_01Yes, it's relentless improvement. And the 11 o'clock meeting, they've extended now to one hour again. This is so that it doesn't get something in between the 11 and 12. The 12 o'clock's also extended by 30 minutes to 45 minutes. And that's just in case there's like an issue that pops up, like on the dev stand up, if there's an issue that pops up, that's a blocker. The lead architect wants to make sure that we have enough time to actually resolve that blocker so that that person can just keep going, right? That's the most important thing. And then on the 11 o'clock,

that extra 30 minutes, we don't use it all the time.

SPEAKER_01But if any operations support people or stakeholders are also doing the configuration, if any of them have an issue, They have the ability to work with a SME that's on the call and resolve it immediately. It's about immediacy of resolution of issues so that there's extra value to the end customer.

SPEAKER_00No doubt. All right. So the only thing that I've done that's been consistent across all the frameworks, if you talk about the scaled agile framework or less, you know, it's big room planning because two full days would save. But at, you know, at a couple of shops I was at, I don't want to even say the names because I'm going to have to edit it out. You know, we went with something called quarterly planning. So every quarter, Because, you know, when you're running a race, you're not leaning forward before the gun starts. You're leaning backwards, rested. Finding time to bring everyone together and look at metrics for the last three

SPEAKER_00months or six sprints. I wouldn't weekly because white noise. Monthly, you could do maybe a light touch, but it seems like everyone's moving towards a quarterly 10-week type thing. You know, I think you're doing everything right. I love it. Talk to you again.

SPEAKER_01Is that okay? Absolutely, 100%. We don't have interdependencies across multiple teams because all of our teams are there. That's a smart way to do it. We're small. 25 people total, 15 on the operations support side, 10 on the development side. That's the reason why we're able to get that. If you are talking about scaling this out to 125 people, then safe, right? Something similar. Absolutely. 100%.

SPEAKER_00No doubt. I remember when we first learned Scrum, we had something called release planning, and it was like, let's look in the head to see what we're going to release in the future. You know, it's very similar to PR planning. Sprints used to be a month back then. You know, now they're a week. They're two weeks. So there's lots of things to talk about how we're all working the same way. It's just that the levers we're switching are different along the way. All right, Mark. No doubt. No doubt. Let's go. All right, dude. Later. Agile! That must be Italian.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. No Doubt, Let's Go! - Sandra

    Oct 9, 202629 minAudio

    On This Episode of No Doubt, Let’s Go! Coach Reggie interviews Sandra Brower an educator, remote scholar, piano teacher, and distance runner. From chairing academic committees and directing PhD residentials to teaching...

    Credit the people on this episode

  2. No Doubt, Let's Go!

    Sep 15, 202623 minAudio

    Welcome to the No Doubt, Let’s Go! Podcast. Hosted by Coach Reggie, this podcast explores the power of “accidental agility” - how real-world leaders, entrepreneurs, and practitioners apply agile principles to solve...

    Credit the people on this episode

  3. No Doubt, Let’s Go! How Do You Get Stuff Done?🎙️✨

    Aug 21, 202610 minAudio

    How do you get stuff done? As I sit down to finalize the chapters for my book, The No Doubt Method, I have been reflecting on the incredible conversations I have had with people from all walks of life. I am on a quest...

    Credit the people on this episode

  4. No Doubt, Let's Go! - Jainish

    Jul 16, 202637 minAudio

    On This Episode of No Doubt, Let’s Go! Coach Reggie interviews Jainish Shah about his approaches to productivity, learning, and getting work done effectively. Jainish shared how he starts by understanding context before...

    Credit the people on this episode

  5. No Doubt, Let's Go! - Karen

    Jul 9, 202630 minAudio

    On This Episode of No Doubt, Let’s Go! Coach Reggie interviews Karen Anderson, a delivery-focused leader currently working on enterprise change portfolio governance. Karen discussed her approach to getting things done...

    Credit the people on this episode