Load forecasting: why DER signals break utility models

Sep 7, 20265 minAudioEpisode 78
ShareXLinkedInFacebookWhatsAppEmail

Utility teams still treat load forecasting as a regression against temperature and industrial schedules. This episode argues that world is gone. Rooftop solar can flip the sign of the weather relationship, a passing cloud can return 40 megawatts in 90 seconds, and a midnight EV rate discount can synchronize 10,000 chargers into a spike that never existed before. Bolting DER signals onto the old model produces a more complicated wrong answer. You come away knowing where the money leaks, through NERC reliability reports and rate cases where a 2% error becomes a nine-figure conversation, why endogeneity breaks price-sensitive models, what probabilistic forecasting with confidence bands gives operators, and why dbt Labs style version control keeps models auditable without telling you they are wrong. 0:00 Why load forecasting stopped being solved 0:46 Rooftop solar flips the weather relationship 1:35 EV charging timers and rate-driven spikes 2:25 Forecast error in NERC reports and rate cases 3:30 Probabilistic forecasting and confidence bands 4:26 Audit your rate changes Monday morning

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Chapters

  1. Why load forecasting stopped being solved
  2. Rooftop solar flips the weather relationship
  3. EV charging timers and rate-driven spikes
  4. Forecast error in NERC reports and rate cases
  5. Probabilistic forecasting and confidence bands
  6. Audit your rate changes Monday morning

Transcript

From the show. Tap a time to play from there.

Welcome to the Leaders Insights podcast. Today's episode, load forecasting for utility operators integrating weather, behavioral and DOR signals into demand prediction pipelines. Everyone in your field keeps saying load forecasting is a solved problem. You told me before we started, that's nonsense. Go. It was solved past tense. For 40 years the utility playbook was, temperature goes up, air conditioners turn on, demand

climbs. You regress against weather and industrial schedules, and you're within 2%. That world is dead and a lot of forecasting teams haven't noticed the funeral. Dead how? Weather still drives demand. It does. But now half your grid fights back. Rooftop solar means a hot sunny afternoon can cut demand instead of raising it. The panels shave the peak. Then a cloud rolls over a neighborhood and 40 megawatts reappears in 90 seconds. Your old model sees weather and says, high demand.

Reality says, actually no. The sign of the relationship flipped and nobody updated the equation. So the fix is just adding solar data to the pipeline. Problem solved again. That's exactly the mistake everyone makes. They bolt DR signals, distributed energy resources, meaning the solar panels, home batteries, and EV chargers sitting behind the meter, onto the same regression and call it modern. What they've built is a more complicated wrong answer. The behavior is the hard part, not the hardware.

Explain the behavior part. Take EV charging. Electric vehicle charging. A utility in California assumes everyone plugs in at 6 p.m. when they get home. Fine. Then the utility offers a midnight rate discount. And suddenly 10,000 cars all start charging at 12 hours, zero minutes, and one second because they're on timers. You've engineered a synchronized spike that never existed in nature. Your forecast, trained on last year's behavior, has no idea the rate change even happened.

That sounds like the utility shooting itself in the foot. Constantly. The price signal changes the thing you're trying to predict. Economists call that endogeneity. The variable you're measuring reacts to your own decisions. Most load models pretend the world holds still. It doesn't. Where does this actually cost money? Give me the pain. Two places. NERC reliability reports. That's the North American body that finds you when the lights flicker. And rate cases where regulators decide what you're allowed to charge.

Under forecast the peak and you buy emergency power at 10 times the price. Or worse, you shed load and end up on the news. Over forecast and you've built a gas plant nobody needed. And the regulator makes shareholders eat it. Either direction, a 2% error, is now a nine-figure conversation. The vendors say their tooling fixes this. You buy that? Partly. DBB Labs, DWE, a data tooling vendor, publishes numbers on how much faster teams ship pipeline

changes with proper version control. And it's genuinely useful for keeping these models auditable. But they sell the software, so cross-check it. The tooling helps you fix a model quickly. It does not tell you the model is wrong in the first place. That's a human problem wearing a software costume. So what does the independent research say people should do differently? MIT Technology Review had good reporting last year on probabilistic forecasting. Instead of predicting one demand number, you predict a range with confidence bands.

As the honest answer on a partly cloudy day with high EV adoption isn't 4,200 megawatts. It's somewhere between 3,800 and 4,600. And I'm nervous. Operators hate that. They want a single number to plan against. But a range is harder to act on. Isn't the single number more useful? A confident wrong number is the most expensive thing in the building. The range tells you when to keep a reserve plant warm and when to relax.

That's the whole game. Knowing your own uncertainty. The dry truth in one line? We spent 40 years teaching the grid to predict the weather. And then we filled every house with a robot that argues with it. Give me the one thing a forecasting team should do Monday morning. Go find every rate change and demand response program your company launched in the last 18 months. Then check whether your model has any variable that reacts to them. If it doesn't, and it probably doesn't, your forecast isn't modeling the grid.

It's modeling a grid that stopped existing years ago. Uncomfortable and useful. Thanks for coming in. Sources for today's episode. The new stack. MIT Technology Review. MIT Sloan Management Review. DBT Labs. Vendor. Data tooling. Done. Want to know where you actually stand? Take the CDO self-assessment at MBA-training.com.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. OEE definitions: why the same shift scores 73% or 85%

    Nov 17, 202611 minAudio

    Why does the same shift score 73% OEE in one report and 85% in another? The episode argues that most OEE disputes come from three unratified data definitions rather than faulty sensors: planned time (is a changeover a...

    Credit the people on this episode

  2. Patient matching: cap overlays before chasing duplicate rates

    Nov 3, 202611 minAudio

    Hospitals are pushed to cut duplicate patient records, and the fastest route is more aggressive auto-merging. This episode asks what that does to overlay risk. Using OneFlorida's 99.3% matching precision (7 false merges...

    Credit the people on this episode

  3. NAV error threshold: back-solving reconciliation tolerances

    Oct 20, 202611 minAudio

    Who pays when a fund's NAV is wrong and the manager never saw the error? Under CSSF Circular 24/856 the investment fund manager corrects and compensates, even when the administrator calculated the price. The episode...

    Credit the people on this episode

  4. dbt State and agent-ready data: why declared meaning comes first

    Oct 13, 202611 minAudio

    Agents dominated dbt Summit, but does smart orchestration or a context layer make data agent-ready on its own? The episode argues no. Fanatics Betting and Gaming saw about 0.2% model reuse from dbt State until it...

    Credit the people on this episode

  5. dbt State: lag_tolerance is now a budget decision

    Oct 6, 20269 minAudio

    dbt State went generally available in September 2026, so rebuilding every model on a cron schedule is now a choice rather than a default. The position here: the tool cannot tell you how stale each model is allowed to...

    Credit the people on this episode