Skip to content
PodSubs
ShowsPeopleGuestsJobsNewsEvents
More
BlogPodCred
Menu
ShowsPeopleGuestsJobsNewsEventsBlogPodCredNetworksSign in
Join nowSign in
  • Shows
  • People
  • Jobs
  • News
  • More
    • Guests
    • Events
    • Blog
    • PodCred
    • Networks
    Join nowSign in

MacroMashup

MacroMashup artwork

🎙️5-Minute MACRO DEBRIEF

Mar 28, 20267 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Debrief in reference to our latest MacroMashup article, Scoring The Grid: This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit www.macromashup.com

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_00Welcome to the five-minute macro debrief for the final, for a time anyway, for the final edition of the Macro Mashup newsletter and the bridge into the new newsletter on the AI Grid report that will be released on March 31st next week. We're going to talk about the structure of the upcoming newsletter,

SPEAKER_00misconceptions that exist, what's actually happening, the system behind it, what it means, all to dig into and monitor on a weekly basis the grid that sits between AI data centers and the generation that provides the power to them. So most of the conversation around AI right now is focused on the demand side, the scaling, the compute, the impact it's going to have on jobs and the way we work.

SPEAKER_00It's focused on how fast it's growing, how much capital is flowing to AI, and how large the opportunity is. But that framing misses the real constraint here, because AI doesn't scale based on demand alone. Just because we want to build it, just because we have the capital to build it, doesn't mean that it's going to get connected, show up, and start working its magic. It scales based on infrastructure. And more specifically,

SPEAKER_00What we're seeing right now is a growing mismatch between two systems. On the one side, you have capital moving very quickly at the rate of around $650 million a year being spent simply by the hyperscalers. And data centers are being planned, financed, and announced at a rapid pace. And on the other side, you have the electrical grid, which moves much more slowly. The bridge that really puts context to both of those things is the

interconnection queue,

SPEAKER_00which is where projects either move forward or get stuck. And right now, they're getting stuck. When you look at how data center capacity is actually distributed across grid regions, a few things stand out immediately. First, capacity is highly concentrated in a small number of regions. Second, a significant portion of that capacity isn't deployable. Some of it is under construction.

SPEAKER_00Some of it is delayed in interconnection queues. and some of it is built but not powered. The headline numbers are there are approximately 5,400 data centers in operation and about 3,000 that are being built in some stage of planning or construction. So the headline numbers really do overstate what's actually

usable at the moment.

SPEAKER_00And that's where people start to misread the system. So what is interconnection? It's not a simple process and it's not evenly distributed across all of the the ISO regions. PGM, for example, has an enormous queue where projects get stuck and only about 15% of them go through. ERCONC clears its queue pretty quickly, so all the projects that enter end up going through the studies

and being ready,

SPEAKER_00but that's where that particular region gets stuck because those projects don't have enough transmission to get them from generation through to load. So that's a different feature in ERCOT to the other regions. So the issue is when projects go through the studies, their impact is determined on the grid. including upgrades, transmission constraints, and system reliability.

SPEAKER_00As more projects enter the queue, the process slow down. And in regions like PJM, other regions also, the back work has become severe. And timelines that used to be predictable are now stretching out several years. And that creates uncertainty. It delays deployment. And it ties up capital in projects that can't move forward. It's only one side of the problem. As I already said, CloudScene reports 5,427 active data centers and 3,000 under

construction.

SPEAKER_00Most of those have to go through large load interconnection studies. And those studies are handled at the utility level and often under NDAs. There is no published QData. on that side of the grid as there is for the generation side. And this may be about to change. In October last year, Energy Secretary Chris Wright directed the Federal Energy Regulatory Commission, FERC, to consider a notice of proposed rulemaking that would allow

FERC to assert

SPEAKER_00jurisdiction over large load interconnections anything larger than 20 megawatts. So we have to watch that docket as it moves forward because it's supposed to be effective by the end of April 2026. So what does that mean? What does all this mean? The key implication is that AI infrastructure will not scale evenly. It will scale where power is available and where interconnection can actually happen. And that creates regional divergence. Some areas will accelerate,

SPEAKER_00others will fall behind, regardless of how much capital is allocated to them. So the constraint isn't demand, it's deployability. And if you're trying to understand where AI gets built, you have to follow the grid, because that's the layer that ultimately determines what's possible. And this is what we break down in the AI Grid Report, what we'll study on a weekly basis. You can read the last version, the last edition of Macro Mashup in this edition in the

referenced article.

SPEAKER_00And from then on, go over, subscribe to the AI Grid Report, and you'll get all of that data there.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Why AI Is Reshaping American Power and Modern Warfare | Liz Young McNally

    Jan 29, 202634 minAudio

    Update:This episode was recorded in December 2025. In January 2026, the U.S. Department of Defense announced a major realignment of its defense innovation structures, prioritizing speed, clarity, and commercial adoption...

    Credit the people on this episode

  2. Episode 6 | Howard Belk on Trust, Clarity & Authenticity in Finance | MacroMashup Podcast

    Oct 6, 202532 minAudio

    What can financial brands learn from the man who rebranded the U.S Army? In this episode of MacroMashup, host Neil Winward sits down with Howard Belk, Co-CEO and Chief Creative Officer at Siegel+Gale, to explore the...

    Credit the people on this episode

  3. Gen Z Losing Jobs to AI: J-Curve or Doom Loop

    Sep 20, 202535 minAudio

    Thank you to everyone who tuned into my live video! Join me for my next live video in the app. Gen Z Jobs being Shredded by AI. J-Curve or Doom Loop This is a public episode. If you would like to discuss this with other...

    Credit the people on this episode

  4. Wall Street's Blind Spot with Phil Rosen

    Aug 13, 202526 minAudio

    Wall Street is full of noise. Phil Rosen is here to cut through it. In this episode of MacroMashup, we sit down with Phil Rosen, co-founder of Opening Bell Daily and former Business Insider journalist, to uncover the...

    Credit the people on this episode

  5. Escaping the 1% Prison: Manish Jain on Fixing Wealth Management with AI

    May 21, 202537 minAudio

    Why do most investors overpay for underperformance - and how can AI help fix that? In this episode of MacroMashup, host Neil Winward sits down with Manish Jain, former JP Morgan exec and CEO of Mezzi, to discuss the...

    Credit the people on this episode