Speaker 1If you go down Altman, I had a deer go across the road. Oh, yes. Yes.
Speaker 2They have very good manners there.
Speaker 3There's one that was really offended by the fact that we were all trying to drive on Altman on Tuesday night.
Speaker 1No, Monday night. And he was.
Speaker 4In the area where a bike would be.
Speaker 1Uh-huh. He was kind of offended.
Speaker 3He steps up onto the sidewalk and is looking at everybody like.
Speaker 1It's my road. Sorry. There's Tim. Is he Tim? Yeah, Tim. So I'm going to pop right there. Yeah.
Speaker 5Okay.
Speaker 1Okay. Good morning, everyone. This is the Joint White Pine County Commission and Fire Commission meeting. Today is Thursday, November 12, 2026. We will start the meeting with the Pledge of Allegiance. The Pledge of Allegiance to the United States of America and to the Republic on which it stands, one nation,
Speaker 1under God, and indivisible, with liberty and justice for all. Thank you, and now we'll have a moment of silence. Okay, we'll start this morning's meeting with public comment. Is there any public comment in the room? Please stand up at the podium, state your name for the record.
Speaker 6My name is William Geltz. And I wanted to introduce myself to the commission. I am the newly appointed town council chairperson in Ruth.
Speaker 2And I just wanted to make myself known to you.
Speaker 6I look forward to working with you and all the various department.
Speaker 1Heads and elected officials.
Speaker 2Please let me know.
Speaker 1And that's all I have to say. Thank you, Mr. Gallants. Thank you. Good morning. Kate Jameson, DSA Lead Project Manager for the record.
Speaker 7So first of all, I just want to shout out that we'll be doing our first Astronomy on Tap at the Outpost tonight from 6 to 7. We have three postdocs from Caltech with us tonight, so that'll be very exciting in case anyone's interested.
Speaker 8I will stick around, try to stick around for the discussion of the letter today, but I do just want to mention that I need to get over to the Ely Learning Bridge, so I might need to.
Speaker 2I just wanted to say I was.
Speaker 8Very pleased to see a draft letter identifying the county's concerns with the project to.
Speaker 1Date on the agenda for today's meeting.
Speaker 8I have enjoyed discussing the project and your concerns because without those discussions, I could never fully understand and attempt to address those concerns.
Speaker 1And I acknowledge that the local.
Speaker 8Perspective of folks that live with the land is truly invaluable.
Speaker 9However, upon reading the draft, I was a little surprised by some of the assertions, particularly at this stage of the process. This included the statement that the county cannot support a proposal with a plan amendment to the 2025 greater sage grouse resource management plan amendment at this time, and that more baseline information is needed with regards to big game species.
Speaker 1I found these surprising as.
Speaker 8The detailed information on both would have not been shared with the county yet as this would be a part of the official NEPA process. While we have attempted to discuss like high level information on both as part of my dialogue with the county the full sharing of our three years of data collection and analysis supported by the BLM and Dow and Fish and Wildlife has not been seen.
Speaker 1I wanted to remind NEPA faith and have been for over three years.
Speaker 8And the project's main request is to be able to begin the official legal process so that the county can be brought in as a cooperating agency, and we can have a more open discussion on the exact proposal.
Speaker 1And the data. This would include.
Speaker 8Sharing the specific language of a proposed project-specific plan amendment, noting this is not a general amendment.
Speaker 2To the Satra's ARPA, which could then be assessed by the county.
Speaker 8I would like to encourage the county to support the start of the official NEPA process for the DSA project so that the open process may allow the county to be better informed before deciding their stance.
Speaker 2Thank you.
Speaker 1Thank you. Is there any other public comment in the room?
Speaker 2You're definitely first. You didn't find the basement. That's all I'm telling you. First, Chancellor, for the record, FRED PODESTA. Madam Chair previous meetings.
Speaker 10I voiced my concern in regards to the Ramsey property at 582 North Highway 93 and the Badrin property at 80 East 93rd Street North being connected to City Sewer.
Speaker 2And Water Service. That hasn't been done. I don't know who's telling you one or the other.
Speaker 1No fire hydrant.
Speaker 10You're in violation or they're in violation of NRS. Same with the City Code. I went to the Utility Board meeting this morning. I asked them for any information that they have. How many units were hooked up. When did they do it. I'm not getting anything. Again you have a Regional Planning Commission. We have rules and regulations that pertain to everybody or that pertain to nobody.
Speaker 2I apply for permits. Pay the money. I'm refused. And I get citations. And yet you got blatant. disregard for the law here.
Speaker 10I'm beginning to wonder about this County Commission and where your focus is. If you don't want veterans or ethnic minorities doing business in this county you need to be specific about that.
Speaker 2We need to address these issues. I want to I'm asking.
Speaker 10That you bring the Heritage Park back on the agenda for possible removal. The school district is going to be asking for a special permit to build the new school.
Speaker 2I don't have a problem with that.
Speaker 10However because they're going to butt up against an 05 zoning they need a conditional use permit. They got 120 acres when I was mayor through the BLM and Jim Copeland. They give away a piece here a piece there and now they're asking for a special permit.
Speaker 2Absolutely not.
Speaker 10You're affecting people that moved out in that area for a reason. And you need to address those issues.
Speaker 2The date along Highway 93 next to the.
Speaker 10Holiday Inn, no ADA compliance, new construction between the Golden Gate and that Holiday property.
Speaker 2You're dumping people off just in front of the tracks. You can't do that. ADA requirements need to be met. It's a federal regulation.
Speaker 10Not a county, not a city, but a federal regulation.
Speaker 2Your RPC.
Speaker 10is not addressing the issue. It isn't the first time I brought it up but I want you folks to know when you have people in office they need to follow through.
Speaker 2At the last meeting I brought a concern forward regarding the.
Speaker 10$ 70, 000 appropriation for the grand jury to date I'm not seeing any of their findings. Again they either need to step up to the plate they need to give.
Speaker 4The community a report And if they don't do what they're sworn to do, then they need to give the taxpayer a refund.
Speaker 1SHERRI KOKX- That's for three minutes, Mr. Chatzis. Thank you.
Speaker 2DIRECTOR DEWOLF- I need some answers, Chairman. I keep coming back and I'm getting nothing.
Speaker 1SHERRI KOKX- Is there any further public comment in the room. DIRECTOR DEWOLF- Good afternoon. SHERRI KOKX- Please state your name for the record. DIRECTOR DEWOLF- Yes.
Speaker 2It's Tiffany Beach.
Speaker 11I'm the director of transmission development for Envy Energy.
Speaker 1I wanted to go ahead and talk today. There was a draft letter that is in the agenda.
Speaker 11And hold on for just a second while I get all my statement points up.
Speaker 2Sorry about that.
Speaker 11We wanted to go ahead and let you know, I still read the draft letter. We had read the draft letter. We understand White Pine County's concerns with regard to Green Lake.
Speaker 1Um, what we're trying to do is be proactive with the county.
Speaker 12We've reached out, we've had meetings with the natural resource committee here today, um, to talk to you and let you know where we have some concerns.
Speaker 11So one thing that I wanted to clarify is the utility corridor. Um, that seems to have come up quite often as we've been talking.
Speaker 1And the energy we're a proponent, but the final decision regarding what that corridor is.
Speaker 2Is ultimately up to the BLM.
Speaker 11They have not issued the record of decision on what that corridor is going to be as of yet. So while the draft letter is completely and totally understandable, there are certain things in it that haven't been determined yet.
Speaker 1The other issue is that within the draft letter itself, it's conflating Green Lake North with SWPPP North.
Speaker 13SWPPP North being from Robinson Summit going north-south up to Idaho, whereas Green Lake North is coming from Reno going east-west into Robinson Summit.
Speaker 1So just a couple of things that I wanted to clarify.
Speaker 11And so within White Pine County, approximately 95% of the Green Lake North is going to follow the existing 230 KB line that is currently there, with the exception of where it drops in for the last couple of miles to come into Robinson Summit.
Speaker 1So with that, We understand the concern.
Speaker 11We understand and are very sensitive to the sage-grouse issues and the impacts that that could have.
Speaker 2Within the county.
Speaker 11And we really want to work together with the county to work through these issues as these projects continue.
Speaker 2And by that, I mean Swift North as well as Green Bay North.
Speaker 11So with that, I just wanted to thank you guys for your time and allowing me to stand here and give that prior to you guys being.
Speaker 2Able to talk about the draft letter on the agenda. So thank you very much.
Speaker 1Thank you.
Speaker 2Any further?
Speaker 1Vincent Fleischman. I can't.
Speaker 14Hear the speakers because we can't hear back there. So I know you're getting a new guy, girl, whatever. But I mean, that's why the courthouse is so much better. Cause you could hear everything. And also it was up on the screen. You can read what's going on here is for hearing. And just because one commissioner doesn't like, it doesn't mean that the public doesn't like it because you guys are here for the public. So you might want to think about that because this is not that good. And it was, it's cold in here sometimes too. Anyways,
Speaker 14I missed you guys. That's why I came back.
Speaker 15Yeah.
Speaker 14See, I was not in favor of the star project a year ago, but that was a year ago. And meanwhile, people are working and getting paid to, to work on a project. And then you guys just kind of go, Oh, we think like, you know, I don't really agree with that. That's not good business because you can't have a whole organization working. And then all of a sudden here comes state, state grouse and this and.
Speaker 2That and blah, blah. It seems like that's just a lot of excuses.
Speaker 14And besides, maybe this should have been discussed with them prior to, like, saying, hey, we want to pause your project. Now, I don't agree with them not paying us. I think they should pay us a lot, too. They're like any business, and we have bills to pay. I said that to those a year ago.
Speaker 1I said that, though.
Speaker 14We come up today and say that, you know, it's modest. Yeah, that probably means mostly nothing. But you did say that people came in front of you and talked about this.
Speaker 2For a long time.
Speaker 14Ago, you should give them credit for that. They should, you know, really, I think, rethink that.
Speaker 2Same with the green link. People have worked on this stuff.
Speaker 14For a long time and then just come along and just say, hey, we decide, hey, we just want to pause things. I don't really think it's fair. It's not good business either. If you were a contractor, you wouldn't like that, okay? You know, I understand that you guys are. Not full-time, but maybe some of you should be. Maybe two people on the commission or something should be full-time. You know what I mean? Because I think there's more work to do than you have people to do it.
Speaker 14Don't really think all your commission works as hard as everybody else. So I believe that with the city council too. I think they should be full-time. There's a lot of work to be done here. And part-time people just... Anyways, thank you very much.
Speaker 2Good morning, Commissioners.
Speaker 17Good morning.
Speaker 15Director William Miller. First off, I would like to applaud the staff of RCI and Mr. Drew for doing all the research and drafting the documents of some.
Speaker 18Of the agenda items that you have today. In regards to the Greenlink project, I've had numerous conversations with them. I'm doing the Tiffany's here today.
Speaker 15I've had conversations with Mark and especially Linda Bessette recently. And the redundancy of the infrastructure of the power grid with Greenlink North is not the issue. The issue, just kind of like stated today, is this three-quarter mile wide right away across the state of Nevada. It is a huge concern by a lot of Nevada residents, a number of large organizations that include wildlife, natural resources, the livestock industry.
Speaker 15They're very concerned of the cumulative effects that are going to be attached to this down the road with other transmission lines and with.
Speaker 2These valleys full up of solar panels. It's ready to go. They're waiting. Right away, they're recommending across the board. White Pine County is not the only person.
Speaker 15There are a number of other counties and organizations that are suggesting this gets moved up to the I-80 corridor. I know it's extended in mileage. I know it's going to be an extended cost, but the cost of the environmental impacts that are going to be associated with this outweigh what the costs are going to be to move this to I-80 corridor.
Speaker 2If this corridor.
Speaker 15Needs to be taken a look at to be on the equivalent of an online project, 250 feet up or right away, if I believe so, the Green Lake project, which is in construction right now, is 275 feet. I don't think there would be that big of a concern if ND Energy would take this forward to the BLM and say, you know what? We understand these issues and these concerns to our environment. And we're going to look at the 275 or 250 foot wide right of corridor
Speaker 15across 250 miles across the state of Nevada. Keep in mind also that their transmission line and don't hold me, but I believe you are 86% committed and transmission on that line right now.
Speaker 19Okay.
Speaker 15So there was only 14% available for anything that meets their standard and attaching to their transmission line. So I wanted to share that information and I hope that you do move forward with this letter of concern today. It expresses the concerns of a number of people across the state of Nevada.
Speaker 2Thank you.
Speaker 1Thank you, Mr.
Speaker 5Williams.
Speaker 1Is there any further public comment in the room? I see none. I will ask, is there any public comment on teams? If so, please raise your hand. Oh, I see someone with their hand raised.
Speaker 2Yes, this is Kevin Baker.
Speaker 20Oh, Mr.
Speaker 1Baker, go ahead.
Speaker 17Thank you.
Speaker 21For the record, my name is Kevin Baker. Thank you, Chairman and Commissioners. I represent the White Pine Pump Storage Project. I sincerely appreciate the opportunity to offer a brief comment on the county's proposed development agreement, particularly as it applies to federally regulated projects. I understand and sincerely respect the county's concerns and support its objectives, including this proposal. We have consistently expressed our desire to work with you and enter into an appropriate development agreement. I believe that the county has an important regulatory role in protecting local interests,
Speaker 21and this proposal is an important step towards that. At the same time, Congress has entrusted hydropower licensing to PERC and the Supreme Court has made clear that states cannot supersede PERC's authority or impose a second licensing process or its equivalent. As such, we request that the agreement respect those jurisdictional boundaries. The county's water agreement with the project demonstrates this balance actually can work. It protects an important county interest while respecting.
Speaker 17The broader federal framework.
Speaker 21With that in mind, I ask the Commission to consider three specific aspects of its proposal.
Speaker 17First, bonding.
Speaker 21Bonding should be limited to specific county interests, such as actual project-related road damage, rather than to serve as general security for.
Speaker 17The project itself.
Speaker 21Second, federal jurisdiction. The agreement should expressly state that certain provisions will not apply to a federally licensed project, For example, requirements governing the development, construction, operation, reclamation, or decommissioning of the project should not become a second county approval process where those matters are already governed through the federal licensing process.
Speaker 17For sure, the.
Speaker 21County has an important voice and role in FERC's process. And I want to and we want to work with you to ensure that those concerns are incorporated in that process. However, FERC retains at all times regulatory oversight.
Speaker 17Finally, consistent treatment.
Speaker 21The nature of the county's impact, rather than the type of business, should generally determine the county's requirements. If renewable energy projects and pump storage projects are subject to requirements that do not apply to other businesses that create similar county impacts, the county should consider adopting an objective basis for that distinction. This is simply to ensure that the processes and regulations are applied evenly throughout the county. I sincerely and respectfully ask the Commission to consider these distinctions
Speaker 21in its process and in the final.
Speaker 17Form of agreement.
Speaker 21I'm happy to work with you at any time on these processes. I sincerely value our relationship with you and believe there is a reliable path forward that protects the county's interests, respects the federal framework, and supports the continued and needed investment in White Pine County.
Speaker 15Thank you.
Speaker 1Thank you, Mr. Baker. Is there any further public comment on teams? If so, please raise your hand. Anyone, do you see anyone? Okay. All right. We will move on to updates from commissioners. Since Commissioner Pauley is on teams, let's start with you. Do you have any updates, Commissioner Pauley?
Speaker 15Not really.
Speaker 16We still had a Regional Transportation Commission meeting scheduled, and one of the members had a family event and could not attend, so we rescheduled it for next week, I believe on Wednesday at 8 a.m., if anybody wants to go to that meeting. It should be right there at the library, 8 a.m., Regional Transportation Commission.
Speaker 17Thank you.
Speaker 1Thank you. Is Commissioner Robinson on? She was going to call me if possible. Okay, I'll move on to Commissioner Noriega.
Speaker 2So it's been a busy couple of weeks. So I did attend the Soil Conservation District meeting just recently. Let them know that there would probably be some changes regarding liaisons in January at our meeting then in January. I met with the DA and with Nevada Energy regarding the potential development agreement. It was also about the Greenlink North project. Golf Advisory Board meeting we met. It's the last meeting
Speaker 2here for a while with the golf course shutting down here in November. I did go on yesterday. I went and met with Kevin at the golf course and I did a tour of the golf course. I had not been all the way through the golf course. And so I got to see the well and take a look at some of the issues that were occurring out at the golf course. Met with the Nature Conservancy with Paula, well, Paula and then eventually Pat at different times. And we
Speaker 2talked about opportunities for renewable energy on brownfields, especially locations like the tailings below McGill and the old smelter properties above McGill. being possible locations where you can't do a lot of other stuff, but solar energy and stuff like that might be an opportunity there. So we looked and talked about opportunities. I also attended a Nevada data center briefing and meeting statewide, and I attended that by teams.
Speaker 2I did raise a number of concerns because although we have no data center proposals, it is becoming fairly clear that this big boom on renewable energy in much of the rural areas is being proposed to fuel the energy needs of data centers on the western side of the state. And so I raise concerns about the cumulative impacts that are occurring as a result of those developments and what it can mean to rural counties. And then I will
Speaker 2be attending this city council meeting this evening with a couple of agenda items related to the RPC as well as potential for doing joint master planning with the city council. That's all I got.
Speaker 1Thank you. That is online.
Speaker 2Oh, good.
Speaker 1Commissioner Robinson, don't you have any reports to give?
Speaker 19Yes, I attended the airport meeting in San Diego. And in reference to the open house next year, they're going to try to have it earlier when it'll be nicer weather. And I'm sorry, I have my notes kind of mixed up here. It's been a hectic time. And they are talking about building more hangers. And the school is going great.
Speaker 19They have a lot of new people signing up to get flying, you know, their licenses. And I attended the library meeting. And that was quite exciting because they are bringing the Freedom Truck Mobile Museum here to Ely. And that will be in the hotel parking lot at 694 Clark Street. November 19th from 11 a.m. to 6 p.m.
Speaker 19and November 20th through the 22nd, that would be Thursday, Friday, and Saturday, or Saturday, Sunday, and no, I'm sorry, Friday, Saturday, and Sunday from 9 a.m. to 6 p.m. And this is just such a great opportunity and it's family-free and it's about... American History Mobile Museum. And it's a very immersive journey to American history. I don't know if you've
Speaker 19seen some of the flyers up around town, but I'd like to also give a special thanks out to the Hotel Nevada and Gambling Hall for providing a space for this. And so I do hope to see some of you there on those dates.
Speaker 11And.
Speaker 19I also attended the CNWRA meeting. And I don't know if Hank is there today or not because Hank is the director. I'm actually his alternate. And it was the meeting goes from 10 to 1 o'clock. And it was just a great meeting. They had a presentation by the Nevada Water Commission. initiative and it was on securing Nevada's
Speaker 19water future. And that was presented by Kip Hollander. He's the chief of hydrology and I'm sorry. And it was, and there was also the department of natural resources and the Nevada division of water reserves, but it was, um, It was fabulous. I mean, you would think that three hours would.
Speaker 17Be a long time.
Speaker 19I was sitting on the edge of my seat the whole time because this is about Nevada. And let's see. Okay. And I also attended. Seems like I attend a lot. Oh, and the library meeting. Going back to the library meeting, Lori,
Speaker 19our director of the library, got an excellent rating on her job evaluation from the library board, which, you know, she just does a fabulous job with this. And that is what I had to report with that. Okay, I know I've attended more. I just can't find my notes here. I'm sorry. It's not been a good morning for me.
Speaker 22Kind of crazy.
Speaker 19Okay, I think... Oh, and the Ag Board. How could I ever forget the Ag Board? One of my favorites. Anyway, I had no report for them, but I did. Get on the phone right away to, because they wanted to know about where they're at with SNIPLMA and finance. And I got on the phone right away with Alicia, our finance director, and she and Cora, our grants writer,
Speaker 19got right on it and shot them an email with the, and myself, with all good news. And so, and right now, the... Ag board themselves are, they had hired a sound system and that's being worked on and getting ready to go in. And so that's a very, that's going to be great. And let's see.
Speaker 21That is, I.
Speaker 19Think that's it for me. And so we're just moving forward. And I, oh, I also, with the library, I attended another meeting with Lori at nine o'clock on the 4th of November. And it was about the walking story. We got all the information on that, but no decision was made whether we're going to go with that or not because it it caught it was a little bit pricey
Speaker 19so we've not made it you know they haven't made a decision yet if they really want to reach out and ask for the money to do that and that's all I have okay.
Speaker 1Thank you um I'll report that I had a meeting with some NG representatives for the Lonely Bread Project. We talked about ravens and noxious weeds and halogen, winter fat, the same thing that applies to almost all the projects. I had a meeting with NNRDA, which is the Northern Nevada Regional Development Authority, and Sheldon brought in Aramac, which has a new division called Aramac Nexus. They have a
Speaker 1lot of housing solutions and developments. So I think that would be very positive for some of the major projects we have coming in here. We have everything from temporary housing to stick built housing. I also attended the CNRWA meeting that Commissioner Robinson was just talking about. The Nevada Water Initiative is a scientific effort to modernize Nevada's baseline groundwater estimates and water management frameworks. They are looking for
Speaker 1additional funding from the state and they were looking for support from CNRWA, which I think it's very important. We need to know about Nevada's water and the costs that they're asking for. They're only asking for $ 2 million a year, which is said is the cost of one overpass. So I think we need to get behind that. And then Sheldon Medrick, NNRTUA, brought in Cavison Homes. This is another builder, developer. He is looking to provide affordable housing. I think he
Speaker 1was very interested in Ely. They're currently also working with Nevada. I mean, Tonopah and Goldfield. So I think that's a very positive meeting that we had. And hopefully he will... or they will come here and provide us with some housing. I had a November 10th meeting with Ring Plan and IT. We have some future developments for our phone systems that we need to look into. And then I gave a
Speaker 1speech yesterday for the Veterans Memorial. So that's my report.
Speaker 2We'll go back.
Speaker 1Okay.
Speaker 19Did you do a speech with yesterday?
Speaker 1The Veterans Memorial.
Speaker 11Yay.
Speaker 19Thank you.
Speaker 1Commissioner Higa, go ahead.
Speaker 2I have one quick go back. I read an article when I talked to Paul about it, and I was going to mention it here. The article identified all 50 states and identified the most affordable location in all 50 states to live in. And actually, Ely was rated as the most affordable community in the state of Nevada. And so I was surprised. Groceries might not be the help,
Speaker 2but I can attest looking at housing markets that housing market is affordable from a buying standpoint and gas is about the cheapest in the state. And so it was something, a definite plus for me.
Speaker 1And something I probably should mention is Cavison Homes is looking at bringing in homes and are providing homes, new homes starting at 299 to 350. So if anyone in the community has some comments about that, please let me know. I think that would be a very good price point for our area. They would be, you know, smaller lots. It wouldn't be five acres. But I think for a new home, I think that would be a very good price point for our community. So... We'll move on. Jeremy Drew,
Speaker 1we'll go with you to a discussion information only regarding the White Pine County Natural Resources, Public Lands and Water Issues Tracking List. Jeremy Drew, Principal Resource Specialist.
Speaker 17Good morning, Chair. Can you hear me all right?
Speaker 1Yes, we can, Jeremy. Go ahead.
Speaker 20All right, we'll step through the tracking list in short order, but there is a lot going on in the realm of planning, especially at the national level. So you'll recall that this summer, the Department of Interior and BLM proposed regulation revisions to their grazing regulations on public lands. USDA Forest Service just came out, I believe yesterday, with their proposed revisions, and we've got a 30-day window on that. So we will put together some comments on that for
Speaker 20your December meeting. DOI has also released some proposed revisions to their planning regulations, which cover things like resource management plans and corridor designations and everything else that's very pertinent to the county. On that, we have a 60-day comment period. Comments will be due January 11th, and certainly we'll take a look at those given everything that's going on in White Pine County. Kind of related to that, but on a separate governmental track, is the Bipartisan American Affordability.
Speaker 17And Jobs Act. That was voted on this.
Speaker 20Week for cloture, and then there will be a vote between now and the end of Congress, at least on the Senate side, as we understand it. That's a major reform bill that covers most of the major acts that we deal with on public lands. So NEPA, Waters of the U.S., Endangered Species Act, National Historic Preservation Act and everything else. And it's a bipartisan bill that's been worked on for quite some time. It does look at a lot of potential streamlining. It looks at some exemptions and
Speaker 20streamlining for county infrastructure and includes things like streamlining development and maintenance and additions of power grid infrastructure in designated corridors. So this all really starts tying together in terms of what's going on. That's an act that the National Association of Counties has been watching and the Nevada Association of Counties to some degree. And I just wanted to flag that because of all the things going on around the
Speaker 20planning scene. So with that, we'll move on to Caltech. We'll talk about that in our next agenda item. I did want to thank Katie and Kevin for offering up a field tour last month, and they did, because we obviously didn't want more than two commissioners on that tour, offer to do future tours. So if folks want to do that, I'm happy to help coordinate future tour activities. Obviously, we talked about Greenlink, and we'll talk about that more
Speaker 20in the upcoming agenda items. Really no new updates on the other renewables at this point other than the applications are still pending action. White Pine Water Power, I think most of the commissioners probably got the email. But just to remind everyone that the hydrogeological testing was completed last week or two weeks ago now. The results are pending. I believe the due date on the study is to FERC on January 30th. And then the FERC Ready for
Speaker 20Environmental Analysis date is still April of 27. I don't recall as relates to water rights if we talked about the Baker versus Holland case last time. So just in case we didn't, from the county's perspective, there was a favorable outcome on that. It's pending either remand to the district court or an appeal by the federal government, but essentially Um, there were concerns around that as relates to adjudications on water rights prior to the McCarran amendment. Um,
Speaker 20and that, uh, the ruling was favorable. The other thing to mention on water between now and year end is Desert Research Institute is working on an analysis of, uh, future use and water demand for White Pine County, um, to update their, to update into our water resources plan. That is pending review, hopefully by the NRAC committee. And we also got some funding to update the water plan. So we're actively working on converting that plan into an
Speaker 20electronic Word document so that we can do updates going forward more easily for you all, rather than just dealing with a hard copy and PDF copy. I'll skip down to Nevada Association of Counties and their Public Land and Natural Resource Committee meeting, which will be November 19th at 3 p.m.
Speaker 17It's a big agenda.
Speaker 20There's a lot of discussion on it on some of the planning rules and regulations that I just mentioned. So anyone who's interested in that, there is a virtual option, and they also hold it at their NACO office here in Carson. And then there was some correspondence that came in after the support material deadline. So we got two invitations from BLM for a cooperating agency status on an oil and gas lease sale, and then the Blue Diamond grazing conversion. We did provide an email back to them as a placeholder, but just to flag for you that
Speaker 20that letter of interest or potentially an MOU on those two cooperating agency.
Speaker 17Invites may be coming on the December agenda. With that, Chair, I'm happy to answer any questions.
Speaker 1Any questions? Okay, Jerry, then we'll move on to item two. Thank you, Jeremy, on that one. Discussion for possible action, review, and approval of a draft comment letter to Caltech regarding its proposed DSA 2000 project. proposed in North Spring Valley. This letter is in response to several recent updates provided by Caltech to the Commission, as well as the Natural Resources Advisory Committee, and provides some early input into county
Speaker 1concerns and inputs. Jeremy Drew, Resource Concepts, Inc.
Speaker 22Jeremy?
Speaker 1Jeremy?
Speaker 17Yeah, Chair, thank you again.
Speaker 20For the record, Jeremy Drew, this letter was drafted in part due to the field tour we were able to take on October 23rd. The county has had a lot of discussions back and forth with DSA, and I really appreciate their outreach and their continuous update of not only this board, but NRAC, as well as myself and other staff on their project. But to date, I don't believe we've provided any formal input to the process. And so the intent of this letter is to provide some formal input.
Speaker 20The project has not, as Ms. Jamieson said earlier, entered a formal NEPA process. So this would be kind of a pre-NEPA input session here. If you look at the letter, we thank them for their continued communications, as I said, in paragraph one. Second paragraph kind of talks about the county weighing the potential impacts to natural resources with the county's customs, culture, and economy. I think the biggest concern that I see from my standpoint is just the location
Speaker 20and magnitude of the project.
Speaker 17You have a.
Speaker 20Largely intact ecosystem, which is unique on public lands. And that, I think, is what makes the project site.
Speaker 17More challenging.
Speaker 15Dr.
Speaker 20Jamison, I should say, did flag her concern about saying that we couldn't.
Speaker 17Support a resource... management plan amendment.
Speaker 20I understand there may be some information that we haven't seen, and we also did caveat that statement in the bottom paragraph of page one with at this time. So if there's more information that can help allay our fears or more information on what mitigation might take place, Um, I'm not so sure we've got to enter the NEPA process to get that. And it may be a discussion with the DA's office, but there may be an opportunity to sign an NDA or something like that. Um, if more discussion around the details would be appropriate, but we do, uh,
Speaker 20make that statement. Um, and I think that's a discussion that was had on our field tour as well. Um, on page two, we talk about, uh, there was some discussion about ground truthing, the greater sage grass habitat model. in North Spring Valley, as well as what sort of mitigation actions should be taking place. In the next paragraph, we flag our concerns about potential impacts to big game species. And then we reiterate our concerns on potential for limitations
Speaker 20on land.
Speaker 17Use and noxious weeds, which is nothing new.
Speaker 20And then we close by saying the county is open to being a partner in the development of the project. but does have concerns at this time given the size and location of the project. That's a quick update of or overview of the letter but I'm more than happy to answer any questions or take feedback on additions or revisions.
Speaker 1DIRECTOR HAMPSON- Okay. Commissioner Noriega did you have any comments.
Speaker 19FRED PODESTA.
Speaker 2I support the letter and Dr. Jamieson I I understand your concern but I will share something here. I recognize that the NEPA process has not started, but as most people are aware, I've got a long history with NEPA process. And for me, the NEPA process is probably as much or more important than the process itself. Because in my experience, the NEPA process is a bureaucratic process and it's about
Speaker 2following the steps. And that early planning before NEPA ever begins is probably much more important. The county right now, and this is just one, the county is being flooded by all of these large-scale projects looking to go on public. And so many of us live here because of the wide open spaces and everything. And what we're seeing is as urban areas get more and more congested, they're looking
Speaker 2to push that congestion out to the areas that we've called home. And so we as a county have to be cautious and try and make good, but very difficult decisions about what we feel is appropriate out here and what may not be, or if it is, how we recommend that it move forward. But I do support the letter just to keep on the forefront of the concerns the county has.
Speaker 1Commissioner Powell, do you have any comments on this letter?
Speaker 16You know, I concur with Jose on this. Also, I do support this letter, and I think it's a necessary safeguard.
Speaker 17Okay.
Speaker 1Commissioner Robeson, any comment on this letter?
Speaker 19I totally support it. I think it's very important, and I do agree with Tim and Jose.
Speaker 22Okay.
Speaker 19With their comments that were made.
Speaker 1Sorry. We do greatly appreciate the tour and the opportunity we have to give in to look at the area and have discussion about all the concerns that we have here. So... I'll move to approve.
Speaker 2The letter to Caltech regarding the DSA 2 Fast project.
Speaker 1Okay. I have a motion to approve. Okay, I have... Second. Any further comments before we go to vote? Okay. Hearing none, I have a motion to approve this letter from Commissioner Villanueva. A second from Commissioner Robinson. All those in favor say aye.
Speaker 23Aye.
Speaker 1Any opposed? Hearing none, motion passes. We'll go on to item number three, discussion for possible action. review and approval of a draft comment letter to NV Energy regarding its proposed Greenlink North 525 KV transmission line project and proposed resource management plan amendment, RMPA. This letter is consistent with prior letters provided to BLM and specifically addresses request for
Speaker 1input from NV Energy from their September 15, 2026 update to the Natural Resources Advisory Committee. Jeremy Drew, Resource Concepts, Inc.
Speaker 2Thank you, Chair.
Speaker 20Similar to the last letter, this is in part as a response to NV Energy's presentation to NRAC in September. Would have loved to have had this on the agenda in October. We just had a lot of conflicting things going on in October. So You've heard some public comment on this before. I'll step through kind of the points of the letter. And as you'll see, we've attached some of our previous comments. So a lot of this isn't new news, but there are some nuances and things that
Speaker 20have changed in the last handful of months with this project. So paragraph one, again, thanks, NV Energy, for coming out and listening to NRAC. I think having NV Energy representatives there probably gave them a better perspective of some of the concerns that the county has had. Um, I think to commissioner Noriega's point and his updates, a lot of those concerns revolve around the precedent being set and the cumulative impacts. Um, we do flag that our, we would be most supportive of a pause and a relook, um,
Speaker 20at the IAD alternative. If you'll recall, when Greenlink started on planning, SWPPP North wasn't being built. And the only reference we really have to SWPPP North is that it's going in a congressionally designated corridor. And that's a project that wasn't even under construction when the planning on this all started. There was a lot of discussion in the NRAC meeting in September around potentially minimizing the utility corridor to just the footprint of the project. And so if that is an option, certainly I think it's one that
Speaker 20the county would be interested in and we flag our support for because that would start to eliminate our concern around some of the cumulative impacts, especially with all the planning changes going on at the federal administration level in terms of streamlining projects in corridors and the number of projects that, quite frankly, are proposed in application format now that would propose to use that same corridor to get back to the Robeson substation. So we flagged that in item three. In item four, we talk about specifically, and
Speaker 20this was a discussion that came up in NRAC, the mitigation activities that occur and if the project moves forward, that some of those mitigation and offset activities should be occurring in White Pine County. I think at the time we discussed this at NRAC, most of the projects proposed for the conservation credit system were in other counties, to the north.
Speaker 17They indicated that they were starting to work with.
Speaker 20Eureka County on some potential offset projects and CCS projects there. And then we were asked to identify some specific projects And at this point, what we identified is potential public land projects covered by the Long and Ruby Valley Watershed Restoration Plan that are in proximity to the project and also outreach to some potential private.
Speaker 17Landowners along the route in White Pine County.
Speaker 20At that point, again, we reiterate our support for continued communications going forward and the intent of our that are just kind of solidifying and providing additional feedback to what the NRAC discussions were. With that, I'd be more than happy to answer any questions.
Speaker 2Okay.
Speaker 1Commissioner Villanueva, I'll start with you again. I'll just, I support the letter.
Speaker 2I've read through it several times and I will share why I support this letter. There are concerns and it's not so much specifically about the power line itself. It's about everything else that is about to come and hit us. No one in this process wants to talk about these other actions because Nevada Energy and Nevada BLM and all the other entities involved don't want to potentially have to
Speaker 2analyze those as connected actions or cumulative effects. So we're ignoring all of this. But there was a reason why this original project came out with a three-mile wide corridor, because the intent was to allow power lines back and forth, both to the Robinson substation as well as the substation in Austin. And what would follow with those power lines is solar facilities located everywhere. And these solar facilities, some of them are not being planned yet. with input from
Speaker 2the residents or the county or anyone else. It's people throwing darts at a map using Google Earth on what best fits their company. And so the corridor width and what is following is the biggest concern that I have and getting a handle on all of that to protect the interest of this county and the citizens of this county.
Speaker 1Thank you. Okay, Commissioner Pauley. Any comments on this letter?
Speaker 22I'm also in support of this letter.
Speaker 17We had.
Speaker 16Previous public comments months ago about the corridor widths were highly concerning. So I too am highly concerned of the corridor and the effects of the citizens of White Pine County.
Speaker 2Thank you.
Speaker 1Commissioner Robinson, did you have any comments or questions about this letter?
Speaker 19I totally agree with what has been commented by Tim and Jose.
Speaker 1Very concerning.
Speaker 19Everybody has always been upset about that wide corridor because we know what's going on. So I agree.
Speaker 1Okay, thank you.
Speaker 2I want to add one other thing. As we look at the potential stuff that is facing us, and we know that this drive for renewables out here is being driven by the data center issues. There is a proposed data center in Story County right now that is a million square foot. And when I asked the question, how many solar panels are designed on the roof of that building? Anyone know what the answer is? It's not being designed. And before these companies come out here and look to
Speaker 2place solar fields everywhere out here and impact our residents, We need to make sure that they are planning for what they can take care of on their own structures back there. And it's something that could be easily designed in those designs.
Speaker 1And Jeremy, I appreciate you putting the past letters in the back. Because as you said, this is, these are concerns that have been raised as we've gone along through the years. These projects do years. Thank you for putting this in here. And I support the letter. So is there any further public comment? I mean, not public comment, Commissioner Chavez.
Speaker 2Yeah, I'll move to approve the letter.
Speaker 1I'll second that motion. So we have a motion to approve this letter from Commissioner Noriega and a second from Commissioner Carson. All those in favor say aye. Aye.
Speaker 1We'll go to the 930 Fire Commission. Oh, thank you, Jeremy, so much. We really appreciate all the work you do.
Speaker 17Thank you, commissioners.
Speaker 20And since I won't see you before, I wish everyone a healthy and happy Thanksgiving.
Speaker 19Thank you.
Speaker 17Okay.
Speaker 1We'll move on to the 930 Fire Commission. Discussion update on fire district progress. Courtland Hall, White Pine County Fire Chief and Pat Stork, Ely Fire Chief. Are either one of you on teams?
Speaker 17Good morning, Commission. This is Court.
Speaker 1Court, go ahead.
Speaker 5Not a whole lot going on.
Speaker 23We continue to do our training as usual. The city of Ely is putting on an advanced EMT class. Uh, the county is putting on a basic EMT class. I believe the city is a little over halfway through with theirs. The county just hit the halfway point. Uh, this Sunday, we had a mass casualty incident training. A lot of people probably saw the smoke and ambulances, fire trucks and helicopters flying around, uh, That training was incorporation with the hospital,
Speaker 23the sheriff's office, city and county fire EMS, as well as Intermountain Health ground and air ambulance services, both.
Speaker 5K-E-O-Y-E-L-E.
Speaker 179-1-1 was called.
Speaker 23Until the 21st patient reached the hospital was an hour, 19 minutes, and 30 seconds. So that's 21 patients transported to our hospital in that time frame. And that's about all I have to report.
Speaker 1Okay, thank you, Court. Appreciate that information. Okay, we'll move on to Item 3A1, Jose Noriega, Discussion for Possible Actions. Review and approval of statement of qualifications or requests for qualifications from third party plan review and building inspections on an as needed basis. Third party costs will be paid from building permit fees collected from project proponents. Jose.
Speaker 2BOY, am I in over my head on some of this stuff. Some of it is a challenge so. I've been working with Chris, and what we need to do is we need to look at, as I stated, providing Chris the opportunity to hire a third party for planned reviews and inspections on these larger projects specifically, especially the renewable energy projects. It's going to overwhelm their department when
Speaker 2these start coming online, is already starting. Talking to Chris, if we hire a third party, all the costs from the third party will come out of the fees that are collected from those third parties to do it. So it won't be any additional cost to the county. As I was putting this together, I missed a piece that I've been going back and forth with on the mayor. So there will be an additional item on the December agenda today. to update a section within the MOU on
Speaker 2the building department that as it currently stands, if we had a large project on the county and it came forward, the costs associated with that project would have to be borne in half by the city to do all of the work. So that'll come forward in the December agenda, but I wanted to proceed forward with this to see if we can get agreement to go ahead and authorize the hiring of an as needed third-party review and inspection.
Speaker 1And in the backup, you have a company here.
Speaker 2That is a company that Chris provided to me that he recommended because of their experience and their pricing structure because the as needed means we only pay for the services that we actually get from there or request for them versus the a monthly fee that we could pay to have them on essentially retainer. So if we're able to and Chris is comfortable, then I would recommend to
Speaker 2move forward and approve him using this company if we can do it that way.
Speaker 1Is this something, this is Chris's recommendation? for this company, is this something we should put out to bid?
Speaker 2That I'm not sure. I don't completely know. Any advice?
Speaker 3I think you both know where my office is.
Speaker 1Yeah. And the office hours that I keep.
Speaker 3So these are types of professional services that don't have anything.
Speaker 1I would have been happy to give you that answer before you put it on the agenda.
Speaker 2If that's the case, I would recommend to proceed with this company. It was a recommendation that Chris.
Speaker 1Commissioner Pollard, do you have any weigh-in on this?
Speaker 16Yeah, I do, but I want to start with we still have yet to get answer back from the city on how come that they're Code enforcement slash review slash assistant has not been brought forth from the city. And it seems like the county, we keep stepping up, stepping up, stepping up, and with no response there. But yes, Jose, we do need to get something in place for Chris, because I know we're going to be overwhelmed here rapidly.
Speaker 16So I'm in support of bringing on a.
Speaker 22Third party, but I'm still... We're still.
Speaker 16Fighting the city on the backside, wanting them to actually come through with what they promised.
Speaker 2We have additional follow-up we have to continue with on those other items within the MOU.
Speaker 1Well, they're actually... We need to bring that to the December agenda.
Speaker 19Yeah.
Speaker 1We need to bring that MOU to the December agenda because I don't see any headway being made. Yeah. With that agreement. Okay, Commissioner... Commissioner Robinson, do you have any comment or questions about this agenda item?
Speaker 19No, I totally agree. I totally agree.
Speaker 1So the motion is to approve this?
Speaker 2Yeah, I will move to approve this authorizing Chris to utilize third party with no additional cost to the county beyond the permit fees collected.
Speaker 19I second that.
Speaker 23Okay.
Speaker 1Okay. Any other comment from the board? All right. I will ask for the vote. I have a motion from Commissioner Noriega to approve this agenda item and a second from Commissioner Robinson. All those in favor say aye. Aye. Aye.
Speaker 19Aye.
Speaker 1Aye. Any opposed? Hearing none, motion passes.
Speaker 2K-E-O-Y, Ely.
Speaker 1We move on to item B. This is discussion for possible action. Review and approval of model utility scale renewable energy development agreement used as a model for or preparation of specific development agreements on individual proposed projects. Commissioner Noriega.
Speaker 2So this was also a document that Chris brought to me regarding development agreements. Backup information in there. You can see that he actually cited other development agreements as examples. When he did it, I I'll be honest, and it was brought up during earlier public comments. I do agree that we need to look at a model agreement that goes beyond just renewable energy. It would apply to any
Speaker 2kind of energy development, any industrial type of development. And so we may need to do some additional modifications on this. to clean it up and make it so that it can be used for one fall. And then I also, just looking at it and reading it again last night, it looks like to implement this, we need to do an ordinance, I believe, to approve it. And so I will need help from the district attorney's office, I think, to proceed forward on that. So at this point, I
Speaker 2would recommend that either get the commission's approval or not approval to take this, move it forward, make some, the modifications we need to do with kind of some of those stipulations. Those are my thoughts. But yeah, there's an opportunity to comment for any motion.
Speaker 1Well, if I recall, I don't know which meeting it was, but they did bring up the issue of having something specific to utility. It should not be specific to utility.
Speaker 2Yeah, I agree.
Speaker 1And then I have a lot of notes on this. Sorry, I have a lot of notes. And I don't know if you want to discuss all of this now at this time, or if we should table this and work on this some more.
Speaker 2I guess my thoughts would be that not, I guess it would be, I would ask for a vote of support from the commission to move forward with continued working on this today. a final, both the structure of the agreement and the ordinance required to put it into place.
Speaker 1You would like to move forward with continuing to.
Speaker 2Work on it?
Speaker 15Yes.
Speaker 11Yeah.
Speaker 1Okay.
Speaker 2I always worry about tabling stuff because I'm worried about it not continuing forward. Mr.
Speaker 1Polling, do you have any comments or questions on this?
Speaker 16I'm somewhat I'm somewhat in support of it to the effect there is a lot of things in here.
Speaker 22I've been through it once. I'd like to go through it five times.
Speaker 16There's a lot of things in here that just, you're right, that aren't quite fitting for our model. And I don't want to adopt something that we're not ready to adopt at this point. So I am kind of on the fence about this one.
Speaker 22We need something, but.
Speaker 16Yet, I don't think this has got everything we need. It's got some stuff that not right in it.
Speaker 10Well, okay.
Speaker 19Would we want to table this for now then? Cause I agree with what you're saying, Kim, we need to go through this several times with a fine tooth comb.
Speaker 16Jose, what would be the, could we get a, could we have a meeting you, me, and let's sit down with Chris and, uh, We can't have Paula there, but we can definitely have Paula's notes there with us, or we can bring this before the commission at another time if we want to all be involved in this.
Speaker 2Let's do this. Let's go ahead and table this with the understanding that each commissioner needs to take a look at it and identify the concerns or the proposed changes each of us have. Tim, you and I can meet with with Chris to kind of work through some of the details and also to make this a little broader as far as what it covers versus just the narrow focus renewable energy. And then once everyone's had the chance
Speaker 2to do additional looks at it, then we will put it on the agenda. I would probably recommend maybe a January agenda item, giving us enough time to look at it. Bring it back in January with the idea at that point we'll all be ready and we'll put our heads together and make the meeting and make the changes we need to make and finalize this. And then we'll work with the DA's office on whatever ordinance type of stuff we can do. Will that give you enough time, Melissa,
Speaker 2to help us through it? Okay. Does that work for you, Tim and Pat? Yes, definitely.
Speaker 1Absolutely. I would just like to say that given the open meeting law, I would like to give some input at this time for you two to take into consideration.
Speaker 2Take notes.
Speaker 19Oh, jeez.
Speaker 1You're going to make me take notes? Yes. Number one is financial security. I think that our road superintendent's idea of tiered financial security was a very good idea, rather than requiring 115% upfront for the entire project. I think that was a very good idea. I think that some of these items, uh, for example, section seven, nine, 10
Speaker 1talks about, it talks about acceptable to the County. I think it needs to be specific, uh, probably to the BOCC. Um, In the agreement, I think we need to require, let me get my notes here. We need to require a financial or fiscal impact analysis before DA approval, covering projected
Speaker 1property tax revenue, anticipated abatements. I think we need that discussion about property tax abatements upfront because we do have the opportunity to make comment on that before it's approved. And so then we would also have in there anticipated net county revenue. So if the developer does apply for tax, abatement, it would require disclosure and notification to the county. In
Speaker 1your model agreement, Article 5, it talks about the county engineer. We do not have a county engineer.
Speaker 4Right.
Speaker 1Maybe you should say the county's appointed engineer, something to that effect. Under the Article 7 on the water resources, I think we should require for any project, not just utility, any project, to require baseline groundwater monitoring wells and periodic reporting on these wells, whether it be probably quarterly. Under
Speaker 1fire protection, I'd like to see, and this again is for you guys to talk about, not me, require a county approved hazardous material inventory. A county approved hazardous material inventory. Again, that would be for any project. Under Article 13, where you talk about local hiring, procurement, and community benefits, I think we should require a workforce housing plan. What is
Speaker 1their plan? Do they plan on putting them in a hotel where there is no availability? Do they plan on putting them in tents? What is their workforce housing plan? I think your annual compliance report is very good. And the research that I did, it was recommended instead of requiring the The report on March 31st to push it back to April 30th, just because especially with the large project,
Speaker 1they need a little more time for that. And that would be an annual April 30th. They could provide a preliminary report on March 31st. On Article 18 under ownership assignment and successors, I think we need more specificity. I can't find my notes. Oh, here it is. Okay. I think if there is any plan for ownership assignment successors
Speaker 1that the developer should deliver to the county written notice at least 30 days in advance, it would identify and address the principles of the proposed transferee and along with a description of the property and obligations to be transferred, and evidence of the transferee's financial capability to perform those obligations that are transferred, and an assumption agreement. I'm sorry
Speaker 1to dump all of this on you now, but I can't participate in your meetings. I would like to- I'd like to see a dark sky protection clause added because in White Pine County, we value our dark skies. They should have an outdoor lighting plan before building permits with fully shielded downward aimed fixtures. And I do realize there
Speaker 1are safety concerns and those need to be addressed in that also. And for any projects that would affect the airport, there should be something in there about aircraft detection lighting systems. Under Article 20, which talks about insurance and indemnification, we should be specific about insurance that's required. The county should
Speaker 1always be added as additional insured And for a large project, you might want to start with commercial general liability at 5 million per occurrence, 10 million aggregate. Talk about automobile liability, workers' compensation, employers' liability. And this would be a question for the DA down the road, not today, a standard force majeure clause.
Speaker 22Paula, I'm sorry, standard what clause?
Speaker 1Course majeure. It's a legal clause. It's usually in every contract.
Speaker 2I like that the executive spells.
Speaker 1And I think my last note.
Speaker 19Is the developer submit a checklist.
Speaker 1It has construction contractor and major subcontractors. It says when available. I would cross out when available. And I would say submitted 60 to 90 days before construction begins. Not when available. It has to be available. I would require it to be available. And I'm sorry to dump all of that on you.
Speaker 2Oh, it's okay. Thank you, Paula, for.
Speaker 19For researching that and coming up with these, because I think they've all been very important that you've brought up.
Speaker 1Well, these development agreements, I think, are very important to our county, and I think we need to be very thoughtful and thorough in addressing everything. Absolutely.
Speaker 2They're coming up now in most of the rural counties because of what's happening. Right. I do know, for instance, with the GreenLynx, Greenland West or whatever the other part of it, Nye County and Esmeralda, both are either in process or have already done this with the bad energy.
Speaker 1In the cell. No, we'd definitely like to get ahead of it.
Speaker 2Yeah. We're already kind of behind, and we've got to do what we can now to get caught up and try and stay ahead.
Speaker 11Right.
Speaker 2Yeah.
Speaker 1Commissioner Pauly, anything else you'd like to add? No, ma'am.
Speaker 16I think you covered quite a bit, a little redundancy, what you and I were thinking on that, but.
Speaker 22All the rest of it, yeah, I've got notes.
Speaker 2You guys are so much more detailed than I am, and I like swinging a big club.
Speaker 1That's very specific, especially in agreements, so that down the road, there's no problems. Commissioner Robinson, anything you'd like to add?
Speaker 19No, I'm real excited about this, and I'm excited about the detail. Thank you for doing your homework on this, everybody, because I wasn't included in, but this is so important.
Speaker 1Thank you, Jose, for getting this started and bringing this forward. This is a great start.
Speaker 2We've got to get moving on all of these.
Speaker 1We do. And one person can't do it all. We'd have to be a team here.
Speaker 2Yeah.
Speaker 1Okay. So Commissioner Noriega and Commissioner Pauli can move forward with this.
Speaker 2I'll second that.
Speaker 1Okay. Any further discussion from the board? Okay. Hearing none. Commissioner Carson, myself made a motion to table this and Commissioner Noriega. In the second, all those in favor say aye.
Speaker 10Aye.
Speaker 16Aye.
Speaker 17Aye.
Speaker 1Opposed? Hearing none, motion passes. Moving on to item B1A, Nicole Steffi, County Clerk. Discussion for possible action. Approval of the canvas of the vote for the 2026 general election. Nicole?
Speaker 2Thank you. I've provided everyone with.
Speaker 3This information and added it to the backup as soon as it was ready on Tuesday. I wanna first thank my staff who's worked very hard to get us through this election season.
Speaker 1It's a relief to finally have it be over.
Speaker 3I wanna thank the workers who worked really hard on election day, working long hours. And I wanna thank the voters that turned out.
Speaker 1We did have.
Speaker 33,113 total votes cast, which is only a turnout of 57.59%. And I looked through some records to see how that fell in comparison. And it was actually the lowest turnout that White Pine County has seen in a general midterm since 1998.
Speaker 2So that was kind of disappointing.
Speaker 3But we did have 16, 137 mail ballots returned that were accepted and counted.
Speaker 1We had 645 early voters. We had 811 voters on election day.
Speaker 3I also had 22 people register as same-day registered voters and all but I also had 22 people register as same day registered voters and all but two complied with the Nevada revised statute requirements. And plenty of those votes were counted and two were not. Two people failed to meet the same day register requirements by not providing a
Speaker 3Nevada driver's license or ID on election day. So they cast HAVA provisional votes, which resulted.
Speaker 2In them being registered, but their votes not being counted.
Speaker 3I received a number of ballots that were lacking a signature or the signatures didn't match. We reached out to everybody through various methods and eight remained uncured and those ballots were not counted. We sent out Over 5,000 ballots and 2,048 of those ballots were not returned by voters. We received 14 ballots within the four days after election
Speaker 3day that were postmarked on or before November 3rd, and those were counted, presented to statute. Three arrived that were postmarked after November 3rd, so those were not counted.
Speaker 1Thank you. Yes. I saw you reach out for curing some of those signatures, and I thought that was great. Very good job on that. And I think our election went very smoothly. Thank you. Yes, it did.
Speaker 2Thank you.
Speaker 19Thank you.
Speaker 1Yeah. Any comments or questions from the board?
Speaker 19No, I just wanted to thank them also. It's a lot of work.
Speaker 2I'll move to approve the canvas to the vote.
Speaker 19I'll second.
Speaker 1Okay, Commissioner Robinson. Okay, so we have a motion from Commissioner Noriega to approve the vote and a second from Commissioner Robinson. All those in favor, say aye. Aye. Aye.
Speaker 11Aye.
Speaker 1Any opposed? Hearing none, motion houses. We will move on to item B, discussion for possible action, approval of the minutes of the October 14th Joint White Pine County Commission, Fire Commission, and Liquor Board meeting.
Speaker 17Okay.
Speaker 2So this will show that I actually read them. Because I am not a detail-oriented person, but I did find something that there was a mistake, but I don't have the solution to it. So page 21, section H, that July 2026, and it was something Alicia dropped, it showed that I both moved and seconded the same item. And I don't recall if I moved or if I seconded,
Speaker 2but I couldn't have done both. Thank you.
Speaker 1Thank you. I missed that one. There we go.
Speaker 2Mr. Not detailed comment.
Speaker 1I have a few comments. On page 11 on the third line down, it says Commissioner Noriega advised that the AAB needed to renew lease prices. I believe that word should have been reviewed, not renewed. On page 13 in the second paragraph, it talks about Commissioner Vogler and he felt that there was some major stuff that would rip the guts out of this County. I think we could
Speaker 1delete that sentence. It's not necessary for that item. On the second line, it says there was a decision regarding local zoning business licenses and concerns regarding safety. I believe that should be discussion It was not a decision. We were discussing what we were discussing. A plan to move
Speaker 1forward with public nuisance complaints. And the third paragraph, again, Commissioner Bogler noted that he believed beauty was in the eye of the beholder and noted his experience at HOAs. And I believe that On page 16 in the second line, he noted that it was for the benefit of the
Speaker 1golf pro that the meetings were held on site, should be S-I-T-E, not S-I-G-H-T. It's one of those words that can be interpreted in various ways. Okay. On page 19 in item 2A, on the fourth line down that they received $ 10, 000 from the grant. I think it just lacks
Speaker 1a T, just a typo. Oh, on page 24 in public comment, Paula Carson is a private citizen noted that she was glad to report that the missing GAB minutes were now posted. Could we just spell that out? Because at this point there's nothing, immediately referring to GAB. And then I would also like to request that in the future, you just put Paula Carson chair, not chair man. Looking
Speaker 1at Jeremy Drew's letters, I see that whether it's male or female, he just put chair, and I think that's a little more appropriate. And that's all I have. Commissioner Pauley, any comments or questions about the minutes? No, ma'am.
Speaker 22I really didn't get the opportunity to go through them.
Speaker 16I was kind of tied up on the other agenda items, but everything that you went through, I concur.
Speaker 1Okay. Commissioner Robinson, any comments or questions about the minutes?
Speaker 22No.
Speaker 1Okay.
Speaker 2I'll move to approve the minutes.
Speaker 1With the changes.
Speaker 10Yeah.
Speaker 1Okay. I will second that motion. I'll take Commissioner Noriega, made the motion to approve with those changes. I make Commissioner Carson made the second. All those in favor, say aye.
Speaker 11Aye.
Speaker 13Aye.
Speaker 12Aye.
Speaker 16Aye.
Speaker 8Opposed?
Speaker 1Hearing none, motion passes. We will move on to item C1A, Cole Burdett, Maintenance Superintendent. This is discussion for possible action. Approval of change order number one to extend the completion date of the golf course irrigation well. PWP number WP2026-309 to February 28th, 2027, due to the delivery delay of the pumps, motor, and discharge end. Presented by Dave Miller,
Speaker 1Basin Engineering. Good morning, Dave. Thank you.
Speaker 5For the record, Dave Miller, Basin Engineering. This is just to extend the contract completion date while we wait for the materials to show up so they can put them in. Just our procedure, but we need to change it because that date's coming up.
Speaker 1And I understand there's a lot of companies that are experiencing... Right now, yes. I have three pump and motor type projects. All three are different. All three different manufacturers, vendors, suppliers, makes, and they're all delayed. Question for you. Was there a change in the motor or in the pump?
Speaker 15No.
Speaker 5It's still what was back.
Speaker 17Okay.
Speaker 1In the bid, yeah. I had a conversation with BJ that said that they were discussing that, but I didn't know if I had to do it.
Speaker 5They did discuss that, but we could not find the right one to change that. And the one where they did find it was actually delayed farther out than this one.
Speaker 2So we just stayed in the course.
Speaker 1Do you think the operation, April?
Speaker 2That is the goal. That is my push.
Speaker 1So. Any questions from the board? Any questions?
Speaker 22Yes, there's no incurred cost, is there, Dave?
Speaker 1No. Any questions, Commissioner Robinson?
Speaker 19No. I would move to approve, though.
Speaker 1Okay.
Speaker 2I'll second.
Speaker 1Great.
Speaker 15All right.
Speaker 1I have a motion from Commissioner Robinson to approve the change order number one and a second from Commissioner Noriega. All those in favor say aye.
Speaker 5I'll get a copy from you so I can pass it on.
Speaker 1Okay. We'll move on to item number two, Mike Halsey, human resource director, not direction. Item eight, discussion for possible action, review of the organization chart for White Pine County. And Mr. Holsey is not here today, but Commissioner Moriga requested we move forward.
Speaker 2I ask that it just stay on the agenda. I looked at the org chart, and so my request is I would like to actually see a complete org chart. This one, as it stands, just shows departments, and in the boxes below it, it doesn't show the true org chart, that the whole three of we're all employees on and i think for a commission we need we're going to need to have that org chart because at some point i want to get us past the idea that we're
Speaker 2in a hiring freeze because i Us being in a hiring freeze creates problems when we're not able to fill positions. And I'll use the TA's example where we have to look at the org chart and say, okay, we have these positions, but maybe to fill the holes, we need to adapt to do these. And to be able to make those decisions, we need that full org chart to see what positions are on the books and make clean decisions. Yeah.
Speaker 1The hiring freeze was for new positions.
Speaker 2New positions. And that's why a good, clean org chart showing all the positions is, in my opinion, fairly critical. So we don't have that now, so it's something we just need to make sure and relate to Mike, because it could come up again in a December agenda item. So it's something that I think is important to be able to start making some of those calls.
Speaker 1So I had some thoughts on this also. My last conversation with Mike was that we have approximately 180 employees that has increased dramatically over what we used to have. But the population of White Pine County has not increased. I don't know why we have to have all these additional employees. And what's missing are the elected officials, the Sheriff's Department, the Justice Center, et cetera, et cetera. And
Speaker 1those should also be included maybe in a separate chart.
Speaker 2Yeah.
Speaker 1Because it's just specific to the board.
Speaker 2You're right. Each department, each elected office, because the employees under the elected officials are county employees, each of those needs to be one page by themselves. So this is good as a starting point. And then you'll have a follow-up page that will say the maintenance department, And under coal, it'll list all the different boxes of those positions of work for him. And so I agree.
Speaker 1You know, this has been very fluid. He's worked hard on this over the time of the last few months, but it's a great starting point.
Speaker 2It's something that I had to do years and years of in the former government because we went through the same issue. In bureaucracies, what we tend to see is bureaucracies tend to grow. And we've got to know where we're at. so that we can determine what we can afford in the future and having a good joint chart to make those decisions is the absolute starting point.
Speaker 1I think it will be invaluable when we get to budget. Yeah. To know where we're at. Okay. All right. So, Commissioner Pauly, did you have any comment on the organization chart? It moved.
Speaker 2You're muted.
Speaker 5How about now?
Speaker 22It's better? Here we go.
Speaker 16Also, I'd like underneath the finance director and all of the categories above, each employee, but I would like to have those categorized as are in that department, whether it's a deputy finance director, if it's payroll, and right on down the line. So all these positions that are below each one of these department heads, and then how many positions that are unfilled in that department and what they are.
Speaker 22It could all be color-coded.
Speaker 2I totally agree with you because you have a base org chart, and then you can have what we call the working org chart. And the working org chart is a fluid org chart over time that shows that vacancies, not vacancies, and we have to have someone that has vacancies maybe it would be Mike that would be able to go in there and update it like quarterly to show those vacancies.
Speaker 1Okay. Okay.
Speaker 19No, I don't. No, I have, I like what everybody's already said. And I agree.
Speaker 11I will.
Speaker 2I'm going to talk to Mike a little bit about it. We'll see if we can get it. get some, some updates to this plan now.
Speaker 1Okay. We'll just let, let this go on.
Speaker 2Yeah, we'll table it.
Speaker 22Okay.
Speaker 2Is that a motion? Yeah, that's a motion to table this to a future meeting when Mike is available.
Speaker 17Okay.
Speaker 1Give him a little more time. Okay, I'll second that. So we have A motion to table from Commissioner Noriega and a second from Commissioner Carson. All those in favor, say aye.
Speaker 13Aye.
Speaker 1Aye.
Speaker 15Aye.
Speaker 1Aye.
Speaker 10Opposed?
Speaker 1Hearing none, motion passes. We will move on to our second public comment period. So is there any public comment in the room?
Speaker 5No?
Speaker 1Seeing none, is there any public comment on teams? If so, please raise your hand. Okay. Seeing none, I have a motion.
Speaker 2I will move to adjourn the meeting.
Speaker 19I'll second.
Speaker 1Commissioner Robinson, thank you. We have a motion to adjourn from Commissioner Noriega, a second from Commissioner Robinson. All those in favor, say aye.
Speaker 13Aye.
Speaker 1Aye.
Speaker 16Opposed?
Speaker 1Hearing none, motion passes. We are adjourned.
In the headlnes: Drive carefully this weekend! White Pine Athletics gets NIAA honors Library gets accessibility grant Public Defenders office tries to rebuild White Pine Chamber plans for 2027 Washoe County Search and...
IN the headlines: Record snowfall in White Pine County Preview of the new K-8 School held last night Knights drop fourth straight Coyote Springs developers get favorable ruling Sigal Chattah appointment goes to Supreme...
In the headlines: Relatively quiet weekend Sheriff's Office blotter FEMA-FCC testing Emergency Alert System today Flippo files to possibly run in 2028 Nevada Government may have 8% more in 2027
In the headlines: Five arrests headline last week's Sheriff's Office blotter State Public Defender's Office issues extend to White Pine County Golden Knights fall to Canucks Titus re-elected to GOP caucus leader Nevada...