In this kickoff session of Joe On The Jobsite, Joe and Phil discuss how they got started in construction and their journey to becoming superintendents.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Good morning. It's 5 .30 and we're on the job site. And welcome to the first edition of Joe on the Job Site. And my very first guest is Phil Davis. He and I have known each other for years. Welcome, Phil. How are you doing this morning? Well, thanks for having me. It was nice. The yard looked real clean out there. Great looking job site. Well, if you keep them clean, you keep them safe. That's half of the battle right there. Half the battle. So, how many years have you been in this industry? I know I've worked with you off and on for... At least 20, 30 years.
I've got 47 years in the business. I came out of high school and tried a year of junior college, and then my friends were driving nails, and I decided that's where I needed to be, too, and started with a hammer in my hand. Well, I started carrying lumber as a grunt, and I always wanted to be the guy that was the next up in front of me. And that's how I carried it all the way through my career. So how did you make it from the grunt up to superintendent? What did you do to get those little stepping stones? I think the biggest thing was I was very good at math. My mother
was a school teacher, so math to me was secondary. So I knew I understood everything there was about carpentry and about building things and layout and things like that. It's all about math, if you could understand that. So I went from carrying lumber to laying out trusses. and laying out hip roofs and being able to do that laying out floors from blueprints understanding how to read a blueprint and then always wanted to be my boss's boss and just kept working my way up worked your
way up earned it time by time experience job by job came out of residential construction after about 12 13 years my first commercial job was a small bank and uh i got on that as an assistant foreman i think it was But I was a grunt again, but I was in a different level, a whole different atmosphere. And then once we got into commercial, the work just came along and it got bigger and bigger. What do you think helped your career
path the most as you were coming up through it? Did you have someone of significance that took you under his wing? Did you have a person that... wanted to see you grow and specialized and taught you things. Because in my experience in the field, I'm running the, as I grew up and came up as a carpenter like you, I had guys that wouldn't teach anything because they didn't want you to take their job. Oh, yeah. Well, it was a little bit different than that. I think the biggest driving force was I had a wife and two kids.
I wanted to make more money. That was the driver. Family. And to make more money, you had to take more responsibility. So I was never afraid of taking on a job. I loved a good challenge. I was never second thoughts about should I do this. Whenever I got the opportunity to move up and be promoted, I always took it. And then once we got into big construction, big, big commercial, motels and things like that, I think a lot of it was personality. I was able to keep everybody
playing well in the sandbox, you know, making sure everybody knew what they were doing, feeding materials, and always look ahead, always look at the next step. What do I need tomorrow? What do I need to do today so tomorrow will go good? Yep, looking ahead, long -range, short -range planning and stuff. And that goes back to being a carpenter. I saw earlier on the biggest thing was to... to be prepared for the next step. I've got two guys up there nailing plywood. Well, they're going to need another piece of plywood. So I've got to make sure they've got a piece of plywood coming up. Or cutting rafters. I was
always two rafters ahead. I'd hand them one, go cut another one, hand them one. So as long as you kept them busy, you were efficient, and it looked good to your boss and the people on the job. Yeah. So you mentioned starting in the commercial end. What was one of your – first jobs that you looked at on your own and had to figure out what to do probably staged a job we built a i built a as a as a real superintendent i built a stick frame two -story motel on a creek
over in st petersburg and that opened my eyes to a lot of things first time i'd ever seen uh pilings driven We were there, and the old guy that was running the crane, and he was doing all the concrete, he picked up a 40 -foot, 10 -by -10 concrete pylon, and they lifted it up, set it right where it was supposed to be, and started lowering it down, and it disappeared. I said, does that happen often? He said, we hope not. But I think that was the first real challenge
that I had. And I learned a lot off of that. Again, it goes back to being able to coordinate everybody in a logistical manner, in a good sequence, so everybody was going to make their money. That was the biggest thing. It's what I told everybody through my career. I'm here to make money. I'm getting a paycheck. You're here to make money. I want to help you make the money that you're supposed to make as a subcontractor. And I'll do anything I can to help you. But somewhere along the line, I'm going to need a little help back. And I always got that. Yeah, communication. And it always worked for me. Absolutely. And building relationships with your subcontractors.
Yeah, I found out that you'll do a job sometimes and help a guy out. One of the most common things I always liked was you'd be framing the interior and the concrete and the stub ups to the concrete. The electrician or the plumber might miss it by half an inch. You could, okay, dude, chip it out and move it. Or, all right, look. There's no harm in it. The bathroom's not going to be challenged. I'm not impacting furniture or any other finishes. I'm going to have them move the wall over a half an inch for you so you can get
with it and not have to do the work. Absolutely. Be adaptable. Yeah. And those guys will remember you on the next job that you'll play and help them. And that's a good thing. And that first job is where I truly learned about RFIs, submittals. I mean, it was a real big, big project. And the architect. told me early on if you send me an rfi send me a solution yep or an option a couple of options so i always made sure that if i had a problem i could figure it out with some help
maybe but being able to present that rfi with an answer uh and nine times out of ten they would go with what you you came up with yeah and you could keep the job going you weren't held up Yeah, that's one of the lessons I learned about RFIs years ago was you have a challenge, you have a problem, you have a headache. We don't always know the answer, but when we talk to the guys in the field and say, what do you think? What can we do? What are our options? You might hear three or four different variations, and you sort them through. You get the one that works the best, and that's the one you send in. They're
happy to do it. The owner's happy that we vetted it and just didn't throw money at it to make it go away. Yep, and another big thing along that line was always to be thinking about, with that option, I don't say that the tile we were supposed to use was unavailable. Well, I'm not going to pick something from Italy. I'm going to pick something readily available that we can get tomorrow, and that's the option you throw at them. So you always give them something that's viable. And you think about that, RFIs, and then
you get into submittals. One of the jobs the superintendent has to do is be very familiar with the cementals. What parts, what pieces, when they come and how are we getting them? When do they do? What's the RO we want to hold? What's our installation method? How does it fit in the wall? What can we do without having to wait on them getting here? You know, that's another part of the process that you shake out by looking ahead in the project. Absolutely. And that goes back to starting out with the plans. You've got to know those plans better than anybody out there. The first thing that on a project, I would always
go through the plans page by page, detail by detail. I would highlight the details that I didn't understand. And I always knew somebody I could call, a plumber or electrician or something, and say, can you explain this to me a little bit? So when you get into the actual construction process, you have a full understanding of how everything goes. And that really played true when we started doing these high -efficiency buildings. Yeah, you did one. With the air barriers and stuff like that. um you have to follow details down to exactly what they're telling you to achieve
the the performance of the building when it was all done yeah the um the people that are involved in that it's amazing how much you can get help from the field and when you get them in a room and talk to them even though You yourself, and I've done it in the past, when we look at a job, we break it down and we see where do we want to start first, second, third. Can we do two flow lines? Do we need two flow lines? Can we work in two places at once? One of them would be you have a civil package. Well, you can start
out away from the building doing the civil while you're doing the structure and then finish next to the building. But you always call in your subs and ask them the questions, and you'll be surprised how much help you can get. And when you have their buy -in, they're going through it lickety -split, and it makes it look easy for everybody. Absolutely, and that's a big part of it is getting everybody together, sitting at a round table just like this, and say, okay, this is where we're going to start. We're going to go put the deep sewers in first. All the low stuff goes in, then we start working our way
up. Where do you need to be? Plumber, I've got to get over that. Well, electrician, I've got to get under that. So you get all these people talking together on a project, and it tends to make a good flow. Everybody knows where everybody's at, and you're not putting them out of sequence. There's a definite sequence in projects that needs to be followed if you want to do it efficiently. Again, back to saving everybody money. Right, and when it's right down to it, the subcontractors are there to make money. working as a team on the job site as a collective team, you can help
them make money and even improve their production. So their boss is happy. They're getting good kudos, and they're feeling good about the job. And the one thing that you eliminate a lot of by those group works is mistakes, things that go in the wrong spot. That goes to be looking ahead. When I do this today, what's that going to affect me tomorrow? What's that going to impact? If I've got steel coming into the job, okay, well, just take it off the truck. Well, you just don't put it anywhere. You don't put it anywhere.
It'd be right in the crane path. You know, you could really mess your concrete guy up. How many times have you walked out in the field and gone, that's not what we talked about. What did you get out of the conversation? That's one of the worst things. When you tell somebody to do it, look, I want you to take the steel off. I want you to put it right there. And they look at you and they say, okay, we'll do it. Steel comes in, you see them, they're unloading it somewhere else. He goes, well, I'd rather put it over here. It's easier for me to get to. And I said, no, there's reasons that I told you to put it there. Right here, a manhole goes 14 feet deep right
here where you're putting the steel. Now I can't do it. You know, I had that happen once. And then you get to convince them, oh, by the way, since you got it in the wrong spot, you're going to have to move it. Exactly, now you're handling it twice. Yeah. And you're losing money. Yeah, and you're losing money. But in your time. in this industry, do you feel like there was one spot that made a big break in your career path, something that kind of like pushed you over the hump, like, yeah, I'm on this? Yeah, it was definitely after I worked for the architect and we built
some banks in that motel I was telling you about, that was my first real job. I went to work for a very, very large concrete company, which introduced me to... big construction here in the central Florida area. And by working for them, there were superintendents and project managers of the general contractors that decided I would be better off working for them. And that's how I went from actual working into a superintendent role. And back then, we would have multiple superintendents
on the job. You'd have a general. Yep. And you had multiple suit. You'd have an area superintendent. You would have a structural superintendent, a civil superintendent. I mean, you know, you had different guys. Everybody was in charge of something else. Yeah. And then with my background with the concrete company, I was always in charge of concrete. I've built concrete plants on my projects before, right on the project. Batch plants, yeah. Absolutely. Those are always great. Temporary batch plants. I built one one time that was fed by a ship. We were in the Bahamas, and it came once every 12 days and dropped off
a sizable amount of cement in our silos. And by having that plant right on the project saved tons of time, tons of time. So things like that that you start as you get older and wiser, I guess. And I'm not afraid to throw it out there. When I told them the first time that that's what we should do, they were like, well, that doesn't sound cost effective. I said, well, look at it both ways. And we did, and we partnered up with some concrete companies there and made it work.
I worked in Trinidad for almost three years, and we didn't have a bash plant. We had concrete delivery. Right. And we were lucky to get, you know, when you set up a pour, you like, you know, if you need 100 yards an hour, you want to have. the rotation in the trucks. You know how long it takes to get to the plant and back. Your testing lab is there. You know how long they take. So you know what your cycle is to get the truck into the pump, empty, back, filled, and bringing you some more. We were lucky. You'd get four
trucks, and they would come in the morning. You might not see them again until 3 o 'clock in the afternoon. Yeah, it's hard to work around something like that, like I say. When you can control it, you have better. Better scheduling advances. Well, it's a batch plan. Yeah, it's the same thing. A lot of times when we set up projects, we go to the ironworking company that's going to fabricate the steel and show them what we have and let them get a mill steel purchase. Right. That way they purchase it one lump, and
then they fabricate it, and it all comes in one truck, and you don't have to wait or look around for it and stuff. Those are handy little things. Again, another question, and just sitting here thinking about what you're telling me, what would you say your dollar value is you have put in place of work to date? It's got to be upwards of $3, $4 billion probably. Yeah. I mean, $200 million high school, $400 million casino. It
doesn't take long to hit a billion, so maybe upwards of $5 billion. Yeah, that's quite a bit. I'm sure you've got the same under your belt, as many big projects as you've got. Oh, yeah. I've done things from nuclear power plants to hospitals, hotels, jails, prisons, schools, tunnels under roads, aquatic features, containment areas. I would say total to date would be hit the $5
billion mark in in -place work. Doesn't take long. Yeah. Well, it does take long. But you stop and think about all the work we've put in place. You know, when I was young, I worked on a project for a holiday inn. And it was me and this guy named Leroy. He was 76 years old. He taught me how to cut a compound miter with a handsaw. Taught me how to cut trim without a miter box. Taught me how to cut a lot of things. And he was always going around to me going, boy,
your bulbs is bad. And so we were doing some work. One of the things we were doing was we were drilling, putting up a salad bar for Holiday Inn. So we would go in, gut the room. They'd refurbish it. We'd put new systems in. And in between, we were building salad bars and reefer miking tops. This guy was drilling. drilling like this. And I walked up to him and I said, hey, you need to hold the drill straight. He threw the drill down and said, you do it. I looked up and there was Leroy. I'm in trouble now. A
little while later, we were reefing mica on tops. When you reef mica stuff, you put sticks down in the middle. You glue both sides. You put it down and you center it. And then once you center it, you pull the middle one out and get it tight and then walk yourself out. Well, I walked around the corner and the guys were holding the pre -cut circles going flip they were missing them so guys that's not how you do it well guy said you do it so i got my sticks and started doing them next thing i know i looked up they're standing over there and there's leroy watching me keep
an eye on you keep oh yeah this went on there's a number of these that happened shorten this up a little bit but we um We got done, and you know the green checks? Remember the pockets of green checks? You'd always watch them come out. He handed all those guys green checks but me. And he looks at me, and he goes, boy, your bulbs ain't so bad. That's all he said to me. That's all you needed. No, that was all I needed. But leading into that, Leroy took the time to teach me. things on how to do how to he was 76 years
old i was in my early 20s but he was teaching me how to do things different ways and as you mentioned before math he was showing me math it out lay it out cipher it out think it through plan it and do that what do you think what what would what would you think would be a good way or some good advice to give to someone coming up in this trade on how to learn because i didn't graduate from college when i was a kid dad said
come on i'll get you and your brother on it forward and uh you'll have a good good career and i said no dad i'm gonna go to buildings i like buildings and i worked my way i went to apprenticeship school or vocational school i went through some college classes and realized didn't have the money and had other opportunities spring up but i had the fortune to find my way through and come up with things and had people that helped me. What would you say to someone who wants to learn and out of high school, wants to pick up
the craft, what would you give them as advice? Again, start on the bottom so you understand it from the bottom up. Sweep floors, tote lumber, whatever you got to do, and always work harder than the next guy because at some point they're going to weed the crew out. And as long as you're the hardest working guy on the crew, you'll always be there. Yep. So work hard, pay attention, and ask questions. There you go. If you don't understand, ask questions. Yeah. I was always asked, why do we put these trusses, you know, at two foot on center? Well, it's got to meet the plywood.
All right. So then we start, I mean, just ask questions. There's no dumb questions. A lot of dumb answers, but no dumb questions. Right. And I think that was one of the things, you know, as I grew up, I had carpenters who wouldn't tell me anything. Asking the question, and I was very fortunate. I had a lot of electricians and plumbers and millwrights and people that worked even in the power plants that you would ask them the questions. And 85 % to 90 % of them would stop and explain it to you. Right. Because they wanted
to see someone else come up in the trade. There's a gap between us and the next generation. Huge. We're dinosaurs. We're both going to be extinct here pretty soon. I feel like a dinosaur sometimes. I do too. But, you know, when you look at all of the timing and the stuff, the parts and pieces that we've been through, from learning how to do it, walking our way through the trades, asking the questions, we've made our mistakes. We've learned by making those mistakes. If you're not
making a mistake. And the difference is in a mechanic or a person that's doing the trade is how you think yourself out of it. You will make a mistake. Absolutely. And I got to ask you this question. What was one of the worst ones you made? I can honestly say one of the worst mistakes. And then how did you figure it out? One of the worst mistakes I ever made didn't even have anything to do with the job. I was in my truck going to
get some drinking water for the guys. On a big job. Had 500 guys on the job. My crew, I had the concrete crew. And the general superintendent pulled up beside me going the other way and leaned out the window. He goes, where are you going? I said, nowhere in particular. And I didn't go over. That was not the thing to say. I learned at that point. That was a learning minute in my life. Think about what you're saying. Yeah. As far as construction mistakes, sure, we're going to make them. You're going to have a layout
that doesn't work. You're going to have boards that are too short. You're going to have those things. But like I say, you learn from them and you remember those. But it also taught you when you're looking at the drawings to know them. You can't know from soup to nuts right off the bat. But if you're in the civil, you're in the structure, you're in the rough end, those are the key elements to hit on first and get used to and find and understand and know. absolutely what's that plumber doing what's that electrician doing why is that pipe there what does that do like you said ask questions if you that helps
you as a general uh knowing who can go first who can go first in this area or that area to where we can work and coincide on both sides and meet in the middle yeah things like that you know um Try to understand the whole job. I don't know everything there is to know about construction, but I know enough people that I can call. If I don't know, then I can get an answer. That's right. There's always somebody out there that can help you. Somebody that we've met along the way. Yep. And they've tried it, done it, trued it, made a mistake. Yep. Blown it. Yeah. And, you know, that's one of the things
I found in some of the generations I've been around is not asking. They just go ahead and try to do it. Yep. And there's no harm in picking up the phone and asking or asking something. And one of the most impressive things that I ever got out of an individual or superintendent that was learning the craft was, I don't know about this. Can you walk me through it? Can you explain what needs to be done? Can you show me what this means? And, of course, my favorite thing is always to say, if you look at the electrical.
There is a notes page and then there is a page reference for symbols. Flip between the two and you can look and understand. It'll tell you and explain it to you. You don't have to be an electrician. Right. And if you understand. what you're trying to achieve it helps you understand why i'm putting that conduit there and not there right or you know why we're running this vent stack over that side because we're going to pick up three more toilets or something um it helps you understand what they're doing if you understand why they're doing it yeah and don't be afraid to ask i'd
like say i'm a lot of times asking the plumbers or electricians you know why you put that box there or why are you running a conduit overhead not on the ground well it's easier i can do it later Stuff like that. One of my favorite things I learned was if you had an electrician on the job, he always wanted to put the home runs underground. He ran out for the home run. And the home run is the wire that captures all the circuits and then brings it back to the panel to terminate at the breaker. And they always love to put them under there. And I used to heat it because...
The time it took away from, we couldn't get the slab down. You'd have the slab prepped perfectly, and then he'd come in there and dig a ditch right across the middle of it. Yeah, but then when it came into roughing in, it made all the difference in the world. So you traded a little bit for here and there, but it improved your roughing performance greatly, especially pulling wire and stuff. That was a good one I always liked. And again, they're going to go out there and do something. good subs they'll do something that you don't really get a grip on but they're
doing it for a reason and it might be time time saving might be money saving but they're doing it for a reason so just ask them why are you doing that they'll tell you and more likely they've been doing it enough yeah they've they've learned just like we did that It don't work very well that way. Let's try it. We're going to try it. We're going to do it this way. Absolutely. And it's neat when you stand there and look out and watch them work and it's a well -tuned bunch. It's really interesting. And when, you know, some of the, I've watched iron workers, you know,
when they're setting steel and you go around, you level the anchor bolts and stuff to get the structure in. And I've set some columns, the H columns that had inch and a half flanges on them on huge. that held multi -story steel structures. And, you know, when you ask them, why did you set that one first? Well, how do you know that's, how do you, and they love to let you know. But I learned that when I started picking a sequence on the job and how I wanted to go through, now
I understood their thought. I understood the plumber's thought, the electrician's thought. I could help put together a better schedule. for the project. Absolutely. Like, you know, when you're doing some projects, you've got CEP areas that they need to go first because they've got to start up in order to finish. You may have a building that has a lot more work in it, and you've got to understand that, hey, Mr. Ironworker, you're going to go here and here and here. Same thing with your slab, your rough -in and stuff. I can open up a school with classrooms and no library. But I can't open it with a library and
no classrooms. You do the classrooms first, get them out of the way. Yep. And you've got to have the – Should have had something come up. And you've got to have the HVAC on and the fire alarm and all the life safety systems. They don't care. And that goes back to the big picture. You've got to understand the whole thing and how you're going to get to the end with your inspections, your buyout with the owner, and the turnover. It's all got to happen. In a sequence, again, we go back to sequencing. Yep. And after you've
done it a few times, you understand, like you said, I've got to have chilled water. Well, then I've got to get the chilled water, all the chillers up, and those have got to be running, which means I need big power to those chillers. Yep. And you need permanent power because you can't run them on temp. Yep. So you've got to be getting your main feeds in. Yeah. Yeah. Just look ahead and try to dodge all. Again, it goes into looking in tomorrow. What am I going to do tomorrow? Yeah, tomorrow, next week, three weeks, four weeks. And that goes to another good subject is look -aheads. Yep. When we get a job, a big
job. Kind of like what we've done here. There you go. The first thing we do is build a schedule. And you have to get people to buy into that schedule. And it's got to be built on knowledge, past knowledge of time. and materials a lot of stuff you lead time on materials you might not get your chillers for eight months so you you work it into by the time those chillers come they're ready to be set down charged and ready to go you know have everything else done in front of you and the three -week lookaheads give you a day -to -day this is where we're going to be tomorrow boys
and this is where we need to be friday and if we're not here by friday we're working saturday right you know And that's that weekly communication in the subcontractors meeting. Absolutely. And that's where you get them all in the room and you can ask them the questions and find out where they're going, how they're moving through, and what headaches do you have. that you can help them with so that they can keep moving. Yep. My 6 .30 meetings in the morning with the foreman's on the job. One of the things that I found in my later years is when I get a subcontractor
and we're scoping them out and we're bidding the job and we're looking at him, he's got to swear to me and promise that he's going to keep the same foreman on there the whole job. Right. Nothing worse than getting somebody in the middle of a job that hadn't been there to try to pick it up and run with it. Yeah. And then you get in there, they lose parts, pieces. Things get lost, forgotten, missed, and you get the surprises. Those 630 meetings are the best. This is where we're going to be today. And a lot of times it will flush something out. Like I'm going to be digging a ditch over here. Well, I've got to
lay some block over there. Okay, well, let's figure this out. Who can go first? Yes. And then you work it out. Exactly. Until all of a sudden everybody goes out the door and, hey, we've got a problem. You know, work it out in that meeting in the morning. And the job flows. There is something that really supports holding a good schedule. Yes, it's got to flow. It's got to flow, and you're addressing the challenges, the problems, the situations that come up. The schedules are made, but it doesn't show all the little intricacies of challenges that you see every day. Because
it changes. It's fluid. It's fluid. It's a guideline of how you're going to complete the job. The one thing you've got to remember is that end date don't push out. That's right. Exactly right. That's probably one of the hardest things to do on a big job is to maintain the schedule that you started with. Yeah. And in solving the challenges where a subcontractor falls behind, how can you reset to let the other subs go and get them to work? So, well, I've enjoyed talking to you today.
I've sure been happy to be here today. I would love to have you for another 30 minutes if you've got time. Absolutely. Let's take a little quick break. I see the daylight coming up. Daylight has broke. Yeah, let's go out and see the crane. I need to check the job site. Let's go check it and come back and do another sit down. Let's do it. Well, this is Joe on the job site. This was our first edition. Thank you. And we will see you next week.
Today, Tim Ferris rejoins Joe to discuss his role within the ACE Mentorship program. How did Tim get his start working with ACE? What does Tim do to help prepare students to meet the expectations and work they will be...
Today, Tim Ferris joins Joe to discuss his career and some of the projects he’s worked on. How did Tim transition from college sports to construction? What are Joe and Tim’s experiences dealing with tornados while on a...
Today, Juan rejoins Joe to discuss the ACE Mentorship program in depth. What do ACE Mentors teach to the students and how? What kind of events and activities does ACE offer for students to participate in? How does ACE,...
Today, Juan Torres Hunt joins Joe in the trailer to discuss his intro to the industry, from his experience with his father to becoming a project manager. How did having mentors help Juan when he was trying to find his...
Today, Travis rejoins Joe to talk in depth about the ACE Mentorship program. What is the goal of ACE and how do they work to achieve it? What are some examples of events and activities that ACE uses to help introduce...