Today, Tyler Brooks sits back down to go into a bit more detail about the tools his shop uses and the importance of job satisfaction.
How have automated technologies such as CNC machines helped to improve production capacity? What observations has Tyler made about how job satisfaction and company culture influence a person’s capabilities? What advice does Tyler have for new members in the industry?
Find out the answers and more on this week’s episode of Joe on the Jobsite!
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Welcome, and thank you for coming back. We're continuing our conversation with Tyler Brooks, who is the fabrication manager for S .I. Goldman. We were out walking the site. What do you think? I thought the site was pretty good. I was checking out the piping, but I did notice you did say Schedule 80 earlier. I didn't see no Schedule 80 out there. I said Schedule 40, but I don't know 80. I misspoke. It's Ruffton Underground Schedule 40. I got you. Yeah, I kind of caught
that a little bit later about having the chiller roughed in underground. And I meant the underground rough in, but I really just messed up saying 80 instead of 40. Nope, that's fine. It's still pretty fun. Yeah. It's coming along. We got another year or so to finish, and we're looking forward to getting there. You, before we left, we were talking about S .I. Goldman and their changes that they're making. So what I'd like to hear
is when you get a new machine, you don't know how to run it. You got to train it. And then when you, your teams and everything. So can you walk us through some of your new machines, what they do? How do you school your people up? All right. Yeah. So we just, we just purchased a new Watts 242. It's a pipe profiler machine where it will cut. It will. So you feed the machine piece of pipe. and it will cut to a precise cut
length for you. It'll also do a fish mouth, and it will cut holes, like weld -a -let holes, so basically a hole for a weld -a -let, which is an attachment, like a branch line off a piece of pipe. So let me kind of step back just a little bit where our BIM department, which is our BIM VDC department. And if you don't know, BIM is building image modeling, and VDC is virtual design construction. Yeah, they kind of take the place of what we used to do years ago, where we had
the light table, and we laid the vellum down, and we looked at that light table, and we assigned elevations. So both those programs now, right? Yeah, well, I'm going to stop you there, because when we were doing the renovation upstairs to bring this BIM department in, I actually found two of those lights up there. Well, if you don't want them, I'll take them because like me, I'll keep them as an antique. Let's see if I can locate them. Well, it's good to show sometimes what we did in the past. Your BIM, your VDC, we used
to spend three weeks, four hours a day, one day a week doing those drawings, laying them over, marking them. And it was on vellum. It was a paper the light showed through so you could see all your lines. And fortunately, they didn't print but one color, black. So you really had to pay attention what line was what. Now, ductwork never looked the same size as sprinkler pipe, but you looked for the intersections. And now you can take BIM and VDC and slice the building
vertically and look at it and see the pipes going this way, rotate it around and see them this way. know your ceiling height, know your bottom of beam and bottom of all your encumbrances, and it helps you put it through. It's amazing because you can actually walk through the job, you know, looking at a 3D BIM model and looking through it. And like you're saying, you can see all the different layers that go with it. It's amazing. But with this new department, well, with the department at the shop now, it's great
because we're not miles between each other. If there's a problem, they can come down and take a look at it and physically touch it and see, hey, it didn't work. I mean, it looked good on paper, but maybe it didn't work in reality. So with this new machine, we are now connected to the BIM or the VDC department now, where they can send all these spool drawings, which the drawings are how we fabricate. are parts and pieces. That's what we're looking at. So they're
a detail so that one person could read. You got to cut the pipe 12 inches long. You're going to put a 90 that's 38 degrees out of rotation or turn this way. Yeah. And the machine can realize that. Right. Yes. Well, it will know the cuts. This machine is just going to do our cuts for us. So which is it was phenomenal because to what what we're using now, we're using the Alabama
quick cut. Sounds sounds pretty. I guess I want to say backwards. So is that a machine? It's a machine. Yes, that's what I'm saying. Never heard one Alabama quick cut, you know, but it's you know, it works and it does the job. It's it's. There's no computer or anything to it. It's all switches and manual cutting. Basically, we just drop the plasma on it, and it just rotates around. The new Watts 242 is going to... All
the spool drawings, all the cuts are going to be loaded into this machine. So it comes from the BIM? People right into the machine. Once you guys agree this is it, this is the drawing we want, go ahead and make it. We're just going to feed the machine, feed it the pipe, and we'll overlook it, make sure those are the cuts that we like and the parameters, and push the go button. Now, we haven't had the training. We have the training coming up in two weeks. So once we have
the training, I'll be more fully involved with it. This is just from what I'm reading. what i'm seeing and you know we we went to a couple other facilities and you know and seen you know what the machine does and send a couple emails out to our um opcos and see uh sister companies and you know see what this machine does in the capabilities so you have the new machine and you get your training set up how long does it take to train someone for this machine well they're telling me a week So you got eight hours a day
for a week to train people? That includes the person that loads the computer to the person that turns it on. Yes. So once this machine cuts the pipe, it just cuts it at the proper angle that you need to make the system. How do you get it fabricated with the right pieces together in the right order at the right angles? How do you control that? So it's going to put a 37 .5 degree bevel on it. That's the bevel that we need to make the wells. We're two joining pieces of pipe with that same bevel. So we get the nice
filler material when we're welding. But all the pieces are going to be numbered. So once they come off the assembly line, you want to say, or the cut, they're going to be numbered with what spool number they are, what cut length they are, so that when our pipe fitter gets the parts and pieces, he'll know what goes to. Is this numbered by a person or by the machine? By a person. Now, there is a labeler. We haven't got that far yet with it, but it will spit out a label for you, and you can slap the label on
there. And that's where we want to go with it, where you can have a QR code, and you can scan it and trace that piece of pipe. Yeah, a QR code. You can trace it right through. By the way, here's the picture. Click. And we can see what we're doing now. Yeah. We got the idea. So that's where we're going. We got the machine in place. We are building all the infrastructure around it, meaning the rollers, the infeed tables, and the outfeed tables. I'm drawing all that stuff up, ordering material, and we're building it in -house. We have built the infeed table outside. I send
it to the galvanizer, meaning it's not going to rust. It's going to last forever, hopefully until I retire. That's good. Now, once this is done, you've got them cut. You've got them labeled. They go to the welder. How does the welder know which angle? Like he's got a 90, and if you're looking at straight up as zero, and you have to rotate to 90, you usually have 35s or small angles because you have to go around or under
something. Engineers typically only allow so many bends in the lines for their calculation. How does he know if it's zero is the top? And he's at 18 degrees off of zero for that 90. Well, we have levels that tell you the degrees digitally. Okay. So we have that. We can also do old school weight. But generally, we're doing more 45 and 90s. Very seldom are we doing any miter cuts
with like a 30 degree. I mean, don't get me wrong. We do do them. And they are challenging at times because we're not. it's not a typical a 45 is a store -bought fitting you know 90 is a store -bought fitting but then all of a sudden you have to do a 22 and a half degree so now we have to take that 45 and cut that 40 feet 45 and a half to get our 22 .5 right and we got to make sure that is correct um we do it but it's it's just not maybe Sometimes it's cheaper to buy the 22 and a half. Well, you can't buy them.
It's funny. You can buy 45s and 90s, but not 22 and a half. My lead guy had suggested, hey, they should make fittings that are 22 and a half degrees. How many would you use of those just for production's sake? How many would you use in the 22 and a half? I mean, it just seems like it sounds like the 45s and the 90s are normal ways you can reroute. and you lay out and allow to use for 45s and 90s so i mean not not particularly
on a regular job is not you going to use them but we you know probably i would say you know a couple jobs a year we we do use a a offset like that okay um the buildings are not always square you do get round buildings every now and then you know so you have to go around that curvature so that's where you're adding those miter cuts in here to make those subtle turns around um so we've had is your welding on this pipe done with a machine or does it stick welded so we mig weld everything in the shop mig welding is
for production so we have the pipe works uh 400 machine that is what is what we use and it does it for you or no no there's a there's a person person does it is a person well we're not there yet so we have looked at some automated welding um we're just trying to see if you know that would suit us for what we're doing Because some of the machines are limited to what they can do. Or if you want to spend, you know, half a million dollars or something, I'm sure they'll take it. I've seen the machines that actually can weld inside a pipe. Now, they can't go like
in the middle of a 20 -foot stick, but three, four, five feet in where they're putting a lead off on with a flange down and it has to be welded. I've seen those machines weld them. They're pretty cool. I haven't, but I mean, I've seen that I, not something that we would. Well, there's a lot of investment there for that need. Yeah, that's very true. When you're buying this machine and making these changes, you're investing in the machine itself, your people training, and all of it. So he's got a little expenditure before he starts getting a return on what he's invested.
It will come. So what would you say is the machine advancement between now and when you started? From now on, well. Because we talked about BIM and VDC advancement. Now, the machinery, you just told about one of the machines that advanced. Around the years ago, I worked in a hollow metal door fabrication shop. We hand cut all the frames.
We welded the frames. We ground the frames. Now there's a machine with a die cut in it that cuts that. And then there's a machine now that puts it together. and it literally tabs it off, and then you have small welds you don't have near the work you used to. It's done by machine. So that's where I'm going with you as far as pipe fitting. Yeah, so, I mean, as for the pipe fitting, you know, portion after it's cut, you know, right now that's all done by humans. And there are
tools, there are innovative tools that will hold the flange and keep your flange level for you. There's two, you know, two old pins, and, you know, there's some... innovative tools out there that you know we we do use and you know we will weld flanges you know basically have a wall of flanges and all those flanges are welded they're true they're square and we basically just bolt right up to that so i mean we we are doing some things in the shop as for that but most of that's all done by humans putting it everything together um but besides the uh the watts 242 we also bought
a cnc machine I love those. So for metal, not for wood. Dang, you had my heart there for a minute. But I know what the CNC machine does. How do you use that machine? So that machine is, I mean, we also, we lay a piece of plate in there, a four by eight piece of plate. It'll cut up to three quarter inch thick. Again, same thing like I spoke about with the nesting. You can maximize your sheet. And you can nest all
your square plates. If you're going to make, you know, plates for stands, base plates, you know, so if you're going to do an eight by eight or four holes in the corner, you know, back in the day, or I want to say back in the day, three years ago, we were cutting them out like on the bandsaw. We would cut the, we wouldn't use a plate. We use a flat bar where we'll cut the flat bar or we use our iron worker and use the shear and cut it and then bring it up to the. and punch all the holes in each corner, each corner, each corner, next piece, each corner,
and that's tedious, and that's a lot of work. This machine now, you just lay a 4x8 sheet of flat plate down there. How many cuts do you want? Do you want to use the whole sheet? And then you can adjust how many sheets or how many pieces you want to cut, and it's going to tell you how long it's going to take to cut all those pieces out. Took a little break there. We're talking about CNC machines. So I got my first experience with a CNC machine in Trinidad. We were down
there doing a building for a company. And I walked into the cabinet shop that was doing the millwork for them. And they had this huge machine. And it was about 7 feet wide and 12, 14 feet long. And I looked at it. It was brand new. And I asked them, I said, what do you do with it? And they said, we don't do anything with it. We don't have anybody that can program it. tell it what to do and how to run our systems. I said, you got a book? They had a book. Well, I had nothing
to do at night. So I took it home and read through it and everything. And I took one of their young guys down there that wanted to learn it that was computer savvy already. And we sat down and we went page by page to where he could run that thing and start telling it what to cut. And from when I first saw Sand Machine, they were what? with a two axis. Now they have them up to five axis. So what that means for me and in my industry is where I used to have to take a special blade
to cut a door panel. You know, you see the raised door panels with the scalps. I could tell that machine to cut it and it would cut the tapers and the edges and everything. All at one time. Yeah, the head oscillates and moves around for that. Yeah, and that was really cool. And I can imagine what it would mean for you. Like you just said, what took you four days, you cut out in a day with your CNC machine. So you have the advantage of turning it on, programming it. I'm going to do something else while it's working.
Well, yeah, to a certain extent. So the employee needs to be there in case the machine malfunctions or something happens. Because sometimes it will topple over if it... catches a high lip or didn't cut all the way and it might be a you know a piece of slag there and knock it over so but yeah in a sense i get what you're saying and they're easy to restart when they hit that too because they have they have memory yeah yeah they can back up and take off all right so a lot of people don't know what cnc stands for do you computer navigated controls numerical
numerical control yeah but it's close I can't get an A for effort. No, we, you know, a lot of people think, you know, cutting and everything, it's something with the C, but, you know, that's good. Well, and you think of the time saved on it. That's one of your machine advancements that we have. One of the challenges we have in this industry is 30 years ago, labor market was strong for these crafts. It's changed in the last 30 years. It's not as strong as it once. So the
companies have had to find new ways to advance their work without the same amount of manpower. And fortunately, you've got companies that just built a machine that you had that's a time saver. Oh, yeah. It's expensive. But what kind of cultural change would you think you have saw since you've been? coming up through this era of mechanical systems? Well, I mean, so, you know, different companies do different things, you know, and,
you know, cultural wise, you know, with SI Goldman, I feel, you know, family oriented and, you know, I feel everybody's a team there and everybody works together. So, you know, problem solving, you're not by yourself by any means, you know, and you have all the support systems there in place, you know. You know, going from all the way to the bottom, all the way to the top, it doesn't matter. I feel like everybody is unison. Well, that, you know, you said family oriented.
That's a key element. When you go to work, you don't want to not like going to work. Right. I mean, especially if you were 50 years old and realized, man, I hate this job and I got to work till I'm 66. Oh, my Lord. It gets a little undaunting on a person and wears them down. And that says a lot for a company that keeps it that way and works it and maintain. You mentioned also it's a team. Yeah. And the teams together. And I love it when you see a group of people working as
a team and they're rolling around. working on ideas and they rag each other a little bit and you hear them laughing and carrying on, gee, it's the best result out of those than you would ever dream of. Oh yeah, there's some ragging going on. It's fun. And they don't, neither one of them take it to heart because some days you have one person with a better idea than the other person. But the person realizes that idea is better than mine unless you use it. Those are good parts on a team build. Finding those people
to work together, it's worth working to keep them going. It is. Do you guys do any kind of a rewards program for production, team building, or anything? Some companies I've worked with, once a year we would go do a shotgun or clay shoot, or we'd have a golf outing. I had one company, we finished a job that made more percent than it was supposed to on profit. Because we honed it up and tuned it in. And they took us
deep sea fishing for the day, all of us. So you say that. And yes, yes, the company does. We go on some outings. We've done bowling. We've done the pool hall. We've done Topgolf. So, yes. So we do, I think we do about three outings a year. It was Employee Appreciation Day and stuff. We do those. And I also, for the Fab Shop, I also do some things for the shop as well. We'll do some cookouts or, you know, maybe we'll, I
like to cook. So I would cook them breakfast. Oh, I'd love that. I guess I make the best, well, I make a breakfast sandwich. Apparently I make the best breakfast sandwich where they told me I need to get a food truck. When are you doing it next? I'll stop by. Hey, we can do one of these over there. You got a podcast there. I'm up for that. Come on, here you go. We'll talk about that after this and set one up. I think that'd be a good idea. There you go. So Tommy's shaking his head yes, so we're in. Yeah, he was. So, yeah, and it's a positive. It's a positive
feeling. And, you know, like I told you, it's family -oriented. I feel like I've been here only two or three years. That's how it feels. And, you know, we're past 10 years. It's gone by so quick, it doesn't feel like the 10 years at all. Well, that's good to hear because you're going to be one of those guys at 50 years old waking up going, dang, I love going to work. I'm having a good time today. I do. I'm at work at 4 .30 every morning. You got the work -life balance. You got a job you love. What more can
you ask for? So you've been in the business about 28 years. And what kind of training programs do you do at your company at S .I. Goldman? What do you look for in individuals? Because there's going to be people listening to this that say, I'd like to try that. They may want to pick up the phone and call us. I go, man, because you remember you started at the ground floor learning how to sell the pipe in the fittings. Yeah. You
pulled it off the shelf and didn't even know what it was when you started. Someone else has to learn that. And someone else has to learn the fitting, the weld, the type, the use, the machines, the timing. how to think their way through problems and situations, how to plan a job, how to plan their work. That's what you're doing. When you're managing that fab job, you're planning the flow of how that's going to be the most efficient. So you've got to train the next person behind you. Well, I mean, I take them under my wing, and I show them parts and pieces
of, if somebody's behind me, my lead guy is showing parts and pieces of what needs to be done in order to maintain. uh the shop like for instance i'm here right now he's running the shop you know so he had been taught something you know to to keep it going and you know and be able to uh you know sometimes a problem well not sometimes but problems do evolve or happen so you know what's the best thing to do to to solve that problem yep how to think it through how to think it through now uh If an individual comes in and
is green, I try to figure out where can I stick that individual. Maybe I put them in the tool department because it's not just fabrication. We have all the vehicles we're in charge of. We have 60 plus vehicles we're in charge of. All the tools that come in and out of the shop, making sure maintaining those tools and making sure the employees have good operating tools. And then again, the fabrication. So there's a lot that goes around a lot. in that shop um you
know training besides the training for the shop we also have a welding program in -house welding program after hours and they can be certified with and they can be certified yes uh in -house uh we have a well weld instructor you know again works for us and after hours i go back and i i built a a welding training area so you know they get certified that way What level can you certify them to? Like 3G, 6G? 6G, yeah. So a
6G certification. We also do an in -house pipe fitting program. So you do a training program in -house? In -house, yeah. All they have to do is have the initiative to want to learn, to show up. Absolutely. We always said, if they're on time... You know, in my day, when you went to work, if you started at 7, you were there no later than quarter till. 7 o 'clock meant you were in your workplace, ready to go, not walking up, putting your gear on, and then going
to your workplace. It meant you were at your work point, ready to go at 7. And if you got done at 3 .30, sometimes the companies would say, okay, we'll give you 10 minutes to roll up, put your gear away, and then you walk out. They show up, they have initiative, and they have the dream to become and grow and learn. Those are your key points. If you were going to give a piece of advice to a young person that wants to walk through your front door and learn
the craft, I like this work. I'd like to learn it. It's not easy. It's not hard, but you can make a very good living at it. Yeah, you can. What piece of advice would you give an individual that says that walks to your front door? I mean, well, first of all, not to give up, you know, and if, you know, if you fall down, get back up, you know, that's, that's, you know, they're going to make mistakes. You're going to make mistakes. You're going to make mistakes. And that's how you learn from your mistakes. You know, I didn't, you know, I didn't get to where
I was by, you know. Not making a mistake. I made several mistakes. Lord, I made a few. You know, that's one of my advice is, you know, don't give up. If this is what they want to do and they really want to learn it, I mean, there's a lot of opportunities, a lot of opportunities at the Fab Shop and, you know, anywhere else. The Fab Shop could be just a stepping stone. You can come through the door and not know anything, right? So then you can learn, like, back to where I started, learn all the valves and fittings
and pipe. Because we have residual material that comes back. We have everything there that we're billing for a fabrication job or for a job fabricating. So they can learn all the parts and pieces. They can learn all the tools. They can learn some of the machinery. They can learn some of this, you know, new machines that we're running now. If they like the shop, they can stay in the shop. Or they can move on from there and then go out into the field. And maybe they become, you know, become a foreman and run their own job. And then sky's the limit. Sky's the limit for them. They
just have to have the desire and the heart and dedication. Yes, absolutely. Now, do you guys have insurance for employees? We do. And vacations and stuff? Yeah, we have insurance and vacation. We absolutely do. 401k. Well, that's good. I started putting mine in when I was 36. No pensions. No, the pension things have kind of gotten thinner now. The 401ks and other things have taken over. But it's still good to be working toward that
and have it. So we're wrapping up now. If you have anything else you'd like to add about your time in the industry and the people you've met, because it sounds like you've had a lot of good people that helped you. You listened, you learned, you've progressed, and now you're in the seat. to train the next generation to come through so that when you retire, you have a legacy that follows behind you. Yes, absolutely. I hope that happens. Well, you'll always have somebody that
you've made a difference in. I've had it in my career, and I worked in it for 25 years. I had three or four superintendents that worked under me. Most I've had under me is eight on a project. But your impact on them, you don't see it until one day you see them later on and they say, thank you for what you did. Now I understand. Well, there is one individual that always, every time I talk to him, he says, was I your best hire? I said, yeah, to where he is now. So that's just
funny. They're proud to try. Yeah, it's great. And I hope somebody learns a lot from me. And I put in. a lot, you know, for the, into this industry. And, and I love it. I love every bit of it. I love waking up every morning and going to work. It's important for people like you and I to leave someone behind to fill in our shoes, whether we can do 10 or we can do two, we leave somebody behind. So it's been great having you today, Tyler. I appreciate you coming. I will,
we will look at coming up to SI Goldman and doing one right on site. I think it would be great. uh to do that yeah so this is joe with another edition of joe on the job site thank you
Today, Tim Ferris rejoins Joe to discuss his role within the ACE Mentorship program. How did Tim get his start working with ACE? What does Tim do to help prepare students to meet the expectations and work they will be...
Today, Tim Ferris joins Joe to discuss his career and some of the projects he’s worked on. How did Tim transition from college sports to construction? What are Joe and Tim’s experiences dealing with tornados while on a...
Today, Juan rejoins Joe to discuss the ACE Mentorship program in depth. What do ACE Mentors teach to the students and how? What kind of events and activities does ACE offer for students to participate in? How does ACE,...
Today, Juan Torres Hunt joins Joe in the trailer to discuss his intro to the industry, from his experience with his father to becoming a project manager. How did having mentors help Juan when he was trying to find his...
Today, Travis rejoins Joe to talk in depth about the ACE Mentorship program. What is the goal of ACE and how do they work to achieve it? What are some examples of events and activities that ACE uses to help introduce...