NOTE: This episode originally aired on March 29, 2026. It has been updated with new information. With reservoirs at historic lows following one of Idaho’s worst water years on record, the state could face even greater challenges in 2027. RELATED | Record heat and dwindling reservoirs leave Idaho bracing for another tough water year Sen. Kevin Cook, R-Idaho Falls, says expanding water storage is critical to Idaho’s water future, and he’s making it a priority in 2027. Next month, he’ll lead a trip to Washington, D.C., to meet with Idaho’s congressional delegation about water storage projects. RELATED | Local legislator asking you to sign petition in support of water storage projects in Idaho RELATED | Local legislator focused on longterm water storage projects to complement recharge efforts and secure Idaho’s future RELATED | Local legislator who led trip to D.C. says Idaho’s water supply is priority for our congressional delegates In 2025, Cook and Rep. Rod Furniss, R-Rigby, co-sponsored a resolution identifying six potential sites for water storage projects. One of the most notable proposals calls for rebuilding the Teton Dam. Cook will join us next week on “It’s Worth Mentioning” to discuss the proposal and the future of Idaho’s water supply. In the meantime, we’re revisiting our March episode exploring the history of the Teton Dam disaster. Host Rett Nelson looks back at June 5, 1976, and the events surrounding the dam’s catastrophic failure, marking the 50th anniversary of the disaster. Nathaniel Gee, a dam safety expert with ties to Rexburg and the author of a new book about the disaster, discusses the contentious political history behind the dam’s construction. RELATED | The Teton Dam disaster was connected to more history than you ever imagined Richard Robison, nephew of the man who oversaw the dam’s construction, shares a firsthand connection to the tragedy. His uncle was the last person standing on the dam’s crest when it failed. Robison toured the site several times during construction and recalls what he witnessed behind the scenes. Gee and Robison also share their perspectives on whether the dam should be rebuilt. Our final guest is Trent Walker, a Rexburg native whose parents owned a popular local restaurant back then. Walker recently retired as an audio engineer for the Tabernacle Choir. He and Richard collaborated on an album that sets the words of Teton Dam disaster survivors to music. RELATED | He survived the Teton Dam Disaster. Now he’s bringing memories back to life through music Walker discusses the project and shares one of the album’s songs at the end of the episode. The 17-track album called Teton Letters is available to stream for free. Listen to part 1 here and part 2 here. If you grew up in eastern Idaho, you’ve heard the stories of the Teton Dam disaster. This episode is packed with history, personal memories and a look at what the future could hold for the site. Watch previous episodes here. Check out the show on Facebook. If you have a tip or a guest idea, email rett@eastidahonews.com. OTHER TETON DAM EPISODES The forgotten Disney voice actor who came to Rexburg after the Teton Dam disaster The Teton Dam disaster was connected to more history than you ever imagined Voices from the flood: Survivors reflect on the Teton Dam collapse Caught in history: The untold story behind an iconic Teton Dam photo
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Welcome to It's Worth Mentioning. I'm your host, Rhett Nelson. And as we wrap up the water year in 2026, it was definitely one for the record books, but not in a good way. The National Weather Service in Pocatello is reporting that Idaho, along with most of the western United States, experienced its hottest year in history. Precipitation levels statewide over the last year were 90 to 110% of normal overall, but most of Idaho was below 50% of
Speaker 1normal last winter. The southern half of the state began the water year in 2025 in a moderate to severe drought, but as of September 30th, the drought level has intensified. Most of the southern portion of Idaho is now under extreme drought conditions, and without sufficient snowpack this winter, we're in for a very difficult year ahead. And so as farmers look ahead to 2027, there's a lot of concern and fear and trepidation. And a lot of farmers are,
Speaker 1you know, trying to get creative about how to stretch Idaho's water supply even further. Senator Kevin Cook of Idaho Falls says water storage projects are the key to having enough water to go around. And he's made water storage projects a priority over the last year or so. In 2025, he and Representative Rod Furness of Rigby co-sponsored a piece of legislation that was proposing six water storage projects throughout the state of Idaho. And of course, one of the
Speaker 1most noteworthy and popular ones is the Teton Dam proposal to rebuild it. Now, of course, we've devoted a lot of attention to the Teton Dam on this show over the last year since it is the 50th anniversary of the Teton Dam disaster. And so with that disaster and this history of destruction there are mixed feelings about rebuilding the Teton dams. Senator Cook created a petition that he took to Washington, D.C. last year to show our congressional delegates that there was support for rebuilding the Teton dam
Speaker 1and for water storage projects in general. He's about to return to Washington, D.C. It's been about a year since that trip, and his goal is to have a water storage project get underway in the near future and he's seeking congressional approval funding for such a project to move forward. His big goal is to have 750,000 acre feet of water storage by the year 2100. And Senator Cook has
Speaker 1said that the Teton Dam site is one of the most feasible projects and would provide the most storage capacity. Just with the Teton Dam reconstruction alone, It provides up to like 350,000 acre feet of water storage, which takes us halfway to that goal already. So with all this talk about water storage and water and whether to rebuild the Teton Dam, among other projects that are being proposed,
Speaker 1we are planning to have Senator Cook on the show. We're hoping to have him on next week or excuse me, this week. But he was busy with other obligations, but he will be a guest on the program next week where we can talk about some of these things. In the meantime, I thought it pertinent and worthwhile to revisit a previous episode devoted to the Teton Dam. We got into the contentious political backstory of the Teton Dam, concerns about the design flaws and how the dam moved forward anyway,
Speaker 1despite those concerns. And I had two guests on the show back in March.
Speaker 2To talk about that.
Speaker 1And it's history. It's good background knowledge to have in preparation for our conversation next week. Here's a look back at this episode from March 2026. And then be sure and tune in next week for our conversation with Senator Kevin Cook.
Speaker 3Downstream face on the north side.
Speaker 4Of the dam is completely caving in.
Speaker 1Don Ellis overlooked the Teton River as he watched a wall of water break through the newly completed Teton Dam.
Speaker 5It was 1155 a.m.
Speaker 1On June 5th, 1976. The local radio personality was broadcasting live on KRXK as the 3,100-foot-long flood mitigation dam, which sat about 15 miles northeast of Rexburg, collapsed. The whole north side of the dam is caving in, Ellis reported. People downstream better get out. Funding for the $ 100 million
Speaker 1Teton Dam project had been approved by Congress five years earlier.
Speaker 5The U.S.
Speaker 1Bureau of Reclamation broke ground on the project in 1972. Despite concerns about the dam's design before and during construction, it sat on a foundation of compacted dirt that covered porous and unstable canyon rock. Despite this, the dam was completed and rushed into operation without any testing. The reservoir was initially filled at the standard rate of one foot per day and later doubled. at the request of engineers to keep up with spring runoff. The fill rate was
Speaker 1doubled again about a month later. Hours before its collapse, the reservoir was nearly filled to capacity, and the dam was operating without a functioning outlet works or spillway gate. Without a mechanism to control water flow and pressure, the dam's failure was imminent. Contractors were on site that morning, among them John Calderwood and Owen Daly. tried in vain to plug seepage holes on the downstream face of the dam.
Speaker 1They were there pushing stuff in the hole of the bulldozer as the dam was falling around them. Daly's bulldozer got stuck. He ran to get another bulldozer to try and.
Speaker 2Pull his out.
Speaker 1As he hopped out to get it, his bulldozer fell in, and the water washed it downstream. Daly quickly ran to another bulldozer at the top of the dam and started pushing dirt on the other side. At 11.52 a.m., three minutes before the dam's collapse, the torrent of water had increased and Daley abandoned his efforts. Following Ellis' live report, the studio announcer confirmed with local law enforcement what was
Speaker 1happening and urged people in the area to evacuate. Evacuate your homes immediately. Just go, the announcer said. Ultimately, the dam's collapse spilled 80 billion gallons of water into eastern Idaho. 11 people died, along with 13,000 head of livestock, according to news reports at the time. Homes and tens of thousands of acres of land were heavily damaged or destroyed. The Idaho Transportation Department estimates that about 3,000 people were
Speaker 1made homeless by the flood. Cleanup took months and cost over $ 2 billion. That's more than $ 11 billion in today's dollars. Welcome to It's Worth Mentioning. I am your host, Rhett Nelson. Today we look back 50 years in retrospect, the 50th anniversary of the Teton Dam disaster. Nathaniel Gee, a dam expert who used to work for the Bureau of Land Management,
Speaker 1he has a doctorate in dam safety, and is the author of an upcoming book about the Teton Dam disaster, He's going to look back at the dam's construction and tell us the political, contentious political backstory before the Teton Dam was ever constructed. Why in the world, knowing that there were all of these concerns with the dam's design, why in the world did construction ever move forward? Nathaniel Gee can provide insight on that. And then we also
Speaker 1have a conversation with Richard Robison. He grew up in Rexburg, now lives in Cincinnati, Ohio, but his uncle Robert was the project manager for the Teton Dam's construction. He's able to share those memories, personal firsthand accounts of what happened before and on that day of the disaster. Jam-packed show that you don't want to miss. A look back at June 5th, 1976, the day the dam fell. Nathaniel, thank
Speaker 1you so much for joining me today.
Speaker 6Hey, thank you so much for having me, Rhett.
Speaker 1Most people in eastern Idaho, especially if they've lived here their whole life, like we said, they kind of are familiar with the events that happened that day. And they've heard about the construction of the Teton Dam and its failure and then all of the aftermath of that. But people aren't as familiar with the long, decade-long saga leading up to it there was quite a political battle just to get the Teton Dam approved for construction. So Nathaniel,
Speaker 1do you want to tell us about that and the players involved?
Speaker 2Absolutely.
Speaker 6So if you look at the 50s and 60s, there was a lot of pressure on congressional congressmen and senators to bring home big.
Speaker 2Dam projects to their area.
Speaker 7Right.
Speaker 6They were dams were very popular. hey, dam would bring you water supply, flood control, recreation, power. The list of benefits was long. And so there was a fight in Congress to always try to say, hey, how can we bring these projects here?
Speaker 2Well, in Idaho, it.
Speaker 6Was Hammer Budge was there in the second district of Idaho. He was the congressman in the 50s from 1951 through 1961. And he was very popular in general. But One of his weaknesses was he was unable to bring a dam to Southeastern Idaho. And they had looked at Teton Dam. Reclamation had done some initial investigations. They were concerned about the foundation and some of the other issues. Because of that, it didn't have a great cost benefit ratio at Reclamation.
Speaker 6So he actually focused most of his efforts, he put forth a bill to try to bring forth a dam called Burns Creek Dam, also in the area.
Speaker 2But it was there.
Speaker 1That was near Palisades, if I remember.
Speaker 2That's right. That is correct. So it's still in the district.
Speaker 6It wasn't in the exact same spot, but down by Palisades, Burns Creek Dam.
Speaker 2But he failed. People didn't see it as a viable project.
Speaker 6The other problem he had was he was fairly conservative and he had voted against a lot of other dam projects. He felt like they weren't good use of federal dollars. And after voting against so many, it was hard to get other people to vote for his project. In fact, leading into the 60s, you get a very young Ralph Harding who wants to run against him for Congress. And he focuses on two issues when he runs against him.
Speaker 2Reclamation. which is the water projects.
Speaker 6Hey, yes, Budge is for the Burns Creek Dam, but he hasn't got it there, and the reason is is because he won't vote for other people's projects.
Speaker 2He's not doing what he should. I will be better. I will get us a dam.
Speaker 6And two, he really hammers Budge on he's not a good member of the church. And the reason he does that is he sends out a letter to everyone in the district.
Speaker 2It's a copy of an article out of a.
Speaker 6Washington byline And it's really funny that this was a big deal at the time.
Speaker 2But a Washington byline had done something.
Speaker 6They'd written an article about the fact that Hammer Budge had not let the home teachers in in Washington. And Ralph Harding makes a copy of that and sends it to everyone in the district. It's called the Black Edge Letter because it had this big black edge around his photocopy of it. And it goes to everyone. And sure enough, in 1960 when he runs, He wins. And then he pushes those issues. You know, he really gets in there. He tries, he actually tries to get Burns Creek Dam
Speaker 6at first, but he really realizes pretty early on it's not gonna fly. And so he shifts to Teton Dam, trying to get Teton authorized. By the time it gets authorized in September of 1964, he needs it.
Speaker 2Because he's on the ropes.
Speaker 6He's about to go into a reelection that honestly, he almost drops out. He's in so much trouble politically. And he thinks, if I can get this dam, it'll save me. And the reason he's on the ropes is he's gotten into some of his own tussles related to the church. In September of 1963, he gets so frustrated with Ezra Taft Benson. And what happened was Ezra Taft Benson was part of the John Birch Society. And he had viewed
Speaker 6that as very extreme, right? They're extremely conservative.
Speaker 1Was Ezra Taft Benson at the time also serving as Secretary of Agriculture?
Speaker 6No, he had left that position. So that was in the 50s under Eisenhower. He had served there for during years, but when he left that position, he still remained very politically involved in conservative causes. And one of the big controversies was he and his son, Reeve Benson, they had used the church buildings for John Birch Society meetings.
Speaker 2And the church had come out and said, you can't do that anymore.
Speaker 6But just the fact that there was this tie really upset Ralph Harding, who was a Democrat. Ralph Harding's a Democrat.
Speaker 2Ezra Taft Benson is a Republican.
Speaker 6And he actually goes on the floor of Congress and he gives a speech which sounds more like an internal argument within the church, right? He gets up and basically says, in Congress, the First Presidency and Quorum of the Twelve need to stand up to Ezra Taft Benson and stop him from using his church position to push extreme political agendas.
Speaker 6And when he does this, Reed Benson gets very upset. And they start writing different opinion pieces back and forth in newspapers against each other. And Ralph Harding finally says, you know what? The church is on my side on this. He's like, I've gotten letters from Joseph Fielding Smith, from David O. McKay's son, Robert McKay, and even President Eisenhower. And they're all telling me that they agree with me about Ezra Taft Benson.
Speaker 2And if you don't leave me alone, I'm going to produce those letters.
Speaker 6He finally decides that he needs to produce these letters, but he doesn't want it out to the press. So he says private copies to a lot of people in the district of these letters from Joseph Fielding Smith and President Eisenhower and Robert McKay.
Speaker 2But of course they get leaked to the press, right?
Speaker 6And the problem is it puts Joseph Fielding Smith, it puts Robert McKay in a very odd position. And so what they do is they come out and say, he took those letters out of context. We support Ezra Taft Benson. And it really made Ralph Harding look bad. So bad that there was talk that he shouldn't run at all. That there was so much of the church felt like, hey, you've aired our dirty laundry within the church too much.
Speaker 6You shouldn't run and you don't have a chance to winning. And so he pushes for Teton as like a last ditch effort to save his campaign. He thinks, hey, if I can get Teton passed, People will be so excited about the dam and that I did it that they'll overlook this thing I've had with Reed and Ezra Taft Benson and they'll still vote for me. And he gets it passed. September 1964, the authorized Teton Dam, he does
Speaker 6this big float party. He wants to make, highlight, hey, this is a big deal. So at the end of September, he gets Stuart Udall, who's the Secretary of the Interior, also a member of the church, He gets him to come and with Mike Kieron, who's a congressman who's over the appropriations. And that's a huge deal because it's one thing to get.
Speaker 2Your project authorized. It's another thing to get it appropriated. The two big A's.
Speaker 6You need to get it authorized and then you need Congress to give you the money to actually build it. And they come and they float down the river. They do a big press conference. And then Mike Kieron... the over-appropriations, he's a congressman from Ohio, says something that changes the mood very much so. He says, I promise that I will get this project funded if and only if you
Speaker 6vote for Ralph Hardin. If you vote in the Republican, I will not fund this project. And voters in Idaho feel like this is blackmail. He is blackmailing us, telling us we have to vote, you know, a certain way.
Speaker 2And it didn't go over well.
Speaker 6He even gets actually right after the float trip, shortly after that, he gets President Johnson to actually come as well to try to boost his campaign.
Speaker 2But it's not enough.
Speaker 6And just to show how bad it is, The district will actually vote. It was the very last time that district voted for a Democratic president. They voted to reelect President Johnson.
Speaker 4That's right.
Speaker 2Would never vote for a Republican again.
Speaker 6But they crossed over to vote against Ralph Harding and vote in George Hansen. But the one thing you can say is Ralph Harding did get the Teton Dam authorized. So it's now authorized. It's an improved project. Bureau of Reclamation can begin to start to work on it. The problem is it's not funded. And George Hansen is not able to overcome Mike Kirwan. Mike Kirwan, who's over those
Speaker 6appropriations for public works projects.
Speaker 2Is true to his word. He does not fund Teton Dam. He won't allow the funding to go through.
Speaker 6And so Teton Dam kind of goes on.
Speaker 2A stall pattern for a little while.
Speaker 6Reclamation still does a few things to try to keep it going from a design standpoint. They do do some of the design work, but it can't get the actual budget appropriations to move it forward.
Speaker 1The dam is completed. How long before the, you know, the final piece of material is laid in the dam?
Speaker 2Well.
Speaker 1Between when the dam actually fails, like how much time goes by?
Speaker 6So it's a funny thing that one of the questions you always get when you're involved with dams is when was this dam built? And the answer is so hard to pinpoint. Because, you know, there's embankment material. One of the mistakes they made on Teton Dam, which is really sad, is one year after Teton was authorized, Fontenelle Dam almost fails. Literally comes within feet of failing. It gets washed away
Speaker 6a lot like Teton Dam, but a little bit of it stays the water from completely washing out the dam. And the only reason it's saved is because it has a large outlet works. that they're able to pump down the dam once they see there's a problem. Teton didn't even have an operating outlet works when.
Speaker 2It was failing.
Speaker 6Because they were scared of a lawsuit from the contractor, they didn't get the penstock completed.
Speaker 2They hadn't coded it. They hadn't completed the coding.
Speaker 6And even though they knew that, it said in the specs, you need to have your outlet works operational so you do not fill the reservoir too fast. They were supposed to only fill one foot a day. But they said, you know what? We think we can get it done soon.
Speaker 2Let's just risk it.
Speaker 6And so they left the outlet works not operational. They went from one foot a day to two feet a day. They wrote them and said, is it okay if we go two feet a day? And they wrote back and said, okay, that's fine. To three feet a day, to four feet a day. And they had no way to slow it down because they had finished the embankment and closed up the auxiliary outlet works and started to fill. before they finished the outlet works. That morning at 9 a.m., they decide this is getting bad.
Speaker 2We need to open up the outlet works.
Speaker 6So they called in a contractor and said, we'll just open it, even though contractor shows up about 1130. They never get them open. They never get the outlet works open before the dam completely fails. So to answer your question, they had finished placing embankment.
Speaker 2Earlier that year, but they were still work. It was still an active construction site. So here we are 50 years later.
Speaker 1A lot of research has been done. We know a lot more about why it failed and why the disaster occurred. Before we started recording, I was telling you about one of our state legislators, Kevin Cook, has a proposal on the books right now to looking at six potential water storage sites across the state of Idaho. And one of those proposals includes rebuilding the Teton Dam. I know that rebuilding the Teton Dam was a topic of conversation after
Speaker 1it failed 50 years ago, but it's not clear why it ever happened. But from what I've gathered from Senator Cook, there's a lot of support for rebuilding the Teton Dam today. What are your thoughts about that, knowing what we know now?
Speaker 2Yeah, great question.
Speaker 6And I will premise it by first saying I have not done the analysis you know, of what makes sense in that area, the cost benefit analysis. What I will say is during that time, the late 60s, early 70s, we looked at building dams and we were very good at looking broadly at the benefits. You know, water supply, flood control, power, recreation. We were not so good at looking broadly at the costs. The costs, we just look
Speaker 6at the costs. We didn't look at the risk it increased to people downstream. We didn't look at the long-term environmental impact. We didn't hold that in the equation. Nowadays, we're better at looking at that, right? We look more broadly. But it's still hard to put numbers.
Speaker 2To those things, right? Teton was barely viable back then.
Speaker 6You know, you look at the benefit cost. It was tough to justify this project back in the 1970s when they did. Has that calculation changed?
Speaker 4I don't know.
Speaker 2Is farming becomes so much.
Speaker 6More valuable up in the Rexburg area that it makes sense?
Speaker 2It might be. I couldn't say.
Speaker 6People do ask me is could you build a safe dam on that site? And I would say yes. You can build a safe dam on that site. It would be a very expensive safe dam. To deal with the geology is going to cost a lot of money to deal with it properly and build the dam properly.
Speaker 2Is it worth that cost?
Speaker 8I don't know.
Speaker 6That's what you have to really look at. Is it worth the cost to do it and do it right? If so, it might be a good project.
Speaker 2I don't know. I'm not really in a place to say.
Speaker 8Fascinating.
Speaker 1Nathaniel, this has been a great topic of conversation. Let me just mention your book one more time, Failure and Fortitude, How Faith, Politics, and Power Shaped the Teton Dam Disaster. People can look for that in May, wherever you get your books. Anything else you want to add in these last few minutes?
Speaker 2No, it's been great meeting with you.
Speaker 6The book was so fun to research and put together. It dives deep in all sorts of stories and connections and things obviously that we didn't have time for, but really enjoyed meeting with you. Thanks so much.
Speaker 1His name is Richard Robison. His uncle was the project manager who oversaw the dam's construction. And he remembers as a 13 year old boy, being given a personal tour of the dam while it was under construction. His uncle was the last man to be on the crest of the dam when it collapsed. 50 years later, he's involved in an effort to advocate for the dam's reconstruction. Richard Robison joins us via Zoom from his home in Cincinnati, Ohio. Richard,
Speaker 1thank you for joining us today.
Speaker 4You're welcome, Brett. It's good to be here with you. Thanks for having me.
Speaker 1Yes, and I'm eager to hear this because a lot of people are familiar with this history, but they aren't familiar with these personal stories. And I'm eager to get into that with you. First of all, when you initially reached out to me, you talked about your Uncle Robert. As we mentioned, he was the project manager for this. But you referred to this as, he kind of referred to this as his dam. This was Robert Robison's dam. So do you wanna start off today by talking about kind of the attitude he had about this project and
Speaker 1how he was put in charge of this?
Speaker 4Sure, so I can still remember how exciting it was when my dad told us Uncle Bob was moving to Rexford to build the Teton Dam because growing up, I didn't know him much because we lived in Idaho and they lived, he was working on projects. And well, he built the Willard Bay that separates the freshwater from the saltwater in the Great Salt Lake.
Speaker 2So the Willard Bay was his project.
Speaker 4So after that, he'd been working in Colorado and Nevada on projects. And so when I was 10, nine or 10, they moved to Rexburg to start working on the Teton Dam.
Speaker 2When did construction start?
Speaker 4Construction started officially towards the end of 71. Uncle Bob had moved to Rexburg, Robert Robison, And initially before the design was finalized, they started doing some pilot grouting programs, especially on the south abutment. And so it really began in 71 and it was completed fall of 75. Well,
Speaker 4it wasn't completely completed, but the embankment was completed enough where they started the filling. Initially we had a foot per day and then of course it filled until June of 76 and we know what happened then. So it was about a three and a half year, four year construction process. My dad and I used to go up to the dam and my uncle would give us behind the scene tours of it. I probably saw, besides political officials,
Speaker 4and the actual construction workers, I probably got backstage tours of the dam being built more than the average person.
Speaker 1There were concerns with the Teton Dam construction from the beginning. Initially, the Bureau of Reclamation had proposed filling in the foundation gaps with grout. They later determined that to be ineffective. They ultimately dug a trench and filled in both sides of the abutments with dirt, and I think the idea there was to kind of help reinforce the foundation and overcome some of the concerns with the location there, with
Speaker 1a lot of rock that was unstable for this kind of construction. But my question to you, Richard, is, you know, the Bureau was aware of these concerns, but construction moved forward anyway.
Speaker 6Why is that?
Speaker 4Like, what was the conversation with the Bureau at that time? Well, if you go back to that era, that generation, starting from the 50s on, starting after World War II on, you know, this was the generation.
Speaker 2That did things.
Speaker 4They fought and won World War II, and we were building major significant infrastructure really all over the country. And the Bureau of Reclamation had built so many successful dams that their design department, which was siloed away from the construction group in the Bureau, became very overconfident in their designs because all of them had worked to that point. And so the design they chose for the Teton Dam
Speaker 4was a pretty standard embankment design. And they were aware of the fractured rhyolite on the canyon walls, especially the north abutment. And it was just hubris and overconfidence in their design. And the design group didn't feel like they needed to, you know, make any significant changes to compensate for the difficult geology there. And, you know, we know from family memory that Uncle Bob had concerns about the
Speaker 4dam design, but the way from the beginning and expressed his concerns to the Bureau. And you know what the Bureau, you know, what companies and government you know, organizations choose to document and not document when, you know, meetings happen between bosses and other people down the line. You know, that's always been an issue. But Uncle Bob was concerned about the design from the beginning. But like one of
Speaker 4the things I originally said was the Bureau of Reclamation was siloed at that time. The project construction arm of the Bureau was in a completely different silo than the design group, and they rarely, if ever, communicated. And so he had concerns, we know that as a family, and for whatever reason, he had very little power to impact the design. And it's interesting, because you brought up the
Speaker 4key trench that they designed after they determined during the pilot grouting that it wasn't gonna be economical or sufficient. And so what's interesting about that key trench design is it actually won a significant engineering award then. So it was the award winning flaw. Now after the dam broke, that award was rescinded. But that key trench was considered by the Denver, by other civil engineering groups around the
Speaker 4country and around the world, I guess, as such a cost-effective way to not only reinforce the foundation, but on those abutment walls to put a impermeable interface between the dam core and the permeable canyon walls. So it was considered very cost-effective, elegant design and won the award. And then that award was rescinded after it broke. The morning of.
Speaker 1The collapse, June 5th, 1976, he was the last man on the crest of the dam.
Speaker 4Not only was he the last man on the crest of the dam, but Robert Robeson is credited for saving hundreds, if not potentially thousands of lives because he had the foresight. You know, from family conversations, Bob, I believe, was fairly certain that 9 a.m. that morning that the dam was gonna collapse. And of course, if you look at the history, they tried everything within their power to try and stop
Speaker 4the breach. You know, they sent dozers out on the downstream face of the dam to try and fill in the seepage that was starting. And on top of the dam, they were pushed, you know, after a whirlpool developed, they were pushing what they call riprap, large boulders into the whirlpool. hoping it would plug up the pipe that had started through the dam. But yeah, so he was the last man standing and he also was instrumental during the reconstruction
Speaker 4to fight to ensure that the Bureau of Reclamation paid the people of that valley back in terms of compensation. So the 300, I think it's around 300 million that ended up being allocated to help people replace their homes and belongings and compensation for their property losses, Robert Robison was highly responsible in advocating that that happened and the people of the Valley be taken care of. So he really did carry the weight of that disaster. And honestly,
Speaker 4there were, you have to be careful You know, you have to say the good and bad. There were actually death threats against the family that really most people don't know about. Oh, really?
Speaker 8Wow.
Speaker 4After they left the dam, after, you know, the collapse had consummated and the reservoir had emptied, the Bureau of Reclamation actually set up shop in our driveway. Our home was on the Rexburg Bench So it wasn't impacted by the flood. Robert Robison's home was down a couple of blocks away from Porter Park in Rexburg, which was impacted by the flood. And so his home was hit. So they set up a trailer and radio systems. And I
Speaker 4remember as a boy, just, well, a lot of emotions. So at the time it broke, I was almost 14. So I was feeling a lot of despair And then my uncle showed up and, you know, my memories are he was completely professional and just doing his job managing the crisis. And looking back on that, it's absolutely amazing to me.
Speaker 3Yeah.
Speaker 1Well, but after this collapse, you have told me that your uncle carried the weight of this collapse around with him for years.
Speaker 4He sure did. He took it personally.
Speaker 1So talk about that.
Speaker 4Well, when the dam collapsed, he was 52 years old and he passed away at age 93. So that's a long time to carry that weight. So as an engineer myself, who's been involved on designing significant things, in fact, my career has revolved around preventing things from failing. and from breaking and how to design them so they don't do that.
Speaker 4So over the years, you know, I put myself in my uncle's shoes that day and thought, man, how would you deal with a catastrophe standing there watching the last four, you know, really the consummation of your career. He was at the peak of his career. He was building the most significant embankment earthen dam that had been built in the United States for a lot of reasons. and to stand there and watch it collapse literally within four hours.
Speaker 4And that was really the shock, even to the technical people, both during the collapse and after they studied it, is just how fast it fell apart once the failure mechanism kicked in. Later on in life, after my uncle's Bureau of Reclamation career ended and he retired, he literally worked on other engineering projects, including consulting for big mining projects around the country. He worked until his late 80s. So
Speaker 4it never affected him to the point where it shut him down. He was always productive, always working.
Speaker 1After all the cleanup and after all of the reparations had been made, there was talk at that time of rebuilding the Teton Dam.
Speaker 2It never happened.
Speaker 4Do you know why? We can speculate why, and I think the biggest why, I'm sure there's many, but the biggest why is it was such a national embarrassment, especially to the Bureau of Reclamation, that with all the lawsuits and the visibility of that, our country lost its stomach to go out and build major dams like that again.
Speaker 4And that literally ended the era of building large dams in this country, which still has not resumed for 50 years.
Speaker 3Yeah.
Speaker 1And this, you know, and we've spoken off air before we started recording that engineers like yourself, people in the engineering industry still refer to this as one of the worst civil engineer disasters in history.
Speaker 4So this, the.
Speaker 1Impact of the Teton Dam collapse goes far beyond eastern Idaho. It's something that's still referenced nationwide.
Speaker 4Worldwide.
Speaker 1Anything you want to elaborate on that a little bit. Don't talk about that.
Speaker 4Yeah, so this is probably the most studied, referred to civil engineering disaster, or at least in the top three. You know, there's a couple of bridges and a shopping mall or a hotel that are widely studied. But there's been studies done literally around the world on the Teton Dam collapse. And, you know, really, one of the legacies of that collapse is, and, you know, part of that's my...
Speaker 4you know, some of my uncle's congressional testimony, is that led to the Reclamation Federal Dam Safety Act of 1978. So really, the dam safety standards that are in place today is one of the legacies of that failure.
Speaker 1So here we are 50 years later. And this project comes full circle. You are advocating for the reconstruction of the Teton Dam. And so let me give some more context along with that. So Senator Kevin Cook, he's a local legislator here in Idaho Falls. He has a proposal on the table.
Speaker 2That is about.
Speaker 1Providing water storage projects. throughout the state, and one of those projects is a proposal to rebuild the Teton Dam. He recently led a trip to Washington, D.C., and brought a bunch of people with him to bring these water storage project proposals to the attention of our congressional delegates here. And of course, on that trip, one of the projects they talked about was the Teton Dam project. Richard, you accompanied Senator Cook on that trip to D.C., so... Do
Speaker 1you want to tell us about that trip and what the conversation was about the Teton Dam specifically?
Speaker 7Sure.
Speaker 4So the trip to Washington DC was to ask for support from the federal delegates, the four federal delegates from Idaho, and to deliver a petition with 5,000 signatures on it to support water security and agriculture resilience in Idaho. And so The Senate Memorial SJM 101 that Senator Cook sponsored and was passed last year in Idaho calls for 750,000 acre feet of new storage in Idaho, along with continued
Speaker 4funding of managed aquifer recharge. And really, Rhett, the flagship piece of that legislation, which is because it gets the most bang for the buck. Almost 40% of that 750K new storage would come from the Teton Dam. So that really is the cornerstone of projects that give the most bang for the buck. And so it's interesting because from
Speaker 4a 14-year-old boy to a 63-year-old, engineer who's, you know, been working 35 years. To me, the legacy of the dam really is its unfinished business. So that dam was meant to be a promise, you know, to the valley there in, you know, the Snake River Valley around Rexburg and Sugar City. It was for water security, actually national food security because, you know, so much of the potato
Speaker 4supply comes from Idaho and irrigation resilience. So really, it's unfinished business and an unkept promise. And to a lot of engineers, the Teton Dam failure is something to study. And to historians, it's something to go back and revisit and talk about. To me, it's in my DNA. I stood there and saw the impact on our family and on my uncle and on the community I grew up in.
Speaker 4And here 50 years later, I'm in a position where the dam's in my DNA. And I was very happy to accompany the group of people from Idaho last November that went to DC. And as we had the meetings, I spoke up and said, almost 50 years ago to the day, my uncle was in congressional hearings testifying about the collapse of the Teton Dam, which 50 years later is still a scar on that valley, you know, it
Speaker 4represents the scar of a day of despair. And of course, you know, there was an amazing cleanup and rebuild after. But, you know, to me now, 50 years later, it represents unfinished business to deliver water security to, you know, the original promises why it was built 50 years ago.
Speaker 1Richard, this has been a great conversation. You know, it's always fascinating to go back and hear the the memories of that day.
Speaker 2In the last few minutes.
Speaker 1That we have, because we have kind of talked around this, that you have wanted to come back to this and finish the project that your uncle started. But as we mentioned, you're an engineer yourself. Just talk about what prompted you to go into engineering and follow in your uncle's footsteps. Was it the Teton Dam collapse that inspired that or was it other things?
Speaker 4I don't think it was the Teton Dam collapse. The Teton Dam collapse impacted me as a 14-year-old boy to the point where I've literally studied it. This information's become, you know, more and more available over the years. So, you know, then I went to engineering school in my 20s. So I've literally studied the dam for the last 40 years intensely. But, you know, it was growing up and.
Speaker 4Honestly, seeing my uncle as a hero to me building, you know, it was almost like being a rock star in Rexburg. It's like, oh, your uncle Bob's nephew, your Robert Robinson's nephew, he's building the Teton Dam. So really, you know, when I look back, I think that's what inspired me to go into engineering is seeing my uncle really be in the head of, again, one of the most significant engineering projects in the history of the country.
Speaker 1Now, I spoke with Trent Walker just a few weeks ago. He is a man who grew up in Rexburg. His parents were the owners of Walker's Cafe. Many people who grew up in this area remember that restaurant, now defunct. It eventually became Me and Stan's, which is now also no longer in operation. But Trent, like so many people, has memories of the Teton Dam flood. Trent worked as the audio engineer for the Tabernacle Choir for more than two decades and is now involved in an album project
Speaker 1commemorating the Teton Dam disaster. He's worked with a number of singers to write some of these songs, which, by the way, are based on oral histories of what happened that day. He's turned it into music. He'll talk about this album project, and at the end of our show, we will play one of those songs from that album. Here's my conversation with Trent Walker. Trent, thanks so much for taking some time with me today.
Speaker 3You bet.
Speaker 7Thanks, Rhett.
Speaker 3Appreciate it.
Speaker 1I want to get into this album project because I think it's really unique. But before we get into any of that, I want to get to know you a little bit. You grew up in Rexburg. Your dad owned what used to be Walker's Cafe, which is now a defunct business. But for many years, it was me and Stan's, which was around for a long, long time. Do you want to talk about, you know, your experiences growing up in Rexburg and being associated with that restaurant?
Speaker 6Yeah.
Speaker 3Yeah. I mean, yeah, we grew up. My dad had him and my uncle had opened the Walker's Cafe originally in Rigby. And then my dad, they decided to expand, and so my dad moved to Rexburg and opened the cafe in Rexburg, opened Walker's Cafe, which was kitty corner from the courthouse just off Main Street. And so that's kinda,
Speaker 3I grew up in the restaurant business. You know, every day was going to the cafe to eat and growing up with your parents, you know, working at the cafe. Grade school was a block away from the cafe, so every day for lunch, you know, I ran to the cafe and ate and go back to school and get out of school and go to the cafe and bus tables and make salad. And my dad, it was the
Speaker 3home of the scones, they called it. And so somebody had to make those scones. And so when I was young, we were back in the kitchen cutting scones all night long. putting them on trays for the next day. Spent a lot of time in the restaurant, but it was good. Rexburg was a lot different than it is now. Smaller, the school was smaller, but it was a very tight-knit community,
Speaker 3and so everybody knew everybody. It was just a great place to grow up.
Speaker 1Like I said, people are familiar with this event if they've lived in this area. I mean, Main Street was flooded, the whole city was flooded, many of the streets were destroyed, many businesses. Did the flood, was the flood the undoing of Walker's Cafe in Rexburg?
Speaker 3It was, it was at the time, yeah. Yeah, I mean, it wiped it out, you know. A wall of water went through there. They found... If I remember right, they found our cash register in Burton in somebody's field. So that's probably what, you know, five miles away, four or five miles away. And yeah, I mean, it pretty much, yeah, you could have never put a food establishment back in
Speaker 3that building after that mud and the water. And, you know, the water was one thing, but the problem was the mud. We had our home just, we lived just a block away from the cafe, and the basement was completely full of mud, whether it was in the cafe or our home. From top, six, seven feet of mud, completely full, and
Speaker 3you would go in there, people came with buckets and shovels, for days we did nothing but just shovel mud out of the basements of homes and businesses and then try to clean it up. So with that, the mud was toxic and just the, it just would've never, you would've had to tear the building down and rebuild the building
Speaker 3to be able to put food back in. in that area and so at the time that just wasn't gonna happen. The flood pretty much took everything.
Speaker 1You're currently involved in a, you're producing some songs or writing some songs related to the Teton Dam disaster and what you're doing is you're telling stories of different people who were involved in that experience and you're trying to write these songs and match the tone of these stories. You mentioned before we started recording some of these stories of these people who were involved are kind of humorous stories. And some of them obviously are a little more on the serious side. But I guess just tell us a
Speaker 1little bit about this project and like how this got started.
Speaker 3Well, it got started by my mother, which nobody in the family knew. had actually given an oral history right after the flood to a writer, a student from Ricks College. And evidently these kids had a project and they were going around the community and talking to certain people who
Speaker 3had had experiences with the flood, trying to document their experiences and put them on paper. And then these things were stored in a file at the college. Now, I never remember this. I do not remember my mom doing it. I don't remember ever hearing about it. But a person sent me a copy of this thing and goes, you gotta read this, you know? And so I read it and it was awe-inspiring, you know? And I was like,
Speaker 3this is pretty cool, you know? And, but I remember, after reading the story, I lived that, right? I mean, I remember what she was talking about. And then I realized, we started looking into it and there were lots of these. There were lots of people from Rexburg and Sugar City and Wilford and all of these places that had been majorly impacted by the flood. I mean, even I had
Speaker 3an aunt and uncle that lived in Roberts. And I knew a little bit about what had happened in Roberts where the water settled out there and just wouldn't go down. So those poor people out there, the water went down in Rexburg and we were able to start cleaning up. And in Roberts, there was a muck of mess out there for half the summer, trying to figure out what they were gonna do. And so, in reading some of
Speaker 3these stories, we started looking at these oral histories and going, you know, some of these stories are just, some of them are really quite funny, but they all bring back to life those moments that we all lived. And that I think people, at least young people, you know, they don't know anything about this. They've heard, okay, there's a flood, there's a dam. You know, it was at the time, in fact, it probably still is, it was probably the largest natural disaster you know, in the United States for,
Speaker 3you know, that was caused by the government, you know, by a poor decision. But it was no one's, you know, no one man's fault, you know. And even reading the stories of the engineers that built a dam, you know, and the thoughts and feelings that they had after the flood, you know, it really kind of pulls at your heartstrings a little bit. And so in looking at it, we
Speaker 3decided to try to take these songs and put them to music. And after a few of them, we're going, wow, maybe we're onto something here. And so our hope is that we can make these songs available somehow. And in the families of these people, and the community members will be able to relive.
Speaker 1When are you hoping to have it complete and where can people buy it or access it?
Speaker 3Hopefully we'll let you know where it's gonna be available. And I've talked to some radio stations in the area. And so we're actually in the process of getting some stuff sent out to them. We wanna give them some teasers and get their feedback and see kind of how they wanna handle it. there's going to be a lot of commemorating going on during the month of June and some celebrations. And really, we just want people to enjoy it and be able to download it and hear it.
Speaker 3And like, say, the families that the stories are about, be able to share it with them and their grandkids and their friends and family. And I think people will really enjoy it.
Speaker 9June morning in Rexburg town, temple spires in the sky. Henry drove the river road with Jenny riding by. The mountains held their breath that day.
Speaker 8The valley felt the strain.
Speaker 10Then a whisper ran through the farms The dam had broken in pain Sirens cried across the fields Dust rose on the plain And the river came like judgment down The canyon.
Speaker 8Like a train.
Speaker 11But on the hill above the valley Where the wheat fields touch the.
Speaker 10Sky A quiet man unlocked.
Speaker 12The gate and let the people by. Trailers rolled like refugees through the dust.
Speaker 11And summer wind.
Speaker 9And the landlord on the hillside.
Speaker 8Said, you can stay here till you mend. loading trucks rolled in families pale with fear children clung to blankets still shaking from the river near.
Speaker 7And word spread through the county roads like fire across the grain there's a place up on the college hills where mercy has a name on the hill above the valley.
Speaker 10Where the wheat fields touch the sky a quiet man unlocked the gate and led.
Speaker 12The people by trailers rolled like refugees through the dust and summer.
Speaker 8Wind And the landlord on the.
Speaker 11Hillside said you can stay here till you're.
Speaker 5Mad.
Speaker 11No cameras on the gravel road, no speeches for the crowd. Just acres of forgiving ground and kindness spoken loud The river took the valley floor.
Speaker 12But hope still found a way Fields of gold above the flood where broken hearts could stay.
Speaker 11On the hill above the valley where.
Speaker 10The wheat fields touch the sky The quiet man unlocked.
Speaker 11The gate and led the people by. And years from now they'll tell the tale when the river crossed the land.
Speaker 12Of the landlord on the hillside with the valley.
Speaker 4In his hand.
Speaker 3Mmm.
Speaker 1Mmm.
Speaker 5June morning in Rexburg town the river took its toll But mercy grew on higher ground and steadied every.
Speaker 1Soul That does it for this episode of It's Worth Mentioning. Be sure and follow our show on the East Idaho News YouTube channel. We're also available in audio format wherever you get your podcasts. Leave us a five-star review so
Speaker 1that we can get recognized by more people. If you have a tip or guest idea you'd like us to explore, shoot me an email at rett at eastidahonews.com. For It's Worth Mentioning, I'm your host, Rhett Nelson. We'll see you next time.
Speaker 7Room no one takes then the radio cracked the air and silence settled everywhere one small
Idaho is experiencing a historic statewide drought - even though precipitation has been near normal. So what’s behind the water shortage, and what will it take to turn things around? On today’s episode of "It’s Worth...
EDITOR’S NOTE: This episode originally aired on May 3, 2026. We are reposting it because of Veteran’s Day last week. “It’s Worth Mentioning” will return with a new episode on Nov. 22. A spur-of-the-moment decision to...
James Stewart was already one of Hollywood’s biggest stars when he arrived at Gowen Field, a military base near Boise, in January 1943. But he wasn’t there to make a movie. He was preparing to fight a war. At 33,...
Sen. Kevin Cook, R-Idaho Falls, has made water storage a focus of his platform in the Idaho Legislature. He joins Rett Nelson today on “It’s Worth Mentioning” to talk about his perspective on the need for storage...
Sugar beet harvest is in full swing across Idaho and Duane Grant, a longtime sugar producer from Rupert, says this season got off to one of the roughest starts he’s seen in the 45 years he’s been in the industry. This...