Episode 126: Parallel Line in SAP S/4HANA Cloud – A New Era of Implementation Flexibility feat. Infosys

Jul 16, 202532 minAudio
ShareXLinkedInFacebookWhatsAppEmail

Enabling safe, scalable innovation with SAP’s Three-System Landscape In this episode of Inside SAP S/4HANA Cloud, host Jerry Lowery dives into the transformative power of the Parallel Line (PL) in SAP S/4HANA Cloud Public Edition. Joined by Ajay Kumar from Infosys, and SAP experts Nicola Pace and Jai Srinivasan, the discussion explores how the Parallel Line enables seamless configuration, testing, and data migration, without disrupting the main project line. Learn from real-world implementation experiences, discover key benefits, prerequisites, and best practices, and get a glimpse into the future roadmap of this innovative capability. What topic would you like us to discuss next? Send an email to insides4@sap.com. Show Notes: Download the episode transcript Learn more about Parallel Line in Nicola Pace’s article: (1) The Parallel Line for SAP S/4HANA Cloud Public Edition, three-system landscape | LinkedIn Check more in the SAP Help Portal: Parallel Line in SAP S/4HANA Cloud Public Edition | SAP Help Portal Access the Parallel Line Overview (accessible for S-Users): Digital Library - Asset Preview Page Join the SAP S/4HANA Cloud Public Edition 2508 Early Release Series: SAP S/4HANA Cloud Public Edition Early Release Series Check our enablement assets for SAP S/4HANA Cloud: https://chart-bdmaicr0au.dispatcher.eu2.hana.ondemand.com/index.html?hc_reset Visit the SAP S/4HANA Cloud Public Edition Community: SAP S/4HANA Cloud Public Edition | SAP Community

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Welcome to the podcast Inside SAP Esperana Cloud. There is no customer success without product success and project success. I'm Jerry Lowry, P&E Solution Architects reporting SAP Esperana Cloud Public Edition, and I'll be the host for today's episode. Today, we'll discuss the parallel line or PL. implementation experience at one of our SAP customers in the area of professional services at the support of the SAP partner Emphasis. As our guest today, we have Ajay, Senior Industry Principal from Emphasis and from SAP, we

have Nicola Pace, SAP Product Manager for S4 Honda Cloud Public Edition and lead of the early Adopter program for the parallel line and J Srinivasan, P&E Solution Architect supporting SAP S4 Honda Cloud Public Edition and Regional Point of Contact for the parallel line. Welcome to you all. Let's start with a short introduction. Some fun facts about you, You first, Ajay. Thank you, Jerry. I lead the services portfolio for Infosys for all SAP engagements for customers across the globe.

Over the last few years, I had the opportunity to deliver S4 HANA public Cloud LED finance transformation for our customers in this industry segment and still continuing that journey with support from my clients and SAP. Funny thing, well, there is nothing much funny about me. I try to be as focused on my work and therefore my colleagues and my friends always make fun of me about that fact. Good to be here. Thank you. Thanks, RJ. So great to have you Nicola.

Thanks a lot to Jerry. This is Nicola Pache. I am from Product Management SCPS for HANA Cloud Public Edition and well during the last five years, I supported the go to market first of the three system landscape architecture for the Esfahana Cloud Public Edition. Then I moved to the landscape extension called Parallel Line by leading together with our colleague Darwin Talyarita, 2 early adopted programs that ended successfully with the

general availability of the three system landscape in September 2022 and of the Parallel line in April 2025. Indeed, I can say they have been quite 5 interesting and challenging years. Thank you, Nicola. Jay, could you give us? Thanks so much for having us today. I'm really excited to be here. For the past eight years, I've been working as a solution architect for SAPS for HANA Cloud Public Edition, helping

customers succeed with the implementation and deployment of SAPS for HANA Cloud Public Edition. Currently, I'm serving as a region point of contact for Parallel Line in North America. Outside of the tech world, I tap into my creative site right through writing and directing short films. It's a passion that keeps me inspired and also he was my fresh thinking and everything I do. That's a little fun fact about. That's great. Thank you, Jay. OK, let's dive in. Jay, could you provide us a quick introduction for our listeners about the parallel

line in SAP As for HANA Cloud Public Edition? Sure, before. Elaborating, I think 1 should need to understand what's a background and also the problem which parallel line would solve. Traditionally with ECC applications right implementations, I have encountered many customers who needed to perform various tasks like project specific configurations, testing, upgrades, data migration and also training. These tasks often require a separate client within their environment. With a move to SAPS for an upload public edition and it's 3 system landscape, we now have a

more flexible solution called the Paddle line which allows the customer to perform the tasks like project specific configuration, testing, upgrades and data migrations. That's the advantage of having a pallet line. That sounds very interesting. Could you put a little more color on what is the? Pallet line, Yeah, absolutely. The pallet line is a state-of-the-art offspring that provides enhanced flexibility within SAPS for HANA Cloud Public Edition actually became available to SAPS HANA Cloud Public Edition customers using a three system landscape as of

April 1st, 2025. Essentially, it offers a separate workspace in SAP Central Business configuration, including two additional tenants for configuration like D120 and the testing environment D120. This has been a long running ask from a lot of our customers. So what can customers do with these additional tenants? As I stated earlier, the paddle line allows customers to test to validate scope extensions, roll out new countries, we can extend organizational structures, perform data migration, build and test integrations, and

contact training and testing. The beauty of it is that all these activities can be done without any disruptions to the main project line. Yes, that sounds like a significant advantage. How does this help, especially during critical event cycle? Upgrades. Indeed, it's particularly. Useful during the upgrades when as we have seen by when you innovations are introduced, customers can test and validate these changes to the parallel line without affecting their main line of business. This ensures A smoother transition and minimize this

risk. I could see, yes. So help me understand, is this feature only beneficial for live customers or could new implementations also take advantage? I could imagine this would be particularly useful for cutovers and migration testing. You're right again, it's not just for the live customers. Even those in the middle of their implementation can leverage parallel line for data migration test, haddock training or any other testing needs as long the prerequisites are satisfied. It is designed to offer flexibility at any stage of the project life cycle and making

the entire process more efficient. And turning to Nicola, I imagine you have significant insight considering your experience. Do you want to add anything? Yes, Jerry. Well, as I also have recently described in an article on LinkedIn with the introduction to the market of the three system landscape, SAP made already three years ago a big step ahead in the cloud ERP space. This three system Landscape new architecture fulfilled most of the requirements raised by

customers after the previous launch of the two system landscape and the three system granted among all other improvements also new fundamental capabilities like more extensibility, more configurability of the solution, control on content deployment to the productive environment. It also offer more separation of concern between development and test which into a cell were combined. It also grants full continuity for project activities during

the software upgrade cycles. After the general availability of this three system landscape, however, SAP started collecting additional requirements also for this three system landscape architecture. That brought us to the concept of the parallel line. This architectural enhancement is intended on one side to offer more runs of the same activities like data migration and testing in a separate environment.

On the other side, even more importantly, grants the separation of subsequent configuration projects from the life cycle events that are continuously innovating the productive environment. So we can say that the parallel line offers the implementation team the capability to run parallel configuration projects in separate environment with different timing for deployment, the configuration to mainline and to production. Nicola, thank you.

So this is very insightful. Let's turn to AJ. So AJ, could you explain a bit about emphasis experience with customers and implementing the parallel line? What kind of businesses are they in and what was the scope of the implementation? Thank you, Jerry. I would echo the statements made by Nicola and Jay. The S 400 cloud product has evolved over a period of time starting with the basic 2SL with manager solution and a set of SSU is. Then it was further enhanced

with the central business configuration within the two SL where you could have those control deployments and then enable that. Subsequently, TSL was enabled and now we have the Parallel Line and this whole journey indicates that the aim is to bring parity between the cloud capability and what most of the customers who are in this cloud journey expect. Our experience with Parallel Line is for a leading services firm with operations in 40 plus countries where their leverage is for HANA Public Cloud as the

centrepiece for their finance transformation. And the use case is pretty much everything which Jay and Nicola elaborated, be it for multiple rounds of data migration, to validate data in a clean environment or with a multiple phased roll out, how do they efficiently and effectively manage the operations and the continuing roll outs, How do you enable that? And the centrepiece of that is going to be the Parallel Line environment. I see. I see. OK. Thank you. Ajay. Jay, are there any prerequisites

for implementing the parallel line? Yes, Jerry, again, if a customer would like to implement parallel line, there are certain prerequisite checks which have to be met and it includes the following. Again, these are the prerequisites checks which are being defined as of now. So the first one would be that the production tenant must be provisioned. The second, all CBC and BC transports in the customizing tenant should be released from the customizing tenant. I'm talking about the transports in the main line, right? The 3rd, all the transports in the import buffer of the test

segment should be imported. Finally, the mainline workspace in CPC, all the activities and milestones of the scope and organization structure phase should be in completed status and the mainline workspace should be in the product specific configuration phase and it should be unlocked. And again, this please request check must be requested by the customer using SAP for me. Once the prerequisite checks are met, the customer will receive a notification e-mail in their

inbox and the service request will be updated in SAP for me. Then the customer can create a service request to initiate the branch and then follow the process. Great. OK, thanks, Jay. I think that's very clear. Ajay, could you please share why did the customer choose to implement the parallel line for this project? Sure. This customer has a global business operations with spread in 40 countries and given the complex nature of their organization, it wasn't feasible for them to do a Big Bang Golie

and therefore as a part of the Golie, we evolved on a phased Goliev. Now with the phase go live, it brings certain aspects during the program and go live of the initial phase. For example, during the program with multiple phases, we need to manage multiple rounds of data migration both for the initial phase as well As for the subsequent phases. Now in three system landscape where you didn't have the provision like an on Prem to

refresh the database because customers come from that mentality, how do you satisfy the need for them to do multiple rounds of data migration and that's where parallel line comes into play. So that's the first use case for this customer. Second, I mentioned about the rollouts where multiple rollouts are planned for this customer. We are starting with the initial goal live in this November and then next year which is 2026, there are about three goal as planned and then subsequently in 2027 few more goal lives are

planned. Now with multiple goal lines, how do we manage the operations and the rollouts efficiently? How do we bring the differentiation where we can provide priority for anything which impacts operations while maintaining the project schedule? That's the second use case for parallel line where we will be able to focus on specific tasks as a part of the parallel line and then deal the main line for other set of tasks. The third aspect why we decided to consider the parallel line is

on localization with the 40 countries and of course some unsupported SAP countries. How do we ensure that the program is not at risk while accidentally activating something which can then put the entire program in jeopardy? That's under use case for parallel line where we could activate new countries, check their localizations, validate it before we do it in the main line. Because parallel line gives us the ability to rebranch as many

number of times as we need. For example, if I stand up the parallel line today and I did a set of tasks, I found that something is wrong and I will not be able to use that parallel line any further. I am able to bring down that client and stand it up again with the latest copy and therefore it helps me validate certain of certain edge use cases or edge localizations without impacting the program.

These are some of the examples and needs which we thought through and chose to go with the Parallel Line project. Jerry. Thanks, Ajay. That makes a lot of sense. And you know, we can see that it seems the customer experience was pretty good and they certainly, you know, received a lot of benefit from from the parallel line and it really helped their project. So maybe a two-part question, where are they at today? So what's the status update on the project?

And could you also, you know, second part, walk us through some of the various steps and share some of the experiences so far? Sure. We started this program last last year the sometime made of 2024. We finished our design and then we started the build in 2025. We are nearing the completion of build and then starting the testing in about a couple of weeks with the aim to go live towards the end of this year followed by rollouts starting next year.

So 2026 and 2027 is going to be full of rollouts. That's essentially that's essentially the status of the program. So from an Activate perspective, we are currently in the realized phase of the Activate methodology and we will soon be in the deploy and then run and of course the rollouts will start our experience, our experience with parallel line or if I have to talk about the step, the very first step in the process is to understand how does parallel line work, what it can do, what it cannot do, what

are what are the three requisites and how do we go about with the process. It starts with enabling as Jay mentioned earlier in this session, it starts with enabling the parallel line we were earlier adopted. Therefore Nicola and team helped us through a set of processes. But now it's AG solution is in general level GA and therefore customers have to raise a request and as a part of the request there are pre checks done wherein the transports, it is verified with the transports are In Sync.

If all the changes have been migrated and then if those pre checks are done then customer we raise the request. You get the tenant provisioned within one day and once the tenant is provisioned there are set of post processing activities. Example the parallel line works through a table copy which means all the config data is copied from the existing mainline tenants DNT to a parallel dev and test tenant. However the reference data of

the config is not copied. So as a part of the post processing, we will have to do that and we have to load the data which is all the reference data apart from the reference data to make the processes work. In the parallel line, there may be additional data which may be required for examples, you may have to create some test data like customers, like projects like sales, orders and etcetera. Those are the things which we have to be which we have to create. So we went through this process, validated it, and then once we

do a basic testing, we feel that the parallel line is usable and then we release it for the use, for the purpose. For example, we get one cycle for data migration and that's when we release it for subsequent rounds of data migration. And once you do this as a as a step one, the next important step we do is to keep the lines In Sync before the main line. We have a habit or a practice of moving the transports every every fortnight, which means

every alternate week we move the transports and keep all the systems In Sync. This is to ensure that the systems are In Sync and all the monthly patches and upgrades which happened by SAP as a part of hot fix or other maintenance is delivered which is delivered to all the systems. It's not delivered in different versions for different system, thereby resulting in some potential errors at a later point in time. We extended that concept to the parallel line and therefore what we do once we sync the main

line, the following week we sync the parallel line and that's when we do the rebase and the merge, which means whatever is work is done on the main line, we copy that to the parallel line. And if we did some validations or new solutions in the parallel line and we find it to be acceptable, we do a merge to the main line. And that's that's the second step of the process, which we do. And the third step is we periodically evaluate as to when we should do a RE branch.

When we initially set up the environment, we did a RE branch. Subsequently, we used it, we activated few countries, we tested the processes, but and then the main lane continued with set of other set of configurations. Now for data migration, we wanted a clean set of an clean environment with all the configs. That's when we decided that we should do a rebranch. So the third step is to decide what would be the appropriate time to do a rebranch. And in all this process it is

important to consider the lead times taken for this, build that into the project plan. That has been our learning and the experience of how we went about approaching the parallel line. We did have our share of challenges in understanding and trying to work it through, but that's part and parcel of any project, yeah. Awesome awesome Ajay, thanks for sharing your experiences. Like one thing, I would advise the customers to regularly synchronize the parallel line with the main line using the

rebase function. I think that's a practice that would help them prevent any conflicts. Moreover, during the project implementation in the in the parallel line, it is recommended to avoid making major conflict changes in the directly in the main line. This approach we know promotes more stable and manageable processes. I think Nicola would agree to that. Is there any other recommendations for our business? Nicola I. Would agree Jay. Moreover, let me please add also that together with development

and integration, the good practice of performing a regular rebase is also strictly related to creating the right configuration conditions in the target system. So in essence, with the rebase, the parallel line gets regularly synchronized with any configuration that is being made meanwhile in the main line. And this helps primarily for two

reasons. Number one, that any validation happening during test in the parallel line is more reliable because the condition of existing configuration in the parallel line reproduced more loyally the one in main line. And #2 that all incremental configuration which are done in the parallel line has more chance of success and not generating conflicts when they will be merged to the main line,

because they will find their very similar conditions in terms of configuration. Exactly same condition in terms of configuration. This ensures correctness in the merge as well. OK. OK, Nicola, let's stick with you. Let's talk about the future of the parallel line. What do you think could be improved in future PL. implementations and in the product itself? It's great question because with the general availability, Jerry

of the parallel line, we, I think we believe we reached only the very first to stay, only the very first milestone and much, much more is on the plan in the next weeks. We have to strengthen clearly and make fully robust the operational steps execution for branch and all the incremental configuration synchronization to which happens during rebase and merge. We have to make them robust. We have to make them completely consumable as a self-service by

the customer. In the short term, it's true we also target to allow customers to replicate the parallel line attendant specific extensibility artifacts and to build also with very low effort those master data which are required during the consumption of the parallel line tenants. One additional target we have is that while today the merge is

offered as full or none, meaning whatever is being built in the parallel line gets replicated to the main line once merge is executed. In the mid term. Our ambition is to offer the so-called selective merge, meaning that we want to allow customers to to select from the parallel line only a portion of the incremental configuration which they built, for example, only one country out of two and

have it replicated to the main line only one and not the full configuration. This at the moment is still not possible, but we're working to make it possible in the midterm. And the other major pillar of our road map for the parallel line is to offer customers multiple parallel lines at the same times, so that this can serve customer needs for different purposes, different use cases, different implementation projects at the same time.

Yeah, I could see that could be very great. Thanks. Thanks. Nicola. Ajay, speaking from the point of view as a partner, what was your experience with the implementation and were there any particular challenges that stood out to you? Thank you, Jerry. Our experience as I mentioned earlier, initially it was a learning experience. The parallel line at that point as a part of earlier doctor was available under two options. So we had to we discussed with Nicola and team and then took

their guidance in terms of which option to choose. And then we went out for the table copy option. And once we set that up, I think we had our set of expectations or wish list as I may call. And what we realized is that why the solution does offer a bit of capabilities. It is important to plan the post processing which I elaborated. For example, we should have sufficient task in the project

plan and sufficient time in the project plan to allow for the post processing be it copying the reference master data which is there in the OR even set up of basic data to validate that the parallel line is set up properly. Let's say we should have ready made templates for let's say LTMCS for customers, project sales, orders, materials which may be required to test. So those set of preparation has to be done and then we should request this line so that once

the parallel line is available, we are able to effectively use it and use it soon instead of trying to spend time in getting it ready. So that's one key experience which we had as a part of our adoption. The second is in terms of the Mudge and the rebase frequency itself and both Nikola and Jai articulated about it. We had the experience where we were going through the country activations. I mentioned we had about 40 plus

countries. So our Sprint cycles in every Sprint we take about 8 countries. We had about 5 to 6 prints. Now after and going by the SAP best factors, we didn't activate more than five countries. So we had the parallel line we set up, we set up all the four, completed all the post processing. Then we subsequently activated five countries in the main line. And that's when we realized that when we try to rebase such a huge change, be it in the form of number of countries and of

course some countries by itself themselves are complex and therefore it needs more time. So it is important to rebase periodically and not try to rebase in mass so that you don't end up with a lot of accumulated config. If you if you do that, it's possible that it could result in some error and may need involvement from the support team from the back end. So that's the second learning we had in terms of how we can, how we can do it more frequently.

And the feature which Nicola mentioned about selective merge, I think that is something which will definitely benefit customers because that will also help address this, this requirement of how do we avoid trying to do a merge with a higher data set or a higher config or a higher code base. And the third list given, we now have the parallel line, we have the main line. And then of course, all both the main lines and parallel lines undergo the periodic maintenance

in the form of hotfix for which a calendar is already published by SAP. It's important to consider that calendar as well in doing these tasks, not just the project timeline, because system availability will depend on that calendar as well and that may impact the ability to do certain tasks and therefore that should be considered. So these are some three key learnings which we had and we are incorporating that in subsequent phases of our project

plan. And as we continue to use the solution more, we will have more learnings and we will continue to evolve and adopt them. Thank you so much, Ajay. Nicola, are there any other use cases where you see the parallel line being implemented successfully? How do you envision other customers implementing the P the PL. in the future? Yes, Jerry. So as you, as I told at the very beginning, the parallel line was brought to the market and introduced to our customers via

a specific program called early adopter program in which selected customers when enrolled. Now what we noticed, what we have observed during this program is that primarily customers enrolled asked to use the parallel line in order to perform three specific use cases. Having additional data migration run, having additional testing environment where to execute testing activities and having a separate environment different

from the mainline tenants where also to execute training sessions for the business users. Now clearly also when we come to the data migration run, what they appreciated is also to having repeating possibilities to perform the mocks, the data migration mocks multiple times after having deleted and recreated the parallel line anew. Now this kind of consumption. So these three use cases which I described are totally in line with our expectation.

However, at the same time, what we expect now is to and. And by the way, what's also our vision, our purpose why we brought the parallel line to the market is that customers can perform a subsequent project waves having using the parallel line for configuration extension. It could be a new country, it could be a new org structure like a company code. It could be a new scope or bundle of scope items like a new business process like

manufacturing, like procurement that was not implemented in Wave 1. And they would like to implement that in Wave 2. And they do that before doing it in the main line, they do it in the parallel line and they can have proper testing of these new capabilities which are then delivered to the in line and can be combined with the life cycle that is regularly innovating the productive environment. Thank you, Nicola. OK, I know we've covered a lot

of information here in our podcast. Gentlemen, thank you. This has been a fascinating discussion about the parallel line implementation methodology. We hope our listeners found it informative and are inspired to consider the PL. for their future projects. On a personal note, I want to thank each of you for taking the time and turning to our audience. We want to thank you for joining this episode and invite you to subscribe to our podcast at sap.com/podcast, at Spotify, Apple Podcast, or any audio platform you use to get your notifications when new episodes are available.

And if you like this episode, don't forget to give us five stars. You can reach us by e-mail at insides4@sap.com or add us directly on LinkedIn TuneIn next time and be inside SAP S4 Honda Cloud.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. TechEd #11: AI-Powered Tooling and SAP Cloud ERP Transformation

    Nov 23, 202614 minAudio

    Recorded live at SAP TechEd 2026 in Berlin, this episode offers a rare, unfiltered take from one of the SAP ecosystem's most seasoned voices. Host Fernanda speaks with Oliver Schreiber, SAP Mentor who brings over 30...

    Credit the people on this episode

  2. TechEd #10: How Joule Studio and n8n Orchestrates Enterprise AI

    Nov 20, 202616 minAudio

    Recorded live at SAP TechEd 2026 in Berlin, this episode of Inside SAP Cloud ERP gets into one of the most significant partnerships in the SAP ecosystem right now. Host Yannick speaks with Vladimir Shakhov, Strategic...

    Credit the people on this episode

  3. TechEd#9: How AI Transforms Cloud ERP Migrations

    Nov 18, 202614 minAudio

    Recorded live at SAP TechEd 2026 in Berlin, this episode takes a refreshingly grounded, practitioner-first look at what AI in SAP really means in the field today. Host Fernanda speaks with Wouter Lemaire, independent...

    Credit the people on this episode

  4. TechEd #8: The Benefit of Laying the Groundwork for AI

    Nov 16, 202615 minAudio

    Recorded live at SAP TechEd 2026 in Berlin, this episode of Inside SAP Cloud ERP brings something the series hasn't had yet: the perspective of an actual large enterprise customer architect, not a consultant or partner....

    Credit the people on this episode

  5. TechEd #7: The Hidden Risk in Every SAP Transformation — Organizational Change Management

    Nov 13, 202618 minAudio

    Recorded live at SAP TechEd, this episode of Inside SAP Cloud ERP zooms in on the dimension of SAP transformations that gets the least attention - and causes the most damage when ignored: Organizational Change...

    Credit the people on this episode