A modern airport terminal is about far more than appearances. It impacts safety, accessibility, economic development, and the first impression visitors have when they arrive in Richmond. Host Lindsay Darnell sits down with Richmond Municipal Airport Manager Rodney Mayse and Board of Aviation President Jonathan Meade to discuss the long-awaited terminal replacement project, the funding behind it, and why this investment matters for the community. Rodney and Jonathan explain what the new terminal will include, how Richmond secured a $1.4 million FAA grant after years of persistence, and why those federal dollars cannot legally be redirected to roads, libraries, or other city projects. They also discuss how airport revenue helps support the project, what construction will look like while the airport remains open, and how the Bipartisan Infrastructure Law created new opportunities for airports like Richmond's. The conversation also looks beyond the building itself, exploring how a modern terminal can strengthen economic development, better serve pilots and corporate visitors, support future community events, and position Richmond for continued growth. Whether you're an aviation enthusiast or simply interested in how public infrastructure projects come together, this episode offers a behind-the-scenes look at one of Richmond's most significant investments in recent years.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_02Welcome back to another episode of Inside Richmond the City's Pulse. I'm Lindsay Darnell, your host, and today I have Rodney Mays, Airport Manager, and Jonathan Mead, the president of Board of Aviation, joining me. Guys, thank you.
SPEAKER_01Thanks for having us back.
SPEAKER_02Yeah. So I wanted to have you back. Last time I had you on here, we talked about the grant you received to do um the architectural drawings of a new airport terminal. You recently were awarded another grant to begin the next phase of that, constructing this airport terminal. So I had a few questions to ask you. Um, you guys came out with a press release, and I think there was a lot of questions on social media. So I wanted to just kind of be transparent, clear the air, and get some of those answered.
SPEAKER_02So my first question would be: can you explain what the 1.4 million FAA grant will specifically fund at the Richmond Municipal Airport?
SPEAKER_01So it'll fund a new terminal and it's roughly 3,500 square feet. So the project is focused on new passenger and public use space, ADA accessible facilities, updated utilities and building systems, improved operational space for airport staff and pilots, and modernized infrastructure that meets the current FAA expectations.
SPEAKER_02Now, another question, it's not on my list, but this grant, um, as well as a lot of other grants that the city applies for, um, has to be specifically used for one thing and one thing only. We cannot take that grant money and say do street repairs or um, you know, any other kind of project that we're doing currently in in the city. Um, can you kind of explain a little bit where this grant is coming from and what it specifically can be used for?
SPEAKER_01Yes. So this is the the BIL. And this grant, we've we've applied for this grant for five years. This was our fifth and final time we could apply. So this was um the bipartisan infrastructure law, and it opened up this grant for uh smaller airports like ours to uh to build a new terminal. And so, like I said, we applied it for it five years in a row. We were lucky to get this uh the fifth and final year. So it was kind of like winning the lottery. This was competitive across the whole United States, and uh we were only two airports in the state of Indiana that got this grant.
SPEAKER_01We were one of two, and Indianapolis International got five million, uh I think for do redoing their baggage clean area. And we received the 1.4 for our terminal. And speaking on grants, and this is grants, no matter what pot of money it's coming from. So grant is project specific. Uh so this grant, uh the 1.4 is for the terminal. It cannot be used to uh repair streets, it can't be used to build uh a new library or redo a library.
SPEAKER_01This is from the federal aviation and it has to be used for, in this case, the terminal building. And uh so that's what we're gonna do with it.
SPEAKER_02And I think there is a lot of misconception um conceptions on how grants can be used, um, but you have to follow the guidelines. Every grant has guidelines that have to be followed. You have to do reporting throughout the whole process of your project with the grant money to be compliant with those, you know, stipulations that are given to you with this grant money. Um, so we really wanted just to kind of clear the air and be transparent about that and you know to educate that hey, this is specifically for the terminal.
SPEAKER_02We cannot use it for any other projects going on.
SPEAKER_01That's correct.
SPEAKER_02Um, can you tell me what needs or challenges at the airport led to pursuing this grant?
SPEAKER_00Yeah, the the current terminal building is old. Um, it was built in the 1940s and um you know it's really showing its age. Um it leaks like a sieve. Um, you know, water comes in when every time it rains. Um really rehabbing the building isn't a viable option. Um the structure of the building is uh it's it's at a point where it's at its end of life. So uh a couple of other challenges that we have. The building's not ADA compliant.
SPEAKER_00Um there's no way to make it ADA compliant. It has two different floors and one set of restrooms is on the upper floors. So um there's no way that we can actually make that uh ADA compliant for uh passengers that have disabilities. Um the other thing is the the the building's not laid out ideally for an airport terminal. Um, you know, it's very segmented. Um there's not a great place for like a pilot lounge.
SPEAKER_00Um it's it's a struggle for us to give pilots after hours access to the building as well, um, which you know we we have people flying in at all times of the night. And we don't we're not staffed 24-7. So we wanted a building that, you know, we could allow pilots to come in and use the restroom facilities, take a break, and you know, potentially go out back out on you know, flying it their airplanes.
SPEAKER_02And I think a lot of people too don't understand that you don't just have um, you know, private pilots with their small planes uh utilizing that airport. You do have corporate jets stopping in. You have other jets stopping in to get gas that are flying maybe across the country. Um, so I I really kind of wanted to touch base on that as well. It's not just private, you know, recreational plane, uh, you know, airplanes and pilots using it.
SPEAKER_02It is being used for other and bigger things, right?
SPEAKER_01That's correct. So we we have uh most of our factories, businesses in town have some sort of flight department, whether they have their own aircraft or whether they use charter service. Uh we see a lot of net net jets, uh, delta private jets that fly in there. It's a commuter, uh charter flights. Um so just about every, like you said, it just about every business in town has some sort of flight department. You may not directly use the airport.
SPEAKER_01So somebody you know, your your kids, your grandkids, your spouses work at a factory that have some type of flight department. So they're coming in and uh to the airport and going to the business, check on the business when they the pilots are there. So that's the main thing that we wanted to share with this terminal building is we want a nice facility, not only for the way it looks, uh, you know, the airport when someone lands to to start a business here um or to expand their business here, the airport is the first thing that they see, and it's the gateway to our city.
SPEAKER_01And uh we've we've talked to the mayor, we've talked to economic development, you know, it's like we've got to get a new terminal building because this is the face of our city. This is the first thing they see when they land here. So we we have to have nice modern facilities for pilots to want to come to Richmond. So so there's surrounding airports, uh, Oxford, Connorsville, other airports that pilots can go to. So if they have a nice facility in Richmond, it's kind of up to the pilot where they want to land. What's what's most comfortable for them?
SPEAKER_01What's you know, what amenities do they have? Do they have a crew card to come into town to get uh food? Some airports do, some airports don't. Uh, what kind of facilities am I going to relax in? You know, we want comfort, we want modern facilities, you know, for pilots to come and relax, because when they're here, they may be here all day long. They may be here an hour, they may be here well into eight, nine, ten o'clock at night, waiting for the passengers to get back. So that was another pushing factor for a new terminal is to hopefully with this terminal building increase our air traffic.
SPEAKER_01Um so pilots want to come here.
SPEAKER_02And if we wasn't able, like let's say we were denied this grant, another community would have received it to do the updates to their terminal. And so we really want to stress that too. That, you know, I have said this numerous times on this podcast when we've talked about grants, is why not us? Why not Richmond? Why not enhance the quality of place, quality of life, the beautification of our city that we live in? Um, you know, it's it's really important that, yes, it is tax dollars, but would you rather your tax dollars go to another city in Indiana or to another state when it could be brought back home?
SPEAKER_02Like you said, it's kind of like winning the lottery. And it is, in a sense, you know, 1.4 million is a lot of money. And why not bring it back to the community so it can be put back in it?
SPEAKER_00Yeah, it is important to know that the bipartisan infrastructure law is a lot more than just this terminal grant. There was a lot of um funding for different areas of the government, different areas of transportation that was included in that bill uh when it was approved by Congress and then signed into law by the president. Um you know, we're actually talking about a a small portion of a small portion of the BIL overall, you know, what that that uh law actually funded.
SPEAKER_00So there was a lot more. This is going to fund, you know, the the bipartisan infrastructure law in general is going to fund road construction projects, community infrastructure projects, all of those uh different types of projects are being funded. And we're talking about the small bucket. And that was earmarked specifically for airports our size. Um and you are 100% correct that if it didn't come to us, it would have gone to another airport our size someplace else in the country.
SPEAKER_02So yeah. And so it's really important that when we can get those grants, that we receive them so we can keep thriving as a community, keep enhancing as a community.
SPEAKER_01We all pay taxes and we're not gonna get away from that. So it's kind of rewarding uh, you know, for me as a taxpayer to see my tax dollars coming back to a community I live in. And so, like you said, you know, you're gonna pay taxes whether you like it or not. So at least we're getting that money back in our community.
SPEAKER_02Right. And that's something that I'm always thrilled to see. Um, so how will this project improve airport safety, operations, or passenger experience? I know you kind of touched on that, you know, the comfort for the pilots when they're flying in. Let's say it's a corporate jet. They're going to check on um the factory that they have here in Richmond. The pilot has to hang back. They're not going to go with everyone to the factory. They're going to be hanging back.
SPEAKER_02So you do want it to be comfortable for them. So they choose our airport instead of another airport around us.
SPEAKER_01So a few things I jotted down. So the new terminal is expected to improve accessibility for passengers with disability. We talked, we're not, we're not ADA compliant. Um, building safety and reliability, uh, it's got leaks. It's it's hard to heat, it's hard to cool, and so it'll be more efficient and reliable. Um, like you said, the operation, operational efficiency for the airport management and pilots, uh, passenger comfort and experience of the facility, uh, energy efficiency and long-term maintenance, because this building has been a maintenance nightmare.
SPEAKER_01We just put, I hated to spend the money, but we had to spend$10,000 on the roof upstairs because it was, it was not only it was pouring in, it wasn't leaking, it was pouring in. So I came in, the the whole waiting area was completely soaked. And so I spent the rest of the day trying to drive the carpet out. And so got the new roof put on, thought everything was great, came in, it was even probably more wet than it had been in the previous, but the some of the drains were blocked, and and so it's just an ongoing maintenance issue.
SPEAKER_01And uh it's it's time, you know. And fortunately, we we do got the funding, and uh yeah, we're looking forward to the future with this new building.
SPEAKER_00There is an aspect of air safety also with this new building. Um, you know, when you know you have people that are flying, you know, pilots that are flying these corporate jets, or even small, you know, single-engine airplane pilots that are flying um that need to stop and take a break. If we don't have the facilities for them to do that, you know, that is somebody who's potentially getting back into an airplane that's stressed or tired or you know, not at their peak, not at 100%.
SPEAKER_00So we do want to have a area for pilots where they can re-energize and get back into the air safely rather than you know getting back into an airplane when they're tired or stressed or not at their best.
SPEAKER_02Yeah. No, I think that's very important as well. Um, what is the overall scope of the terminal project tied to this funding? Um, I kind of know about it, but I wanted uh you guys to kind of touch base on that. So, what is the scope? What is going to be done with this funding?
SPEAKER_01Go ahead. So it'll be the construction of the new terminal. Um, it'll be approximately 3,500 square feet. It's all one level. Uh right now, the situation we are, if we had to redo remodel our building, uh, we would have to put an escalator elevator or something in to be AVA compliant. Right now we're grandfathered in. So, but if we did anything work to that building at all, it would just be a huge expense there for an 80-year-old building. So it'll offer uh more modern public areas uh offices and uh to support those functions.
SPEAKER_00So yeah, the the overall construction project of the terminal is um going to cost about$2.9 million. Um so obviously this grant is funding part of um that construction. Um we did we have already bid the project, so we do have a um we do have a low bidder, we haven't notified them yet um just because of timing with the FAA and everything. But you know, we have you know, to fund the overall$2.9 million of this project, we are taking money from the airport's uh you know, cash account that we had, that's money that we've made through running the FBO at the uh the airport.
SPEAKER_00So doing fuel sales, hangar rentals, uh ramp fees, et cetera. You know, that's the money that we've generated as a you know an entity uh running the airport. Uh and then we also do have a couple of other um FAA grants that are always earmarked to our airport that we're using, dedicating to this project as well.
SPEAKER_02Okay. I was actually gonna ask um that question. Um it was gonna ask is the 1.4 million grant fully covering the project, or are additional funds or local match dollars or donations going to be included? So thank you for answering that. Um The airport actually has a lot of history as well. Um, that I have learned recently within the past two years, I would say, is uh why the airport was built there. And that was during one of the wars, and it was going to be kind of like a training ground for soldiers to learn how to fly.
SPEAKER_02Is that correct?
SPEAKER_01I think it yes, and and I think it was more of a reliever for right pat Air Force Base. Um, so that explains why we have long runways and wide runways. Uh, we have runway 624, which is about 5,500 feet long and it's 150 feet wide. And 624, I think in 15 we redid that, so they reduced the the width to 75 feet wide. It's right at a mile long, also. And so we do get a lot of student traffic because we don't have much of a crosswind with the two runways, so pretty popular students.
SPEAKER_02Okay. Um, so my next question is is what is the expected timeline from grant approval to project completion? And I know this can all change due to weather and materials, but what are you guys kind of seeing in the future of when this might be completed?
SPEAKER_01So, right now, the the most of the FA grants roll out in in the late summer, early fall. So we're looking at to being fully funded around uh correct me if I'm wrong, Jonathan, August September of this year. And so once we get all the funding in place, we can get the authorization to proceed. We can get the purchase orders issued uh once we have those grants in hand. So we're looking at uh, like I said, uh August September at the start date. And then uh I think the contract is for 12 months.
SPEAKER_01So hopefully by earlier summer, it's just core on what kind of winter we have, because this will be a lot of the project will be done in the winter. So that's why we're hoping to get things started um quickly. And uh, so it'll take about 12 months is the the contracted time. So this time next year we should be in our new building.
SPEAKER_02That'll be exciting. Do you guys think you might host an open house for the public to come out and take a look?
SPEAKER_01Absolutely. So definitely we are we'll plan some type of uh opening ceremony, we'll have some type of groundbreaking ceremony. Hopefully, we can get Congressman Sharif back in town for that.
SPEAKER_02Um and he was a big help to getting this grant, right?
SPEAKER_01He was, he really went to bat for us. I think he was on a subcommittee for the FAA and he really worked behind the scenes to to get Richmond uh you know on the spotlight to get this funded. So a big shout out and thanks to Congressman Sheree for that.
SPEAKER_02Yes, for sure.
SPEAKER_01And also Mayor Oler. Um he's the one that kind of reached out and got him to our airport and uh got this this thing going. So special thanks to him too.
SPEAKER_02Yeah. No, I was there when he visited Congressman Shree, visited the airport. And so um, yeah, I mean it's exciting. I'm glad that he noticed us, saw what we were wanting to do, and really did help out, you know, put in a good word for us. Yes. Um, what are the key milestones the public should expect to see over the next year?
SPEAKER_00So as Rodney said, hopefully this summer we will um we'll get the uh all of the final paperwork and everything that we need from the FAA from the grant perspective. Um unfortunately I have to say I hope we get that there. The FAA moves at the FAA speed. And so um, you know, we we have to wait on them. Um but as soon as we do have that, you know, the um the plan is groundbreaking this fall. Um and so you should start to see, you know, the dirt moving um in that September, October timeline, starting to see the building be uh erected, the steel going up and the walls and everything uh late fall, early winter, um, you know, finishing the inside construction, you know, the end of winter, beginning of spring.
SPEAKER_00And then, yeah, as we said, hopefully, you know, May, June next year, we're gonna be having that uh grand opening celebration at the airport that uh you know, we're really looking forward to having the community out to see, you know, what we've done, what we've built.
SPEAKER_02Um, how will airport operations continue during construction or upgrades?
SPEAKER_01So we will keep our current terminal building open during this construction. So there's not gonna be any interference with any type of air traffic. Uh the airport will stay open as in business as normal. It'll just be closing one building and moving to the new one. So there's not going to be any any changes with the operations.
SPEAKER_02So the new airport terminal is going to be built how far away from the existing terminal?
SPEAKER_00Uh it's it's about 200 feet away. So it's if you've ever been out at the Richmond Airport, um, as you're driving in, uh the parking lot is in front of you. The current terminal is on the left, and uh we're putting the new terminal all the way on the right side of the parking lot. So it'll just be on the other side of that uh main parking lot.
SPEAKER_02Okay. So I was gonna ask too, is there any plans for the existing terminal once the new terminal is built and you guys have migrated over to it?
SPEAKER_01Um at the at the present time, it'll be where it's it's gonna be torn down. Uh like I said, it's lived its full life expectancy and there's not much you can really do with it. So yeah, once the new buildings are open and and finished, uh then we'll start the process of uh demolition.
SPEAKER_02Yeah. Okay. Um are there any risk factors that could delay the project timeline?
SPEAKER_00You know, with any construction, there's there's risk factors, there's unknowns that um, you know, they could start moving dirt and find out, okay, the soil isn't stable enough to put a foundation on. Um there's also you know potential delays coming from the FAA. Um right now we don't anticipate any, you know, government shutdowns or anything like that. But you know, anytime you know the federal government is disrupted, you know, that potentially disrupts you know that flow of money from the FAA. So um you know we don't anticipate.
SPEAKER_00Any of those things happening, but you never know.
SPEAKER_02What long-term impact do you expect this investment to have on economic development and future airport growth enrichment?
SPEAKER_00You know, from the economic development aspect, um, you know, we do anticipate this having, you know, putting that that brand new front door on the community that uh investors can see as they're coming in to, you know, look at do I want to locate a factory or a warehouse here? Um, you know, we anticipate that having a positive effect on the community. Um, the the other thing that this term new terminal is going to do for us as a community is give us a venue.
SPEAKER_00Um something that we haven't been able to do out at the airport. Uh, just because we haven't had the facilities to do it, we haven't really been able to host fly-ins, um, you know, where you have pilots from the surrounding area coming in to uh you know get together and and have an event. Um we haven't been able to do things like um STEM education uh events and that sort of thing. This will give us the um facilities where we can host some of those types of events and other events too.
SPEAKER_00Um one of the things that we're building with the new terminal is uh in on the uh air side, we're building a nice big patio that will have seating out there that could be used for you know other types of community events or corporate events. You know, somebody who wants a nice outdoor venue that has uh, you know, a picturesque setting, you know, we're hoping that people will be able to do that. We want the airport terminal to be the community's airport terminal. We don't want it to be, you know, just a place for the pilots.
SPEAKER_00Um, this is the city of Richmond's airport, and the community should be able to use it as well.
SPEAKER_02I I love that. That's great.
SPEAKER_01Yeah, anybody's uh welcome to come out any day of the week and hang out with us, watch airplanes take off and land and bring your lunch with you and hang out. You know, the airport's a fun place. You never know what's gonna land.
SPEAKER_02And learn some more history too. You have a lot of photos on the walls of famous people that has flown into our airport, uh, whether they were coming to visit Richmond or it was just a place to land before they went on and to to do what they were doing and then come back.
unknownYep.
SPEAKER_02So the history is really interesting to learn.
SPEAKER_01So I do have one more statement I'd like to make um before closing. Um so a lot of people have kind of a just kind of wanted to explain where FA funding comes from a little bit. Now, this is uh aside from our BIL, that was a different pot of money, and then uh we did touch a little bit on that, but the most of the FA funding is generated within the aviation community and it stays within the aviation community. So the airport and airway trust fund, the AATF, is the biggest source for FA funding.
SPEAKER_01And uh these funds are um come from airline ticket taxes, uh fuel taxes on aviation, gasoline, and jet fuel, which we we sell both of those at our airport, cargo shipment taxes, international arrival and departure fees. So when there's an FA project, say a runway project, or you know, we we got a new snow removal equipment and a snow removal equipment building, that's where those funds come from, is within the aviation community.
SPEAKER_01So it's not an actual new tax that's coming out of your paycheck. Um if you've flown commercially, then you've paid a very small portion towards you know these grants that we we receive. So just to kind of hopefully put a little peace of mind on uh residents that uh this airport's costing them a lot of money and it's really not.
SPEAKER_00And and I think it's also important to note where our local funding comes from as well. Our operating budget is uh fully funded from the airport property itself. We do not take money out of the uh the city funds to operate the airport. We do that through um, you know, raising money through air, you know, fuel sales air or aircraft, through you know, 100 low lead and jet A fuel sales, through hangar rentals, ramp fees, um, and then our farm ground lease as well.
SPEAKER_00So that the money to run the airport in our local community is coming from the airport.
SPEAKER_02And it's not costing the local taxpayers because you're not taking it from the general fund from the city.
SPEAKER_01Correct. And one of the highlights of my career as airport manager, other than this new terminal building, is last year we were able to uh basically have a million dollars in our savings account for the airport, which is remarkable for an airport our size that's not on the tax levy. So we've done without, we've done without some new equipment. We've been frugal with our funds because we had this dream of a new terminal building. So we we tried to put everything towards this, uh, you know, as far as our savings goes, towards this project. And uh thankfully, with uh, you know, good budgeting and kind of making wise decisions when it comes to finances, you know, along with the aviation board and myself, and uh we're in a good spot to finish the funding and the shortfall that we had with uh you know the grants.
SPEAKER_01Uh little thing we didn't touch on is just because we have FA grants, there's a lot of things in the building that's not FA eligible. So we have to pay for those things, you know, either out of our our cash balance or you know, sometimes we go to redevelopment for our local matches for the the grants. Uh right now it's two and a half and two and a half percent. So we have to pay two and a half percent towards these grants. The state uh also kicks in two and a half percent.
SPEAKER_02Now I'm excited. I I truly believe once this construction project is done and you know, word gets out that we have a new terminal, we're gonna see a lot more increase in air traffic stopping here because we'll have a better terminal, it'll be more comfortable. Uh, there might be better amenities at the terminal than you would see at another terminal our size. Is there any last thing that you guys want the community to know about this project, the grant, or anything else that the airport has planned for the future?
SPEAKER_00You know, I would say uh Rodney's invitation, you know, to come out and see the airport now. Um, you know, that's that's definitely open. It's it's our community's airport. Um it is, you know, if you have, you know, kids that are interested in aviation, it is great to, you know, bring them out and let them watch airplanes take off and land. Um and and then also, you know, if there's members of the community that are, you know, interested in aviation, we have a flight school at the aviation or at the airport. You can learn to fly, you know, we'd be happy to have you.
SPEAKER_00We always love having new pilots and new students coming out and learning how to fly. So, you know, just a general invitation, please come visit the airport. And uh, especially once we get the uh new terminal built and we're having all sorts of community events out there, please come out and see it.
SPEAKER_02So if the community wants to come out, what's the hours of operation that they could come out to see the existing terminal right now?
SPEAKER_01So we're typically there from 8 a.m. to 5 45 p.m., seven days a week.
SPEAKER_02Take that invitation, come out and see the airport. Um, we'll document the before and after. And then once the new terminal is completely finished, come out to the, you know, the grand opening, open house and see it. I'm sure there'll be a ribbon cutting.
SPEAKER_01Absolutely.
SPEAKER_02And we'd love to have you out there.
SPEAKER_01Yes.
SPEAKER_02Guys, thank you for joining me. It was a lot of information. I think we were very transparent to kind of just, you know, clarify exactly what is this project, where the money's coming from, where the money can be used. And, you know, it's a great thing that we're seeing coming to our community.
SPEAKER_01Yes. Thank you for having us. Yes, thank you for having us.
SPEAKER_02That's Inside Richmond, the city's pulse. Make sure to join us next time.
In episode 34 of Inside Richmond: The City’s Pulse, host Kalleigh Smith and Mayor Oler are joined by Dakota Collins from Earlham College’s Revitalize Richmond initiative to talk about the changes taking shape downtown...
This week on Inside Richmond: The City’s Pulse, guest host Kalleigh Smith welcomes Kristi Cruse to talk about Richmond Parks and Recreation, the Richmond Farmers Market, and the opportunities you might be missing right...
What does a day in the life of Richmond’s mayor actually look like? For Mayor Ron Oler, it can start with the phone ringing before sunrise and change completely before he ever makes it through the day’s calendar. Mayor...
A red, white, and blue safe buried beneath concrete for 50 years. A plaque counting down to July 4, 2026. On July 4, 2026, Richmond's Bicentennial time capsule was finally opened, revealing a remarkable collection of...
Richmond has been quietly doing something most cities put off for years: counting and assessing its public trees one by one. In this episode, Lindsay Darnell is joined by Thomas Hill, GIS Coordinator for the City of...