I sat down last week with Scott Flesch, probably the most experienced bid-protest lawyer ever. Scott was the Chief Trial Attorney for the Army, where he worked on over 2,000 bid protests. He is now a member at Miller & Chevalier, a D.C. law firm. Our conversation started with the most recent Executive Order mandating fixed price contracting, and moved into the risks that contractors face from the FAR’s new class deviations implementing the DEI Executive Order. Scott also discussed the importance of intervening in protests, the differences between GAO and the Court of Federal Claims, and how small-business issues have come up in some recent cases. Links discussed Scott Flesch bio (Miller & Chevalier) Intervention Download: Why Offerors Must Prepare for Bid Protests Executive Order: Promoting Efficiency, Accountability, and Performance in Federal Contracting FAR Council Memo: Agency Implementation of Executive Order 14398, Addressing DEI Discrimination by Federal Contractors Life Sciences Logistics LLC v. United States (Court of Appeals for the Federal Circuit) Global Connections to Employment, Inc. v. United States (Court of Federal Claims) Noblis MSD, LLC v. United States (Court of Federal Claims) Revelations Counseling and Consulting LLC v. United States (Court of Federal Claims) CSlope Solutions LLC (GAO) Timestamps Introduction and the Value of the ABA Public Contract Law Section 00:00:00 The Shift Toward Fixed-Price Contracts 00:03:20 Dealing with Ambiguous Requirements and Bid Protests 00:09:58 Navigating the DEI Executive Order and False Claims Act Risks 00:14:37 Understanding CICA Stays at the GAO 00:23:27 CICA Stay Overrides 00:29:33 Procedures at the Court of Federal Claims 00:38:28 The Role of Intervenor’s Counsel in Bid Protests 00:41:12 The Noblis Case and Pleading for Injunctive Relief 00:50:32 Choosing Between the GAO and the Court of Federal Claims 00:53:21 The Revelations Case and Limitations on Subcontracting 01:00:44 The Certificate of Competency (COC) Process 01:05:23 Conclusion and Contact Information 01:10:20 With 20 years of Federal legal experience, Sam Le counsels small businesses through government contracting matters, including bid protests, contract compliance, small business certifications, and procurement disputes. Sam obtained his law degree from the University of Virginia and formerly served as SBA’s director of procurement policy. His website is www.samlelaw.com. This video is for informational purposes only and does not constitute legal advice. This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit www.govconintelligence.com
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_01Welcome back to GovCon Intelligence.
SPEAKER_00My guest today is Scott Flesch. Scott, welcome to the program. Sam, it's a pleasure to be here. Good to actually sit down with a friend. I do consider Sam a friend. I knew him when he was in the Small Business Administration when I was in the Army. You'll hear a little bit about that, but it's personally rewarding and professionally rewarding to keep in touch with Sam. He is brilliant on small business issues, and I have gone to him on several times.
SPEAKER_01Yeah, I think that's great, Calvert. As a member of Miller Chevalier in Washington, she's a long-time governor. She's a former chief and then she's a trial attorney at the RE. She advised the RE and several . Former adjunct, Catholic Givers, Columbus School of Law, U.S. A couple of years.
SPEAKER_00My sentence is over in about four years.
SPEAKER_01How's it looking?
SPEAKER_00Oh, it's fun. For those folks that know a little bit about the American Bar Association, it is a valued asset. It is a collegial space for attorneys, especially the procurement Sam Le samlelaw Gov Compare ideas is definitely likes a box of chocolates every week.
SPEAKER_00And the one thing that our clients do want is consistency in our advice. The problem is keeping tabs on all the changes in order to give them competent advice of the day and how that translates into long-term strategic plans, their budgeting. Sam Le samlelaw GovConnect
SPEAKER_00to distribute wealth, and that is federal government contracts. The wealth is shipped not only to large businesses, but small. And the more diverse, in fact, that the contractor base is, the healthier the economy is, the healthier the industrial base is, the more capability it gives to the Department of War or Department of Defense. And so you do want to encourage businesses to participate in the federal procurement system, and you do that through transparency, through fairness, predictability. and that leads to increased competition, lower prices, a better quality.
SPEAKER_00It's when that entire process gets disrupted that lawyers, unfortunately, have to get involved for these clients. They have to spend money at times and it can chill their interest in proceeding and taking on risk. So that's going to permeate some of the discussion today, I think. That's a really good one. Important point about the business aspects of government contracting that there are some companies that are 100% government contracting and they know the game very well but what the government really wants are companies that might be in the commercial space and coming in to government and find a
welcoming environment there
SPEAKER_00so on that note
SPEAKER_01We saw an executive order come out at the end of last week, Friday of last week, about mandating fixed price contracts and preferencing fixed price contracts. Agencies have to write a justification if they move away from that, either time of materials, labor hour, or cost reimbursement. What are the legal issues in that executive order? And then how do you think it'll affect this welcoming environment for commercial contractors? So I think the best term of art I've heard and I used to that it was a little bit
SPEAKER_00of a nothing burger, right? The federal government has always consistently preferred fixed price contract and that is all about allocation of risk. On a firm fixed price contract, the government is able to offload substantially the amount of risk towards performance and cost to a contractor. At the same time, a contractor doesn't want to absorb all the risk, and they like those sorts of contracts at times, if in fact the requirement and the facts call for it to structure, to shift that risk back to the government. This is a criticism of mostly cost reimbursement type contracts.
SPEAKER_00And cost contracts are usually very large in dollars, complexity. But the reason it normally is a cost contract is because it's hard to define the exact requirements as well as all those factors that are influencing the requirement, the ability to perform. Think war zone, contingency operations, research development. And so in order to incentivize those contractors from getting into that space and participating and making the investment, The government takes out a little more risk on cost contracts. They're going to pay all reasonable, allocable, allowable costs plus a fee.
SPEAKER_00And so the government usually pays more and takes on more risk. The contractor's risk is minimized, but the government's trying to get away from that because these contracts are extremely costly, burdensome to administer because there's a lot of cost accounting that goes into it. They take years to close out. I mean, They're complex. And that's why you don't see a lot of small businesses in the cost space because they don't have the infrastructure. They don't have certified cost and pricing teams and auditors, and they don't want to be in that business. They want to be more commercial-like.
SPEAKER_00And so this is consistent. It's a nothing burger, really, because the government is just reinforcing the preference towards fixed price contracts. That's where commercial vendors reside mostly. And the risk is on the contractor to keep quality up, but price is down. That's what the government wants. and they don't have to take on all the overhead of cost and accounting teams, certified pricing and costing data. It keeps it simple. However, there was another piece of that preference to fixed price contracts in the executive order that I don't know if it's been fully thought through yet.
And we're going to see when the DFARS provision gets issued of how it's going to be implemented. And that is firm fixed price contracts or performance based metrics type contracts.
SPEAKER_01What does that mean?
SPEAKER_00Yeah, so good question. We're going to see in the DFARS provision, but what it normally means, FAR 4.6 lists out all these different types of contracts, firm fixed prices in there, cost is in there, but also incentive-based contracts, even incentive-based firm fixed price contracts. And one is just, you have the firm fixed price, but you have another element to it that if a contractor It could be goals, performance, it's very subjective, but you lay that out in actual the contract in the agreement with the parties. If they achieve those milestones, they're owed an additional fee.
SPEAKER_00With that comes surveillance, potentially submission of a request for the incentive fee, proof that you've earned it, possibly a fight and dispute, and that can be quarterly, that could be annually, it's depending on the contractor structure. So if you really want to get away from complex contracting, and go back to firm fixed price, but then you have this other potential of performance based metrics type contracts. It's not really simplifying at all. Another example is award fee type contracts.
SPEAKER_00Okay. Award fees, those are, again, you've got a fixed price that a company will perform for, but then the ability effectively earn more if they see certain metrics There's an award fee plan. There's administering that plan. There's submission that I achieve these goals and a fight over that. And again, it could be quarterly or whatever the contracts agreed to. That is very administratively burdensome and not simplified. So I understand shifting the risk to fair and fixed rights contracts.
SPEAKER_00The administration is all about making contracts more commercial-like. And that is a good goal. You want to make the contracting process easy and familiar, especially to small companies and vendors. You want them to participate to, again, control costs, improve competition. But at the same time, if the company's risk is higher because they're not sure they're going to actually meet those performance-based metrics and take a loss, it could be a disincentive for some, it could be incentive for others,
SPEAKER_00but it's not simplified.
SPEAKER_01Yeah, when I was in government, we didn't do many incentive based contracts because you're working off of annual appropriations and you have to obligate that at the time that you award the contract. So when you get down to the point of providing that incentive, the government has been a big Encouragement to provide the incentive because otherwise they can't take, it's not like a private company where you can take the money back and shift it over to another contract. You've already obligated that ahead of time. So I wonder if they've solved that issue as they come through. If you deny them the incentive, what are you going to do with that money?
SPEAKER_01You can't go back and obligate it on another contract. Yeah,
SPEAKER_00the fiscal rules, the interpretation of fiscal rules these days, we know we're under stress, for lack of a better term. But you're right, for those types of contracts, They do have to obligate, but they're always going to have it being a subject to the availability of funds clause. Right. And so a contractor is not going to go into that sort of contract knowing that all dollars will be available throughout the period of performance. And so it increases their risk.
SPEAKER_01Yeah. Yeah. The other thought on fixed price contracting, you mentioned this with the cost reimbursement is for those cost reimbursement contracts, their Not particularly well defined. So if the government really is going to shift cost reimbursement to fixed price or time materials, labor hour to fixed price, they have to define the requirements better than what they've been doing. And that's difficult to do when you have a contracting workforce that has left because of DRP or has just undergone attrition. What is a contractor to do when it gets a fixed price
solicitation and doesn't
SPEAKER_01understand what the requirements are?
SPEAKER_00Yeah, this is definitely a two-part problem, right? Potentially. One is literally in the bidding stage, the formation of the contract. And we'll talk about existing contracts that may be converted in a moment because that's another issue, right? So at the formation stage, when the business is looking at a solicitation, It's structured as a firm fixed price opportunity. And they're reading the requirements of the statement of work, whatever it's called. The agency is calling different things. But those are the requirements, right? It specifies literally what you have to do. It should tell you what the limitations are. It should say what the government's expectations are as well.
SPEAKER_00And if there's ambiguity in what the government's even asking for, How do you price that? How do you build a team? How do you recruit personnel? How do you potentially get financing for it? Because some of these are privately financed. Rest companies may not have that kind of capital. That is going to be difficult when you do have, like you said, a lot of the infrastructure on the acquisition side has eroded over the years, and this year especially, and they're not putting forth very clear, concise, and measurable and achievable requirements. Number one, it's a disincentive for businesses to step in to the extent
that
SPEAKER_00Maybe the government's asking for too much, right? Or too much risk to be absorbed by a contractor. And contractors, these days should be very low to just assume, I'm going to make it up on the back end, especially if the requirements are crystal clear what they had to do. It's that ambiguity that becomes a problem. If you don't know what the government is actually asking for, what the expectations are, what you have to do to perform and succeed, you've got a couple of choices. You can take on that risk and assume you're going to perform well and the government's going to like it. Some businesses may assume that they'll make it up through
change orders and request for equitable adjustment later if the government issues directions that
SPEAKER_00change the requirement. But then you maybe have a fight over whether there's a change. But what you can do up front, and what I advise businesses to do all the time, is if there is a clear ambiguity, we call that a patent ambiguity, that is something that on the surface a reasonable contractor would see as a disconnect from the requirement, something that's fuzzy, they can't tell what it means. They have and should take advantage of the bid protest process and either issue an agency-level protest, a protest at GAO,
SPEAKER_00and you could go to the Court of Federal Claims, but you see a lot of solicitation challenges at the Government Accountability Office. And the timing on that is very important. You've got to submit that protest, even just seeking clarity if the agency's refusing to clarify via the Q&A system or The response is just a disconnect from what the requirement actually says sometimes too. You've got to submit that protest before the deadline for receipt of bids and proposals.
SPEAKER_00If you wait past that, you're going to be untimely at the GAO, you're going to be untimely at the agency, and you're likely to be untimely at the Court of Federal Plains. Isn't that a lot with post-award protests too where GAO says,
SPEAKER_01oh, you should have, this was a patent ambiguity, you should have protested it back before bids were due during the solicitation stage.
SPEAKER_00Yeah, the only ambiguities that can be raised in a timely fashion at GAO and the courts is a latent ambiguity, something you could not have reasonably anticipated. Another issue pops up. The agency's something more. There's a post-award direction that you said, wait a minute, this is different than what I understood, and I could not have reasonably anticipated the agency's reasoning. They didn't elaborate in a Q&A. They didn't tell us otherwise. This has created a What we see to be now an ambiguity in the solicitation that was
latent, not patent.
SPEAKER_00I didn't know, I didn't have a reasonable expectation, or I could not reasonably see that there was a vagueness or ambiguity in the solicitation terms. You can raise that, but you better raise it within 10 days of when you knew or should have known, or else you're also going to be intimately at the GA.
SPEAKER_01Speaking of ambiguities, I think there's an ambiguity here in the executive order that came out on racial discrimination in government contracting. The deviation has now come out from the FAR Council. They did it in less than 30 days. They had 30 days to do it. They beat that, which was surprising. And then agencies presumably will start implementing that deviation into their contracts soon. And they're supposed to go back and modify previous contracts. There's a whole schedule for that. But there's this question. You have this clause in your prime contract of what to do with
subcontractors.
SPEAKER_01So tell me a bit about that, about this. Reasonably Knowable Standard That They Have For Subcontractors And What Is A Prime Contractor Expect To Do To Oversee Its Subcontractors Compliance With That New Foreign Deviation Clause So I Think This Leads Us To Go Back In Time A Little Bit About A Month From Now Roughly A Little Bit More Than A Month On March 31st 2006-26 President Trump Issued A New Diversity Equity Inclusion Related Executive Order
SPEAKER_00Titled Addressing DEI Discrimination by Federal Contractors. This follows a number of other executive orders in play that addressing what the government believes to be illegal DEI. This one clarified it a little bit more and talked about the illegal DEI as applied to contracts. Activity, which racially discriminatory DEI activities, and in a very broad sense, but does go further and define that as racial discriminatory
DEI activities as
SPEAKER_00disparate based on race or ethnicity in their recruitment, employment, meaning hiring promotions, contracting, program participation or allegation or deployment of an entity's resources. It goes a little further to further define program participation as membership or participation in or access or admission to training, mentoring, or leadership development programs, educational opportunities, clubs, associations, or similar opportunities that are sponsored or established by
the contractor or
SPEAKER_00subcontractor. And so raises a whole host of questions about, okay, we now have a definition, but that is extending to the company's activities, programs, clubs, associations. Okay, what does that mean? It's where they expend resources, okay? Program participation is a little bit broader. The company actually spends its resources on those that meet that definition. It could effectively violate
SPEAKER_00This Executive Order, not that that's criminal or civil and in bias nature, but now we've got these deviations which are going to implement these new clauses in contracts. And originally, Executive Order talked about contracts in the future, new contracts. However, we now have guidance and a deviation that's going to be implemented in existing contracts by the end of the year, and a FAR clause that's going to be in all new contracts within the next 30 days. And This flows down.
This creates obligation for the primes to monitor their subs and for the subs that
SPEAKER_00also follow this new deviation via contract. And why it's also significant is it's going to require the companies to acknowledge that the government's payment on the contract is tied to this. And if a company violates it or doesn't report it or spends resources and violation of it, it literally could be a false claim because they're certifying compliance with it. Yeah. False claim liability now because of DEI programs and companies
spending resources
SPEAKER_00on clubs, association, training resources, the whole laundry list. So false claim could mean that it's subject to the whole value of the contract. Oh, could be more than that. And trouble damages? Yeah. It literally could. It is a company termination clause, effectively. Because companies that go through the false claims process effectively, especially small to mid, that's it. It literally could be that meaningful. And that's why at the beginning of this discussion, we talked about chilling effects on entering the federal
government workspace and
SPEAKER_00procurement in general. This one is, I see this as certainly having a chilling effect because it is hard to know how the government's going to interpret this, you know, illegal participation, whether it violates the DEI itself, what is racially discriminatory DEI activities. And that is really subject to interpretation. The government has done a little bit better job of telling contractors what it believes it would be.
SPEAKER_00But again, There's a lot of open questions.
SPEAKER_01It's almost purposefully ambiguous. It's all encompassing, first of all, at least they did not include sex or gender in it.
SPEAKER_00So it's racial discrimination. So you have that clarified.
SPEAKER_01But that whole list that you just read, that's a lot of activities. And it could include things that If the contractor is participating in both state and federal or local and federal that they might be required to do under one set of procedures and then prohibited under another set. So what do you choose in that situation?
SPEAKER_00I can't tell you on this podcast because it takes an analysis, right? It depends on the specific state. It depends on your contract. It depends what the activity is that's in question. Miller at least has an entire team in our workplace culture practice group that does this and advises companies. And it has to literally get and meet with a company to understand what the raised activity is, what their concerns are, an analysis of where they practice, the state laws that are applicable. It's an issue. It is very complicated for businesses.
SPEAKER_00This is not a self-promotion, but if they're not consulting their in-house counsel or outside counsel to help them interpret this as applied to their activities or what their subcontractors are doing, especially with this new false claim threat that's tied to this illegal DEI activity, they're endangering their very existence. What would be the challenge that the government would run into in trying to bring
SPEAKER_01the False Claims Act case under this? I had the Settlement with IBM, $17 million.
SPEAKER_00So it seems like there's risk for companies out there,
SPEAKER_01but usually you need some sort of c-enter in a false claims act case. You have to have some knowing violation. How hard is it to bring this case from the government side?
SPEAKER_00The question, I think you need to ask a little different question. I think all these cases are going to be hard for the federal government, right? Because you're going to have a judicial system that is going to help interpret the laws objectively and they'll apply their own objective judgment to it. It's whether DOJ is going to bring cases even though they have not the strongest of cases in order to encourage those companies to settle. This is, I don't think This is all about the government punishing anybody.
It's about setting incentives in place that don't do anything that even look,
SPEAKER_00smells, or tastes like it's DEI's applies to race. And the Department of Justice, I think, his personal opinion, this is not my firm's opinion, is probably going to be bringing certain cases, and you mentioned one, I could likely bring other cases that, in fact, for the sole purpose of bringing the business to the table. and send messages to others that they shouldn't even get close to the third rail on this, even if it looks, smells, or anything that could be interpreted as, again,
SPEAKER_00racially discriminatory DEI activities, that should just say no, right? That appears to be the message the administration is taking. That is not From a legal standpoint, I am not talking cultural, moral, ethical. From a straight up legal perspective and a risk perspective, companies really need to think twice about doing anything that even comes close to what may be interpreted by the Department of Justice or even your contracting officer to be, again, racially discriminatory DEI. Sure. I've seen it with universities,
you've seen it with law firms and varying outcomes.
SPEAKER_01Both of those areas.
SPEAKER_00And that's difficult for businesses because they have codes of conduct. They have internal policies that for decades have promoted certain social networks. Important policies to implement various aspects of either, I'm not saying curing racial discrimination, but at least providing opportunities, right? And this sets a bar that's pretty darn high as far as a level of scrutiny on those companies now that not even come close to implementing those
policies or keeping
SPEAKER_00those policies. So it is back to chill, potentially the process. for government contractors. If you are new to the space, you should go in eyes wide open and have a full review of your internal policies, codes of conduct, HR, everything that you do before you engage in this space so that you're not setting yourself up or the prime for failure because this is a prime sub-issue. A lot to think about with that and the Justice Department is going to be very busy
SPEAKER_01on the civil rights end and on the contracting end.
SPEAKER_00I'm very lucky to have you on the program as Probably the most seasoned bid protest attorney, potentially of all time. How many bid protests have you done? A thousand at this point? Seasons award. We worked on a few when we were in government together and then now you've gone out
SPEAKER_01and been very successful in private practice. One of the reasons to go and protest is to get a stay of performance, the SICA stay. And there's been an important case that's come out recently from the Federal Circuit about SICA stays. So before we get into the case, could you just explain what a SICA stay is and how that comes about when someone goes to protest a GAO?
SPEAKER_00Sure. Let me, this is a very complex topic with really arcane timeliness rules, and I'm going to try to simplify it for the audience as much as possible. So when you say seek a stay, we're talking GAO protests. Protests follow the Government Accountability Office. And why we say seek as a statute, say competition and contracting. You find it at 31 USC 3551 and on two and three. But the provisions related to the stay and an override of a stay,
SPEAKER_00which is in a new term of art, you're going to find a 3553. Here's what it is. For a GAO protest, as soon as an agency receives notification of the protest from GAO, that's different. It's not the filing. It's a notification of the protest from GAO. If the agency has not made a ward of that contract yet, full stop by statute. Not make a ward. Okay? That's a simple rule. That's the easy one.
SPEAKER_00If it's an agency protest, there are agency rules in play that also apply that, okay, really by regulation. But when you say seek a stay, it is GAO protest. You can still get a stay by the agency, you file the agency on a protest level via their regulations, but seek a stay is pure GAO. In a post-award scenario, this is where it gets interesting. It's a general rule of 10, okay? And the GAO rules to file, track with, the timeliness,
SPEAKER_00they get to seek a stay, except for one small issue. The general rule is a rule of 10 days. You have to protest something within 10 days, a newer should have known the basis for protests, that adverse action, right? And so if, in fact, you file your protest and the agency gets notification of that protest within 10 days of the award happening, statute applies, the agency has to stop performance. So you made the award, contract has been awarded, the awardee may or may not be on the ground running and hustling,
SPEAKER_00who the heck knows at that point, but they have to stop. They actually issue a stop work order by statute that they cannot proceed with work. And if you're the awardee at this point, this stinks because you just got awarded a contract and all of a sudden you're told to stop work and you're in limbo a little And one thing that's important to remember is that a GAO protest, the shelf life, it was 100 days by statute. From the day it's filed to the day it must be decided by statute, with some unique exceptions like shutdowns,
SPEAKER_00things like that, you're going to get a decision. But that stay will apply for that full 100 days or the day that GAO closes the case, issues the decision. It could be day 90, 80, whatever it is. If the case is dismissed at day 20, see if this day goes away. So if, in fact, the protest is alive at GAO, it could go to 100 days. The stop on performance is going to continue. Same thing with the pre-award protest. Can't make award until while the protest is alive. For those sorts of acquisitions that you have required debrief
as part of it,
SPEAKER_00not just any debrief. Number one, it has to be the type of procurement that allows for a required debrief if asked for within a certain window of time by the offeror, the interested party. The agency gives that debrief, and then if it's civilian, you're going to have five days before you have to file that protest and GAO gives notification to that agency, right? That has occurred in five days after the debrief is closed for
a seek-a-stay to apply.
SPEAKER_00You can still file a protest. You've got 10 days. But if you want to seek a stay to apply in a post-award scenario in a civilian agency, you've got five days.
SPEAKER_01That's a faster timeline, but potentially not applicable to task orders or GSA schedule because of the required debrief. You got to look at it closely.
SPEAKER_00You got to look at it closely. What if GSA is doing the procurement for Department of War? Technically, the contracting rules apply to GSA, but yes. It is quicker, but again, you've got the debriefing period. It extends it out a little bit, right? It's not 10 days from ward anymore. It's five days from the date that debriefing closed that you have to file a protest and a post-war scenario for that SEGA state to apply. If your Department of War for certain acquisitions valued at certain levels, and there's a few, right? You may actually have an enhanced debriefing, meaning that it's required.
SPEAKER_00And then after you receive the initial debriefing, you have the opportunity to ask follow-on questions. You have to ask for those follow-on questions within a specific period of time, two days. Then once the agency answers those questions, you have five days to file. So you have that 10, 10, five. And so you got to really know, number one, who's conducting the procurement? Is it a civilian agency or Department of War agency? What is the value of the procurement? Is it going to have a required debrief? And does it also have an enhanced debriefing component?
SPEAKER_00But yeah, required debriefs are only for those procurements that are negotiated where you have a comparative evaluation of offers. This is why bid protest attorneys do this full time because it is nuanced, right? But yeah, if it's a GSA schedule contract, you're not going to have a required debrief, technically, unless it's built into the solicitation. Agencies can agree to it and may be required by that, maybe.
SPEAKER_01Right. So let's talk overrides. That's where this case comes out. You and I both dealt with overrides when we were in government. What is an override and how has that changed?
SPEAKER_00Okay. So we talked about seek a statement in place. And remember, the agency can't make a ward or it may have had the order, the stop performance, the stop work order to the awarded contractor. But stuff's important. The requirement doesn't go away. That may be for troops that need to be fed. Transported. It could have literally an urgent and compelling nature to it, or it could be the best interest of the United States that, in fact, the agency proceeds or overrides the seek a stay.
SPEAKER_00Again, we're talking GAO protests, right? So, again, back to the Competition and Contracting Act. It allows the head of the procurement activity to authorize performance to actually proceed, notwithstanding the stay. or for a ward to go forward notwithstanding the stay based on really either the best interests of the United States or because there's an urgent nature of the requirement that justifies not following the statute. And the agency has to document those reasons and it's got to do
contemporaneously, right? And then it has to provide notice of that override to the GAO before the override
SPEAKER_00becomes effective. And so that override, the agency can override these SECA stays, even though they're in place by operators of law, because again, best interests, urgent, compelling reasons, what happened? That override can be challenged, okay? And so the override itself is, again, you have a separate DNF, it's a separate procurement action, it's a standalone issue. So wait a minute, Scott, you're telling me I've got to fight the protest and spend legal fees on that, and if the agency overrides it, I've got to fight that too?
SPEAKER_00Yeah, it's worse than that.
SPEAKER_01And do you go back to GAO?
SPEAKER_00No. One thing GAO does not have jurisdiction over is SEGA over. In fact, they don't have jurisdiction over SEGA stays. The agency is not even choosing to apply it illegally. GAO has no jurisdiction over it, and they've said so in their decisions. You Have To Go To The Court Of Federal Claims That Has Exclusive Jurisdiction Over Seek A Stay Overrides So Now Yeah You May Have A Literally Bifurcated Fight The Merits Of A Protest Are Being Fought Literally At The GAO And You're Over The Court Of Federal Claims Fighting A Different Acquisition Decision The Reason For The
Basis To Override That Stay And It Used To Be Until This Case We're Going To Talk About Life Size Logistics Which Was Issued By The Federal Circuit On April 15th Of
SPEAKER_002026 It used to be that even the underlying merits of a protest as it related to prejudice were important for the court to adjudicate. And you had literally split operations. So you had to fight the fight and fight against the agency's determination of best interest or urgent and compelling basis at the court of federal claims. It's a little simpler now. Still, you have to do it. You have to go to the court. But there's no obligation anymore under this recent clarification by the federal
SPEAKER_00circuit to literally Demonstrate the prejudice, per se. All you really got to do is identify that the agency's decision was arbitrary, capricious itself. So this case simplified the fight as it relates only to the overrides. Previously, there was a four-factor test that the agency's The Court of Federal Claims followed at times, the Court of Federal Claims followed and the Department of
Justice struggled over what actual four-part test was at play in order to challenge these overrides.
SPEAKER_00But the Federal Circuit took exception to justice and honestly, the court's previous interpretation of the four-part test in order to do that, the obligation for protesters and plaintiffs in the Court of Federal Claims to demonstrate that the agency's override was arbitrary and capricious. There used to be an obligation to demonstrate the likelihood of success and merits like we just talked about. They also had to show that there was irreparable harm literally staying the procurement to the plaintiff.
SPEAKER_00Then they had to evaluate a balance of equities, in fact, was in its favor because agencies do get a lot of discretion. If it's the permanent war and because the national security requirement in the Tucker Act to give deference to agencies, especially if national security is in play, it was hard to get over. And then there was another aspect of showing the benefit to the public. All those things are necessary to demonstrate that the Court of Federal Claims and previous override decisions,
SPEAKER_00but no longer. In fact, the Federal Circuit cleaned this up a bit to focus everybody on only that the decision itself was arbitrary capricious. and that, in fact, there's this scheme that had been developed by the courts over time was not required by statute. In fact, it was created by the courts and went far beyond what was necessary for a protester that's litigating something at the Government Accountability Office to then move over to the Court of Federal Claims. And now it's a straight-up arbitrary capricious analysis with limited,
SPEAKER_00I would say more limited, you still have standing, you have to be an interested party, But you don't have to prove the prejudice per se. You don't have to show, in fact, doing a weighing of the public interest. You don't have to show irreparable harm. You just go up and attack the decision.
SPEAKER_01You don't have to do the whole protest at the court. Right.
SPEAKER_00Which saves costs. They already have businesses that are even going to consider doing this because they can't wait for the hundred days. And they could do it for a variety of reasons. I mean, we talk about that too, but It makes it a little bit cheaper because it focuses the fight, right? If, in fact, you want the agencies seek a stay override to effectively be nullified by the court, you want the status quo from your perspective. The government wants its own status quo. And you don't want to get too far down the lane where, in fact,
SPEAKER_00It becomes almost impossible to undo contract performance. Key personnel are being recruited. It could be that they're being swapped from literally the incumbent to the new awardee and these employees are moving. It could be assets. It could be supplies. Whatever the nature, the prejudice does not get better with time, usually for the losing party. It's going to get worse with time for the losing party if performance is allowed to continue.
SPEAKER_01So this case is Good for protesters. It makes it somewhat easier for protesters to keep the SICA stay going and particularly good for incumbents because they can keep their people on. If there's a stay, they can maybe get an extension of performance.
SPEAKER_00Yeah. Yes. I mean, your viewpoint's going to change if you are literally the incumbent. If you're the intervener, you're already going to likely intervene in the SICA stay override challenge. If you're a protester, you just don't want the train to leave the stations. You don't want a word to be made. You don't want performance to continue because it's going to get much harder to get back in. And you got to remember also, except for task order procurements, right? You start a purchase of the government accountability office. You can bring it after that's done,
if you've lose, to the Court of Federal Claims.
SPEAKER_00You're not prohibited from doing so. And so what you don't want to do is also have the Court of Federal Claims judge the underlying merits of your GAO protest. You could change the protest, the grounds may change, but you don't want the court to evaluate the merits before you even get there. And this also may impact the override, the ability to challenge, where you bring the protest initially to. Protests are expensive for a reason because the record can be voluminous to court of federal claims. It's more limited GAO, but there's a lot of litigation and pleadings and potential
motions getting into
SPEAKER_00the record. And there are other reasons why sometimes companies protest, right? That could be the incumbent. Usually they believe they're wrong and there was an evaluation challenge or something, but the government believes sometimes protesters will just protest to get a bridge contract extension. And that may be true. But you have to have a good basis and a reasonable basis to even bring a protest to GAO and not get it dismissed. You've got to have evidence. In fact, there's a violation. Yeah, it has changed. It's become, I wouldn't say changed, it's been clarified.
SPEAKER_00It was always there. You always had to present a prima facie case that, in fact, the government violated procurement statute of regulation. You had to bring some sort of evidence, just not belief, information and belief. You've had to present something. But I think it's clarified as a GAO believes and expects that a protestor is going to bring some evidence, declaration, documentation to show, in fact, that there's more likely that an error had occurred even at the beginning stages of a protest. Let's get more into the Court of Federal Claims because there
have been a couple of
SPEAKER_01cases about procedure in front of the Court of Federal Claims, something that I know you, first of all, know a lot about, but you are passionate about as well, getting the procedure right. There was one case where there was significant criticism of the government and then another case where there was significant criticism of protesters' council, a position that you've been in several times. Let's start with the government criticism. What happened there in the Global Connections case?
SPEAKER_00Yeah, so Global Connections to Employment Incorporated in the U.S., this decision was originally issued in April 2nd, reissued in April 13th, and that's not uncommon. But it really simply had to do with delay, right, effectively. What this court, I think Gov Sollinson is the current chief of the Court of Federal Claims. He likes to run a tight ship. He doesn't hide it. And he has set a tone where protesters' counsel and government counsel will sufficiently plead,
SPEAKER_00will not hide facts from the court. Not that that happens, but maybe Just Through Mistake Or Resources They Don't Have An Ability Literally To Process Cases As Quickly As Possible The Other Thing Is DOJ Is In A Tough Spot With Their More Limited Resources These Days The Attorney Level And Their Support Staff But The Records Are Getting Smaller And Why That's Important Is That The Court Of Federal Claims Its Entire Administrative Record Under The Administrative Procedures Act That Is Arguably
SPEAKER_00Produced to the court, and that includes all proposals, all evaluation records, can include drafts, emails, even for a protest. And so Department of Justice has to take all of that, process that, package it. It's not that easy, because first they have to get it from the agency, make sure it's relevant, talk to the other side about what goes in the administrative record, and file it. And it takes an enormous amount of administrative burden. And I can't get behind the reasons or basis for the government in this Global Connections case
SPEAKER_00to what in the judge's eyes here, and this was Judge Tapp, effectively be dilatory in his processing and not stand the agreed upon schedule between the parties. But it did raise such a level that, in fact, he thought that he was flagrant and it amounted to unapologetic disregard for the court's order and counsel's time. In this case, Judge Tapp ordered DOJ to show cause why it shouldn't even bear the reasonable cost associated with drafting and submitted the plaintiff's response,
SPEAKER_00in this case, to a motion.
SPEAKER_01So I'd be interested to find out what happened. Did the government actually have to pay for the plaintiff's reasonable cause?
SPEAKER_00I do not know. A lot of these cases, almost all the protests are sealed. I think that does, maybe it's a good segue to talk just about intervention for a second. Yeah, one thing that we understand as attorneys is companies do not want to pay unnecessary fees and legal fees, right? It's a huge expense and normally it is unrecoverable, right? But if you just want a contract and it's a significant value, The one thing you don't want to do is have a protest be filed against the
SPEAKER_00government's decision. It's not technically your win they're protesting. It's the government's decision to award you the contract and the underlying record and the judgments that are made that are being usually attacked. It could be some aspect of your proposal, but it's that the government didn't catch it or that their judgment related to it is arbitrary, capricious, unreasonable. So all of that All that analysis and criticism relates to proprietary and source selection information.
You're talking proposals, evaluation records, source selection decisions, all that.
SPEAKER_00You're not going to get as a company, okay? You're not going to get access. You're going to get a debriefing, and hopefully it's helpful. But when a protest is filed, those records become relevant all of a sudden, and you're still not going to get access because what happens at GAO and the court is a protective order is issued. and the protective order covers all records that are filed in the court or the GAO. And only those parties, the counsel usually, are admitted for access to see those records.
SPEAKER_00In-house counsel, I wouldn't say they never get admitted to protective orders, but there's another layer of scrutiny for them. Yeah, right. There's a case called US First Steel that effectively scrutinizes the access to proprietary and source-related information for those that are involved in the competitive decision-making process. So that's why in-house counsel, unless literally the structure allows for them to be somewhat insulated, will not get access. And so you have to basically hire outside counsel.
And if you are the awardee, okay, and the award is potentially being attacked by
SPEAKER_00You want to protect your interests. And what that really means, it really means you want to defend and protect the government's decision because that's what's getting attacked. And so it's important to have counsel know, one, if you have counsel already, but two, to plan ahead for this. One thing that's really interesting, we've had a few massive size protests at the Court of Federal Claims recently, we're talking with 20, 30 different parties, is each one of those have to have their own counsel.
SPEAKER_00That counsel has to be admitted to the protective order. That counsel has to be vetted via conflicts, meaning that their existing clients don't have existing conflicts with representing you as a company. That process is not quick. And so if you are a company going into a competition you think is going to be pretty litigious, And if you think you're going to potentially win, otherwise you wouldn't bid anyway, you probably want to line up outside counsel in advance. It doesn't mean you're going to have substantial litigation fees. It means you've done the administrative processing and they
have them ready to go.
SPEAKER_00Basically your assault team. And that takes a little bit of time and processing. Get the conflict review, getting the attorney knowledge about the procurement so they can hit the ground running. Why is this quick? We just talked about a CECA stay, okay? If it's pre-award, it's instant. And again, if the agency provides, gets notice from GAO in a certain window of time, they have to automatically stop performance. So when that happens, the agency's getting attacked, their acquisition record's getting scrutinized, and they're starting to make decisions. And sometimes agencies will hit the easy button, right?
SPEAKER_00What is the easy button? So there's something called corrective action and protest. An agency, if in fact it has a reasonable basis to do so, believes it can cure an administrative defect in the source selection paperwork, the evaluation, some aspect of the curement violated procurement statute of regulation or was inconsistent with the term solicitation. So they can fix it. And they get basically a do over corrective action. And again, recent agencies are under extreme stress these days with limited resources.
SPEAKER_00So, setting that stage and talking about how quick it is and why you want your interests represented immediately, as an intervener, you may not get notification of the protest the same day. Things are already going down the track. You've got to monitor. The agency is supposed to provide you notification of the protest. Within one day, it should, pursuant to the FAR, but that doesn't always happen. And so this is why having counsel already locked in, conflict-free, ready to proceed in order to jump in and parachute to an active protest once you
find out about it is critical because the agency started to make judgment calls,
SPEAKER_00evaluating its own record, looking at the easy button. If you can come in there and help them, because that's the goal, help them see if their decision is defensible. And sometimes it's not, but you can also help them shape the corrective action to fix it. If you can engage with the agency right away, an intervener's counsel, that's what it's called, a counsel that's representing the awardee can come in, not only represent their client's interests, but help the agency evaluate the protest grounds in almost like a common interest type scenario.
SPEAKER_00So you can assist the agency.
SPEAKER_01So you can have a seat at the table through this intervener's counsel to potentially see corrective action or decide whether to take corrective action.
SPEAKER_00Absolutely. And you can also pressure test certain arguments. You can help them draft or at least identify potential motions. You can point out where we think you're going to lose even if the agency believes they're going to win. You come in subjectively objective, but he sees a protest council will come in and know likely what GAO is going to see and how they're going to react and how they're going to evaluate a certain issue once you've looked at the record real quick. So you want to basically get those interests projected
immediately so you can help
SPEAKER_00shape a little bit, influence, but also help the agency make the right call. Because again, you come in too late, those decisions are made, you're reactive now, you may turn into the protesters instead of the intervener. And that is not only at GAO, it's actually even more important for protests filed to the court of federal claims. They go faster. And here's why. Under the rules of the court, and those rules may be adapting over the next year a little bit, protesters have to provide pre-filing notice to the Department of Justice that,
SPEAKER_00in fact, they're considering protest. They also have to identify likely interveners interested parties. DOJ should reach out to those parties if they know their counsel are, so should the agency, but it doesn't always happen. But what does happen is the Department of Justice is getting involved right away. They're evaluating the case from a third-party neutral stance. They represent the government, they assist the agency. And again, conclusions are being drawn. It could be that voluntary stays are being decided. It could be that corrective action is being advised even before
you get a seat at the table.
SPEAKER_00And this, again, 24-hour pre-filing notice. You're going to have the calls between DOJ in that window between the agency. And then you have a complaint filed and things are rolling down the track. Judges are asking for status conferences right away. And if you're not even going to have a seat at the table, you get no say. And so my advice for businesses that are in a procurement, you've invested lots of PD money. Your capture teams really think they've been, they're right. They win an award. From the interviewer's standpoint, and it's defensible,
SPEAKER_00you got to have somebody with a seat at the table. Same thing on the protest side. If you're going to protest, got to have somebody with a seat and knowledgeable and educated because the timeliness rules for protests can be very dicey. Having a relationship with a firm is extremely important, whoever that firm is. And it doesn't hurt to have the experience as a government counsel because on the
SPEAKER_01protest side, you're dealing with government counsel and you want to have those good relationships with the counsel that's representing.
SPEAKER_00Absolutely. Sam, you have keen insight into the Small Business Administration and all the agencies that you dealt with. My experience with the Army, I think is very valuable to my clients. The good aspect, another good thing about my past job is I worked with a lot of Department of War agencies, not just the Army. And so we did training for a lot of attorneys within the federal government on bid protests and appeals and all that. So yeah, our insight, I think, into how agencies think. Who the right person is to contact, how to contact them is not usually readily accessible,
SPEAKER_00but knowing how agencies may react. And some of that stuff changes with time. Being seasoned is an asset and a detriment because you're not there at the agency, but you keep tabs on things at the agency to benefit your clients. And honestly, again, if you're an interviewer's counsel, you're helping the agency. My experience since leaving the government is every time I've been an interviewer's counsel, It was a huge collaborative effort with agency counsel and Department of Justice counsel working together to help defend the decision.
And yeah, that costs your client money, but it's going to save the money in the end. From the agency counsel, it's probably old times for them working with Scott Flesch again.
SPEAKER_00It has been rewarding, professionally and personally, to know both sides of it and the people I've worked with.
SPEAKER_01Terrific. You mentioned Solomson a moment ago, and Solomson issued this noblest case that came out that made a big splash. It was about a $100 million contract for systems engineering issued by the Navy. And noblest showed that the Navy committed prejudicial error, but then it looks like they ultimately lost the case. What did Judge Solomson decide of that case?
SPEAKER_00In the noblest case, it was a Navy procurement. Noblis came in and made various counts. They call them counts in a complaint at the Court of Federal Claims. And all were dispensed by the judge, except for one. Judge Solomson did find that the Navy's evaluation of past performance was arbitrary and capricious. Judge Solomson has a knack for writing and likes to instruct both practitioners and companies about the nuances of the federal procurement rules and regulations. His decisions are very entertaining. But however,
even though he found this error, he kind of points out the defects in the process.
SPEAKER_00And although the error was found, he found that noblest itself waived any entitlement to injunctive relief. And that's what the court gives is a court that proclaims injunctions. Court GAO gives recommendations. That's another story why, because they're not a court. They're part of the legislative branch, but it has teeth. But the court issues federal court injunctions and it prevents an agency from acting in a certain way. They're not going to direct awards. They're not going to flip an award. They're going to basically send it back to the agency to redo
their judgment. And here they found Noblis was not entitled to any injunctive relief because first, Noblis' original complaint did not ask the court to enjoin the government or
SPEAKER_00salute's performance of the awarded contract. Noblesse only asked this court to declare the award to still be unlawful pursuant to APA standards. Noblesse repeated the prayer for relief almost verbatim in the MGR in a pupunctury conclusion. And Noblesse did not brief any of their prerequisite injunctive relief factors, and those are exhaustive. The pleading requirements at the court of federal claims are actually pretty onerous. It is a federal court, which comes with not only pleading requirements,
But necessary standing, prejudice, injunctive relief factors at every stage.
SPEAKER_00It could be a preliminary injunctive relief, a TRO fight, as well as the permanent injunctive relief that's always sought in the end, that's the merits. But yeah, he found effectively that the way Noblesse had led its arguments and what he had asked for as far as the remedy was nothing the court could really provide. And effectively, even though they found error, Denied a number of things, but most importantly, the motion with judgment in the administrative record, in fact,
SPEAKER_00because of these defects. So this plays out a difference between practicing a court of federal claims and
SPEAKER_01practicing a GAL. You have to check more boxes, it sounds like.
SPEAKER_00Yeah, no, Court of Federal Claims is a heavier lift. It's definitely more expensive. The pleading requirements are more onerous. The processing, the record, the procedures, it is all record-based. There is, in some cases, potential for discovery, but very limited discovery. Oh, interesting. What's the reason for that?
SPEAKER_00A number of reasons. Part of it's resource-based. So the Department of Justice, whether you fault it or you pat them on the back for doing so, is doing an excellent job at vetting cases upon pre-filing. And so what used to be, I think more than 10 years ago, the cases would just develop and the DOJ would not get into the record too deeply at the outset. Now, what you're having and you're finding is the Department of Justice is getting A limited record,
SPEAKER_00engaging with counsel right away, getting into the weeds within the first 24 hours, and making calls on, number one, whether there's a voluntary stay, because, again, there's no SECA state anymore. It doesn't apply to the Court of Federal Claims. Two, what is potentially defective in the agency's record and what the protesters are likely to bring in the complaint, because you don't have a complaint most times. when they're making judgment calls earlier. And so cases seem to be actually being adjudicated earlier. They're getting to, in some cases,
a more limited records pursuant to agreement of the party on what's relevant.
SPEAKER_00And they're getting resolved. In fact, there was a stat I heard a couple weeks ago, I can't repeat, but a significant percentage of cases never even make it out of the pre-filing stage because the Department of Justice is coming in and evaluating, talking to agency and in a lot of cases, fixing things. So you don't see, the Department of Justice is not involved in GAO protests. It's the agency council, and a lot of times that council has been involved in actually
the acquisition.
SPEAKER_00They take on a little more ownership. It's a little more personal. I think there's a little less objectivity in some agencies because, again, that attorney advising the procurement, and now there's a defect that's alleged. That's human nature, right? But when you add a Sam Le samlelaw
Another consideration is, do I have a better chance of winning at Court of Federal Claims? And some of these statistics that we've seen out of GAO indicate that they are not
SPEAKER_01sustaining as many protests. Is that the case? And have you seen that in your practice?
SPEAKER_00Yeah, we'll see what the end of the year numbers bring. They come in surges. We have seen a number of sustains from GAO over the last couple of months. I don't think there's a trend yet. It's too early to tell. But again, the key differences, only 2%, roughly, of GAO protests are ever going to have a hearing where parties can argue. There's written submissions, but there's no witnesses interviewed normally. There are, on occasion, a hearing at GAO where the GAO will adjudicate an adversarial proceeding and witnesses will be asked questions by GAO,
SPEAKER_00possibly the attorneys. Depends upon what the GAO attorney will allow. But that's just infrequent, so there's less room to advocate. You just do it on paper. You're going to have an oral hearing at the Court of Federal Claims to help draw the attention of the judge to specific aspects of the record that are in line with your party's interests. You're going to have numerous pleadings and motions and development. There could be supplementation of the record. And again, the record is extremely broad already. The entire acquisition by default, it can be shaped down.
SPEAKER_00But if you are truly litigating a protest at the Court of Federal Claims, you're going to see the entire record and potentially even identify additional errors and defects. At GAO, the difference is the agency is only required to produce relevant records and relevancy is usually defined by the issues raised in the protest. For instance, if you're going to be attacking the evaluation of your proposal, that's your protest. You're more likely not going to get access to the proposals or evaluation records
SPEAKER_00related to the other offerors. It's going to be redacted out or you're not going to get it. And so your ability to look at other and find other defects Very limited GAO. Court, everything's in the record, you're going to find it. The question is whether you're an interested party to allege it, right? But if you see your entire record and you see other things that are, again, a violation of procurement statute of regulation, you can ask to amend your complaint. In fact, you can amend your complaint by rights within a certain window of time. So you have more ability and opportunities to advocate.
SPEAKER_00You have access to more records. And again, an objective body, at least at the outset, the Department of Justice is coming in and looking at the agency's decision. And a lot of this is also practical, right? The Department of Justice will come in and just tell the agency, Okay, this is a widget that you want. How important is it? And do you really want to go six, nine, 12 months for a court of federal claims protest when I think you're going to lose and not be able to get that widget? Or do you want to fix it now? And in some cases, they'll even settle and create a creative solution through the
consent of the
SPEAKER_00parties where everybody's happy. It happens from time to time. Because if a federal court has the case, blesses off on that action, and it's adopted via a court order, what's the violation? Okay, you had litigation. No one's going to come in absent an appeal to the federal circuit and tell the court that was wrong, but somebody's got to appeal that. So there is a lot of reasons, those are some of them, to go to the Court of Federal Claims first these days. But back to a comment we made earlier.
SPEAKER_00The type of procurement, it may limit you in where you can go. A task order procurement, meaning the award, or anything in relation to the issuance of a task order, by statute can only go to the Government Accountability Office.
SPEAKER_01And that's only over particular thresholds?
SPEAKER_00Only over certain values, yeah, which is raised year by year. In fact, the last threshold was raised a bit for part of the war, so many agencies are a little bit less. Talk to your counsel about your specific circumstances. And if it's pre-award, what is the value? And the record may help you through independent government assessments. If you have that, maybe the value of proposal. All these little pieces may actually have impact to your ability to protest the jurisdiction, whether you can even protest a task order.
SPEAKER_01Okay. Okay.
SPEAKER_00That came up a lot when we were working on the Rule of Two,
SPEAKER_01whether you could protest the Rule of Two at the task order. The far overhaul says you cannot do it. You cannot protest the Rule of Two at the task order. I don't want to let you go without asking you about a couple of small business cases that have come out recently. There's one called Revelations out of the Court of Federal Claims. It's about the limitations on subcontracting. This is a good case for companies that work VA, Veterans Affairs, because there's a special VA requirement that companies certify to the limitations on subcontracting with their offer.
SPEAKER_01It's a particular statute for the VA. We've talked about limitations on subcontracting on this show several times. And in this case, the service-abled veteran-owned small business went after a VA set aside and, in the VA's view, did not comply with that special certification, tried to argue that it had been considered to be certified. What happened in that case? Why did the business end up losing in that decision?
SPEAKER_00In the end, it's pretty simple, right? We talked about, and I think it referenced the ground rules for a competition. What does that mean? That means when an agency issues a solicitation and it talks about how it's going to, what it expects in the solicitation, the requirements, right? As well, what I mean by requirements, the proposal requirements, what goes in a proposal, the content, the forms, the information you are required to put in. It also specifies how an agency says it's going to evaluate offers, sets up that scheme.
SPEAKER_00That together becomes the ground rules for the competition, okay? Not only is the agency bound by that, but offerors are bound by that, okay? That is the ground rules for that competition. And if the offeror does not comply 100% with a solicitation requirement, And by the way, if it didn't agree with it, what it should have done, Sam, if it didn't...
SPEAKER_01It's going back to what you said before. There's pre-award protests. You could have looked at that as a patent ambiguity. Patent ambiguity, latent ambiguity, again, protesting when you knew about it. But if you don't believe that it is necessary, this is where businesses get in trouble, right?
SPEAKER_00Small and big, by the way. We know better. Okay. We know better because the agency doesn't really want that. The requirements don't really say that, but we know what they want. We're the incumbent. We've been doing this for 20 years. I don't care that this requirement of solicitation says X. We're going to do Y. We're not going to comply 100% with that solicitation requirement. They don't fill out a form. That's where you get in trouble because the ground loops for the competition, that box, right? You need to stay within the four corners of that box.
SPEAKER_00It's an artificial box. But it is there for a reason. So back to when we first started this discussion with us, offerors want to know they're going to get a fair shake. Things are transparent, right? The agency is going to apply the rules, be fair and equal to everybody. If you don't stay in those box, right? And you apply the ground rules for the competition, both the agency and the offerors, that's when the system fails. That's where people feel aggrieved. That's where they think they've been disparately treated. This one case in Revelations
SPEAKER_00They didn't do the certification right, at least in Judge Solomson's eyes, they did not comply with the ground rules for the competition. In fact, Judge Solomson says, because Revelations did not comply with the solicitation's explicit instructions, including VAR clause 852-219-75 certification requirements, the VA did not act arbitrarily and capriciously in eliminating the Revolutions proposal from consideration. Again, this decision is 27 pages. You can say this in two sentences. Read the ground rules and comply with the ground rules.
And if you don't want to do it, you better protest because you're going to get excluded.
SPEAKER_00Or here, you're going to spend thousands of dollars and hear from the judge exactly what you could have known going in. If you think you know better, you've already started on the wrong foot. Just play in the box. There were a couple of cases that came up according to federal claims at the same time. I was looking to see if it was in here that said exactly what you just said,
SPEAKER_01which is you have to turn square quarters.
SPEAKER_00That was the phrase.
SPEAKER_01You have to check every box. You have to make sure that you know what the ground rules are. And if it tells you to sign on this dotted line, you need to sign on that dotted line.
SPEAKER_00Yeah, it is artificial. You know better. And a lot of times businesses do. They know better than the government. But you got to play along. You want to win the contract. If you want to talk to the agency about changes, in-scope changes later on, fine. But play in the box now or else those thousands, sometimes millions of dollars that your capture teams are spending on proposals and the employees you're recruiting because you know better, that is a false premise. It's a waste of money and resources and you're setting your company up for failure.
SPEAKER_01One more case I wanted to bring up with you. This one's out of GAO. And this is a case that hits close to home because it involves the Small Business Administration. The SDA comes in to represent its position from the Office of General Counsel. They're actually listed in the representative box of the decision. This is a case about the certificate of competency requirement. This trips up. Agencies all the time. They probably haven't even heard about it. But the rule is, if you eliminate a small business for responsibility reasons,
you must send that elimination to SBA for consideration under the COC procedures.
SPEAKER_01So if a company's been eliminated for responsibility, that's a small business, SBA has the chance to allow that company to appeal. And it used to be that SBA would Tell the agency that it has to make a war to that company sba ogc said yes we agree with the small business that it should have been referred to sba for a csc but gao does not agree with sba what happened in that case so the certificate of competency issue is one that has actually raised some of the most
substantial legal quandaries especially for department of war over the years in fact i think i first met you
SPEAKER_00when We were debating whether or not that was extraterritorial, meaning that the COC and responsibility issues applied worldwide. Because the Department of War is just not a U.S.-based business. They operate in the strangest and most remote of locations. And if you're dealing with a U.S. small business, you have to start with that premise, right? Otherwise, SBA is not going to play here. But if you take an action which can be interpreted as an objective decision that
SPEAKER_00they're not responsible, that kicks in the requirements where SBA's judgment by statute, and even the FAR references it, is reserved to the SBA. Contracting officers cannot declare a small business not responsible without referring to the SBA. Now, KOs can advocate to the SBA and actually be a part of the SBA and why they should agree they're not responsible, and the SBA will give them the deference, but it's that processing piece that KOs trip up all the time. But here,
when you say responsibility determination, what are you meaning?
SPEAKER_00It's not usually a piece of paper saying they're not responsible. It can be criteria in the evaluation scheme, which looks and smells like they're evaluating their capacity to perform, right? And that is responsibility. if it's a pass-fail type evaluation criteria. But in this case, this had an evaluative nature. They were comparing. They had ratings. There were subjective calls. And that does not amount to responsibility determination in
GAO's eyes because it
SPEAKER_00was not check the box. It was not a pass or fail. They're responsible, not responsible. It can even be pass performance, right, where 5 years or you're out. Technically, that could be a pass-fail, right? But here, the agency actually had ratings in their evaluation scheme where they objectively apply criteria and evaluate and read the company under what appears to be responsibility, but allow the agency some discretion in evaluatively rating and evaluating this
SPEAKER_00proposal on that evaluation factor, not pass-fail. So not responsibility. And even though SBA, I understand, wanted to broaden, I wouldn't say broaden their authority, but they have a much more global look at responsibility. So not a surprise that SBA came down this way. I've had that happen before where GAO and SBA have disagreed. Sometimes the agencies in SBA will disagree. That has happened too. GAO applied its historic rules of if in fact is an evaluative process.
SPEAKER_01So in Sea Slope, SBA comes in and it says the COC process should apply, but GAO and the agency ultimately went out. What happens there? What's the reason for that?
SPEAKER_00Facts. Facts sometimes get in the way, right? See, so the past performance evaluation of the protester, it was not a pass-fail. In fact, they got a satisfactory rating that wanted higher. But the facts alone demonstrate it wasn't pass-fell, it was gradations of ratings, which do not equate to a pass-fell analysis, and if it was, go or no go per se. That would potentially amount to responsibility, which would have required a contracting officer to refer to the
Small Business
SPEAKER_00Administration before excluding them from the competition. But here, you know, simply wanting more is not enough. The agency complied with the evaluation criteria, was found reasonable, and certainly didn't violate SBA's Certificate of Competency requirements.
SPEAKER_01I feel bad for SBA, but I lost a lot of cases when I was there too,
SPEAKER_00so it's somebody else's turn to come in.
SPEAKER_01and the leaders of GAO. COC, your rule of two, those things come up a lot for SBA at GAO. Scott Flesch, how do people find you?
SPEAKER_00Uh, easy. They can find me on Chevalier's website. The email address is F-L-E-S-C-H at milchev C-H-E-V.com Also, feel free to contact me via LinkedIn. I have prospective clients contacting me all the time. I am the only Scott Flesch out there practicing government contract law. And if you type in Scott Army Government Contracts, you're bound to find me. I am more than happy to help businesses both small and large.
My clients are all over the map, which is exciting with my new entry in the private practice.
SPEAKER_00Two and a half years. It has been a fun ride, especially when I get to help businesses and their goals and understand what's important to them, how they're structured, and interpret this pretty volatile time on government contracts that continues to change by the day. And I look forward to meeting you. And of course, small business issues. Sam is an expert. I think the world of him. Definitely reach out to Sam as well. But look out for us in future podcasts. There's lots to discuss in this space.
SPEAKER_00Look out for client alerts from Miller & Chevalier. We do issue them all the time. You can get on our distro list pretty easily. But I appreciate the time and the consideration being here on this special podcast. This is one that's very thoughtful. I think it's helpful, small and large businesses, provides great content.
SPEAKER_01Well, Scott Flash, the best mid-protest lawyer out there. Thanks so much for being on the show. Thanks, Sam. Appreciate it.
Size standard comments to SBA are due tomorrow, November 20 (you can file HERE), so I recorded a quick podcast to explain where we sit today on the public’s reaction to SBA’s massive proposed increases and SBA’s...
Right after Election Day, Matt Schoonover of Schoonover & Moriarty and I spoke before a live audience at the SAME Small Business Conference in Charlotte. We discussed what the fate of the SBA size-standard proposal...
Emily Reid, a lawyer with PilieroMazza, joined me to discuss the new direction of the 8(a) program. SBA has redefined social disadvantage, and companies are applying and resubmitting their prior applications under the...
In a livestream, I answered the two questions I get most about SBA’s proposal on size standards: Why is SBA doing this? And when might it happen? I also broke down how SBA could leave just 360 small businesses left in...
David Timm is watching AI change Federal contracting, both at agencies and with contractors themselves, and he’s worried about where this will lead. The Burr & Forman lawyer specializes in bid protests, where AI has...