speaker-0: Welcome to Energizing Tennessee, powered by the Tennessee Advanced Energy Business Council. We're your number one podcast for news about Tennessee's advanced energy sector. I'm your host, Courtney Piper. Today we spoke with Jean Luc Polier, CEO and president of Arano USA. We talked about Arano's Project Ike, a multibillion dollar uranium enrichment facility in Oak Ridge. It's one of America's largest uranium enrichment developments for reestablishing a significant and reliable domestic nuclear energy fuel supply. Jean Luc explains how this would not have been possible without the company's key relationships at the state and local government levels, and the importance of engaging with the Oak Ridge community. Also, Tennessee was recently announced as a potential site for a nuclear lifecycle innovation campus. We asked Jean Luc to go in depth with us about the process of recycling used fuel and its impact on the industry and our nation. Before we kick off the interview, we have an important message for our listeners. Registration is now open for Opportunities in Energy twenty twenty six, happening november seventeenth at the Crown Plaza in downtown Knoxville. We're bringing together our TABC members and stakeholders to discuss all the new and upcoming opportunities in the advanced energy sector, including trends, businesses, technologies, policy, and other exciting developments. Head to our show notes to get your tickets now for opportunities and energy and enjoy the show. If you like what you hear, subscribe to our podcast and don't forget to leave a rating or review. It helps us reach a wider audience to champion Tennessee's advanced energy sector. Energizing Tennessee would not be possible without the support of our TAEBC members. Jean-Luc Palier, CEO and President of Arano USA, thanks for joining us on the show.
speaker-1: Courtney, it's always a pleasure to meet with you, so and thank you for having me.
speaker-0: Let's get started because I think ha the the story of how Arano USA came to Tennessee is really unique and inters interesting. So let's start at the beginning, set the stage. Arano is new to Tennessee. T so talk to us about Project Ike. You all had a code name before we knew you were Arano. Talk to us about Project Ike and how you came to our great state.
speaker-1: Thank you, because it's a very good question. first Orano USA, we've been present in the US for sixty-one years, so we've been well established. We have about fifteen facilities and engineering offices across the states, but none in Tennessee. And back in so this project started back in February twenty twenty two, unfortunately, because it was it started with the invasion of Ukraine by Russia. And many of our customers, in particular in the United States. came to see us and said we would like is to get access to enriched uranium free from Russian influence. So the easiest way, the fastest way for us to to provide these resources to our customers was to expand our current plant in France, in the in in Turkestan, so it's the southern part of France. It's called called GB2. This is the largest European enrichment plant and we have decided at that time to increase by 30%. Also for us it we it was making a a lot of sense to start a project in the United States. So this project we kicked in b around I would say June of twenty twenty three. And at that time I said to my team, because we owned a site in Idaho, we already had a license from the NRC to to build and operate an enrichment plan in Idaho and I said to my team, guys, let's restart this project in Idaho and they say, No no. Wait, why we don't do a site section? I said for what? We already have a site. We never know. I say okay, no problem. So my and my first meeting was with with this consulting firm called McMullis. We're in Memphis, Tennessee. It was I remember was in November of twenty twenty three, and it gave me a proposal for diff for about ten sites across five states, and Oak Ridge was not on the map at that time. So I know it's a secret city, everybody knows this, but it was not on my map. And I met with several states of with f two governors, several states. But none of the sites which were proposed to be were ideal for a project. And I went back to my consultant and said, I don't think that we found the right s site. I said, by the way, and it was in March of twenty twenty four, Oakridge is interested. Can we show you the site? I said, Why not? Everybody knows Oak Ridge, where enrichment started. I say, Yeah, let's go. But my goodness, it was the best meeting that we ever had. good the entire community was there. I remember there was Mayor Wade Creswell, Mayor Terry Frank, Randy Hammond, the city manager of Oak Ridge, Mike McGill who represented the education programme, Tracy Butter from the e Tech. Everybody was there and and also DOE and UCOR. And the site they proposed first is a DOE site. I is a called SSP two, so self-sufficient parcel number two. Don't ask me why this is this acronym, but this is the name of of the site. It was a wonderful site which was I would say used by DW in the past so during the the the Manhattan project. not during the Manhattan project, sorry after the Manhattan project. And currently remediation by by UCO and the local community was really, really interesting in having us and the nuclear culture as in Ocre is is amazing. But also During that meeting, they showed me this video of Governor Lee, where he shared his vision regarding the development of nuclear policy and nuclear energy in the state. And I could really feel that there was a clear alignment at the state level, county level, and at the city and in the city of Oak Ridge. So it was really amazing this alignment, this willingness I would say to promote nuclear energy in in Oak Ridge, but also the nuclear culture, as I say, from the local community and the very strong support that we got from the community. But also the education programme because Mike McGill, what he presented at at that time was a really remarkable. to see that the state of Tennessee with a county, with a city, has an education programme that involves not only the the universities, the University of Tennessee of course, but also Tennessee Tech, but also the local community colleges, the TCATs and even the high school of Oak Ridge. And as workforce is very key for our project to be successful and seeing that, feeling that, I said Oak Ridge. is our site number one and is how we change from Idaho to Tennessee.
speaker-0: This alignment that you describe between state government, local government, our education institutions, I have to imagine that's pretty unique. So can you describe what it was like interacting with our state and local governments and how that might have compared to other states that were courting Irano? As you
speaker-1: is is clearly unique. And I will talk about first the vision from Governor Lee because people forget, but yes, his vision back in twenty twenty two. Today nuclear is a solution, but back in twenty twenty two, nuclear was a problem. And you people forget that, but people wanted to shut down the nuclear power plants. I even had a dismantling business unit because we ex ev the market expected that fifty percent of the nuclear power plants would be shut down in the US. And Governor Lee Back in twenty twenty two had this vision that no, nuclear energy is not a problem, it's the solution for nuclear no sorry, for energy security. And and this vision was I would say was converted into a nuclear policy but Commissioner McCrawder Brendan Gibson, the chief operating officer, implemented and this vision and policies were also shared by the local communities, as I said, at the count at the county level and the city of Oak Ridge. And this one was very, very important for us. In addition, as you said, this education program is is unique to see that the entire spectrum of the education of the education I would say the of the education entities starting from the universities and ending to the high schools is also remarkable. It's unique to Oak Ridge. I will tell you that it was back in twenty twenty two, we made the decision in twenty twenty four, but today I'm contacted I was contacted by several states' representatives from other parts of the country to see how Tennessee was so successful and what have they done for regarding their education programme. So today some states are wants to do exact want to do exactly what what Tennessee did back in twenty twenty three. Twenty twenty twenty from twenty twenty two to twenty twenty four.
speaker-0: So are you sharing our secrets with other states?
speaker-1: I'm not sharing the secret, I'm sharing the facts.
speaker-0: That's great. I I love to hear that Tennessee is doing so many good things in the advanced energy area because that's why the Tennessee Advanced Energy Business Council was formed. We have so many unique assets, so many businesses, research institutions. It is such a central part of our economy and for other states to look at what Tennessee is doing and say, Hey, how can I get a little bit of that? shows me that we are doing something right and we are definitely. leading. So speaking of leader leading, that brings me to the nuclear renaissance. We are either right at the beginning or squarely in the middle, depending on who you talk to. So describe Project Ike and Irano's role in rebuilding our US nuclear fuel production. Yeah.
speaker-1: So today the US government has the objective to quadruple nuclear energy output. So we have about one hundred gigawatt of nuclear capacity and we have to go up to four hundred gigawatt by twenty fifty. This is a significant and challenging, I would say, increase in terms of nuclear capacity. The country will be successful by developing its supply chain. Supply chain to build new reactors, whether they are micro small, advanced or or or large, the AP one thousand, but also successful in the development of its supply chain in terms of nuclear fuel. Today, the United States imports about sixty percent of its annual uranium from foreign countries, including twenty five to thirty percent from Russia and China. And as you know, they are not our reliable partners anymore for the fuel supply. And that's why it's so critical that the United States give read reinvigorate and and redevelop its own domestic capacity of enriched uranium. So that's why Project ACE is so critical, because our objective is to build a plant in Oak Riction Tennessee that will supply as much or about the same as what today we import from Russia in terms of enriched uranium. But it's based on today's needs of 100 gigawatt. If and hopefully the United States will be successful, but when the United States quadruples this nuclear energy output, you can imagine that the needs of energy will increase significantly. Today the needs of an Utranium is about two thousand two thousand tons per year. If we quadruple this need it will go up to eight thousand tons per year. And on top of that, if you had the needs of the advanced reactors that needs high acido and so that is that means that we need an Utranium at a higher level. This need the the yearly need of an Uritranium could go could be between eight thousand to ten thousand tons per year. This is significant for significant from two thousand tons today. But out of these two thousand tons, as I said earlier, sixty percent are imported from foreign countries. If the United States wants to be self sufficient, it means that we need to add more capacities of and rich uranium Today and there's no time to lose. We as the industry we need to all work together to ensure that our customers, the nuclear the utilities of the future operators of the advanced reactors, they have the nuclear fuel that they need today and tomorrow.
speaker-0: Jean-Luc, you are so right. The amount of enriched uranium we will need to revitalize our nuclear energy supply chain nuclear energy in general is just so tremendous. It will take a coordinated industry effort. And it is quite frankly more than any one company could probably provide when you look at the the sheer volume. So so when when are we gonna get you when are you gonna be enriching uranium in Oak Ridge? This this does not happen tomorrow.
speaker-1: It won't happen tomorrow, as you said, because first we need to get the license from the safety authority NRC, we need to get the permits from the from TDEC and the city of Oakridge, of course. we need to mobilise and we are currently in the in this phase to ensure that we our project will be on time and on budget and our objective will be to start production in twenty thirty one about.
speaker-0: Excellent. Excellent. Now let's talk about something that is also very beneficial to our state, very beneficial to the nuclear renaissance. And that and something that Arono has experience with. Tennessee was recently named as a finalist for the Nuclear Life Cycle Innovation Campus. Can you talk more about nuclear fuel recycling? Talk talk more about what it is, Arano's experience with it, and why it presents such a great opportunity as we're thinking about revitalizing our nation's nuclear renaissance.
speaker-1: So what we do in France and we have done it for the last in fact seventy years, because we started that in nineteen fifty eight. but I will talk about our recent experience with our largest reprocessing facility that started operations in nineteen seventy six, so exactly fifty years ago. So it's called La Hague, it's a reprocessing plant. So in this plant we take the nuclear use fuel and we separate in the during the process the plutonium. the uranium and the final waste. You need to know that in the nuclear use fuel, ninety six percent of the material can be recycled and reused as new fuels. This is the plutonium and the uranium. It's huge. Yes, huge. And the remaining four percent cannot be used and would be put I would say for final disposal. And is what we do in is what we do in France. And we have done this successfully for the last fifty years and we produce recycled fuels with plutonium and uranium that is burnt again in the in the reactor. So we have four reactors for we have four reactors in France, for instance, that are licensed to burn what we call the reprocessed uranium. So this is uranium coming from the reprocessing. And about one reactor out of three in France burns the plutonium in what we call the MOX fuels. So it's a it's a combination of plutonium and some deped uranium to create this this recycled fuels. Also, we have provided this service this service of reprocessing and recent to many of our customers, in particular in Europe. To give you some examples, so Spain, Italy, Belgium, Switzerland, and even Germany. So we have reprocessed their fuels and provided them with recycled fuels. And also we provide this service to Japan and even to Australia. Also, back in two thousand five, we have been asked by the US government to recycle some plutonium owned by DOE. And so we did that and we supplied mox fuels which were burnt in reactors in the United States. So this reprocessing and recycling is a way I would say to s not only to reuse the energy in the nuclear use fuel, and as you said it's huge, it's ninety six percent that you can reuse, but on top of that it's a way to significantly reduce the toxicity and the volume of the funnel waste to be disposed of. In France, because we have no space, real estate is very expensive. The same for Japan, the same for the European countries. I would say in the United States there's a the real estate is today maybe not a problem, but tomorrow, with a I would say with the willingness of the US government to quadruple nuclear nuclear energy output, it would be very important that the nuclear w the final nuclear waste to be disposed of or reduced as much as it's possible.
speaker-0: That's what this nuclear lifecycle innovation campus seeks to do, correct? This gives us an opportunity to extract more energy out of the used fuel that would otherwise go to waste. And there is no reason there is no good reason to do that. You can get more energy out of that used fuel and then the amount that is truly waste is actually significantly smaller than if you did not do this recycling. So it sounds like a no brainer to me. Am I missing something?
speaker-1: an obrailer to all of us. However, I will be honest, is I I would like to come back to this date of nineteen seventy-six, because nineteen seventy-six is the date when we started our latest reprocessing plant in France, but this is also the date when the United States government decided to stop reprocessing in the US due to political concerns. related to non-proliferation. So and for the last fifty years we have not done reprocessing in the US. Of course, the the the national apps have continued to develop some maybe some new technologies in terms of reprocessing, but there has been no commercial plant ever built in the US for the last 50 years. So we have to restart, I would say, a new a new industry that is not so easy because reprocessing requires, I would say more investment than a a sim I would say than an enrich enrichment plant, for instance. It requires, I would say, hopefully the the the the use of techno of new technologies and we're very open about it. it we as a Rhino we will not invest in a reprocessing plant in France because our priority is to make sure that we're successful with Project Ike. So we'll put all our resources in the US on Project Ike and on our other activities that we have done for the last sixty years. But we are willing to support the states, our industrial partners in their plan to build a reprocessing plant. But it will take some time, to be honest with you, because we need to ensure that first the local communities that will see reprocessing plant will be in favor of this kind of new technology, of course, in their community. And second, that there are also some t customers for the off tech contracts. We have customers to to to for reprocessing and for recycling in your in in Europe and in in Japan, but this market needs also to be developed in the United States.
speaker-0: Excellent. Well I'm sure we will be relying on Arano for some expertise as this as this project evolves. Now, the Tennessee Nuclear Network, which our friends at at ETEC run, they've also talked about how high tides lift all boats in terms of the nuclear industry. There's more an industry coming to Tennessee and I'm sure you all are vying for the same workforce and other sorts of resources. So How has Aranos experienced this mutual success when everybody else seems to be coming into the market and your competitors are also doing well?
speaker-1: Yes. So first regarding our competitors, we welcome of course all of our projects. Because first we need competition. This is good for the market. This is good for our customers. This is good for the country. So we we're we we love to have competitors. And in addition, is what I said earlier, with the objective of United States quadruple nuclear energy output by two thousand fifty, we need more enrichment capacity. And we need other projects to be successful. Also we applaud the Department of Energy's decision to give a nine hundred million dollar award to of course to Rano for the low enriched uranium programme, but also to General Matter and Centrus for the highest low enriched uranium programme. Because this program was was developed by the by Congress to make sure that there would be new enrichment capacity to be developed in the United States and it's a way to jump start this new enrichment capacity. So we need everybody, we need everybody to be successful. And as I say, we welcome our competitors. For two reasons. Because we need competition for the for the country and for our customers. And we need more enrichment capacity anyway to ensure that all the current reactors and the future reactors to be built in this country will get enough fuels and will be independent in terms of import from Russia and of course from China. So this is our my first point regarding the competition. Regarding we say the other companies coming in town, you're right. I mean there's some tensions regarding the resources and so on. But we want to work also as a as a partner because we have the same needs as some of the other companies in terms of workforce development. We want to ensure that the local TCATs, one state community college or PACP Community College, they have the right programs to how to develop the workforce what we need. And it and we don't need of course we need engineers. We need nuclear engineers, mechanical engineers But also we need many operators, we need project managers, we need financial people and we need other staff positions. And we have common needs with we say our our peers who want also to be in in Oakridge or who have already been in Oak Ridge. And we have already started discussions with some of our partners, like Oakridge National Lab, to develop some training program that would be common between different I mean between Oakridge National Lab and Orano to to ensure that we have the right I would say workforce and skills that would be needed to operate our plants.
speaker-0: Let's talk about workforce development because it's the thing that's on everybody's mind. I can't turn around in Oak Ridge without somebody talking about workforce development. You mentioned some partnerships that Arano has to bolster your workforce, but talk more about Arano's approach to workforce development. So
speaker-1: We have our approach we really want is to work with with the universities, but also with the community colleges and the TCAS, but also with even with the high school. And so we we of of course we we met with University of Tennessee, Tennessee Tech. I met with Ranset Community College several times. I have a meeting with PACP very soon. But even the high school is is for us meeting with the high school is very important. I mean back in t Back in 2025, one of my first I would say presentation was to Oak Ridge High School. And some people asked me at that time why, because our project, as I said, we we started production in 2031, but then we'll have a ramp-up phase until we reach full capacity. And this project from today will last for the next 10 years in terms of construction, ramp-up, and com and commissioning and ramp-up. And I know that my future operators, my future engineers. My future project managers are currently in in high school and I want to ensure that not only the with the the faculty of the high school, but also the the the high schoolers, they know about Orano, they know about Project IC, so that when they are ready to to find a job, they would f they would think of us. So we really want to develop these long term partnerships with the faculties and with students as early as we can in terms of their I would say in in in in terms of their education. Full crowd.
speaker-0: What do you say to high school students to first of all get them interested in nuclear energy, but also arano? these are these are kids. They're sixteen, seventeen, fifteen years old. What do you say to these kids to get them interested in the industry? So f
speaker-1: It's a very good question because it's what ch I want to make sure that they're interested in joining the nuclear energy. But most I would say you know, in the high school of Aukridge I'm very amazed by the the the culture that they have already regarding nuclear energy is thanks to their parents, to their neighbors, the fact that Oak Ridge has been embedded in the development of nuclear energy not only in the United States but in the world. So they they want to work for the nuclear energy and I'm very delighted about it. But regarding Urano, we explained of course of our history that we've been here in the US for sixty years and also of our mission. Our mission is to ensure that the United States will have domestic capacity of enrich uranium, not only to support the needs of its of of its nuclear reactors, but also to stop its reliance on Russia and China regarding the import of enriched uranium. And this one is a key statement that resonates a lot, even to high schoolers.
speaker-0: Yeah, I can see that. I this newer generation, I mean, even myself included, when I was looking to enter the workforce, I wanted mission driven work. I wanted purpose driven work. And certainly Arano and other folks in the nuclear suppr supply chain can offer that to high school students, to young people, that this is mission driven, purpose driven. work. There is a bigger purpose that you are working for every single day. The paycheck is great. The things you can buy with that is great, but there's a larger purpose and a larger mission. I have to imagine that really resonates with high school students in particular.
speaker-1: Exactly. And and this is very a very important statement that you made because it's what we we do when we meet with high schoolers but also with the students of universities and community colleges.
speaker-0: On Luke, closely related to workforce development is community engagement. And more people are paying attention to the industries entering their communities, especially with tech and energy. So how does Arono balance progress with community buy-in and local engagement to maintain trust?
speaker-1: Local engagement is our number one priority and we really want is to be transparent as we have been in I would say for the last sixty years in the United States. But even more active with the local community. As soon as we started Project AC, we participated in many local events and we continue to do do so. to we we had meetings with the Chamber of Commerce, I went to the City Hall for Oakridge to to present the project. I was invited also by by the council of Oak Ridge and and just after Christmas also to give an update to the local community and we welcome this kind of intervention and to answer questions from the public because we want to be transparent and to demonstrate of course to the local community that our project is important for the United States, for the state, for our customers, but also for for them. And this one requires a lot of communication. We have of course our FAQs on our website where people can look at and get answers and if they don't get the right answers, should not hesitate to contact us directly. We have a an office in Oakridge where been very active for the last year. We participated in in the in local events like the Science Nuclear Science Week. We the next one will be in October. We sponsored a big exhibition of regarding nuclear enrichment in the K twenty five museum. And we continue to do so because we want to be a very active and transparent member of the local community, an active citizen and constituent.
speaker-0: Jean Luc, where can people learn more about Project Ike?
speaker-1: So first go to our website, Urano Group, and you you will see there's a dedicated page for for Project Ike. Of course on LinkedIn and please follow us, Urano USA and you will have many updates on Project Ike. Also we're on Twitter, on tr on Thread and other social medias. I'm very good in in Link on LinkedIn, to be honest with you, I'm not so good.
speaker-0: You are, you're very good. You are very active.
speaker-1: But please follow us and we'll and you will get a lot of would say updates on project i.
speaker-0: You are extraordinarily active on LinkedIn and I will say if anybody wants to know what you are up to and also about Project Ike, you can follow Jean Luc on LinkedIn and you'll get all the inside details. Jean-Luc Palier, thank you for joining us and being on Energizing Tennessee.
speaker-1: Thanks so much first for having me, but more importantly is what we you do also for the community. your organization and what you do are so important to promote not only energy in Tennessee and new and and and innovation and new technologies, but also to promote Tennessee to the world. So thanks so much for everything that you you do.
speaker-0: Well thank you. And that's our show. Thanks for tuning in to Energizing Tennessee, powered by the Tennessee Advanced Energy Business Council, your number one podcast for news about Tennessee's advanced energy sector. If you like what you heard, please share it with others or leave a rating and review. To catch the latest episodes, subscribe on Apple Podcasts, Spotify, or wherever you get your podcasts. Don't forget to follow TAEBC on social media or sign up for our newsletter to hear about our events and learn even more about Tennessee's growing advanced energy economy. Thank you for listening to Energizing Tennessee.