Coordinated with Fredrik

Coordinated with Fredrik artwork

Europe’s Grid Plumbing Crisis

Feb 18, 202635 minAudio
ShareXLinkedInFacebookWhatsAppEmail

There’s a strange paradox at the heart of Europe’s energy transition. On paper, 2025 looks like a victory lap. Renewables generated nearly half of the EU’s electricity. Wind and solar alone overtook fossil fuels. A decade ago, that would have sounded like science fiction. We have become incredibly good at harvesting energy from the sky and the wind. And yet, at the same time, we are wasting staggering amounts of it. This is not a generation crisis. It’s a plumbing crisis. The Ferrari Engine in a Model T Chassis Here’s the uncomfortable truth: We built a 21st-century renewable generation fleet and plugged it into a 20th-century grid. Modern renewables are: * Variable - the sun and wind don’t follow office hours * Distributed - rooftops, fields, offshore wind farms * Digital - powered by inverters and electronics But the grid they connect to was designed for something entirely different: * Centralized, giant power plants * One-way power flow * Passive consumers * Heavy mechanical inertia It was built for coal plants pushing electrons in one direction. Now power flows in every direction, from millions of rooftops, batteries, EVs, and wind farms. The infrastructure was never designed for that. And the consequences are becoming impossible to ignore. Curtailment: Paying for Power We Throw Away When the grid can’t move electricity from where it’s produced to where it’s needed, operators do something painful. They curtail. That means telling wind farms or solar plants to stop producing electricity - even when the wind is blowing and the sun is shining. And because of contractual agreements, we often pay them anyway. In 2025: * Germany, France, and the Netherlands curtailed 3.9 TWh of renewables. * Great Britain alone wasted 10 TWh - roughly enough to power every home in London for a year. * Congestion costs across seven key European countries hit €7.2 billion in a single year. Let that sink in. We are paying billions to shut off clean power and then paying again to turn on fossil fuel plants elsewhere because the wires can’t carry the energy to where demand is. This isn’t an environmental failure. It’s a coordination failure. Negative Prices Are Not a Good Thing You may have seen headlines about negative electricity prices. It sounds like abundance. It sounds like victory. It’s not. In 2025: * Germany experienced 539 hours of negative prices. * The Netherlands saw 584 hours. Negative prices happen when there’s too much electricity in the wrong place at the wrong time and not enough flexibility to absorb it. The market is essentially screaming: “Someone please use this power.”“Someone please stop producing.” But we don’t have enough storage. We don’t have enough transmission. And we don’t have enough flexible demand. So the price collapses. Negative prices are not a sign of success. They are a stress signal. The Iberian Blackout: When Physics Fought Back In July 2025, Spain and Portugal experienced a massive blackout affecting 60 million people. It started with what should have been a manageable grid fault. But that day, the system had very low inertia. Old grids relied on massive spinning turbines in coal and nuclear plants. Those rotating machines act like giant flywheels. They resist sudden changes and stabilize frequency. Solar panels don’t spin. They connect through inverters. They have zero physical inertia. When the disturbance hit, frequency collapsed almost instantly. Protective systems cascaded. Spain and Portugal were electrically islanded to protect the rest of Europe. This was a wake-up call. A grid dominated by electronics behaves differently than a grid dominated by heavy mechanical systems. If we don’t design for that difference, we pay for it. How We Got Here: The Postwar Blueprint To understand the problem, we have to go back to 1949. European engineers toured the United States under the Marshall Plan and returned with a clear philosophy: * Big power plants * Centralized generation * One-way transmission * Predict and provide It worked. It rebuilt Europe. It powered decades of growth. But it baked in a core assumption: energy flows from the center outward. Today, that assumption is broken. And nearly 40% of Europe’s distribution grids are over 40 years old. They were not built for: * EV charging * Rooftop solar * Bidirectional power flow * Real-time flexibility We added millions of high-performance renewable assets. We did not upgrade the roads. The Queue: 1,700 GW Waiting in Line Across 16 European countries, 1,700 GW of renewable capacity is stuck in grid connection queues. That’s three times what Europe needs to meet its 2030 climate targets. Why? Because: * Grid studies are slow and bureaucratic * Transmission build-out takes 8-15 years * Developers submit speculative “ghost” projects to secure queue spots * Permitting and public opposition delay everything Solar farms can be built in 1-3 years. Transmission lines take a decade. We’re trying to run a sprint while tied to a marathon walker. The Perverse Incentive: CapEx Bias Here’s the structural problem few people talk about. Grid utilities earn regulated returns on capital expenditure (CapEx). That means: * Build a €1 million transmission line → earn guaranteed returns for decades * Install €100,000 worth of congestion-solving software → no profit margin Under most regulatory systems, utilities are incentivized to build concrete, not code. Even if software solves the problem faster and cheaper. This is not a technical limitation. It’s a regulatory one. If we don’t fix the incentive structure, we will keep choosing the slow, expensive option. The Software-Defined Grid The future grid needs four layers: 1. Sensing You cannot manage what you cannot measure. We need real-time visibility at the edge of the network. 2. Control & Automation Grid events unfold in milliseconds. Human reaction times are irrelevant. Automation must stabilize frequency and manage flows instantly. 3. Markets Flexibility must be valued. If your EV or home battery provides balancing services, you should be paid. Price signals need to reach the edge. 4. Physical Build Yes, we still need more wires. Especially high-capacity transmission corridors. But they must be built strategically. This is not hardware versus software. It’s hardware + software + coordination. Dynamic Line Rating: Free Capacity We’re Ignoring Today, most transmission lines operate using static ratings based on worst-case scenarios (e.g., hot, windless summer days). But in reality, lines are often cooler and wind-cooled. Dynamic Line Rating (DLR) uses real-time weather and sensor data to increase line capacity safely. The result? 30-40% more capacity from the same wire. Without building anything new. That’s not incremental. That’s transformative. Virtual Power Plants: Coordination at the Edge Instead of building new gas plants to meet peaks, we can aggregate: * EV batteries * Home storage * Smart water heaters * Flexible industrial loads Thousands of small devices can act like one large power plant. A virtual power plant (VPP) can: * Discharge during peak demand * Absorb surplus during negative price events * Provide balancing services At roughly one-tenth the cost of building new physical infrastructure. This is coordination as infrastructure. The Global Race: China Is Moving Faster In 2024 alone, China invested $83 billion in its grid. It has built 37 of the world’s 39 ultra-high voltage (UHV) transmission lines. Europe has zero. UHV lines move enormous amounts of power across thousands of kilometers with minimal losses. This is not just about climate. It’s about industrial competitiveness. If cheap renewable energy can’t reach European industry, manufacturing migrates to where it can. The grid is now geopolitics. The €584 Billion Question Europe needs approximately €584 billion in grid investment by 2030. That sounds enormous. But every euro invested in grid infrastructure saves roughly two euros in system costs by: * Reducing curtailment * Avoiding fossil backup * Lowering congestion costs * Increasing efficiency The cost of inaction is far higher. The Real Political Question We talk about NIMBY - Not In My Backyard. But the coming battle is deeper: * Not under my street (new cables) * N… This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit frahlg.substack.com

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_01Welcome back to the Deep Dive. Today we are unpacking a story that, well, it feels like it was ripped straight out of a sci-fi novel about a utopia that's gone just a little bit wrong.

SPEAKER_00Yeah, it really is the definition of a paradox, isn't it?

SPEAKER_01It is. We're looking at a set of reports that paint this picture of a massive contradiction. It's this huge success story that has almost overnight, it feels like, curdled into a crisis.

SPEAKER_00It really has. I mean, if you just glance at the headlines where you look at the top line numbers for Europe's energy transition in 2025, it looks like a victory lap.

SPEAKER_01It looks like mission accomplished.

SPEAKER_00Exactly. It looks fantastic on paper.

SPEAKER_01Right. And the numbers are genuinely staggering. I was looking at the 2025 summary you sent over and renewables generated nearly 48 percent of the EU's electricity. Almost half. It's incredible. And here's the big one. Wind and solar, just those two, officially overtook fossil fuels. They hit 30% while fossil fuels dropped to 29.

SPEAKER_00A tipping point. A moment people have been working towards for decades. It's something that 10 years ago would have sounded like pure science fiction. It absolutely would have. And it's a monumental achievement in generation. Let's be clear about that. We have become incredibly good at harvesting energy from the sky and from the wind.

SPEAKER_01We solved the scarcity of profit.

SPEAKER_00We basically have. But, and there's always a but in energy markets, this very success has triggered what I can only describe as a massive systemic plumbing crisis.

SPEAKER_01A plumbing crisis. It's not the sexiest metaphor, is it?

SPEAKER_00It's not, but I promise you it's the most accurate one. We have effectively built a Ferrari engine, this amazing high-tech variable renewable generation fleet, and we've just dropped it into the chassis of a Model T Ford.

SPEAKER_01The Model T being our electricity grid.

SPEAKER_00Exactly. The physical wires, the transformers, the substations, and this is the crucial part, the management software running it all. So we're discovering that while we're great at making the green electrons... We are shockingly bad at moving them to where they actually need to go when they need to get there. And the result is that Europe is currently wasting just massive amounts of this clean energy. Wasting it and paying a fortune to do so.

SPEAKER_01So that is the mission of this deep dive. We're going to explore why the main bottleneck, the binding constraint of the energy transition, has shifted so dramatically.

SPEAKER_00Yeah, for the last 20 years, the whole conversation was about... Yeah. How do we get enough green power? Now, the problem is deliverability.

SPEAKER_01It's about getting it from A to B. It's about connection.

SPEAKER_00It's about flow. And it's about physics. And we're looking at this specifically through the lens of our show, Coordinated with Frederick. Right. So we aren't just going to sit here and say, we need to build more stuff. It's not just about pouring concrete and stringing up new copper wires. Although, spoiler alert, we do need some of that. Of course. But we're really going to dig into how the solution might actually be about coordination, about software, and about getting much, much smarter with the hardware we already have.

SPEAKER_01OK, so we've got piles of reports here, data from 2025 grid reports, some fascinating historical analysis going back to the postwar era and this deep research into what we're calling grid plumbing. So let's set the scene a bit more. When you say plumbing crisis, are we just talking about not having enough wires? Is it that simple?

SPEAKER_00It's deeper than just more wires. It's a fundamental disconnect between two different centuries. On one hand, you have 21st century generation.

SPEAKER_01What are its characteristics?

SPEAKER_00It's variable. You know, the sun doesn't always shine. The wind doesn't always blow. It's distributed. It's on our rooftops. It's in fields. It's way offshore. And it's digital. It uses electronics, inverters to connect to the grid.

SPEAKER_01Okay, that's one side. And on the other hand,

SPEAKER_00On the other hand, you have 20th century infrastructure. The grid we have today is centralized, it's static, and it's largely analog. It was designed for a world where a few big guys, a giant power plant, burn coal or split atoms and push power down the line to you.

SPEAKER_01And the consumer was just this passive endpoint, a sink for the energy.

SPEAKER_00Exactly. You didn't interact with the grid, you just consumed from it. Now we're trying to push power in every direction at once, often from the bottom up, from the edges of the network.

SPEAKER_01And the pipes just aren't big enough.

SPEAKER_00The pipes aren't big enough, nor are they smart enough to handle that kind of multidirectional traffic.

SPEAKER_01Okay, so let's unpack the symptoms of this clogged system. That's okay. Plumbing crisis sounds a bit abstract until you look at the real-world consequences, the waste.

SPEAKER_00Right.

SPEAKER_01There's this term that kept popping up in all the reading, curtailment.

SPEAKER_00Ah, curtailment. It's a very polite, very clinical engineering term for a very painful economic reality.

SPEAKER_01Can you explain it for us? What is it? So ideally, when you generate a unit of electricity, you use it immediately.

SPEAKER_00Right. The grid has to balance supply and demand every single second in real time.

SPEAKER_01It's a constant balancing act.

SPEAKER_00A constant precarious balancing act. But what happens when it's incredibly windy in Scotland, but the demand is all down in London and the cables connecting them are already full?

SPEAKER_01You can't just store the extra electricity in the wire.

SPEAKER_00You can't. It's not a battery. The grid operator has no choice. They have to call up that wind farm in Scotland and say, stop, feather the blades, turn off your turbines. That is curtailment.

SPEAKER_01And we still have to pay them, right?

SPEAKER_00Oh, yes. Yes. Because of the contracts, we usually have to pay them for the power we told them not to produce. We pay them to stop.

SPEAKER_01We are literally paying for clean power that we don't get to use. We just throw it away.

SPEAKER_00We throw it away. And in 2025, the numbers were just eye-watering. If we look at Germany, France, and the Netherlands alone, just those three, they curtailed 3.9 terawatt hours of renewable energy.

SPEAKER_01OK, put that number 3.9 terawatt hours into context for me. Is that a lot?

SPEAKER_00It's significant. It's enough to power millions of homes for a year. It's a huge amount of energy to just let dissipate. But the real shocker, the number that made me double check the spreadsheet is Great Britain. Oh, the UK grid is a perfect, almost tragic example of this bottleneck. In 2025, Great Britain wasted 10 terawatt hours.

SPEAKER_0110 terawatt hours.

SPEAKER_00Yes, 10.

SPEAKER_01Give me a sense of scale on that. What does that mean? It is roughly enough electricity to power every single home in London for an entire year. Wait, wait, pause on that. You're saying we wasted enough wind power to light up all of London for a full year and we just threw it in the bin?

SPEAKER_00Yes. The turbines were spinning. The power was there. But the cables connecting Scotland to England, what's known as the B6 boundary constraint, couldn't carry it. It's like a four-lean highway suddenly squeezing down into a country lane. It's a perfect analogy. It's a funnel that's just too narrow. So the operator pays the Scottish wind farms to stop generating. And then, this is the truly maddening part, they have to pay gas plants in the south of England to turn on to meet the demand that the wind power couldn't reach.

SPEAKER_01So we pay twice. We pay to stop the green stuff, and then we pay again to burn the dirty stuff. That seems wildly inefficient.

SPEAKER_00It's maddeningly inefficient, and it adds up. Across just seven key European countries, these so-called congestion costs hit 7.2 billion in one year.

SPEAKER_017.2 billion euros.

SPEAKER_00In one year. And that's money paid by you, by me, by all of us on our bills. It's effectively a hidden tax on our inability to build infrastructure at the pace we need it.

SPEAKER_01This is unbelievable. And this leads to another weird phenomenon I wanted to ask about. Negative prices. I think a lot of people see headlines about negative energy prices and they think, great, the utility company is going to send me a check.

SPEAKER_00I wish it were that simple. It would be nice, wouldn't it?

SPEAKER_01But it's not a good sign, is it? It feels like a glitch in the matrix.

SPEAKER_00It's not a glitch. It's a scream for help from the market. In 2025, Germany saw 539 hours, where the wholesale price of electricity was below zero.

SPEAKER_01539 hours. That's more than 20 full days worth of negative prices.

SPEAKER_00It is. And the Netherlands was even higher, 584 hours. So that's almost two hours a day on average where power has negative value.

SPEAKER_01What does that tell us?

SPEAKER_00It tells us that we have these moments. Usually on sunny Sunday afternoons or windy nights when demand is low, we have a massive surplus of power, a flood of it. But we have nowhere to put it and we can't move it to somewhere that needs it. It's like having a flash flood of clean water, but no reservoir to store it in. Exactly. And here's why the price goes negative. We still have these old inflexible baseload plants on the system. Things like nuclear or lignite coal plants. These plants are like giant ocean liners. They can't turn on a dime.

It's very expensive and technically risky to shut them down and start them up again

SPEAKER_00for just a few hours. So they keep running, even when the sun is blazing and the wind is howling. So you have the inflexible dirty power clashing head-on with the variable clean power. And something has to give. The system is saturated, so the price crashes through the floor to send the most desperate signal possible. Please, for the love of God, stop generating. Or somebody, please, use more energy.

SPEAKER_01It's a system screaming for flexibility.

SPEAKER_00Precisely. And because we don't have enough batteries or pumped hydro storage or transmission capacity to soak up that excess, the price floor just completely collapses.

SPEAKER_01OK, so we've got wasted money and wasted energy. Those are the chronic symptoms. But there was an acute moment, a real heart attack moment in July 2025 that really scared the regulators. The Iberian blackout. This is the event that woke a lot of people up to the physics of the problem,

SPEAKER_00because up until then, this was mostly seen as an economic problem, an efficiency problem. This made it a security of supply problem.

SPEAKER_01Take us through what happened that day, because it sounds like something out of a disaster movie.

SPEAKER_00It was July 28th, 2025, a very hot summer day, lots of air conditioning running and a huge amount of solar power on the grid across Spain and Portugal.

SPEAKER_01A typical summer day.

SPEAKER_00Right. And initially it was a relatively small fault near Granada in southern Spain. A transmission line tripped. About 2.5 gigawatts of generation dropped off the grid. Now, normally a healthy, robust European grid absorbs that. It's a bump in the road.

SPEAKER_01The lights might flicker for a second.

SPEAKER_00You might see the lights flicker, but that's it. The system is designed to handle that.

SPEAKER_01But this time it wasn't just a bump.

SPEAKER_00No, because of the specific conditions on the grid that day, it was heavily, heavily reliant on renewables, solar and wind. And this brings us to a really critical concept called inertia. This is where it gets a bit physics heavy, but it feels like we really need to understand this.

SPEAKER_01What is inertia in a grid context?

SPEAKER_00Okay, think of the old grid. You have massive coal plants or nuclear plants. Inside them, you have these giant metal turbines and generators weighing hundreds of tons, all spinning at exactly 3,000 RPM in sync with the grid's frequency.

SPEAKER_01A huge amount of physical momentum.

SPEAKER_00A huge amount of kinetic energy. It's like a massive heavy flywheel. If something goes wrong, if a power plant suddenly trips offline, that heavy flywheel keeps spinning out of sheer momentum.

SPEAKER_01It resists the change.

SPEAKER_00It resists change. It buys you, we're talking milliseconds, but in grid terms, those are vital milliseconds for the safety systems to kick in and stabilize things. That physical momentum is inertia.

SPEAKER_01And solar panels don't spin?

SPEAKER_00Solar kernels are just silicon and glass. They use electronic inverters to convert DC power to AC and push it onto the grid. They have zero physical inertia. They're just a stream of electrons controlled by code.

SPEAKER_01So on that day in Spain when that initial line tripped.

SPEAKER_00There was no flywheel to catch the fall. The system had very low inertia. So the frequency of the grid didn't dip. It fell off a cliff instantly. Within seconds, it triggered a cascading failure. Protective systems saw the frequency collapsing and started disconnecting more and more generation to save themselves. 15 gigawatts of power just vanished from the system.

SPEAKER_01And that's when they had to pull the plug.

SPEAKER_00To save the rest of the continent from a domino effect, the operators physically severed Spain and Portugal from the rest of the European grid. They became an electrical island.

SPEAKER_01And what was the impact on the ground?

SPEAKER_0060 million people lost power. The entire Iberian Peninsula went dark. It took until 4.00 a.m. the next morning to fully restore everything.

SPEAKER_01That's terrifying.

SPEAKER_00It was. And it proved in a very dramatic fashion that a grid dominated by electronics behaves totally differently than one dominated by heavy spinning machinery. It showed us that grid stability isn't something you can take for granted just because you have enough power. You need the right kind of power and the right kind of controls. It really does sound like we're trying to run a modern software application on

SPEAKER_01hardware from the 1950s.

SPEAKER_00In some cases, that's literally true. And it's why the coordinated with Frederick approach is so focused on using software and smart electronics to digitally replicate that physical inertia. But we can definitely get to that later.

SPEAKER_01That's a perfect segue. I want to go back in time now. Let's do some grid archaeology. How did we end up with this specific grid design? Because it wasn't an accident. It was a choice.

SPEAKER_00It was a very deliberate choice. And to understand it, we have to go back to 1949, the Marshall Plan era. Europe is in ruins trying to rebuild itself after the war.

SPEAKER_01And everyone is looking for a blueprint for the future.

SPEAKER_00Exactly. And there was a specific delegation, 25 engineers from across Europe who traveled to the United States in the spring of 1949. Their mission was to study the American power grid, which was the absolute envy of the world at that time.

SPEAKER_01So they went on a study tour.

SPEAKER_00They toured the Midwest. They looked at dispatch centers in Chicago, control rooms, huge generating stations. They were just in awe of the scale and the reliability of it all.

SPEAKER_01And what was the philosophy they brought back with them?

SPEAKER_00They brought back the philosophy of centralization. The gospel of big is beautiful. They came back and said, this is the future. We need to build big. Massive coal plants, massive hydro dams.

SPEAKER_01And the logic was what? Economies of scale?

SPEAKER_00Economies of scale and a model called predict and provide. We, the utility, will predict how much power people need next year. We will build a giant power plant to provide it. And we will push that power one way from our central plan down the high voltage lines to the passive consumer.

SPEAKER_01It was a top-down command and control model.

SPEAKER_00Completely. And look, we shouldn't knock it. It was an engineering marvel for its time. It powered the post-war economic miracle. It rebuilt Europe.

SPEAKER_01But it baked in a certain assumption about how energy works.

SPEAKER_00It baked in the assumption that energy only ever flows one way. And here's the kicker. The reports show that 40% of Europe's distribution grids, the local wires on your street, are now over 40 years old.

SPEAKER_01So they were built in the 70s and early 80s.

SPEAKER_00Exactly. They were designed for a world without iPhones, without electric vehicles, and certainly without solar panels on every other roof.

SPEAKER_01Okay, so that's the foundation. And then we hit what the reports call the lost decades. This is the 1990s.

SPEAKER_00Yes. The era of liberalization. The EU and Britain, under Thatcher before that, decided to break up the big state-owned electricity monopolies.

SPEAKER_01What was the thinking there?

SPEAKER_00The idea was to create competition and drive down prices. So they unbundled the system. They separated generation. The company's making the power... From transmission and distribution, the companies that own and operate the wires.

SPEAKER_01The goal was to make things more efficient and cheaper for the consumer.

SPEAKER_00Correct. And strictly speaking, it worked. Prices for many people came down. The system became more economically efficient. But there was a massive unintended consequence.

SPEAKER_01Which was? When you focus entirely on efficiency and cost cutting, you stop investing in redundancy.

SPEAKER_00You stop gold plating the grid for the future. You just focus on squeezing every last drop out of the assets you already have.

SPEAKER_01You cut all the fat, but you end up cutting some of the muscle, too.

SPEAKER_00You've nailed it. For about 20 years, from the mid-90s to around 2015, investment in grid infrastructure was basically flat. We were just sweating the existing assets. Meanwhile, investment in renewables started to skyrocket.

SPEAKER_01So we were buying millions of new high-performance cars, the wind and solar farms, but we completely stopped fixing the roads.

SPEAKER_00And we certainly didn't build any new lanes on the motorway. And then came the solar boon. Germany is the prime example here with its EEG, the Renewable Energy Sources Act.

SPEAKER_01Right, the famous feed-in tariffs that made solar affordable.

SPEAKER_00Exactly. It sparked a massive, massive boom. In 2011 alone, Germany connected 7.5 gigawatts of new solar capacity.

SPEAKER_01Which sounds great for the climate.

SPEAKER_00It is great for carbon reduction. But think about where that solar power goes. It's not a big central power plant.

SPEAKER_01It goes on people's rooftops, in their fields.

SPEAKER_00It goes into the capillaries of the grid, the low voltage distribution network, the very end of the line. And remember, that 1949 design was all about pushing power down from the big plants.

SPEAKER_01And suddenly you have millions of houses pushing power up.

SPEAKER_00You get what's called reverse flow. The transformers at the end of your street weren't built for it. The protection switches weren't designed to handle power coming from that direction. It causes voltage to spike. It can overheat equipment.

SPEAKER_01It's like trying to pump water up a waterfall.

SPEAKER_00It is. The plumbing itself fights back.

SPEAKER_01So we have old pipes flow going the wrong way. And now we have a traffic jam, a massive one. I want to talk about the queue.

SPEAKER_00Ah, the queue, the great queue. Because this is the bureaucratic nightmare at the heart of the energy transition. The queue is where hope goes to die right now for a renewable energy developer.

SPEAKER_01The number I have here from our reports is 1,700 gigawatts. That's the amount of renewable capacity currently stuck in connection queues across just 16 European countries.

SPEAKER_00Let's just sit with that number for a second. 1,700 gigawatts.

SPEAKER_01To put that in context, how much is that? That is three times the total amount of renewable capacity Europe needs to build to

SPEAKER_00hit its 2030 climate targets.

SPEAKER_01You're joking.

SPEAKER_00I'm not. We have enough clean energy projects waiting in line right now to save the continent three times over.

SPEAKER_01That is deeply frustrating, so why can't we just plug them all in? What's the holdup?

SPEAKER_00A big part of the problem is that the line is full of ghosts.

SPEAKER_01Ghost projects? What do you mean?

SPEAKER_00Okay, imagine you're a developer. You know the queue to get a grid connection is incredibly long and slow. And you also know there's a high chance your specific project might fail for other reasons. Maybe the financing falls through or you can't get the land permit.

SPEAKER_01It's a risky business.

SPEAKER_00It is. So instead of submitting one really solid, well-planned project into the queue, you submit five or ten speculative ones. You shotgun the system. You're just trying to secure a spot in line. You're holding a place in line for a project that might never even happen. Exactly. But the grid operator legally often has to treat every single one of those applications as if it's real. They have to do complex, expensive engineering studies for all of them.

SPEAKER_01It clogs the entire system.

SPEAKER_00It's like a denial of service attack on the grid bureaucracy. It makes it impossible for the good, viable projects to get through in a timely manner. And even if you're one of the lucky ones, even if you get approved, there's the timeline gap. This is the other killer. Let's say you want to build a big solar farm. From start to finish, you can probably do that in one to three years. These things are basically manufacturing projects now. They go up fast.

SPEAKER_01Okay. But if you want to build the new high-voltage transmission line needed to carry

SPEAKER_00that solar power to the city, the average timeline for that is 8 to 15 years.

SPEAKER_0115 years. Why on earth does it take so long? Is it the actual construction?

SPEAKER_00No, the construction itself is the fast part. It's the permitting. It's the planning, the environmental reviews, the public consultations, the inevitable lawsuits, the local opposition.

SPEAKER_01So we are trying to run a sprint with the runner, the renewables tied at the ankle to a marathon walker, the grid.

SPEAKER_00It's the perfect metaphor. The two are moving at completely different speeds and is hamstringing the entire transition.

SPEAKER_01And there's a financial reason for this sluggishness too, right? This is something I really want to dig into. We need to talk about CapEx bias.

SPEAKER_00Yes. If you understand CapEx bias, you understand the psychology of the modern grid utility.

SPEAKER_01This felt like a crucial piece of the puzzle. Explain it.

SPEAKER_00Okay. So, historically, how does a regulated grid utility make its profit? It's important to remember, they don't sell the electricity itself. That's the generator's job.

SPEAKER_01They just own the pipes. They charge for delivery.

SPEAKER_00Exactly. But the regulator sets their profit margin. And the way it usually works is they earn a guaranteed rate of return on their capital expenditure, or CapEx.

SPEAKER_01Which means spending money on physical stuff.

SPEAKER_00Big physical stuff. If they build a new concrete tower and a new transmission line for a million euros, the regulator lets them earn, say, 5% on that million euro asset every single year for the next 40 years.

SPEAKER_01Okay, so big spending on hardware equals big guaranteed long-term profit.

SPEAKER_00You've got it. It's a safe, reliable business model. But now, what if there's a piece of software for 100,000 euros that could solve the exact same congestion problem?

SPEAKER_01That's not a physical asset.

SPEAKER_00It's not. That's operating expenditure or OPEX. And under most regulatory systems, they don't earn a profit on OPEX. They just get to claim the cost back from the consumer. No profit margin. So if you're a utility executive and you have a choice between building a wildly expensive new line that takes 10 years but guarantees you a 5% profit for 40 years. Or installing cheap software that fixes the problem today but gives you zero profit.

SPEAKER_01You build the line.

SPEAKER_00You build the line every single time. The regulation actively incentivizes you to choose the slow, expensive, carbon-intensive concrete solution over the fast, cheap, smart software one.

SPEAKER_01That seems completely broken. It's a perverse incentive. It's actively encouraging inefficiency.

SPEAKER_00It is the single biggest regulatory barrier to modernizing the grid. It keeps utilities locked in the 20th century. It basically forbids them from being as efficient as they could be.

SPEAKER_01OK, so let's fit it to the solution space, because this is where the coordinated with Frederick theme really comes into its own.

SPEAKER_00It is.

SPEAKER_01Because if we can't just build our way out of this with copper, at least not fast enough, we have to think our way out.

SPEAKER_00We have to move from a hardware-defined grid to a software-defined grid. We need to digitize the plumbing. This is the heart of the coordinated concept, using intelligence and data to sweat the assets we already have, to get more out of the existing pipes. Let's look at some of the specific technologies that were mentioned in these reports.

SPEAKER_01One that jumped out at me was dynamic line rating or DLR. It sounds very technical, but the concept is surprisingly simple.

SPEAKER_00It's one of my absolute favorites because it's such a quick, obvious win. It's low hanging fruit.

SPEAKER_01So how do we currently decide how much power a wire can carry?

SPEAKER_00Right now, we mostly use something called a static rating. Engineers sit in a room, look at the specifications of a power line, and assume the absolute worst-case scenario for operating it.

SPEAKER_01And the worst-case scenario is?

SPEAKER_00A brutally hot summer day, let's say 40 degrees Celsius. The sun is beating down on the wire, which makes the metal expand and sag dangerously close to the ground, and there is zero wind to cool it down. They set the speed limit for that wire based on that one worst possible condition.

SPEAKER_01And that speed limit is then fixed for the entire year.

SPEAKER_00It's fixed. So the speed limit is set for the hottest, stillest day of the year, even on a cold, windy night in January.

SPEAKER_01That seems overly cautious.

SPEAKER_00It is. Because in reality, especially in places like Northern Europe, it's often cold and windy. And wind is a fantastic coolant for a power line. When a wire is cool, you can push much, much more electricity through it safely without it overheating or sagging.

SPEAKER_01How much more are we talking? The data shows on average you can get 30 percent to 40 percent more capacity out of

SPEAKER_00the exact same wire just by knowing what the real time weather is. So you're telling me there is 30 percent of extra highway capacity just sitting

SPEAKER_01there completely unused because we aren't checking the weather forecast. Because we don't have sensors on the lines telling the operator what the actual

SPEAKER_00real-time conditions are. Dynamic line rating is just putting sensors on the wire or using weather data to say, hey, it's windy, the wire's cool, you can open the floodgates.

SPEAKER_01It's a software and data fix for what looks like a hardware problem.

SPEAKER_00Exactly. It's a perfect example of the coordinated approach.

SPEAKER_01That seems like such a no-brainer. Then there's this concept of virtual power plants, or VPPs. The reports mentioned a company called Sourceful Energy and something called the Zap Gateway. This sounds a bit more sci-fi.

SPEAKER_00It sounds futuristic, but it's actually very practical. This is all about coordinating the edge of the grid. Remember all those distributed devices we talked about?

SPEAKER_01The electric vehicles, home batteries, smart thermostats.

SPEAKER_00Exactly. Right now, to the grid operator, those are just millions of chaotic, unpredictable loads. A virtual power plant uses software to aggregate thousands of these little devices so they can act in concert, like one single big controllable power plant. So instead of firing up an expensive gas plant to meet a sudden peak in demand, you could just tell 5,000 car batteries, which are already plugged in, to discharge a tiny little bit of power back to the grid for 15 minutes. The car owner wouldn't even notice. But in aggregate, it's a huge resource.

SPEAKER_01And what about the other side of the problem? When you have too much wind, that curtailment problem we discussed.

SPEAKER_00That's the other key use case. Instead of paying a wind farm to turn off, the VPP could send a signal to 10,000 smart water heaters to say, hey, power is super cheap and abundant right now. Turn on and heat your water for later. You soak up the excess.

SPEAKER_01You're turning flexible demand into a giant sponge for renewables.

SPEAKER_00A giant controllable sponge. But to do that, you need to be able to talk to all those devices. They need to be visible and controllable.

SPEAKER_01They need to be legible to the grid operator.

SPEAKER_00Exactly. And that's what technologies like the Zap Gateway do. They provide that secure, standardized communication link. They bridge the gap between the messy world of consumer gadgets and the highly controlled industrial world of the power grid. And what's the cost difference between using a VPP for this kind of service versus the old way? It's not even in the same ballpark. The analysis shows that using VPPs to provide balancing and flexibility services to the grid costs about one tenth of what it costs to build new physical infrastructure, like a new power plant or new wires,

SPEAKER_00to do the same job.

SPEAKER_01One tenth. That is an incredibly hard number to argue with. It's the difference between building a whole new highway lane for rush hour versus using an app like Waze to intelligently route the existing traffic to avoid jams.

SPEAKER_00One is concrete, the other is code.

SPEAKER_01So if we're going to build this modern grid, the research we looked at breaks down the new architecture into four distinct layers. I found this structure really helpful for thinking about it.

SPEAKER_00Yes, this is the modern grid stack we need to build. From the bottom up, layer one is sensing.

SPEAKER_01Sensing.

SPEAKER_00You can't manage what you can't measure. Right now, as we've said, many grid operators are effectively flying blind, especially at the local low voltage level. They literally do not know what's happening on the wires at the end of your street until a customer calls to complain that their power is out.

SPEAKER_01That's terrifyingly archaic in the age of the smartphone.

SPEAKER_00It is. So we need sensors on transformers, on lines, everywhere to give us real time visibility. Leo 2 is control and automation.

SPEAKER_01This is about speed.

SPEAKER_00It's all about speed. Remember the Iberian blackout. That entire event, from the first fault to the islanding of Spain, happened in seconds. You cannot have a human operator staring at a screen and making a phone call to try and fix that. It's too slow.

SPEAKER_01It has to be automated.

SPEAKER_00The control systems have to be automated to react in milliseconds, just like the safety systems in a modern car.

SPEAKER_01Okay, so sensing, then control. What's layer three?

SPEAKER_00Layer three is markets. This is crucial. We need to create markets that properly value flexibility. If you, as a consumer, are willing to let the grid charge your EV when power is cheap and abundant or discharge it for a few minutes when the grid is stressed, you are providing a valuable service.

SPEAKER_01And you should be paid for it.

SPEAKER_00You should be paid for it. We need price signals that flow all the way down to the consumer telling them flexibility is valuable right now.

SPEAKER_01Okay. And then finally, layer four is the physical build.

SPEAKER_00Right. Because we have to be realistic. We do still need some new wires. We can't software our way out of everything.

SPEAKER_01Where do we need the most?

SPEAKER_00Specifically, we need giant energy superhighways. using technology like high-voltage direct current, HVDC, to move that massive amount of offshore wind power from places like the North Sea down to the industrial heartlands of Germany and France. So it's a combination of smarter local management and bigger interstate highways. That's the perfect way to think about it.

SPEAKER_01And to make all of this happen, especially the software and markets part, we have to fix that broken incentive you mentioned earlier, the CapEx bias.

SPEAKER_00We have to.

SPEAKER_01There's a solution proposed for this called Totem.

SPEAKER_00Kotex. Total expenditure. It's a fundamental regulatory shift, but it's not that complicated.

SPEAKER_01And does it work? It basically says to the utility, your job is to deliver a reliable, affordable, and clean grid.

SPEAKER_00Here is your total budget to achieve that outcome. We don't care if you spend it on capital expenditure like copper wires or operating expenditure like software subscriptions or even paying customers to use less energy. Just get the result.

SPEAKER_01It makes them completely neutral on how they solve the problem. They just need to find the most efficient solution.

SPEAKER_00Precisely. If a software subscription from a VPP aggregator is cheaper than building a new substation, a Totex framework allows the utility to profit from choosing the cheaper, smarter option. So it finally aligns the utility's profit motive with the consumer's wallet and our

SPEAKER_01climate goals.

SPEAKER_00Exactly. The UK has started moving in this direction with their RIO framework, and Italy is also exploring it. But we need this to become the standard across all of Europe.

SPEAKER_01OK, I want to zoom out for the last part of our discussion. Let's look at the global picture because Europe isn't operating in a vacuum here. There is a race going on.

SPEAKER_00There absolutely is. And right now, frankly, China is winning the grid race by a landslide.

SPEAKER_01The numbers coming out of China are just hard to wrap your head around. They are operating on a completely different scale and at a different speed.

SPEAKER_00In 2024 alone, China invested $83 billion in their grid.

SPEAKER_01Eighty three billion in a single year.

SPEAKER_00But it's not just the sheer amount of money. It's the technology they're deploying. They're betting big, and I mean big, on UHV ultra-high voltage transmission.

SPEAKER_01What makes UHV so special compared to our standard high voltage lines?

SPEAKER_00So a standard high voltage line in Europe might be 400 kilovolts. UHV lines are 800 or even 1100 kilovolts. Think of it as moving from a garden hose to a giant fire main. It's a much, much wider pipe.

SPEAKER_01So you can push more power with less loss. You can push massive amounts of power over thousands of kilometers with very,

SPEAKER_00very little electrical loss. And here's the stat. China has built 37 of the world's 39 UHV lines.

SPEAKER_0137 out of 39. So the entire rest of the world combined has two.

SPEAKER_00Two. One in Brazil, one in India. Europe has zero.

SPEAKER_01Why does that matter so much? It matters because renewable energy is often located far away from where people

SPEAKER_00actually live and work. China can now move cheap solar energy from the Gobi Desert to the industrial factories in Beijing, 2,000 kilometers away with incredible efficiency.

SPEAKER_01Which lowers their cost of manufacturing.

SPEAKER_00Drastically. Now think about Europe. If we have abundant cheap wind in the North Sea, but we can't get it to the car factories in Stuttgart without paying massive congestion fees, our industry becomes uncompetitive.

SPEAKER_01So this isn't just an abstract environmental issue. This is about industrial competitiveness, about keeping factories open.

SPEAKER_00100%. If your energy is abundant but stranded, it's effectively expensive.

SPEAKER_01Yeah. And Europe cannot afford expensive energy right now if it wants to maintain its

SPEAKER_00industrial base and compete with Chinese manufacturing. The grid is now a core part of geopolitics and economic strategy.

SPEAKER_01We have a bill to pay, then, the investment gap.

SPEAKER_00We do. The European Commission has estimated that we need to invest $584 billion by 2030 to upgrade and modernize the grid to be fit for purpose.

SPEAKER_01That is a huge amount of money to find.

SPEAKER_00It is a massive number. But we have to look at the cost of inaction. Every study on this shows that for every euro you invest in the grid, you save about two euros in overall system costs.

SPEAKER_01Oh, so.

SPEAKER_00By avoiding wasted renewable energy, by not having to run expensive fossil fuel backup plants, by reducing the need for emergency balancing actions, it is an investment with a massive guaranteed return. It's not a cost. It's a saving. We're getting close to time, but I just want to summarize where we've been.

SPEAKER_01This deep dive started with a great paradox.

SPEAKER_00The paradox that we've essentially solved the generation problem. Renewables are here, they are cheap, and they are working.

SPEAKER_01But we are comprehensively failing the distribution problem. The grid we have is old, dumb, and painfully slow.

SPEAKER_00And this crisis is largely invisible to the public. It's buried in underground cables and tied up in administrative queues. But the costs, that $7 billion a year in waste and more, are very, very real.

SPEAKER_01I want to leave our listeners with a provocative thought. It's something you mentioned in our pre-show chat that really stuck with me about NNNB-ism.

SPEAKER_00Yeah. We all know the term not in my backyard, NNNB, when it comes to things like wind turbines. People don't want to see them. But the real battle of the next decade isn't going to be about that. It's going to be not under my street for a new cable or not, in my view, for a new pylon or substation.

SPEAKER_01We have to build this vital infrastructure somewhere.

SPEAKER_00We do. And it raises a really hard question for all of us. Are we as a society willing to accept the visual and local impact of new grid infrastructure, more pylons, more substations, more wires in order to save the planet? Or will we let a clean energy revolution die in a bureaucratic waiting room because

SPEAKER_01we couldn't agree on where to put the plugs?

SPEAKER_00It's a question of priorities, isn't it? It's a tradeoff.

SPEAKER_01It really is. And for you, the listener, the learner out there, the next time you see a headline about negative energy prices, don't just think free power.

SPEAKER_00Think system failure. Think of it as the grid crying out for help, crying out for flexibility and intelligence. And maybe, just maybe, think about the software and the coordination needed to fix it. Absolutely. That's the key.

SPEAKER_01Thank you for unpacking this with us. It's a complex topic, but it is arguably the most important and least talked about challenge for the next decade of the energy transition.

SPEAKER_00It's where the transition gets real. It's moving from theory to plumbing.

SPEAKER_01Thanks for listening to this deep dive. We'll catch you on the next one.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Counting Years

    Nov 22, 202642 minAudio

    Coordinated with Fredrik, Episode 127. Forty-two minutes on how a company gets its price: what a multiple counts, why the same krona can be worth seven years in one company and twenty-seven in another, how a rise in...

    Credit the people on this episode

  2. Shoulder Check

    Oct 31, 202650 minAudio

    Fifty minutes on two runs a day apart: the rest of Vancouver, and the road from ten Helium gateways to physics first. An interview with Lily. On Thursday I answered her questions in English; on Friday I went back to...

    Credit the people on this episode

  3. We Live Where We Are

    Oct 27, 202637 minAudio

    Thirty-seven minutes on two runs a day apart: the two years after the money came in, and home. An interview with Lily. I answered her questions in Swedish while running; the English voice you hear is my cloned voice...

    Credit the people on this episode

  4. Momentum

    Oct 24, 202639 minAudio

    Thirty-nine minutes on the two years before a term sheet arrived on my birthday, and what it took to turn it into money. An interview with Lily. I answered her questions in Swedish on a fifteen-kilometre run; the...

    Credit the people on this episode

  5. EP123: The Drive. Somebody Has to Say Yes

    Oct 15, 202634 minAudio

    This episode started in a car. A clear October day, low sun, the drive from Kalmar to Stockholm. I could have flown, and it would have been faster. But the hours in the car are a different kind of time. The car keeps...

    Credit the people on this episode