In 1962, a researcher at the RAND Corporation named Paul Baran looked at AT&T’s telephone network and saw something that the people running it could not see. The system worked. It carried every voice call in America. But it was structurally wasteful. Circuit-switched networks reserved entire connections for conversations that used less than 10 percent of available bandwidth. Baran’s idea was to break data into small packets, route them independently, and reassemble them at the other end. He called it packet switching. He presented this to AT&T’s engineers multiple times throughout the mid-1960s. They told him he did not understand how voice telecommunications worked. They were not stupid people. They were reasoning from the wrong model. They saw analog signals on dedicated lines. Baran saw data that could flow through any available path. The gap was not intelligence. It was architecture. I keep coming back to this story because we are living through the same moment in energy. And most of the people running the current system cannot see it. The numbers that should change how you think In the first half of 2025, the world installed 380 gigawatts of solar. That is 64 percent more than the same period in 2024. To put it bluntly, we deployed more solar in six months than existed on the entire planet as recently as 2017. Eight years of cumulative build-out, compressed into half a year. In the US, solar plus storage accounted for 79 percent of all new generating capacity. Not 79 percent of renewables. All capacity. Solar panels now cost roughly ten cents per watt. Stationary battery pack prices hit $70 per kilowatt-hour in 2025, a 45 percent drop in a single year. The lowest commercial cell prices are $36/kWh. These are not lab numbers. These are prices at scale. The hardware problem is solved. Panels are close to free compared to a decade ago. Batteries are following the same curve with a few years of delay. Deployment keeps outrunning every forecast the IEA publishes. This is not a story about scarcity. This is a story about abundance. But here is the part nobody wants to say out loud: we are wasting enormous amounts of this perfectly good electricity. Abundance without coordination is just waste California curtailed 3.4 million megawatt-hours of renewable energy in 2024. Ninety-three percent of that was solar. Germany set a new record of 1,750 GWh curtailed in 2025, with 575 hours where the wholesale price went negative. Generators paying someone to take their electricity. Spain’s solar capture prices collapsed from €61/MWh to under €17. The Netherlands posted 584 hours of negative prices, the most in Europe. Australia curtailed over 7 TWh. In South Australia, 38 percent of all utility-scale solar generation was thrown away. Across Europe, managing these surpluses cost utilities an estimated €4.3 billion in 2024. Globally, curtailment hit 72 TWh. That is roughly Austria’s entire annual electricity consumption. Gone. We spent billions deploying all this capacity. Then we pay people not to use the electricity it produces. That is not a generation problem. That is a coordination problem. And it is getting worse every month as more solar comes online. The pattern that keeps repeating The Baran story is not unique. The same structural shift has played out in shipping and in software platforms. In 1956, Malcolm McLean loaded 58 aluminum truck bodies onto a converted tanker ship in Newark. The shipping container was born. Loading costs dropped from $6 per ton to 16 cents. A 36x reduction. But the container itself was just a steel box. The revolution was the standardization: the standard size, locking mechanisms, and handling equipment. The coordination protocol that let any container from any shipper load onto any ship and transfer to any truck. A longshoremen’s union official watching McLean’s first container ship depart reportedly said he would like to sink that son of a b***h. The incumbents always react the same way. Apple launched the App Store in July 2008 with 500 apps. It hit 10 million downloads in 72 hours. Within a few years it was facilitating over a trillion dollars in commerce. Apple did not build the apps. They built the platform layer: the APIs, the SDKs, the payment infrastructure, the discovery mechanism that turned millions of individual devices into a coordinated ecosystem. The meta-pattern is always the same. A distributed resource exists but is uncoordinated. Incumbents dismiss it. A standardized coordination layer emerges. The economics flip. And an outsider, not an industry insider, drives the change. TCP/IP captured more value than any individual computer. The App Store captured more value than any individual app. The ISO container standard transformed more wealth than any individual shipping company. The coordination layer always wins. Virtual power plants are not a pilot anymore During California’s July 2025 grid stress test, over 100,000 home batteries delivered an average of 535 megawatts to the grid during the evening peak. The Brattle Group verified the results and concluded that the output was indistinguishable from dispatching a gas peaker plant. Grid operators could not tell the difference between 100,000 batteries coordinated by software and a single gas turbine. EnergyHub has introduced what they call the Huels Test, essentially a Turing Test for energy. Can a grid operator distinguish a VPP dispatch signal from a gas peaker? In trials with Arizona Public Service, Duke Energy, and National Grid, virtual power plants passed. Level 3. Automated and indistinguishable. The scale is already real. North American VPP capacity reached 37.5 GW in mid-2025. Octopus Energy’s Kraken platform manages 2 GW from over 500,000 connected devices. Kraken spun out as an independent company at a €7.3 billion valuation. Tesla’s Autobidder orchestrates over 3 GW across energy, capacity, and ancillary service markets. Base Power, a Texas startup, raised $1 billion and is installing 20 MW per month, targeting 100 MW per month by mid-2026. A 400 MW virtual power plant costs $43 per kilowatt-year. A gas peaker costs $99. Less than half. The DOE verified those numbers. Meanwhile, the United States has 2,600 GW of clean energy stuck in interconnection queues. That is more than twice total installed US generating capacity. Just waiting. Only 14 percent of solar projects that enter those queues ever get built. The average wait time in PJM is eight years. Eight years to connect a solar farm to the grid. Versus three years to build a 700 MW virtual power plant from home batteries. The distributed path does not compete with the centralized path. It laps it. The physics gap The classic grid was built for central control of big generators. Now we have millions of distributed devices at the edge. An inverter speaks Modbus RTU. An EV charger uses OCPP. A heat pump might use Modbus TCP or some proprietary protocol. A smart meter outputs a P1 port stream. Different devices, different languages, no common protocol. And the control requirements are brutal. Grid services like frequency response and voltage regulation need feedback on 100-millisecond to one-second timescales. Existing cloud-based interfaces have latencies of two to thirty seconds. There is no execution layer between cloud platforms and physical devices. The gap between what the cloud can do and what the grid actually needs is not a software bug. It is physics. Generation is no longer the bottleneck. Control is. We have the energy. We have the devices. What we do not have is the real-time, protocol-agnostic, edge-native intelligence layer that makes them work together at grid speed. Why we build from the Nordics Sourceful Energy is based in Kalmar, a small city on Sweden’s southeast coast. Not exactly famous for sunshine. But the Nordics have some of the most modern electricity grids in the world. Norway has 93 percent of residential contracts on dynamic tariffs. Finland is at 30 percent. Denmark has approved vehicle-to-grid aggregat… This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit frahlg.substack.com
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_00Welcome to Coordinated with Fredrik. I'm Fredrik Allgren, CEO of Sourceful Energy. Today, I want to talk about what I think is the most important and most misunderstood story in energy right now. Not the cost of solar panels, not battery chemistry, not policy. The story is about what happens after the hardware gets cheap. Because that is where all the value gets created. And almost nobody is talking about it. Let me start with the numbers, because the numbers are absolutely wild.
SPEAKER_00In the first half of 2025, the world installed 380 gigawatts of solar. That is 64% more than the first half of 2024. To put that in perspective, 380 gigawatts is more total solar capacity than existed on the entire planet as recently as 2017. We did 8 years of cumulative deployment in 6 months. In the US, solar plus storage together accounted for 79% of all new generating capacity. Not 79% of renewables, 79% of all capacity.
SPEAKER_00Solar panels now cost roughly 10 cents per watt. Battery pack prices for stationary storage hit $70 per kilowatt hour, a 45% drop in a single year. The lowest observed cell prices are $36 per kilowatt hour. And those are not lab numbers. Those are commercial prices at scale. Elon Musk put it simply at Davos. Roughly 100 miles by 100 miles of solar is enough to power the entire United States. And Tesla and SpaceX are individually building toward 100
gigawatts per year of
SPEAKER_00solar manufacturing capacity. That is not a projection. That is happening right now. So the hardware problem is solved. Panels are essentially free compared to where they were a decade ago. batteries are following the same curve with a few years delay, the deployment is on an exponential that keeps outrunning every forecast the IEA or anyone else publishes. This is not a story about scarcity. This is a story about abundance. Sustainable abundance. We are entering an era where clean energy generation is so
cheap and so plentiful
SPEAKER_00that the old constraints simply do not apply anymore. But here is the thing nobody wants to say out loud. We are wasting enormous amounts of this perfectly good solar electricity. California curtailed 3.4 million megawatt hours of renewable energy in 2024. 93% of that was solar. Germany set a new record of 1,750 gigawatt hours curtailed in 2025 with 575 hours where the wholesale price went negative. Think about that.
SPEAKER_00575 hours where generators had to pay someone to take their electricity. Spain's solar capture prices collapsed from 61 euros per megawatt hour to under 17 euros. The Netherlands had 584 hours of negative prices, the most in Europe. Australia curtailed over 7 terawatt-hours in 2025. In South Australia, 38% of all utility-scale solar generation was simply thrown away. Across Europe, managing these surpluses cost utilities an estimated 4.3
billion euros in 2024.
SPEAKER_00And curtailment hit 72 terawatt-hours globally, roughly Austria's entire annual electricity consumption. Just wasted. Gone. We built all this capacity, spent billions deploying it. And then we pay people to not use the electricity it produces. That is not a hardware problem. That is not a generation problem. That is a coordination problem. And it is getting worse every single month as more solar comes online. Now,
there is a historical analogy here that I think is the key to understanding what
SPEAKER_00happens next. And it goes back to 1962. Paul Barron was a researcher at Rand Corporation. He looked at AT&T's telephone network, the centralized circuit-switched system that carried all of America's voice communications, and he saw a fundamental problem. Not just that the network had central hubs that could be knocked out, but that the architecture was inherently wasteful. Circuit-switched voice networks used less than 10% of available bandwidth. because voice traffic happened in short bursts,
SPEAKER_00but the entire circuit stayed reserved the whole time. Massive waste baked into the centralized architecture. Baran's insight was that you could build a distributed network with no central hub, break data into small packets, send them independently along whatever route was available, reassemble them at the destination. He called it packet switching. Now, here is the part of this story that everyone forgets. Baran presented this idea to AT&T's engineers multiple times in
the mid-1960s,
SPEAKER_00and they told him, and I am quoting from his own account, that he simply did not understand how voice telecommunications worked. There was a group of senior engineers who could not conceptualize data transmission as anything other than analog signals on dedicated lines. As Baran described it, it was mostly generational. If a guy considered the model of transmission to be analog, the idea of breaking things into packets was just incomprehensible. They thought he was bullshitting them. Sound familiar?
The centralized power grid today is the circuit-switched telephone network.
SPEAKER_00Power plants are like dedicated circuits. You build a gigawatt of generation capacity. You build the transmission lines to carry that gigawatt to load centers. And you keep it all running, even when utilization is 5 or 10%. Peaker plants operate roughly 5% of the time. The grid must be built for peak demand that occurs a few hundred hours per year. The rest of the time, all that infrastructure sits idle. Less than 10% utilization of available capacity. Exactly the same structural waste that Barron identified in the
telephone network 60 years ago.
SPEAKER_00Solar panels and batteries are packets of energy. They are distributed, they are modular, they can be deployed at the edge, at the point of consumption, and like data packets, they need a routing protocol. A coordination layer to turn them from random bursts of energy into reliable dispatchable power. That coordination layer is the TCP IP of the energy transition, and we are building it right now. And by the way, we are building it from Sweden, from a small city called Kalmar on the southeast coast,
which might sound like a strange place to build the coordination layer for the
SPEAKER_00global energy grid. We do not exactly have an abundance of sunshine up here. But that is actually the point. The Nordics have some of the most modern electricity grids in the world. Norway has 93% of residential contracts on dynamic tariffs. Finland is at 30%. Denmark has approved vehicle-to-grid aggregators for frequency reserves, with trial accuracy exceeding 95%. Sweden has had deregulated electricity markets since the 1990s.
SPEAKER_00The Nordic flexibility ecosystem, real-time pricing, open markets, smart metering, is years ahead of the rest of Europe. If you want to build coordination software that works everywhere, you start where the market is most advanced. where the infrastructure expects intelligence, where a small team with the right architecture can punch way above its weight. That is the Nordic startup mentality. You do not wait for the world to be ready. You build for where it is going. So, no, we do not have the most sun,
but we might have the best proving ground.
SPEAKER_00Let me give you a second analogy that makes the point even sharper. In 1956, Malcolm McLean loaded 58 aluminum truck bodies onto a converted tanker ship in Newark, New Jersey. The shipping container was born. Before containerization, loading a ship cost roughly $6 per ton. After containerization, $0.16 per ton. A 36x reduction. But here is the critical detail. The container itself was just a steel box. There was nothing technologically sophisticated about it.
SPEAKER_00The revolution was not the box. The revolution was the standardization, the standard size, the standard locking mechanisms, the standard handling equipment, the coordination protocol that allowed any container from any shipper to be loaded onto any ship, transferred to any truck, and delivered to any warehouse. The longshoreman's union official watching McLean's first container ship depart reportedly said he would like to sink that son of a bitch. The incumbents always react the same way.
SPEAKER_00And there is one more. Apple launched the App Store in July 2008 with 500 apps. It hit 10 million downloads in 72 hours. Steve Jobs was initially against the whole idea, by the way. Within a few years, the App Store ecosystem was facilitating over a trillion dollars in commerce. Apple did not build the apps. They built the platform layer, the APIs, the SDKs, the payment infrastructure, the discovery mechanism. that turned millions of individual devices into a coordinated ecosystem.
SPEAKER_00Now, map that onto energy. We have millions of solar panels, millions of batteries, millions of EV chargers, millions of heat pumps. Each one is a device at the edge. Without a platform layer, each one operates in isolation, optimizing only for itself. With the platform layer, they become a coordinated system that can provide grid services, shift energy through time, reduce peak demand, and participate in wholesale markets. The meta-pattern across every one of these analogies is the same.
SPEAKER_00A distributed resource exists but is uncoordinated. Incumbents dismiss it. A standardized coordination layer emerges. The economics flip. And an outsider, not an industry insider, drives the change. TCPIP captured more value than any individual computer. The App Store captured more value than any individual app. The ISO container standard transformed more wealth than any individual shipping company. The coordination layer always wins.
SPEAKER_00Now let me show you that this is not just theory. It is happening. Virtual power plants are no longer a pilot. They are performing like actual power plants. During California's July 2025 grid stress test, over 100,000 home batteries delivered an average of 535 megawatts to the grid during the evening peak. The Brattle Group, one of the most respected energy consultancies in the world, verified the results and concluded that the output was indistinguishable from
SPEAKER_00dispatching a gas picker plant. Indistinguishable. Grid operators literally could not tell the difference between 100,000 batteries coordinated by software and a single gas turbine. Energy Hub introduced something they call the Hewell's test, a Turing test for energy. The question is simple. Can a grid operator distinguish a VPP dispatch signal from a gas peaker? In trials with Arizona Public Service, Duke Energy and National Grid, virtual power plants passed.
SPEAKER_00Level 3. Automated and indistinguishable. And this is not a niche experiment. The scale is already significant. North American VPP capacity reached 37.5 gigawatts in mid 2025. Octopus Energy's Kraken platform manages 2 gigawatts of domestic power from over 500,000 connected devices, believed to be the world's largest residential VPP. Kraken spun out as an independent company at a 7.3 billion euro
valuation. Sunrun has 106,000 customers enrolled across 18 utility programs with four gigawatt
SPEAKER_00hours of networked battery capacity. Tesla's auto bidder orchestrates over three gigawatts across energy capacity and ancillary service markets. Base Power, a Texas startup, raised $1 billion and is installing 20 megawatts per month, targeting 100 megawatts per month by mid 2026. NRG Energy scaled its Texas VPP target from 20 megawatts to 150 megawatts in its first year due to overwhelming demand. Their long-term goal is 1 gigawatt by 2035.
The DOE projects that tripling VPP capacity to 80 to 160 gigawatts by 2030 could address 10 to 20 percent of peak load and save approximately 10 billion dollars
SPEAKER_00annually in grid costs. This is not speculation. This is the US Department of Energy saying virtual power plants are real infrastructure. here is the kicker a 400 megawatt virtual power plant costs 43 dollars per kilowatt year a gas picker costs 99 less than half the cost for the same grid service do verify those numbers california's demand side grid services program scaled from zero to over 700 megawatts in roughly three years meanwhile and
this is the number
SPEAKER_00that should make everyone sit up The United States has 2,600 gigawatts of clean energy stuck in interconnection queues. That is more than twice total installed US generating capacity. Just waiting. And only 14% of solar projects that enter those queues ever actually get built. The average wait time in PJM is 8 years. 8 years to connect a solar farm to the grid versus 3 years to build a 700 megawatt virtual power plant from home batteries.
The distributed path does not just compete with the centralized path, it laps it.
SPEAKER_00Rooftop solar installs in days. Behind the meter batteries require no transmission studies, no interconnection queue, no environmental review for a substation. The speed advantage is structural and it compounds. Every month that utility scale projects wait in queues is a month that distributed plus coordinated gains ground see And the regulatory world is catching up fast. In Europe, since September 2025, day-ahead markets operate on 15-minute trading intervals
instead of hourly blocks.
SPEAKER_00That is four times as many price signals per day. Minimum bid sizes have been reduced to 100 kilowatts, explicitly enabling small aggregators to participate in wholesale markets. Germany's residential solar plus battery attachment rate has crossed 80%. Virtually every new solar installation includes storage. They are adding 500,000 new battery systems per year. In the U.S., despite federal retreat on tax credits, 34 states now have VPP-related programs. Massachusetts has enrolled over 100,000 customers,
providing 650 megawatts of flexible capacity. FERC order 222 is slowly but surely opening wholesale markets to distributed energy
SPEAKER_00aggregations. The market structures for coordination are being built. The hardware is deployed and deploying faster every month. The only thing missing is the software in between. But there is a gap, and the gap is physics. The classic grid was built for central control of big generators. Now we have millions of distributed devices at the edge of the network. Solar inverters, batteries, EV chargers, heat pumps, smart meters. Each one speaking a different language.
SPEAKER_00An inverter uses Modbus RTU. An EV charger uses OCPP. A heat pump might use Modbus TCP or some proprietary protocol. A smart meter outputs a P1 port stream. And the control requirements are brutal. Grid services like frequency response and voltage regulation demand feedback on 100 millisecond to one second timescales. But existing cloud-based interfaces, the way most platforms connect to devices today, have latencies of 2 to 30 seconds.
SPEAKER_00There is, as one analysis put it, no execution layer between cloud platforms and physical devices. The gap between what the cloud can do and what the grid actually needs is not a software bug. It is physics. This is why generation is no longer the bottleneck. Control is. We have the energy. We have the devices. What we do not have is the real-time, protocol-agnostic, edge-native intelligence layer that makes them work together at grid speed. Now I want to zoom out, because this is not just an engineering story.
SPEAKER_00This is a story about the trajectory of civilization. There is a movement called Effective Accelerationism, E at ACK, and I count myself as aligned with this thinking. The core idea is that energy is the foundation of everything. Every unit of progress, every increase in human capability, every improvement in quality of life, traces back to energy. The founders of the movement talk about climbing the Kardashev gradient in maximizing humanity's energy capture. Mark Andreessen laid it out in his techno-optimist manifesto.
SPEAKER_00We should raise everyone to the energy consumption level we have, then increase it a thousandfold. That sounds radical until you look at the numbers and realize solar can actually deliver this. Casey Handmer, founder of Terraform Industries and probably the most articulate writer on solar abundance, puts it beautifully. Since 1973, energy scarcity has driven stagnation on many key axes of progress. The exponentially expanding growth of solar is putting civilization permanently back on track.
He argues that roughly 4-5% of Earth's land surface with solar could provide enough
SPEAKER_00energy for 10 billion people living at current US consumption levels. Ramesh Nam has modeled the learning curve. Solar shows a 30 to 40 percent price decline with each doubling of cumulative deployment. He projects one cent per kilowatt hour solar in sunny regions by 2030 to 2035. One cent per kilowatt hour. That is energy so cheap it changes everything. Now, I did my PhD at Linnaeus University in Kalmar with supervision
at Lund and close
SPEAKER_00collaboration with Chalmers. I was using machine learning to optimize energy efficiency for ships. And one of the things I kept running into was this counterintuitive pattern. Every time you make energy use more efficient, total consumption goes up, not down. Jevons documented this in 1865. Efficiency does not reduce demand. It unlocks it. That insight rewired how I think about the energy transition. The conventional narrative, consume less, restrain yourself, is backwards.
Making energy cheaper and more abundant is the most powerful force for human
SPEAKER_00progress that exists. The question is not how to reduce demand. The question is how to coordinate supply. And that creates a flywheel. Cheaper solar drives more deployment. More deployment drives more electricity consumption. Because when energy is cheap, you electrify everything. Transport, heating, industrial processes, computing, direct air capture. Look at what is happening with AI alone. US data center power demand is projected to nearly triple by 2030, to 134 gigawatts.
A single large-scale AI training cluster can consume as much power as a small city.
SPEAKER_00PJM's capacity market prices have spiked tenfold in some auctions, as AI-driven demand growth triggers scarcity pricing. And it is not just AI. Electrification of transport is adding millions of mobile batteries to the grid. Europe aims for 30 million EVs by 2030. Each EV carries 50 to 75 kilowatt hours of battery. Thousands of gigawatt hours of mobile storage sitting idle most of the time. Every one of those vehicles is a potential grid asset, if you have the coordination layer to use it.
SPEAKER_00More consumption creates more intermittency and grid stress. More grid stress creates more demand for coordination. More demand for coordination makes the orchestration layer more valuable, which attracts more devices, which enables even more solar. The flywheel does not slow down, it accelerates. Now, let me address something honestly, because I think it matters to be straight about the challenges. The most serious technical objection to a solar-powered future
is the Dunkelflotte,
SPEAKER_00a German word meaning dark doldrums, periods where both solar and wind output collapse. Germany experiences roughly two of these per year, where output drops below 10% of capacity for 48 hours or more. In January 2017, a 10-day Dunkelflout left Germany's 91 gigawatts of installed wind plus solar producing less than 5% capacity, while demand sat at 63 gigawatts. Wholesale prices spiked above 900 euros per megawatt hour. Current batteries cannot economically bridge multi-day gaps.
SPEAKER_00That is a real limitation. Grid stability is another legitimate concern. Traditional synchronous generators provide rotational inertia that buffers frequency deviations. Inverter-based solar and wind do not have spinning mass. Integration costs can exceed $25 to $40 per MWh at 50% renewable penetration. And supply chain concentration is real. China controls 60 to 90% of critical mineral processing for solar panels and batteries.
SPEAKER_00These are real constraints. I do not dismiss them. But here is what I notice about every single one of these objections. The Dunkelflaute requires cross-border grid coordination and long-duration storage. Both are software orchestration problems. Grid stability requires grid-forming inverters and synthetic inertia, a software function running on existing hardware. Supply chain diversification requires demand aggregation and flexible procurement. Again, coordination.
SPEAKER_00The contrarian critiques do not weaken the thesis. They reinforce it. The missing piece is not more panels or cheaper batteries. It is the intelligence layer that integrates them. Meanwhile, something extraordinary is happening in Abu Dhabi that most people have not heard about. The master round. The clock project broke ground in October 2025. The goal is to demonstrate that solar plus storage can deliver continuous baseload power. The specs are extraordinary.
5.2 gigawatts of solar PV paired with 19 gigawatt hours of battery storage spread
SPEAKER_00across 90 square kilometers. Designed to deliver a flat 1 gigawatt production profile, 24 hours a day, 365 days a year. $6 billion of investment. Target completion 2027. And they have already signed agreements to replicate the design in Kazakhstan. If this works, and the physics says it should, it shatters the last argument against solar. Solar cannot do baseload. Here is a gigawatt of baseload solar, running around the clock,
in the desert.
SPEAKER_00And crucially, the project is designed to function as a virtual power plant, providing grid services, not just generation. Coordination. Let me bring it all together. We are living through the most significant energy transition in human history. Not because policy demands it. Not because governments mandate it. Because the economics are irresistible. Solar is the cheapest source of electricity ever produced by humans. Batteries are following the same cost curve. Deployment is exponential.
SPEAKER_00But abundance without coordination is just waste. It is 72 terawatt hours of curtailment. It is 575 hours of negative prices. It is 2,600 gigawatts stuck in a queue. The historical pattern is clear. Every time a distributed resource emerges, the incumbents dismiss it, and then a coordination layer captures more value than the hardware itself. Packet switching over circuit switching. Containers over ships. The App Store over individual apps.
SPEAKER_00TCP IP over individual computers. The energy transition follows the same pattern. The hardware miracle has happened. Solar at 10 cents a watt. Batteries at $70 per kilowatt hour. These are not projections. These are today's prices. The substrate exists. What is missing is the protocol layer, the coordination intelligence, the software that turns millions of cheap, intermittent distributed devices into dispatchable, grid-reliable,
SPEAKER_00market-participating capacity. And the Jevons flywheel guarantees that demand for this layer only grows. Cheaper energy means more consumption. More consumption means more complexity. More complexity means more value in coordination. The opportunity does not shrink over time. It compounds. Paul Baran described the distributed network he envisioned as having no center, growing from the edges, and being impossible to control from any single point.
SPEAKER_00That is the grid's future, not a centralized system managed by a handful of giant utilities, but a distributed system where millions of devices at the edge coordinate through software to deliver reliable, dispatchable, abundant energy. The incumbents will react the same way AT&T reacted to Barron. They will say, we do not understand how the power system works, that intermittent renewables cannot be reliable, that you need big spinning generators to keep the lights on. And they will be wrong. For the same reason AT&T was wrong.
Not because they lack intelligence, but because they are reasoning from the wrong model.
SPEAKER_00They are thinking in circuits when the world has moved to packets. See. The hardware revolution created the substrate. The coordination revolution will capture the value. That is what we are building at Sourceful. That is the bet. And I have never been more convinced that this is right. Thanks for listening. I am Fredrik Algren. This has been Coordinated with Fredrik.
Coordinated with Fredrik, Episode 127. Forty-two minutes on how a company gets its price: what a multiple counts, why the same krona can be worth seven years in one company and twenty-seven in another, how a rise in...
Fifty minutes on two runs a day apart: the rest of Vancouver, and the road from ten Helium gateways to physics first. An interview with Lily. On Thursday I answered her questions in English; on Friday I went back to...
Thirty-seven minutes on two runs a day apart: the two years after the money came in, and home. An interview with Lily. I answered her questions in Swedish while running; the English voice you hear is my cloned voice...
Thirty-nine minutes on the two years before a term sheet arrived on my birthday, and what it took to turn it into money. An interview with Lily. I answered her questions in Swedish on a fifteen-kilometre run; the...
This episode started in a car. A clear October day, low sun, the drive from Kalmar to Stockholm. I could have flown, and it would have been faster. But the hours in the car are a different kind of time. The car keeps...