Coordinated with Fredrik

Coordinated with Fredrik artwork

The Hard to Get

Apr 8, 202655 minAudio
ShareXLinkedInFacebookWhatsAppEmail

The story everyone tells about energy is about generation. Solar panels, wind turbines, the clean energy race. And that story is true. Wind and solar just overtook fossil fuels in Europe for the first time - 30 percent versus 29 percent. That’s a real milestone. But the story I want to tell is about what comes after the generation war is won. Because that war is over. The hardware is cheap. The physics works. We have more clean electricity than we know what to do with. The question now - the only question that matters - is whether we can coordinate it. The data is stunning Ember’s European Electricity Review for 2026 tells a remarkable story. Solar alone hit 369 terawatt-hours in 2025, growing over 20 percent year on year for the fourth straight year. It’s now 13 percent of EU electricity, higher than coal, higher than hydro. Meanwhile, Bloomberg NEF reported stationary storage LFP packs hitting $70 per kilowatt-hour - down 45 percent in a single year and 93 percent cheaper than 2010. Generation is abundant. Storage hardware is cheap. The “hard to do” is done. But here’s what the same Ember report also shows: gas generation in the EU rose 8 percent in 2025. Despite having more wind and solar than ever. Gas rose because hydro dropped 12 percent due to weather. That pushed the EU power sector’s gas import bill to €32 billion. Sixteen percent higher than the year before. Let that sink in. Europe has more clean energy than at any point in history. And it’s still spending €32 billion importing gas to keep the lights on. Germany curtailed 9.6 terawatt-hours of wind and solar in 2025 - nearly 4 percent of total output, clean energy generated and then thrown away. Solar curtailment alone rose 97 percent year on year. Spain hit 11 percent curtailment by mid-2025. Sweden recorded 649 negative-price hours in twelve months. This is the paradox of abundance. The cheaper energy gets, the more valuable the coordination layer becomes. Jevons was right (again) William Stanley Jevons observed in 1865 that Watt’s more efficient steam engine didn’t reduce coal consumption - it increased it. Efficiency made coal cheaper, which made it more useful, which drove more demand. The same thing is happening with energy. Since 1990, energy efficiency has increased 36 percent globally. Total consumption has increased 63 percent. LEDs are more efficient, so we installed more lights. AI chips are more efficient per computation, so we built more data centers. In Ireland, data centers went from 5 to 21 percent of national electricity consumption. For renewables, the dynamic has a twist. Solar and wind produce energy when the physics allows it, not when the grid needs it. Abundance without coordination doesn’t just mean waste. It means you still need the gas plants on standby. You still pay the €32 billion import bill. Ember calculated that if batteries had captured roughly one-third of Germany’s curtailed energy, it would have saved €800 million - €613 million in avoided redispatch costs, €219 million in avoided gas generation. The required battery investment? Just €145 million per year over the technology’s lifetime. And then the Iberian blackout drove the point home. April 28, 2025: 31 gigawatts disconnected, 47 to 56 million people in the dark, over €1.6 billion in losses. Spain had just 25 to 60 megawatts of installed battery storage against a 500 megawatt target. Batteries in buildings The EU installed 27.1 gigawatt-hours of new battery storage in 2025 - a 45 percent increase. But look at the breakdown: utility-scale was 55 percent, residential was 36 percent, and commercial & industrial was just 8 percent. Eight percent. Despite being the fastest-growing segment with a projected 71 percent CAGR to €4.1 billion by 2028. The residential market has clear winners - 1Komma5 in Germany with over 300,000 systems, Sonnen with their virtual power plant. Utility-scale is scaling fast. But the middle? The 50 kW to 2 MW behind-the-meter commercial segment? It’s wide open. In the entire Nordic region, there is no single company that combines zero-cost deployment, hardware-agnostic system design, automated multi-market optimization, and end-to-end site coordination for commercial batteries. Not Pixii (sells hardware, doesn’t finance it). Not CheckWatt (aggregates, doesn’t deploy). Not ABB (battery-as-a-service, but only UK). Not 1Komma5 (residential, no concrete commercial product). This is the biggest gap in European energy infrastructure. Financial architecture always comes second - and matters more There’s a pattern that repeats in every major infrastructure buildout. The technology creates the asset. Then a financial innovation creates the market that enables scaling. Oil. Drake drilled the first well in 1859. For 124 years, oil traded through opaque bilateral contracts. Then in 1983, NYMEX launched crude oil futures. Today they trade over a million contracts daily. But the critical point: futures enabled hedging, hedging enabled reserve-based lending, and lending enabled thousands of independent drillers to develop distributed assets. Without futures, there is no shale revolution. Railroads. The US built 190,000 miles of track requiring $10 billion in capital when all US manufacturing assets totaled $6.5 billion. The financial innovation was the first mortgage bond - long-term, convertible, secured by company property. Railroad bonds didn’t just finance railroads. They created the American corporate bond market. Telecom. Between 1996 and 2001, $500 billion went into fiber optic cable. When the bubble burst, only 5 percent of the fiber was lit. But the infrastructure survived. Google, Facebook, AWS, and Netflix scaled on overcapacity fiber that bankrupt investors had paid for. Bitcoin. Eight years of pure technology: $16 billion market cap. Then CME futures, Coinbase Custody, the first futures ETF, and spot ETFs. Result: $2.5 trillion. Technology alone - $16 billion. Technology plus financial instruments - 156x. SolarCity. Their insight wasn’t about panels. By 2010, panels were commodity. The insight was that the bottleneck was financial and operational. Zero dollars down, twenty-year leases. In November 2013, the first solar asset-backed security: $54.4 million, rated BBB+, 4.8 percent. That single deal birthed a $15 billion solar ABS market. But SolarCity also shows exactly how the model breaks. Customer acquisition costs spiraled to $6,000 per customer through door-to-door sales. $3.58 billion in debt against $730 million in revenue. Tesla acquired them in what was essentially a rescue. The lesson: the technology was table stakes, the financing was transformative, but the customer economics killed it. Battery storage for commercial buildings is at exactly this inflection point. The technology is proven. The economics are compelling. No standalone battery ABS has ever been issued. The “SolarCity moment” for batteries belongs to whoever creates the first standardized instrument backed by diversified battery revenue streams. Why Sweden, why now Something most people don’t know about Swedish commercial buildings: a typical property uses 20 to 35 percent of its grid connection on average. The remaining 65 to 80 percent is capacity the owner pays for every month and never uses. Swedish grid fees rose 10.6 percent in 2025 - the largest increase in 30 years. For a commercial property with 500 kW peak demand, demand charges alone run roughly 385,000 SEK per year. The regulator’s revenue cap for 2024-2027 increased roughly 40 percent. Grid companies still have 30 billion SEK in unused revenue headroom. Sweden expects to double electricity consumption by 2045. The recent pause on residential capacity tariff rollout doesn’t change this. Commercial demand charges above 63 amps remain fully in effect, the EU Electricity Market Directive still requires capacity-based pricing, and operators who already implemented effekttariffer can keep them. And here’s the thing that changes the conversation with property owners: Swedish commercial … This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit frahlg.substack.com

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_00Welcome to Coordinated with Fredrik. I'm Fredrik Algren, CEO and co-founder of Sourceful Energy. Today, I want to go deep on something I've been thinking about for months, something that I think is the most important story in energy right now, and almost nobody is telling it correctly. The story everyone tells is about generation, about solar panels and wind turbines, about how we're winning the clean energy race. And look, that story is true. It is happening.

Wind and solar just overtook fossil fuels in Europe for the first time ever.

SPEAKER_0030% versus 29%. That's a milestone. It's But the story I want to tell today is about what comes after the generation war is won. Because the generation war is over. The hardware is cheap. The physics works. We have more clean electricity than we know what to do with. The question now, the only question that matters, is whether we can coordinate it. Whether we can take all of this abundant, intermittent, distributed energy and turn it into a reliable grid.

SPEAKER_00Because right now, we can't. And that failure is costing Europe billions of euros every single year. This episode is about batteries. About what I call the hard-to-get batteries. About why the hardest part of the energy transition isn't building the technology anymore. It's assembling the physical, financial and operational infrastructure to deploy it. And about what we at Sourceful are building to fill that gap. Let's start with the data, because the data is stunning.

SPEAKER_00Ember published their European Electricity Review for 2026 in January. It's their 10th annual report, and it tells a remarkable story. In 2025, wind and solar generated 30% of all EU electricity. Fossil fuels generated 29%. That crossover, wind and solar overtaking fossil, happened for the first time in the history of the European power system. Five years ago, wind and solar were at 20%. They've grown by half in five years.

SPEAKER_00Solar alone hit 369 terawatt hours, growing by more than 20% year over year for the fourth consecutive year. It's now 13% of EU electricity. Higher than coal, higher than hydro. And solar grew in every single EU country. Everyone. Meanwhile, battery pack prices have collapsed. Bloomberg New Energy Finance reported that stationary storage LFP packs hit $70 per kilowatt hour in 2025, down 45% in a single year. That's 93% cheaper than 2010, when the same battery cost $1,474.

SPEAKER_00We've had a 93% cost decline in 15 years. So, generation is abundant. Storage hardware is cheap. The hard-to-do, making clean energy technology that works and is affordable, is done. That war is over. But here's what the same Ember report also shows. Gas generation in the EU rose 8% in 2025,

despite having more wind and solar than ever.

SPEAKER_00Gas rose because hydro dropped 12% due to weather, and that pushed the EU power sector's gas import bill to 32 billion euros, 16% higher than the year before. Let that sink in. Europe has more clean energy than at any point in history. And it's still spending 32 billion euros importing gas to keep the lights on. Because when the wind doesn't blow or the rain doesn't fall, there's nothing to fill the gap except burning fossil fuels.

Germany curtailed 9.6 terawatt hours of wind and solar generation in 2025.

SPEAKER_00That's nearly 4% of their total wind and solar output. Clean energy that was generated and then thrown away because the grid couldn't absorb it. Solar curtailment alone rose 97% year-on-year in Germany. Spain hit 11% curtailment of renewable output by mid-2025. Sweden recorded 649 negative price hours in the 12 months ending May 2025. 649 hours where electricity prices went negative,

SPEAKER_00where generators were literally paying the grid to take their energy, because there was nowhere for it to go. This is the paradox of abundance. The cheaper energy gets, the more valuable the coordination layer becomes. Not less. More. There's an old economic concept called Jevons paradox that explains this. William Stanley Jevons observed in 1865 that James Watt's more efficient steam engine didn't reduce coal consumption. It increased it. Because efficiency made coal cheaper,

which made it more useful, which drove more demand.

SPEAKER_00The same thing is happening with energy. Since 1990, energy efficiency has increased 36% globally, but total energy consumption has increased 63%. LEDs are more efficient than incandescent bulbs, so we installed more lights. AI chips are more efficient per computation, so we built more data centers. In Ireland, data centers went from 5% to 21% of national electricity consumption. For renewables, the dynamic has a twist.

SPEAKER_00Solar and wind are intermittent. They produce energy when the physics allows it, not when the grid needs it. So abundance without coordination doesn't just mean waste. It means you still need the backup system running. You still need the gas plants on standby. You still pay the 32 billion euro import bill. As one Spanish energy expert told Ember, and I'm quoting, grid plus storage plus demand. Otherwise, it's unviable. That's the situation. We have abundance.

SPEAKER_00We don't have coordination. And the gap between the two is measured in billions of euros, millions of tons of CO2, and a grid that's getting harder to manage every year. And here's the thing that should haunt every energy policymaker in Europe. Ember calculated that if batteries had captured roughly one third of Germany's 9.6 terawatt hours of curtailed energy, it would have saved 800 million euros. 630 The required battery investment to capture those savings. Just 145 million euros per year over the technology's lifetime.

SPEAKER_00A cost-benefit ratio that is almost absurdly favorable. And it gets even starker when you look at what the Iberian blackout taught us. On April 28, 2025, a cascading failure blacked out Spain and Portugal for roughly 10 hours. 31 gigawatts disconnected.

SPEAKER_0047 to 56 million people in the dark. Over 1.6 billion euros in losses. And at the time, Spain had just 25 to 60 megawatts of installed battery storage against a 500 megawatt target. The aftermath was dramatic. Spain passed emergency legislation, a 22.5 gigawatt storage target by 2030, halved permitting timelines, a 700 million euro support scheme for battery storage, and in December 2025, The EU passed the GRIDS package,

proposing binding time limits for permitting battery storage.

SPEAKER_00Up to six months for standalone storage, down from processes that currently take up to seven years. Seven years to permit a battery. That's the bottleneck we're dealing with. The EU recognizes it now. 1,700 gigawatts of clean energy projects are stuck in grid connection queues across 16 European countries. The policy is shifting. The question is whether the deployment infrastructure exists to absorb the opportunity. So what do we do about it?

SPEAKER_00We put batteries in buildings. Let me explain why batteries, and specifically batteries in commercial and industrial buildings, are the key to solving this. Ember makes a striking comparison in their report. They look at Italy, where grid-scale batteries discharged an average of 1.1 gigawatts during early evening hours in September 2025, covering about 3% of demand. And they compare it to California in September 2021, when California had roughly 2 gigawatts and batteries also

covered about 3%.

SPEAKER_00What happened next in California? They went from 2 gigawatts to over 17 gigawatts in 4 years. A 2,100% surge. By April 2025, batteries were meeting 36.6% of California's evening peak demand. Fossil fuel's share of the evening peak got cut in half. Zero flex alerts since 2022 despite record heatwaves. Batteries didn't just help, they transformed the grid. The duck curve that once threatened California's grid stability

now feeds the most

SPEAKER_00profitable battery arbitrage market on earth. Gas's contribution to meeting the evening peak got cut roughly in half. And what drove it? Five interlocking triggers. The first state storage mandate in US history in 2010. Massive procurement orders totaling over 14,800 megawatts of clean capacity. The Inflation Reduction Act extending a 30% investment tax credit to standalone batteries for the first time. NEM 3.0 slashing solar export compensation by 75%,

SPEAKER_00which made storage economically essential for new solar. and the relentless cost declines. Each trigger reinforced the others. It wasn't one policy. It was a cascade. The financing stack was equally important. Tax equity partnerships, long-term resource adequacy contracts from utilities that provided bankable revenue streams for 10 or more years. Revenue stacking across capacity payments, energy arbitrage, and ancillary services that made four-hour batteries the optimal grid asset.

SPEAKER_00And in Italy, Ember proved the economics. Italy's Max E storage tender in September 2025 awarded 10 gigawatt hours of capacity at prices that imply an all-in cost of about $120 per kilowatt hour. At that price, stored solar costs approximately 64 euros per megawatt hour. Gas-fired electricity in Italy averaged 111 euros per megawatt hour in 2025. Batteries already beat gas on cost, not theoretically,

SPEAKER_00actually, in real tenders with real money. Now, here's the problem. Here's why this isn't just about building big batteries. In 2025, the EU installed 27.1 gigawatt hours of new battery storage, a 45% increase, the 12th consecutive record. But look at the breakdown. Utility scale was 55%. Residential was 36%. Commercial and industrial, the middle, was just 8%.

SPEAKER_00Despite being the fastest growing segment. Despite having a projected 71% compound annual growth rate to 4.1 billion euros by 2028. Despite the economics being compelling. The residential market has clear winners. 1,5 in Germany with over 300,000 systems. Sonnen with their virtual power plant. The aggregators are there. Utility scale is scaling fast. Massive projects everywhere. But the middle,

SPEAKER_00the 50 kilowatt to 2 megawatt behind the meter commercial segment, it's wide open. In the entire Nordic region, there is no single company that combines zero-cost deployment, hardware-agnostic system design, automated multi-market energy optimization, and end-to-end site coordination for commercial batteries. Nobody. Not Pixie, who sells great hardware but doesn't finance it. Not CheckWatt, who aggregates but doesn't deploy. Not ABB, who just launched Battery as a Service but only in the UK.

Not 1,5, who dominates residential but has no concrete commercial product. This is what Solar Power Europe calls well below the segment's potential.

SPEAKER_00I'd call it something stronger. This is the biggest gap in European energy infrastructure. Now, to understand why this gap exists and why filling it is so valuable, I need to take you on a detour. Because there's a pattern here. A pattern that's repeated in every major infrastructure build-out in history. And if you understand the pattern, you understand exactly where we are and what comes next. Our investor Crucible Capital has a thesis they call Capital Markets Maximalism.

SPEAKER_00Their general partner Meltem Demerors puts it simply. In every great industrial build-out, the financial architecture and the physical architecture rise in tandem. Manufacturing didn't make America great. Financial markets did. Not instead of the physical work. Alongside it. Let me walk through the examples because they're striking. Oil. Edwin Drake drilled the first oil well in 1859. For 124 years, oil was traded through opaque bilateral contracts.

SPEAKER_00The Seven Sisters cartel controlled 85% of world reserves. The spot market handled just 3-5% of global volumes. No transparent price discovery existed. Then, in 1983, NYMEX, a small agricultural exchange best known for trading potatoes, launched crude oil futures. 1,000 barrels of West Texas Intermediate, deliverable at Cushing, Oklahoma. They traded 3,000 contracts the first month. Today, they trade over a million contracts daily, $125 billion in daily notional value.

SPEAKER_00Paper barrel trading runs 30 to 60 times physical flows. But here's the critical point. Futures didn't just create a financial product they enabled the shale revolution because futures allowed hedging hedging allowed reserve-based lending banks could lend against hedged production and that lending enabled thousands of independent drillers to develop distributed physical assets across vast geography without nymex futures there is no shale revolution

SPEAKER_00period The parallel to batteries is precise. Oil wells equal battery sites. Oil futures equal battery revenue contracts and securitization. Reserve-based lending against hedged production equals project finance against contracted demand charge savings and grid service payments. Same template, different asset. Railroads. Between 1850 and 1900, the United States built 190,000 miles of track.

SPEAKER_00This required approximately $10 billion in capital at a time when all US manufacturing assets totaled just $6.5 billion. Railroad securities constituted 81% of all shares traded on the New York Stock Exchange in 1885. The financial innovation was the first mortgage bond. Long-term, convertible, secured by a mortgage on all company property. This structure enabled capital raising from dispersed, anonymous investors. A radical departure from the personal connection financing of the era.

SPEAKER_00Jay Cook, who had pioneered retail bond distribution by selling $1.6 billion in civil war bonds, applied the same distribution network to railroad securities. Railroad bonds didn't just finance railroads. They created the American corporate bond market. The template for structured finance that we still use today originated with railroad bonds. Then telecom. Between 1996 and 2001, the telecom industry deployed more than $500 billion in capital

into fiber optic

SPEAKER_00cable, over 80 million miles of fiber. Companies issued $500 billion in new bonds, 300 IPOs in 1999 alone. When the bubble burst, global telecom stocks lost $2 trillion in value, but the physical infrastructure survived, and only 5% of the fiber was lit in 2001. By the time Google, Facebook, Amazon Web Services, and Netflix came along, they scaled on that overcapacity fiber that bankrupt investors had paid for. By 2022,

Google, Meta, Microsoft, and Amazon used 66% of the world's undersea fiber capacity. The telecom bubble proves that even when financial overinvestment destroys capital

SPEAKER_00in the short term, it creates the deflationary infrastructure foundation for the next generation of value creation. And then Bitcoin. Bitcoin spent its first eight years as a purely technical innovation. By January 2017, after nearly a decade, its market cap was about $16 billion. Then the financial instruments arrived. CME futures in 2017. Coinbase custody in 2018. The first futures ETF in 2021. And then the SEC approved 11 spot Bitcoin ETFs in January 2024.

SPEAKER_00The result? $57 billion in cumulative net inflows into spot ETFs within two years. BlackRock's IBIT accumulated over 800,000 Bitcoin. Market cap peaked at $2.5 trillion. That's a 156.6 increase from the pre-institutional level of $16 billion. Technology alone, $16 billion. Technology plus financial instruments, $2.5 trillion. That's the difference financial architecture makes. And finally,

the example that matters most for what we're building, SolarCity.

SPEAKER_00SolarCity's insight was not about solar panels. By 2010, solar panels were a commodity. SolarCity's insight was that the bottleneck was financial and operational, not technological. Residential solar systems cost $20,000 to $30,000 up front. Nobody wanted to write that check, so SolarCity offered $0 down. 20-year leases. They retained panel ownership. They captured the federal tax credits, the renewable energy certificates, the depreciation benefits.

At peak, SolarCity held 33-34% of the U.S. residential solar market with over 300,000 customers.

SPEAKER_00But the real innovation was the financing. In November 2013, SolarCity issued the first ever solar asset-backed security. $54.4 million. Rated BBB Plus by Standard & Poor's. 4.8% fixed interest rate. 5,033 solar systems backing the instrument. Before securitization, SolarCity funded installations through tax equity at 8-9% cost of capital. After securitization, 4.8%, nearly cut in half.

SPEAKER_00That single deal, $54 million, birthed a $15 billion solar ABS market that exists today, with annual issuance over $4 billion. But SolarCity also shows you exactly how the model breaks. And this is critical. SolarCity never achieved profitability. Customer acquisition costs spiraled from 45 cents per watt in 2013 to 97 cents per watt by 2016, about $6,000 per customer, driven by door-to-door residential sales.

SPEAKER_00Total debt reached $3.58 billion against just $730 million in revenue. Tesla acquired SolarCity for $2.6 billion in what was essentially a rescue. Market share dropped from 33% to about 6%. SolarCity proved the model works. And it proved exactly how it fails. The technology was table stakes. The financing was transformative. But the customer economics, B2C door-to-door sales, single revenue stream, spiraling acquisition costs,

SPEAKER_00killed it. Now, here's why I'm walking you through all of this. because every single one of these examples oil railroads telecom bitcoin solar follows the same pattern a technical innovation creates the asset then years or decades later a financial innovation creates the market that enables scaling and the company that builds both the physical deployment and the financial architecture at the same time is the one that captures the build out

Battery storage for commercial and industrial buildings is at exactly that

SPEAKER_00inflection point right now. The technology is proven. The economics are compelling. But the financial architecture is underdeveloped. No standalone battery asset-backed security has ever been issued. The solar city moment for batteries, estimated around 2027 to 2030, belongs to whoever creates the first standardized, pooled, rated instrument backed by diversified battery revenue streams. Okay, so the generation war is one. Abundance without coordination equals waste.

History shows that infrastructure build-outs require financial engineering

SPEAKER_00alongside physical engineering, and the commercial battery segment is wide open. Now let me get concrete. Let me tell you about Sweden, because this is where we operate and the specifics matter. Here's something most people don't know about commercial buildings in Sweden. A typical office, warehouse or retail property uses 20-35% of its grid connection on average. The remaining 65-80% is capacity the property owner pays for every month and never uses.

SPEAKER_00The grid operator charges based on peak demand. Hit 80 kilowatts once during the month. And that's your bill. Even if you averaged 25 kilowatts for the other 719 hours. That's not a market failure. It's how the grid was designed. Peak capacity costs real money to maintain. Transformers, cables, substations. Someone has to pay for it. But it also means there's a massive amount of unused capacity sitting behind commercial meters across Sweden. The numbers are real.

Swedish grid fees rose 10.6% on average in 2025, the largest increase in 30 years of tracking.

SPEAKER_00Vattenfall, L-distribution's combined winter demand charge, reaches 105 Swedish kronor per kilowatt per month. Elivio in Stockholm charges 81.25 kronor per kilowatt based on your three highest peaks. For a commercial property with 500 kilowatts of peak demand, that translates to roughly 385,000 kronor per year just in demand charges. And these costs are only going up. The regulators' revenue cap for 2024 to 2027 increased roughly 40% over the prior period.

SPEAKER_00Grid companies still have 30 billion kronor in unused revenue headroom. EON raised their rates 19 to 23% in 2023. Vattenfall added 14% in 2026. Sweden expects to double electricity consumption by 2045. EVs, data centers, industrial electrification, heat pumps. All of that requires grid investment, and that investment gets paid for through higher grid fees. Now, there's been some regulatory uncertainty I should address.

SPEAKER_00In March 2026, Deputy Prime Minister Ebba Bush paused the mandatory rollout of capacity-based tariffs in Swedish effektarifer. That was supposed to require all Swedish grid operations. Transcription by CastingWords

SPEAKER_00First, the pause only affects residential customers. Commercial and industrial demand charges above 63 amps remain fully in effect. They've been standard for decades. The trajectory is unambiguously upward. Second, the EU electricity market directive still requires capacity-based pricing. The structural direction is unchanged. Only the timeline and design details are being recalibrated. And third, operators who already implemented effectorifer, like Elevio in Stockholm,

SPEAKER_00can keep them. This isn't a rollback. It's a pause to get the design right. Companies deploying commercial batteries now accumulate operating data and customer relationships that become bankable assets the moment the regulatory framework solidifies. California's exponential ramp started roughly two years before the policies that accelerated it were fully in place. The window before regulatory certainty is when you build the position. Now, different building types have very different load profiles,

SPEAKER_00and this matters enormously for battery economics. Offices are the strongest case for peak shaving. They have a dramatic top hat load profile, sharp ramp up at 7am when ventilation starts, a plateau during working hours, then near collapse at night and weekends. The peak to average ratio is 2.2 to 3.3. That gap between peak and average is where batteries earn their keep. Cold storage and logistics warehouses are arguably the best overall candidates.

SPEAKER_00Refrigeration runs 24-7 at 70-80% of the electricity load. The load factor is high, but peaks come from simultaneous compressor restarts after defrost cycles. And the thermal mass of the building acts as free energy storage. You can precool during off-peak hours and coast through peaks. Shopping centers operate daily, including weekends, with Saturday as the busiest day. Grocery stores have uniquely flat profiles because refrigeration never stops, which means less peak shaving value,

SPEAKER_00but interesting opportunities for grid services. The point is, every building is different. And understanding those differences is not something you can do from a spreadsheet. You need to be on site. You need metered data. You need to understand how each building actually behaves. That knowledge is earned, not bought. Now, here's something that took me a while to understand about commercial property. And it completely changes how you pitch batteries to property owners. Swedish commercial property valuation follows one formula.

SPEAKER_00Property value equals net operating income divided by yield. The Swedish word driftnetto divided by direktavkastning. Everything flows from this. Every The kronor of operating cost reduction increases net operating income, which gets capitalized at the prevailing yield. At Stockholm, prime office yields of 3.85 to 4%. A 500,000 kronor per year energy saving translates to roughly 12.5 million kronor in property value increase. At regional yields of 5.5 to 6%, the same saving creates 8 to 9 million.

SPEAKER_00That's a 20 to 25 times multiplier on annual energy savings. And it works, regardless of whether the property owner pays for the battery. This is the pitch. You don't sell kilowatt hours to a property owner. You don't sell grid services. You sell property value creation. Zero investment. Immediate improvement in net operating income. A 20 to 25 times multiplier on the savings you deliver. And right now, these property companies are under enormous pressure. EU taxonomy requires buildings to demonstrate energy

performance in the top 15% of

SPEAKER_00national stock. CSRD wave one, reporting obligations are hitting every major Swedish property company. From April 2026, Rex mandates systematic ESG incorporation into all commercial valuations. Green certified offices in Sweden trade at 14 to 26% sales premiums over non-certified stock. The brown discount on energy inefficient buildings is becoming measurable, 15 to 35% markdowns across Europe. So on one side, you have rising grid costs.

SPEAKER_00On the other, regulatory pressure to improve energy performance. And in the middle, a battery that costs the property owner nothing, reduces their energy costs, improves their sustainability metrics, and creates property value through the yield multiplier. That's the building owner's side. Now let me tell you about the grid side. Because the battery does double duty. While the battery is shaving peaks for the property owner during the day, it can participate in grid markets during off-peak hours. This is what revenue stacking means,

and it's what makes the economics work.

SPEAKER_00Svenska Kraftnat operates several reserve markets. FCRD, Frequency Containment Reserve for Disturbances, activates within 7.5 seconds, with a 20-minute endurance requirement. Pre-qualified battery volume reached 600%. 208 megawatts in sweden by january 2025 but that market has saturated prices crashed from 30 to 60 euros per megawatt hour in 2022 to under three euros in february 2025 capacity grew from less than 10 megawatts in

early 2023 to 600

SPEAKER_00megawatts while demand stayed at 550 MFRR, Manual Frequency Restoration Reserve, is where the growth is now. Activation within 12.5 minutes. It's had the highest average monthly prices since December 2024. Battery pre-qualified volume surged from 120 megawatts to nearly 600 megawatts in just the first quarter of 2025. And Svenska Kraftnat expects MFRR demand to quadruple between 2023 and 2026.

SPEAKER_00Then there's spot price arbitrage. In SE3, Stockholm's price zone, the spread between off-peak and peak pricing averages 20-50 euros per megawatt hour on normal days and can spike to 80-200 euros on volatile days. Charging at 3am versus the evening peak saves 56% on energy costs. The shift to quarter-hourly settlement in October 2025 created additional micro-arbitrage opportunities. And the big future upside is AFRR,

Automatic Frequency Restoration Reserve.

SPEAKER_00Sweden hasn't yet joined the European Picasso balancing platform, but accession is expected in 2026 to 2027. That opens a significant new revenue stream. So for a representative 200 kilowatt, 400 kilowatt hour system, the conservative revenue stack looks like this. Peak shaving earns 50 to 70,000 kroner per year. Frequency reserves add another 40 to 75,000. Spot arbitrage contributes 25 to 50,000. And manual frequency restoration,

which the market calls MFRR, adds 5 to 15,000 on top.

SPEAKER_00All in, that's 130,000 to 235,000 kronor per year from a single battery. Against an installed cost of roughly 1.15 million kronor, that's a simple payback of 6.5 to 9.5 years. And the model improves materially as battery costs continue to fall toward 200 euros per kilowatt hour, which is expected within 18 months, and as new market opportunities like AFRR open up. But here's the critical thing. No single revenue stream makes this work anymore.

SPEAKER_00FCRD alone, prices collapsed when capacity surged from under 10 megawatts to 600 megawatts in less than two years. Peak shaving alone, not enough to justify the deployment cost. Arbitrage alone, too volatile and weather dependent. It's the stacking that creates the business case. Running peak shaving during commercial operating hours, then switching to frequency regulation overnight, then capturing arbitrage on volatile days, then participating in MFRR when it's called.

SPEAKER_00All from the same battery. All within the same 24-hour cycle. And stacking requires sophisticated optimization that dispatches the battery across all these markets simultaneously, in real time, at the edge. Not in the cloud. At the edge. Because when Svenska Krafnat calls for a frequency response, you have 7.5 seconds to deliver. You can't round trip to a data center and back in 7.5 seconds with the reliability that a revenue-critical bid requires. This is why I keep coming back to the distinction between

technology companies and

SPEAKER_00deployment companies. A technology company builds the software. A deployment company builds the software and owns the physical relationships, the market access, the site contracts, and the operational data that makes the software valuable. The software without the sites is a demo. The sites without the software don't optimize. You need both. That's the coordination layer. That's what we built. Now let me talk about moats because I get asked about defensibility constantly and

SPEAKER_00my answer is honest. The software isn't the moat. If I told you our competitive advantage was our software, I'd be lying to you. Software can be replicated. Algorithms can be copied. Code doesn't create durable advantage. The moat is that this business is hard to assemble, not hard to build. Let me use an analogy. American Tower is a company that owns cell towers. They have about 224,000 towers worldwide. Their market cap is $81 billion. Their EBITDA margin is 66 to 68%.

SPEAKER_00They've delivered 6,933% returns since listing. What's their technology? Antennas. Commoditized antennas that any company can buy. Their moat isn't the antenna. Their moat is 224,000 permitted physical sites with long-term leases, 5 to 10 years, with 3% annual escalators. Zoning approvals take 1 to 2 years. Community opposition makes new construction increasingly difficult.

And the co-location model means adding a second or third tenant to a tower is

SPEAKER_00nearly pure margin. Tesla superchargers. Same pattern. Tesla's charging network grew to 80,000 stalls across 8,100 stations, 50.5% of USDC fast charging. Outside China, superchargers delivered more energy than all other fast chargers combined. The advantage wasn't charging technology. It was vertical integration, station density, and physical deployment speed. Data centers in Northern Virginia. Grid connection wait lists of up to seven years.

SPEAKER_00Primary market vacancy at a record low 1.9%. Rents surged over 50% since 2019. The constraint isn't capital or land. It's deliverable megawatts on a timeline. The pattern across all of these businesses, cell towers, charging networks, data centers, is identical. Commoditized technology, plus scarce physical deployment, plus long-term site contracts, plus financial structuring, equals durable moat.

SPEAKER_00That's exactly the model for commercial batteries. And I want to be explicit about this because I think most people in the energy space still think about defensibility in terms of technology. Better algorithms, better hardware, better software. And those things matter. We invest heavily in our software platform. But they're not the moat. They're the table stakes that let you play the game. The moat is what happens after you have the technology. The moat is what you accumulate through the act of deploying. The battery hardware is commoditized.

LFP sells at $36 to $50 per kilowatt hour from dozens of Chinese manufacturers.

SPEAKER_00Anyone can buy the same battery we buy. The scarce asset is the combination of physical behind-the-meter site access through long-term contracts, grid connection and market access, operational data from hundreds of deployed systems and capital structures that enable zero-cost deployment. Every battery we install requires a site agreement with the property owner. That's a 5 to 15 year contract. Every signed contract is a competitor locked out of that building for a decade. Every installation takes months of site assessment,

SPEAKER_00permitting, electrical work, grid connection, commissioning. You can't replicate a fleet of 500 units with a product launch. And every operating hour generates dispatch data. How does this building behave on a Tuesday in February? What's the optimal peak shaving threshold for this grid operator? How much capacity can we reliably bid into FCRD from this portfolio? That data compounds. You need the same assets running in the same grids to learn the patterns. And then there's capital access.

SPEAKER_00Institutional infrastructure capital, green bonds, project finance from the Nordic Investment Bank, from the European Investment Bank, is earned through track record. The EIB has committed 6 billion euros to the battery value chain over six years and just financed a 290 megawatt solar plus 350 megawatt battery complex in Italy. The Nordic Investment Bank signed a 27.7 million euro loan for a 200 megawatt battery complex in Estonia.

SPEAKER_00These institutions want to fund battery storage, but they need two to three years of portfolio-level operating data from comparable assets before they write a term sheet. First movers with verified performance data get better rates. Followers pay more. none of this is a technology breakthrough all of it takes time that's the point the position strengthens every month we operate now let me bring this back to sourceful and what we're actually doing we didn't start with batteries we

started with what we believed was the hardest problem in distributed energy making different devices from different manufacturers work together in real time at the edge without

SPEAKER_00depending on cloud apis A typical commercial energy site might have EV chargers speaking OCPP, batteries on Modbus with proprietary register maps, solar inverters using SunSpec Modbus, meters on Modbus TCP, and building HVAC on BACnet. Every manufacturer's Modbus implementation is different. Every firmware version has its quirks. Every device behaves slightly differently than the documentation says it should. We use AI to solve device integration across manufacturers and protocols,

SPEAKER_00SunGrow, SolarEdge, Huawei, Dai, Fronius, SMA, across Modbus, MQTT, OCPP, and local meter interfaces. Instead of building custom integrations for every device, we generate them. That collapses what used to take weeks of engineering into something that scales. I think of this as the mess is the moat. People look at the protocol fragmentation in energy and see a problem. I look at it and see defensibility. Because every new site deployment teaches our platform about

edge cases, firmware

SPEAKER_00bugs and protocol quirks that can't be found in any documentation. A company that has integrated 50 device types across hundreds of sites has accumulated years of engineering knowledge that is extremely expensive to replicate. Every inverter that doesn't respond the way its datasheet says it should. Every Modbus register map that contradicts the manufacturer's documentation. Every firmware update that silently changes behavior. That knowledge accumulates in our system. And it creates a gap that widens with every deployment.

Enode in Norway has done excellent work building a unified API for energy devices.

SPEAKER_00Over 1,000 device types from 80 manufacturers, 500,000 connected devices. But they're primarily residential and consumer. focused. Commercial and industrial sites have fundamentally different requirements. Real-time safety-critical operations, regulatory compliance with IEE 1547 and grid codes, revenue-critical applications where a missed frequency response bid costs real money. The industrial energy device landscape doesn't converge toward

the clean consumer standard. The installed base of millions of commercial devices will not be replaced for convenience.

SPEAKER_00Our software is hardware agnostic. It runs on our edge device, the SAP, but also on any Linux-based edge node. That matters because it means we're not locked to one hardware vendor. We pick the right compute for the site and run the same stack everywhere. And local-first architecture matters here. Grid services require response times under 200 milliseconds. Cloud round trips take 2 to 5 seconds. That's not a preference or an architecture choice. It's physics.

SPEAKER_00If you can't respond in 200 milliseconds, you can't participate in frequency regulation, you can't do real-time peak shaving, you can't do the things that generate revenue from grid services. We spent six months stripping away everything that didn't matter. Getting to first principles. Building the foundation properly. That work is done. The platform is solid. And now we're its first and most demanding customer. Every battery we deploy runs our stack. The ZAP reads the building's load profile in real time.

SPEAKER_00It controls the battery. It participates in Svenska Krafnat's frequency markets. It optimizes across P leak shaving and grid services simultaneously, locally, at the edge. Multiple revenue streams from one asset, coordinated by software that runs where the physics requires it to run, at the point of connection. There's one more piece of this puzzle that I think is underappreciated, and it goes back to Crucible Capital's thesis about financial and physical architecture advancing together. The energy transition doesn't need another dashboard.

SPEAKER_00It needs capital deployed into physical assets. The solar industry figured this out 15 years ago. Solar City didn't win because they had the best panels. They won because they financed panels at zero cost to the homeowner and deployed at scale. The technology was table stakes. The financing and deployment model was the business. We're applying the same structure to commercial battery storage, but with structural advantages that Solar City never had. First, revenue stacking versus single stream.

SPEAKER_00SolarCity monetized one thing, net metering. When Nevada rolled back net metering in 2016, their asset-backed security yields spiked from 4.18 to 6.25%. overnight. Single revenue stream, single point of failure. A commercial battery stacks four to six simultaneous revenue streams. When one compresses, as FCRD has in Sweden, others compensate. That diversification fundamentally changes the risk profile. Second, B2B versus B2C economics.

SolarCity spent $6,000 per customer through door-to-door residential canvassing.

SPEAKER_00That killed them. Commercial battery sales target facility managers who understand energy economics. Larger deal sizes. Fewer but more sophisticated customers. Dramatically lower acquisition costs. Third, AI-driven optimization versus static assets. SolarCity's panels produced energy according to sunlight. No optimization possible. Batteries can be dynamically dispatched across all revenue streams simultaneously, adjusting in real time.

SPEAKER_00This increases revenue and revenue predictability, which is the essential ingredient for securitization. The financing model we're building works like this. An SPV, a special purpose vehicle, holds the battery assets. Senior debt provides the bulk of capital at infrastructure rates. We contribute equity, operate the fleet through our platform and manage all market participation. The property owner pays nothing and receives peak shaving savings. Investors get infrastructure-grade returns backed by physical

assets and long-term contracts.

SPEAKER_00Target unit economics per site. Deployed cost of 300 to 320 euros per kilowatt hour. Blended revenue of 8 to 12 euros per kilowatt per month from stacked grid services and peak chaving. Simple payback in 5 to 7 years with contracts running 10 to 15 years. And here's where it gets interesting. Traditional infrastructure finance is slow. Green bonds take months to structure. Bank project finance requires years of track record. That timeline doesn't match the speed at which battery costs

are falling or the

SPEAKER_00urgency of grid needs. Whether through novel capital structures, on-chain financing instruments, or simply being more efficient in how we structure and deploy capital, speed of capital deployment is a competitive advantage when the land grab is physical sites with 10-year contracts. Let me be honest about the risks too, because I think intellectual honesty matters more than narrative polish.

SPEAKER_00Revenue risk from market saturation is real. Sweden's FCRD market saturated within 18 months. Prices collapsed. If ancillary markets saturate faster than new revenue streams open up, the economics deteriorate. This is why multi-market optimization and revenue diversification isn't a nice to have. It's existential. The SolarCity cautionary tale is real. They pioneered exactly this kind of financing as the product model and accumulated over $3 billion in debt without ever achieving profitability.

Any battery-as-a-service company must demonstrate unit economic discipline from day one.

SPEAKER_00We're building this business to be profitable per site, not to burn cash, and hope scale fixes the math. China could flood the European market. Chinese turnkey battery systems cost $73 per kilowatt hour versus $127 in Europe. Chinese manufacturers produce double global demand for stationary storage cells. If Chinese companies bring vertically integrated deploy and operate models to Europe, and CATL and BYD are already entering European manufacturing,

SPEAKER_00the coordination layer advantage could be competed away from below. The commercial customer is hard. Unlike residential consumers who just want lower bills or utility-scale buyers who are sophisticated energy professionals, commercial customers are heterogeneous. Factory managers, logistics operators, property managers, retail chains, each with different decision-making processes, energy profiles and risk tolerances. Customer acquisition in commercial energy has historically been expensive and slow.

And there is no Swedish government incentive specifically for commercial batteries.

SPEAKER_00The green technology 50% tax deduction is residential only. No accelerated depreciation scheme exists for commercial energy storage. This contrasts starkly with California's 30 to 50% investment tax credit. That policy gap is real and it matters. And let me add one more. The competitive landscape could shift faster than we expect. ABB just launched Battery as a Service in the UK and Ireland. Volvo Energy is entering with containerized 1-megawatt systems,

first deliveries late 2026.

SPEAKER_00If a major player, ABB, Schneider, Siemens, decides to bring a turnkey, zero-cost commercial battery product to the Nordics with their existing customer relationships and balance sheet, that changes the dynamics significantly. But I think the multinationals have a structural disadvantage here. They're optimized for large, standardized deployments. The commercial battery segment is messy. It's 200 kilowatt systems in warehouses with weird electrical panels and grid connections that need custom work.

SPEAKER_00It's facility managers who have never thought about grid services. It's municipalities with slow procurement processes. The multinationals are good at selling equipment. They're not built for the hands and knees deployment work that this segment requires. I lay all of this out because I believe the opportunity is stronger than the risks. But I don't believe in pretending the risks don't exist. Every one of these challenges shapes how we build the company. So where does all of this land? What's the synthesis? The generation war is over.

SPEAKER_00Wind and solar have won. The hardware is cheap and getting cheaper. Battery packs at $70 per kilowatt hour. Solar panels at $0.07 per watt. The hard to do, making clean energy technology that works, is done. But abundance without coordination equals waste. Europe is spending 32 billion euros on gas imports while curtailing 10 terawatt hours of clean energy. The grid needs flexibility close to the load. Not optional. Required by 50%.

SPEAKER_00The commercial and industrial segment is the biggest gap. 8% of EU battery installations, despite the fastest growth and the most compelling economics. No turnkey provider in the Nordics combines financing, deployment, optimization and multi-market revenue stacking. Every infrastructure build out in history, oil, railroads, telecom, bitcoin, solar, required financial engineering to advance alongside physical engineering. The company that builds both wins.

SPEAKER_00And the moat is physical, not the technology. The technology is table stakes. The moat is 10-year site contracts. Months of installation work per unit. Dispatch data that compounds. Capital access earned through track record. Just like cell towers. Just like charging networks. Just like data centers. That's what we're building at Sourceful. We install batteries in commercial buildings at zero cost to the property owner. We operate the battery.

SPEAKER_00They get lower electricity costs and higher property values. The grid gets the flexibility it needs to function as consumption doubles. Two revenue streams from one asset, peak shaving savings shared with the owner, grid service revenue, frequency regulation, reserve markets, arbitrage, captured by us. The owner pays nothing. The grid gets flexibility. We capture the spread. We're approving this in Sweden first, Calmar this year, then the grid operators with the highest demand charges and the

property sectors

SPEAKER_00with the sharpest load profiles. But the Nordics aren't the endgame. They're the launchpad. The commercial battery opportunity in Europe is orders of magnitude larger. Germany, the Netherlands, France, Spain, every market with rising demand charges, congested grids and a growing share of intermittent renewables has the same structural gap we're feeling today. We proved the unit economics in Sweden. We proved the financing model in the Nordics. Then we take it across Europe with capital that moves faster than anyone expects.

SPEAKER_00Every site we deploy is a node in a coordinated energy network. Every node makes the optimization smarter every year of operational data makes the financing cheaper it's a flywheel physical deployment generates data data improves optimization better optimization improves revenue better revenue attracts cheaper capital cheaper capital enables faster deployment and the cycle accelerates The Nordic energy storage market is valued at $4.35 billion in 2024 and projected

SPEAKER_00to reach $18.4 billion by 2035. Sweden has the largest battery pipeline in the Nordics, more than all other Nordic countries combined. The CNI segment within that is expected to grow at the fastest rate, and right now nobody owns it. I want to close with something that I think about a lot. There's this phrase I keep coming back to. The hard to get. It comes from a distinction in business strategy between what's hard to do and what's hard to get.

SPEAKER_00Hard to do is technology. Building a better battery. Writing better optimization algorithms. Engineering a faster edge device. Those things are hard. But they're hard for everyone equally. And anyone with enough talent and capital can eventually do them. Hard to get is different. Hard to get is the signed site agreement with a property owner who needed three months of conversations and a board approval. It's the grid connection permit that took six weeks of back and forth with the

SPEAKER_00local grid operator. It's three years of dispatch data from 200 sites that proves your revenue model works and makes your financing cheaper. And it's the institutional capital relationship built on verified performance data, not on a pitch deck. The hard to get accumulates. It compounds. And it can't be replicated with a better product launch or a bigger engineering team. That's why I call this episode the hard to get. Because the energy transition has entered a new phase.

SPEAKER_00The technology phase is over. We're in the deployment phase now. And deployment is about the hard to get things. Site access, capital structures, operational data, grid relationships, regulatory navigation, physical installation at scale, The grid is becoming a network of millions of distributed resources. Someone needs to coordinate them. Someone needs to deploy the capital. Someone needs to do the physical, unglamorous work of putting batteries in buildings and making them earn.

SPEAKER_00That's what we do. Thanks for listening. If you have thoughts, questions, or want to go deeper on any of this, reach out. I'm always up for the conversation. Until next time.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Counting Years

    Nov 22, 202642 minAudio

    Coordinated with Fredrik, Episode 127. Forty-two minutes on how a company gets its price: what a multiple counts, why the same krona can be worth seven years in one company and twenty-seven in another, how a rise in...

    Credit the people on this episode

  2. Shoulder Check

    Oct 31, 202650 minAudio

    Fifty minutes on two runs a day apart: the rest of Vancouver, and the road from ten Helium gateways to physics first. An interview with Lily. On Thursday I answered her questions in English; on Friday I went back to...

    Credit the people on this episode

  3. We Live Where We Are

    Oct 27, 202637 minAudio

    Thirty-seven minutes on two runs a day apart: the two years after the money came in, and home. An interview with Lily. I answered her questions in Swedish while running; the English voice you hear is my cloned voice...

    Credit the people on this episode

  4. Momentum

    Oct 24, 202639 minAudio

    Thirty-nine minutes on the two years before a term sheet arrived on my birthday, and what it took to turn it into money. An interview with Lily. I answered her questions in Swedish on a fifteen-kilometre run; the...

    Credit the people on this episode

  5. EP123: The Drive. Somebody Has to Say Yes

    Oct 15, 202634 minAudio

    This episode started in a car. A clear October day, low sun, the drive from Kalmar to Stockholm. I could have flown, and it would have been faster. But the hours in the car are a different kind of time. The car keeps...

    Credit the people on this episode