Explore the rich heritage of American innovation with Bulletin 240, part of the United States National Museums esteemed series. This collection features original articles that delve into the fascinating history and technology represented in the Museum of History and Technology. Since 1959, the Museum has published shorter, impactful papers highlighting its collections and research. Inside this volume, youll find captivating studies such as Don H. Berkebiles examination of the 1893 Duryea automobile, Silvio A. Bedinis insights on the Borghesi astronomical clock, and Robert M. Vogels exploration of tunnel engineering. Each paper presents a unique facet of technological advancement and historical significance, documenting the evolution of science and engineering in America.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
Speaker 1Section twenty one of Smithsonian Institution, The United States National Museum Bulletin two forty contributions from the Museum of History and Technology, Papers thirty four through forty four on science and Technology by the Museum of History and Technology. This LibriVox recording is in the public domain paper forty one tunnel Engineering, a Museum treatment by Robert M. Vogel, Part three Soft ground tunneling. So great is the difference between
Speaker 1hard rock and soft ground tunneling that they constitute two almost separate branches of the field. In penetrating ground lacking the firmness or cohesion to support itself above an opening, the miner's chief concern is not that of removing the material, but of preventing its collapse into his excavation. The primitive methods, depending upon brute's strength and defy direct application of fire and human force, were suitable for assault on rock, but
Speaker 1lack the artifice needed for delving into less stable material. Roman engineers were accomplished in spanning subterranean ways with masonry arches, but apparently most of their work was done by cut and cover methods rather than by actual mining. Not until the Middle Ages did this skill of effective working openings and soft ground developed, and not until the Renaissance was this development so consistently successful that it could be considered
Speaker 1a science. Renaissance mining. From the earliest periods of rock working, the quest for minerals and metals was the primary force that drove men underground. It was the technology of mining, the product of slow evolution over the centuries, that became the technology of the early tunnel, with no significant modification except in size of workings. Every aspect of sixteenth century mining is definitively detailed in Georgia's Agricola's Remarkable Dairy Metallica,
Speaker 1first published in Basil in fifteen fifty six. During its time of active influence, which extended for two centuries, it served as the authoritative work on the subject. There remains to day an unparalleled early record of an entire branch of technology. The superb wood cuts of mind, workings and tools in themselves constitute a precise description of the techniques of the period and provide an ideal source of information upon which to base the first model in the soft
Speaker 1ground series, the model representing a typical European mine, demonstrates the early use of timber frames or sets to support the soft material of the walls and roof. In areas of only moderate instability, the sets alone were sufficient to count direct the earth pressure and were spaced according to the degree of support required. In more extreme conditions, a solid lagging of small poles or boards was set outside
Speaker 1the frames as shown in the model, to provide absolute support of the ground. Details of the framing, the windlass, and all tools and appliances were supplied by Agricola with no need for interpretation or interpolation. The basic framing pattern of sill, side posts and capiece, all mortised together with lagging used where needed, was translated unaltered into tunneling practice, particularly in small exploratory drifts, and remained in this application
Speaker 1until well into the twentieth century. The pressure exerted upon tunnels of large area was countered during construction by timbering. Systems of great elaboration evolved from the basic one. By the time that tunnels of section well I, large enough to accommodate canals and railways were being undertaken as matter of course civil engineering works, a series of nationally distinguishable systems had emerged, each possessing characteristic points of favor and fault as might be suspected. The English system of tunneling timbering,
Speaker 1for instance, was rarely applied on the continent, nor were the German, Austrian or Belgian systems normally seen in Great Britain. All were used at one time or another in this country until the American system was introduced in about eighteen fifty five. While the timbering commonly remained in place in minds it would be followed up by permanent masonry, arching and lining and tunnel work. Overhead in the Museum Hall of Civil Engineering are frames representing the English, Austrian and American systems. Nearby, a small relief models Figure nineteen is
Speaker 1used to show the sequence of enlargement in a soft ground railroad tunnel of about eighteen fifty five. The Austrian system temporary timber supports of tunnels fell from use gradually after the advent of shield tunneling in conjunction with cast iron wining. This formed a perfect support immediately behind the shield, as well as the permanent lining of the tunnel Brunnel's Tame's tunnel. The interior surfaces of tunnels through ground merely
Speaker 1unstable are amenable to support by various systems of timbering and arching. This becomes less true as the fluidity of the ground increases. The soft material which normally comprises the beds of rivers can approach an almost liquid condition, resulting in a hydraulic head from the overbearing water sufficient to prevent the driving of even the most carefully worked to drift supported by simple timbering. The basic defect of the timbering systems used in mining and tunneling was that there
Speaker 1was inevitably a certain amount of the fail or ceiling unsupported just previous to setting a frame or placing over it. The necessary section of lagging in mine work. Runny soil could and did break through such gaps, filling the working. For this reason there were no serious attempts made before eighteen twenty five to drive subequeous tunnels. In that year work was started on a tunnel under the Thames between the rotherhythen Wopping sections of London, under guidance of the
Speaker 1already famous engineer Mark Isambard Burnell seventeen sixty nine to eighteen forty nine, father of I. K. Burnell. The undertaking is of great interest in that Burnell employed an entirely novel apparatus of his own invention to provide continuous and reliable support of the soft water bearing clay which formed the river bed. By means of this shield brunnel was able to drive the world's first subequous tunnel. The shield was of cast iron, rectangular in elevation, and was propelled
Speaker 1forward by jackscrews. Shelves at top, bottom, and sides supported the tunnel roof, floor and walls until the permanent brick lining was placed the working face. The critical area was supported by a large number of small breasting the boards held against the ground by small individual screws bearing against the shield framework. The shield itself was formed of twelve separate frames, each of which could be advanced independently of the others. The height was twenty two feet three inches,
Speaker 1the width thirty seven feet six inches. The progress was piecemeal in operation. The miners would remove one breasting board at a time, excavate in front of it, and then replace it in the advanced position about six inches forward. This was repeated with the next board above or below, and the sequence continued until the ground for the entire height of one of the twelve sections had been removed, the board screws for that section were shifted to bear on the adjacent frames, relieving the frame of longitudinal pressure.
Speaker 1It could then be screwed forward by the amount of advance the screws bearing to the rear on the completed masonry. Thus, step by step the tunnel progressed slowly, the greatest weekly advanced being fourteen feet. In the left hand portion of the model is the shaft sunk to begin operations. Here also is shown the bucket hoist for removing the spoil. The V type steam engine powering the hoist was designed by Brunel. At the right of the main model is
Speaker 1an enlarged detail of the shield, actually improved version built in eighteen thirty five. The work continued despite setbacks of every sort. The financial ones need no recounting here. Technically, although the shield principle proved workable, the support afforded was not infallible. Four or five times the river broke through the thin covering of silt and flooded the work, despite the utmost caution in excavating. When this occurred, masses of clay,
Speaker 1sand bags and mats were dumped over the opening in the river bed to seal it as the tunnel pumped out. Iq Burnell acted as superintendent and nearly lost his life on a number of occasions. After several suspensions of work resulting from withdrawal or exhaustion of support, one lasting seven years, the work was completed in eighteen forty three. Despite the fact that Brunell had for the first time demonstrated a practical method for tunneling in firm and water bearing ground,
Speaker 1the enormous cost of the work and the almost overwhelming problems encountered had a discouraging effect rather than otherwise. Not for another quarter of a century was a similar project undertaken. The team's tunnel was used for foot and light highway traffic until about eighteen seventy, when it was incorporated into the London Underground Railway system, which it continues to serve to day. The roofed over top sections of the two shafts may still be seen from the river. A number of contemporary popular accounts of the tunnel exist, but one
Speaker 1of the most thorough and interesting expositions on a single tunnel work of any period is Henry Laws, a memoir of De Tame's Tunnel, published in eighteen forty five to eighteen forty six by John wheel Law, an eminent civil engineer, covers the work in incredible detail from its inception until the major suspension in late eighteen twenty eight, when slightly more than half completed. The most valuable aspect of his record is a series of plates of engineering drawings of
Speaker 1the shield and its components, which, so far as is known, exist nowhere else. These form the basis of the enlarged section of the shield shown to the right of the model of the tunnel itself. A vertical section through the shield is reproduced here from Law for comparison with the model Figures twenty one. In twenty three the Tower Subway, various inventors attempted to improve upon the Brunell shield, aware of the fundamental soundness of the shield principle, almost all
Speaker 1bypassed the rectangular sectional construction used in the Thames Tunnel and took as a starting point a sectional shield of circular cross section advanced by Brunell and his original patent of eighteen eighteen. James Henry Grayhead eighteen forty four to eighteen ninety six, rightfully called the father of modern subaqueous tunneling, surmised in later years that Brunell had chosen a rectangular configuration for actual use, as one better adapted to the sectional type of shield. The English civil engineer Peter W.
Speaker 1Barlow in eighteen sixty four and eighteen sixty eight patented a circular shield of one piece, which was the basis of one used by him in constructing a small subway of thirteen hundred and fifty feet beneath the Tames in eighteen sixty nine, the first work to follow the lead of Brunel. Great Head, acting as Barlow's contractor, was the designer of the shield actually used in the work, but it was obviously inspired by Barlow's patents. The reduction of
Speaker 1the multiplicity of parts in the Brunell shield to a single rigid unit was of immense advantage and in advance, perhaps equal to the shield concept of tunneling itself. The Barlow greate Head shield was like the cap of a telescope, with a sharpened circular ring on the front to assist in penetrating the ground. The diaphragm functioned as did Brunell's breasting boards, to resist the longitudinal earth pressure of the face, and the cylindrical portion behind the diaphragm bore the radial
Speaker 1pressure of roof and walls. Here also, for the first time, a permanent lining formed of cast iron segments was used, a second major advancement in soft ground tunneling practice. Not only could the segments be placed and bolted together far more rapidly than masonry lining could be laid up, but unlike the green masonry, it could immediately bear the full force of the shield, propelling screws. Barlow, capitalizing on Brunell's error and burrowing so close to the river bed, maintained
Speaker 1an average cover of thirty feet over the tunnel, driving through a solid stratum of firm London clay which was virtually impervious to water. As the result of this, combined with the advantages of the solid shield and the rapidly placed iron lining, the work moved forward at a pace and with a facility in startling contrast to that of the Thames Tunnel, although in fairness it must be recalled that the face area was far less. The clay was found sufficiently sound that it could be readily excavated without
Speaker 1the support of the diaphragm, and normally three miners worked in front of the shield, digging out the clay and passing it back through a doorway the plate. This could be closed in case of a sudden settlement or breaking. Following excavation, the shield was advanced eighteen inches into the excavated area by means of six screws and a ring of lining segments eighteen inches in length bolted to the previous ring undercover of the overlapping rear skirt of the shield.
Speaker 1The small annalous space left between the outside of the lining and the clay by the thickness and clearance of the skirt, about an inch was filled with thin cement to grout. The tunnel was advanced eighteen inches during each eight hour shift. The work continued around the clock, and the nine hundred foot river section was completed in only fourteen weeks. The entire work was complete almost without incident, in just under a year, a remarkable performance for the world's second subequeous tunnel. The Tower subway at first operated
Speaker 1with cylindrical cars that nearly filled the seven foot board. The cars were drawn by cables powered by small steam engines in the shafts. This mode of power had previously been used in passenger service only on the Greenwich Street elevated railway in New York. Later the cars were abandoned as unprofitable and the tunnel turned into a footway of Figure thirty two. This small tunnel, the successful driving due entirely to Great Heads skill, was the forerunner of the
Speaker 1modern subequeous tunnel. In it, two of the three elements essential to such work thereafter were first applied, the one piece movable shield of circular section and the segmental cast iron lining. The documentation of this work is far thinner than for the Thames Tunnel. The most accurate source of technical information is a brief historical account in Copperthweight's Classic Tunnel Shields and the Use of Compressed Air in Subequeous Works, published in nineteen o six. Copperthweight, a successful tunnel engineer,
Speaker 1laments the fact that he was able to turn up no drawing or original data on this first shield of Great Heads, but he presents a sketch of it prepared in the Great Head Office in eighteen ninety five, which is presumably a fair representation Figar thirty three. The Tower subway model was built on the basis of this and several woodcuts of the working area that appeared contemporaneously in the illustrated press. In this and the adjacent model of Beach's Broadway subway, the tunnel axis had been placed on
Speaker 1an angle to the viewer, projecting the bore into the case, so that the complete circle of the working face is included for a more suggestive effect. This was possible because of the short length of the work included. Henry S. Drinker, also a tunnel engineer and author of the most comprehensive work on tunneling ever published, treats rock tunneling in exhaustive detail up to eighteen seventy eight eight. His notice of what he terms submarine tunneling is extremely brief. He does, however,
Speaker 1draw a most interesting comparison between the first Thames Tunnel built by Moodow and the second built by grat Head twenty six years later. First Thames Tunnel brickwork lining thirty eight feet wide by twenty two and a half feet high. Second Thames Tunnel the Tower subway cast iron lining of eight feet outside diameter. First Thames Tunnel one hundred and twenty ton cast iron shield accommodating thirty six miners. Second Thames Tunnel Tower subway two and a half ton wrought
Speaker 1iron shield accommodating at most three men. First Thames Tunnel workings filled by eruption of river five times. Second Thames Tunnel Tower Subway. Water encountered at almost any time could have been gathered in a stable pail. First Thames Tunnel eighteen years elapsed between start and finish of work. Second Tames Tunnel Subway tower were completed in about eleven months. First Tames Tunnel cost three million dollars. Second Tames Tunnel
Speaker 1Tower subway cost one hundred thousand dollars. Beach's Broadway subway almost simultaneously with the construction of the Tower subway. The first American shield tunnel was driven by Alfred ELI. Beach eighteen twenty six to eighteen ninety six. Beach, as editor of the Scientific American and inventor of, among other things, a successful typewriter as early as eighteen fifty six, was
Speaker 1well known and respected in technical circles. He was not a civil engineer, but had become concerned with New York's pressing traffic problem even then, and as a solution developed plans for a rapid transit subway to extend the length of broadway. He invented a shield as an adjunct to the system, solely to permit driving of the tunnel without disturbing the overlying streets. An active patent attorney as well, Beach must certainly have known of and studied the existing
Speaker 1patents for tunneling shields, which were, without exception British. In certain aspects, his shield resembled the one patented by Barlow in eighteen sixty four, but never built. However, work on the Beach Tunnel started in eighteen sixty nine so close in time to that on the Tower Subway that it is unlikely that there was any influence from that source. Beach had himself patented a shield in June of eighteen sixty nine, a two piece sectional design that bore no
Speaker 1resemblance to the one used his subway plan had been first introduced at the eighteen sixty seven fare of the American Institute, in the form of a short plywood tube through which a small, close fitting car was blown by a fan. The car carried twelve passengers. Sensing opposition to the subway scheme from Tammany in eighteen sixty eight, Beach obtained a charter to place a small tube beneath Broadway for transporting mail and small packages pneumatically, a plan he advocated independently of the passenger subway. Under this thin pretense
Speaker 1of legal authorization, the Subbrossa excavation began from the basement of a clothing store on Warren Street near Broadway. The eight foot diameter tunnel ran eastward a short distance, made a ninety degree turn, and thence southward under Broadway to stop a block away from under the south side of Merry Street. The total distance was about three hundred and twelve feet. Work was carried on at night in total secrecy, the actual tunneling taking fifty eight nights. At the Warren
Speaker 1Street terminal, a waiting room was excavated and a large roots blower installed for propulsion of the single Pasaes Center car. The plan was similar to that used with the model in eighteen sixty seven. The cylindrical car fitted the circular tunnel with only slight circumferential clearance. The blower created a plenum within the waiting room and tunnel area behind the car of about zero point two five pounds per square inch, resulting in a thrust on the car of almost a ton, not accounting for a blow by. The car was thus
Speaker 1blown along its course and was returned by reversing the blower's suction and discharged ducts to produce an equivalent vacuum within the tunnel. The system opened in February of eighteen seventy and remained in operation for about a year. Beach was ultimately subdued by the hostile influences of Boss Tweed, and the project was completely abandoned. Within a very few warry years, the first commercially operated elevated line was built,
Speaker 1but the subway did not achieve legitimate status in New York until the opening of the Interborough line in nineteen o four. Ironically, its route traversed Broadway for almost the length of the island. The Beach Shield operated with perfect success in this brief trial, although the loose sandy soil encountered was admittedly not a severe test of its qualities. No diaphragm was used. Instead, a series of eight horizontal shelves with sharpened leading edges extended across the front opening
Speaker 1of the shield. The outstanding feature of the machine was the substitution for the propelling screws used by brunal and great heead of eighteen hydraulic rams set around its circumference. These were fed by a single hand operated pump seen in the center of Fig. Thirty four. By this means the course of the shield's forward movement could be controlled with a convenience and precision not attainable with screws. Vertical and horizontal deflection was achieved by throttling the supply of water to certain of the rams, which could be individually controlled,
Speaker 1causing greater pressure on one portion of the shield than another. This system has not changed in the ensuing time, except of course, in the substitution of mechanically produced hydraulic pressure for hand. Unlike the driving of the tower subway, no excavation was done in front of the shield. Rather, the shield was forced by the rams into the soil for the length of their stroke, the material which entered being supported by the shelves. This was removed from the shelves and hauled off. The ram plungers then were withdrawn and
Speaker 1a sixteen inch length of permanent lining built up within the shelter of the shield's tail ring. Against this the rams bore. For the next advance, mason real lining was used in the straight section cast iron in the curved The juncture was shown in the model. Enlarged versions of the Beach shield were used in a few tunnels in the Midwest in the early eighteen seventy, but from then on until eighteen eighty six, the shield method, for no clear reason, again entered a period of disuse, finding no
Speaker 1application on either side of the Atlantic, despite its virtually unqualified proof at the hands of great Head and Beach. Little precise information remains on this work. The Beach system of pneumatic transit is described fully in a well illustrated booklet published by him in January of eighteen sixty eight, in which the American Institute model is shown and many projected systems of pneumatic propulsion, as well as of subterranean and subequeous tunneling described Beach, again presumably as author of
Speaker 1the sole contemporary account of the Broadway Subway, which appeared in Scientific American following its opening early in eighteen seventy. Included are good views of the tunnel and car, of the shield in operation, and most important, of vertical sectional view through the shield. I. It is interesting to note that optical surveys for maintenance of the course apparently were not used. The article illustrated and described the driving each night of a jointed iron rod up through the tunnel
Speaker 1roof to the street twenty or so feet above for testing the position the first Hudson River tunnel. Despite the ultimate success of Brunell's Thames Tunnel in eighteen forty three, the shield in that case afforded only moderately reliable protection because of the fluidity of the soil driven through and its tendency to enter the works through the smallest opening. In the shield's defense, an English doctor who had made physiological studies of the effects on workmen of the high
Speaker 1air pressure within diving bells, is said to have recommended to Burnell in eighteen twenty eight that he introduced an atmosphere of compressed air into the tunnel to exclude the water and support the workfe The plan was first formally described by Sir Thomas Cochrane seventeen seventy five to eighteen sixty in a British patent of eighteen thirty. Conscious of Brunell's problems, he proposed a system of shaft sinking, mining and tunneling in water bearing materials by filling the excavated
Speaker 1area with air sufficiently above atmospheric pressure to prevent the water from entering and to support the earth. In this and his description of airlocks for a passage of men and materials between the atmosphere and the pressurized area, Cochrane fully outlined the essential features of pneumatic excavation as developed since. In eighteen thirty nine, a French engineer first used the system in sinking a mine shaft through a watery stratum.
Speaker 1From then on, the sinking of shafts and somewhat later the construction of bridge pier foundations by the pneumatic method became almost commonplace engineering practice in Europe and America. Not until eighteen seventy nine, however, was the system tried in tunneling work, and then, as with the shield ten years earlier, almost simultaneously here and abroad. The first application was in a small river tunnel in Antwerp, only five feet in height. This project was successfully completed, relying on compressed air alone
Speaker 1to support the earth, no shield being used. The importance of the work cannot be considered great due to its lack of scope. In eighteen seventy one, De Witt C. Haskin eighteen twenty two to nineteen hundred, a West Coast mine and railroad builder, became interested in pneumatic caissons, then being used to found the river piers of Eve's Mississippi River Bridge at Saint Louis, an apparent total ignorance of the Cochrane patent. He evolved a similar system for tunneling
Speaker 1order bearing media, and in eighteen seventy three proposed construction of a tunnel through the silt beneath the Hudson to provide rail connection between New Jersey and New York City. It would be difficult to imagine a site more in need of such communication. All lines from the south terminated along the west shore of the river, and the immense traffic cars, freight and passengers was carried across to Manhattan Island by ferry and barge, with staggering inconvenience and at
Speaker 1enormous cost. A bridge would have been and still is, almost out of the question, due not only to the width of the crossing, but to the flatness of both banks to provide sufficient navigational clearance without a draw span. Impractically long approaches would have been necessary to obtain a permissively gentle Grade. Haskin formed a tunneling company and began working with the sinking of a shaft and hoboken on the New Jersey side. In a month, it was halted
Speaker 1because of an injunction by curiously the d L and W Railroad, who feared for their vast investment in terminal and marine facilities. Not until of November of eighteen seventy nine was the injunction lifted and work again commenced. The shaft was completed and an airlock located in one wall from which the tunnel proper was to be carried forward. It was Haskins's plan to use no shield, relying solely on the pressure of compressed air to maintain the work
Speaker 1faces and prevent the entry of water. The air was admitted in late December and the first large scale pneumatic tunneling operation launched. A single twenty six foot double track bore was at first undertaken, but a workface of such diameter proved unmanageable, and two oval tubes eighteen feet high by sixty feet wide were substituted, each carrying a single track. Work went forward with reasonable facility, considering the lack of press.
Speaker 1A temporary entrance was formed of sheet iron rings from the airlock down to the tunnel grade, at which point the permanent work of the north tube was started. Immediately behind the excavation at the face, a lining of thin wrought iron plates was built up to provide form for the two foot permanent brick lining that followed. The three stages are shown in the model in about their proper relationship of progress. The work is shown passing beneath an old timber crib bulkhead used for stabilizing the shoreline. The
Speaker 1silt of the river bed was about the consistency of putty, and under good conditions formed a secure barrier between the excavation and the river above. It was easily excavated, and for removal was mixed with water and blown out through a pipe into the shaft by the higher pressure in the tunnel. About half was left in the war for removal. Later. The basic scheme was workable, but in operation an extreme precision was required in regulating the air pressure in the work area. It was soon found that there existed an
Speaker 1eleven psi difference between the pressure of water on the top and the bottom of the working face, due to the twenty two foot high of the unlined opening. Thus it was impossible to maintain perfect pneumatic balance of the external pressure over the entire face. It was necessary to strike an average, with the result that some water entered at the bottom of the face where the water pressure was greatest, and some air leaked out at the top, where the water pressure was below the air pressure. Constant
Speaker 1attention was essential. Several men did nothing but watched the behavior of the leaks and adjusted the pressure as the ground density changed. With advance air was supplied by several steam driven compressors at the surface. The airlock permitted passage back and forth of men and supplies between the atmosphere and the work area without disturbing the pressure to frontial The principle is demonstrated by an animated model set into the main model to the left of the shaft Fig.
Speaker 1Thirty nine. The variation of pressure within the lock chamber to match the atmosphere or the pressurized area depending on the direction of passage is clearly shown by simplified valves and gages and by the use of light in varying color density in the Haskin tunnel five to ten minutes were taken to pass the miners through the lock so as to avoid too abrupt a physiological change. Despite caution, a blowout occurred in July of eighteen eighty due to
Speaker 1airly engage, not at the face but around the temporary entrance. One door of the airlock jammed and twenty men drowned, resulting in an inquiry which brought forth much of the distrust with which Haskin was regarded by the engineering profession. His ability and qualifications were subjected to the bitterest attack in and by the te technical press. There is some indication that although the project began with a staff of competent engineers, they were alienated by Haskin in the course
Speaker 1of work, and at least one withdrew. Haskins's remarks in his own defense indicate that some of the denunciation was undoubtedly justified, and yet despite this reaction, the fundamental merit of the pneumatic tunneling method had been demonstrated by Haskin and was immediately recognized and freely acknowledged. It was apparent at the same time, however, that air by itself did not provide a sufficiently reliable support for large area tunnel works in unstable ground, and this remains the only major
Speaker 1subequeous tunnel work driven with air alone. After the accident, work continued under Haskin until eighteen eighty two, when funds ran out. About sixteen hundred feet of the north tube and six hundred feet of the South tube had been completed. Great Head resumed operations with a shield for a British company in eighteen eighty nine, but exhaustion of funds again caused stoppage in eighteen ninety one. The tunnel was finally completed in nineteen oh four and is now in use
Speaker 1as part of the Hudson and Manhattan rapid Transit system, never providing the sought after rail link. A splendid document of the Hasken portion of the work is SD V. Burr's Tunneling under the Hudson River, published in eighteen eighty five. It is based entirely upon first hand material and contains drawings of most of the work, including the auxiliary apparatus. It is interesting to note that electric illumination arc not incandescent lights and telephones were used, unquestionably the first employment
Speaker 1of either in tunnel work. The Saint Clair Tunnel. The final model of the soft ground series reflects, as did the Husac Tunnel model, for heart rock tunneling final emergence into the modern period. Although the Saint Clair Tunnel was completed over seventy years ago, it typifies in its method of construction the basic procedures of subaqueous work in the present day. The Thames Tunnel of Bruno and Haskins' efforts beneath the Hudson had clearly shown that by themselves, both
Speaker 1the shield and pneumatic systems of driving through fluid ground were defective in practice for tunnels of large area. Note that the earliest successful works by each method had been a very small area, so that the influence of adverse conditions was greatly diminished. The first man to perceive and seize upon the benefits to be gained by combining the two systems was most fittingly Grated. Although he had projected the technique earlier in driving the underground City and South
Speaker 1London Railway, in eighteen eighty six he brought together for the first time the three fundamental elements essential for the practical tunneling of soft water bearing ground, compressed air, support of the work during construction, the movable shield and cast iron permanent wining. The marriage was a happy one. Indeed, the limitations of each system were almost perfectly overcome by the qualities of the others. The conditions prevailing in eighteen eighty two at the Sarnia, Ontario terminal of the Grand
Speaker 1Trunk Railway, both operational and physical, were almost precisely the same as those which inspired the undertaking of the Hudson River Tunnel. The heavy traffic at this vital Us Canada rail interchange was ferried inconveniently across the wide Saint Clair River, and the bank and river conditions precluded construction of a bridge. A tunnel was projected by the railway in that year, the time when Haskins tribulations were at their height. Perhaps
Speaker 1because of this lack of precedent for a work of such nothing was done immediately. In eighteen eighty four, the railway organized a tunnel company. In eighteen eighty six, test borings were made in the riverbed, and small exploratory drifts were started across from both banks by normal methods of mine timbering. The natural gas, quicksand and water encountered soon stopped the work. It was at this time that the Railway's president visited Great Heads City in South London workings.
Speaker 1The obvious answer to the Saint Clair problem lay in the successful conduct of the subway. Joseph Hobson, chief engineer of the Grand Trunk and of the Tunnel project, in designing a shield, is said to have searched for drawings of the shields used in the Broadway and Tower subways of eighteen sixty eight through nine, but unable to locate any, he relied to a limited extent on the small drawings of those in Drinkers Volume. There is no explanation as to why he did not have drawings of the city
Speaker 1in South London shield at that moment in use, unless one considers the rather unlikely possibility that Greathead maintained its design in secrecy. The hops and Shield followed Great Heads as closely as any other, and having a diaphragm with closable doors, but a modification of Beach's sharpened horizontal shelves was also used. However, these functioned more as working platforms than supports for the earth. The machine was twenty one
Speaker 1and a half feet in diameter, in unprecedented size and almost twice that of Greatheads current one. It was driven by twenty four hydraulic rams. Throughout the entire preliminary consideration of the project there was a marked sense of caution that amounted to what seems an almost total lack of confidence and success. Commencement of the work from vertical shafts was planned so that if the tunnel itself failed, no expenditure would have been made for approach work. In April eighteen eighty eight, the shafts were started near both river banks,
Speaker 1but before reaching proper depth, the almost fluid clay and silt flowed up faster than could be excavated, and this plan was abandoned. After this second inauspicious start, long open approach cuts were made and the work finally began. The portals were established in the cuts several thousand feet back from each bank, and there the tunneling itself began. The portions under the shore were driven without air. When the
Speaker 1banks were reached, brick bulkheads containing air locks were built across the opening, and the section beneath the river about three thousand, seven hundred and ten feet long, driven under air pressure of ten to twenty eight pounds above atmosphere for most of the way. The clay was firm and there was a little air leakage. It was found that horses could not survive in the compressed air, and so mules were used under the river. In the firm clay, excavation was carried on several feet in front of the shield,
Speaker 1as shown in the model of Fig. Forty two. About twelve miners worked at the face. However, in certain strata the clay encountered was so fluid that the shield could be simply driven forward by the rams, causing the muck to flow in at the door openings without excavation. After each advance, the rams were retracted and a ring of iron lining segments built up, as in the tower subway. Here, for the first time, an erector arm was used for placing the segments, which weighed about half a ton In
Speaker 1all respects. The work advanced with wonderful facility and lack of operational difficulty considering the large area. No subaqueous tunnel had ever been driven with such speed. The average monthly progress for the American and Canadian headings total four hundred and fifty five feet. Top efficiency Ten rings, or a length of fifteen point three feet could be set in the twenty four hour day in each heading. The six thousand feet of tunnel was driven in just a year.
Speaker 1The two shields met via v in August of eighteen ninety the transition was complete. The work had been closely followed by the technical journals, and the reports of its successful accomplishment thus were brought to the attention of the entire civil engineering profession. As the first major subaqueous tunnel completed in America and the first in the world of a size able to accommodate full scale rail traffic, the sinc Clair Tunnel served to dispel the doubts surrounding such work and established a pattern for a mode of tunneling
Speaker 1which has since changed only in matters of detail. Of the eight models, only this one was built under the positive guidance of original documents in the possession of the Canadian National Railways or drawings, not only of all elements of the shield than lining, but of much of the auxiliary apparatus used in construction. Such materials rarely survive, and do so in this case only because of the foresight of the railway, which, to avoid paying a high profit margin to a private contractor, is compensation for the risk
Speaker 1and uncertainty involved carry the contract itself and therefore preserved all original drawing records. While the engineering of tunnels has been comprehensively treated in this paper from the historical standpoint, it is well to still reflect that the advances made in tunneling have not perceptibly removed the elements of uncertainty, but have only provided more positive and effective means of countering their forces. Still to be faced are the surprises
Speaker 1of hidden streams, geologic faults, shifts of strata, unstable materials, and areas of extreme pressure and temperature. End of Section twenty one.
Chronicles of America Volume 15 by Jefferson and his Colleagues-Allen Johnson. In this volume, we have the Virginia Dynasty of presidents: Jefferson, Madison, and Monroe. America at this time was involved in expansion...
Military Journals of Two Private Soldiers, 1758-1775 by Abraham Tomlinson. "Perceiving that much of the intrinsic value of these Journals would consist in a proper understanding of the historical facts to which...
History of France by Charlotte Mary Yonge. A brief history of France from the early 800AD to the 1870s, focusing on the successive heads of state and the different wars which shaped France into the country it was by the...
History Teacher's Magazine, Vol. I, No. 2, October 1909. The History Teacher's Magazine was a monthly publication devoted to the interests of teachers specializing in history, civics, and geography. It provides...
Rebel's Recollections by George Cary Eggleston. George Cary Eggleston's Civil War memoir begins with a separate essay on the living conditions and political opinions of Virginia’s citizenry before secession. The body of...