
TRX Gold (TSX:TRX) - Self-Funded Expansion Targets 80,000-100,000 oz Run Rate
Interview with Stephen Mullowney, Director & CEO of TRX Gold Corp. Our previous interview: https://www.cruxinvestor.com/posts/trx-gold-tsxtrx-pitch-perfect-november-2026-12686 Recording date: 24th November 2026 TRX Gold Corp. (NYSE American:TRX | TSX:TRX) operates the Buckreef Gold Project in Tanzania's Geita District, held 55% by TRX Gold and 45% by state miner STAMICO. In fiscal 2026 (year ended August 31, 2026), Buckreef produced 29,650 oz of gold, including a record fourth quarter of 8,173 oz, from a 2,000 tpd plant. The company is now building a 3,500 tpd plant beside it, for 5,500 tpd of combined nameplate capacity, funded from operating cash flow. In a November 2026 interview, CEO Stephen Mullowney set out the near-term production profile. Fiscal 2027 is targeted at around 30,000 oz, in line with fiscal 2026, because the existing plant caps throughput until the new circuit is running. The first quarter is planned as the weakest, as it includes most of the stage two waste strip and an upgrade to the existing plant. Higher-grade stage two ore is scheduled around the end of the second quarter or start of the third. Management is targeting completion of most of the expansion by late 2027 and a run rate of 80,000 to 100,000 oz a year after that. First-year throughput is targeted at around 4,250 to 4,500 tpd as the mining contractor ramps, against 3,000 tpd in the 2025 PEA. The updated PEA is now targeted for around January or February 2027, later than the fourth-quarter 2026 timing in the September presentation. It will add recent drilling and the larger plant. The company plans to lower the cutoff grade given current gold prices. That reduces feed grade but increases cash flow and extends open pit mining by roughly 1 to 2.5 years before underground development. Mullowney estimated 200,000 to 300,000 oz could come from the pit at the targeted run rate, while noting the numbers are not final. The 2025 PEA, at US$4,000/oz gold, modeled 61,700 oz a year, average EBITDA of US$176.3M (peak US$284.7M) and a pre-tax NPV5% of US$1,878.5M. Funding is internal. Mullowney put current cash costs at US$1,600 to US$1,700/oz, fiscal 2026 EBITDA at about US$80M, and cash at around US$30M at the end of the fourth quarter. Borrowings were US$2.9M at May 31, 2026, with US$40M of supplemental liquidity available. Since 2021, the company has invested US$90.5M in Buckreef against US$19.1M of original net capital raised. Mullowney said building in stages costs US$50M to US$75M up front, against about US$300M for a conventional build. It shortens payback, keeps the share count lower and lets the team learn metallurgy and build staff before each step. Gold recovery rose to 84.9% in the third quarter of fiscal 2026 from 67% a year earlier. On valuation, the September presentation shows TRX at 3.0x EV/2027E EBITDA (peer average 3.3x) and 0.55x P/NAV (peer average 0.67x). Mullowney acknowledged that African producers trade on lower multiples than North American peers. The company's lever include growing EBITDA, NAV and resources through drilling this year with minimal dilution. Mullowney also described Tanzania's operating-level regulation as straightforward, citing permitting, labor supply and grid power. View TRX Gold's company profile: https://www.cruxinvestor.com/companies/trx-gold Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

