Skip to content
PodSubs
ShowsPeopleGuestsJobsNewsEvents
More
BlogPodCred
Menu
ShowsPeopleGuestsJobsNewsEventsBlogPodCredNetworksSign in
Join nowSign in
  • Shows
  • People
  • Jobs
  • News
  • More
    • Guests
    • Events
    • Blog
    • PodCred
    • Networks
    Join nowSign in

Built, Wired & Secured

Built, Wired & Secured artwork

When HVAC Loses Its Head: Designing Resilient HVAC Controls in Connected Buildings

Aug 11, 20268 minAudioEpisode 105
ShareXLinkedInFacebookWhatsAppEmail

Modern HVAC relies on networks, cloud services, and interdependent systems. In this episode host Alex Morgan talks with Michael Harrington and James Rogers to unpack the operational consequences when HVAC controls lose connectivity - from tenant comfort and IAQ to business continuity and energy waste. We explore root causes (network outages, vendor remote-access dependence, power and controller failures), practical tradeoffs between centralized/cloud-based control and local autonomy, and low-cost resilience tactics that facilities and IT can implement quickly. Michael shares how outages translate into tenant impact and contractual headaches; James describes maintenance-first approaches that reduce downtime and preserve performance. The goal: give owners, facilities teams, and IT leaders a short, actionable roadmap to reduce single points of failure, align vendor responsibilities, and prioritize interventions that protect occupants and revenue without expensive rip-and-replace projects.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. The Device Graveyard: When Your Building's Technology Becomes E-Waste Before Its Time

    Nov 25, 20269 minAudio

    Every year, commercial buildings install thousands of internet-connected devices - cameras, sensors, access control readers, HVAC controllers - that are supposed to last a decade or more. But the reality is that many of...

    Credit the people on this episode

  2. The Unseen Handoff: When Construction Closeout Becomes an Operations Crisis

    Nov 24, 20268 minAudio

    Every building project has a moment where the general contractor walks away and the operations team takes over. But when it comes to technology systems - access control, BAS, networking, security - that handoff is often...

    Credit the people on this episode

  3. The Tenant Experience Gap: When Your Building's Technology Promises Outpace Its Operations

    Nov 23, 202612 minAudio

    Modern commercial buildings are marketed with smart technology, seamless connectivity, and secure environments. But when a new tenant moves in, the reality often falls short: Wi-Fi dead zones, access cards that don't...

    Credit the people on this episode

  4. The Maintenance Gap: When Your Building's Biggest Repairs Were Preventable

    Nov 22, 20269 minAudio

    Every property manager and facilities leader knows the pain of an unexpected equipment failure: a chiller goes down in August, a pump fails on a holiday weekend, or a critical system stops working at the worst possible...

    Credit the people on this episode

  5. The Documentation Void: When Your Building's Systems Outlive the People Who Knew Them

    Nov 20, 202610 minAudio

    When a veteran building engineer retires or a longtime IT contractor moves on, they often take decades of undocumented knowledge with them - knowledge about how the BAS is actually wired, which breaker feeds which...

    Credit the people on this episode