Adam: Hey everyone, welcome back to Build Connected. I'm Adam.
Pace: And on pace.
Adam: How are you my friend?
Pace: I'm doing pretty good. you know, I like that you using my friend. I was yelling at you this morning, you were all grumpy with me, but now I'm your friend. That's good.
Adam: Well, it it's just another day. You're yelling and steam's coming out of your ears and it's just you know, it's what we're used to, you know? So it
Pace: Let let me ask you this. How do you navigate a partnership? Right? Especially when you're when you've got like a jerk like me at times. Like how do you temper how do you temper like all of my garbage that comes out of my mouth and get on with your day?
Adam: Well, look, you you know, I know we joke a lot about how, you know, you you rant and rave, but you're just a cupcake. And that's what you are, and I know that. And you have your moments, like we all do. And, you know, sometimes I take it, and sometimes I gotta give you a piece of my mind. But but the truth is you're just a softie.
Pace: Man, you nailed it. You saw right through all of it, and I've been exposed. I like that. yeah, cupcake at heart. I think that you I think there's nothing more to say here. See you next time.
Adam: Alright, well let's let's jump into things, okay? let's get into a a product that we that I like, I think we both like. We've been using these things for a long time now, and this revolves around the word floating. Everything is floating these days. We got floating vanities. We got floating shelves. We got floating toilets. I mean, it's it's just endless, right? We don't we wanna we want things to look clean. We wanna be able to have airy feelings in our house and not cluttered messes and you kind of that floating aspect is is what people like. So you know we've done So many floating shelves and so many like even cantilever countertops, right? I mean just back in the day when I think we started when I started anyway in the early two thousands, you know, when we would do say like a kitchen island with a giant overhang, we would order have custom steel plates made that are you know the shape of that countertop and we'd we'd bolt them into the into the pony wall and that would give us the support we would need for our heavy countertops. But now, you know, there's all these companies, there's lots of them. I mean I could name one, but there's so many competitors now that make all sorts of different floating countertop brackets right they're they're steel pieces of steel different shapes and sizes and and can handle the weight of anything you throw at them so it's nice to have all these options it's it's a little expensive but gosh a steel plate wasn't cheap back when we were using those either And then same thing for these floating shelves, right? If you can anywhere from rough framing, right, if you have open walls, there's some really great brackets that you can lag to your studs and can support a, you know, practically an elephant. And then brackets that you can utilize if sheetrock is up. And so I don't know, it's just it's nice to have access to these things and kind of pull off the kind of sleek floating shelf vanity, whatever floating kind of thing your heart desires. It's all it's all out there and we're we're finding ourselves purchasing these brackets for gosh most of our projects, right?
Pace: I think that's right. I you know, to go a little more kind of wide angle here, and I know this is not what you're talking about, but just brackets in general. Like for me, I can think back like when my mom built she had a custom house built back in the 80s. Okay, so we're going back a little bit. There was not a single bracket, not a single hanger, not a single post base in that entire house. So No positive connections, as we would call them today. So the amount the industry has shifted in what is that, 40 years, 50 years? It's crazy. Like we can't do anything structural now without a positive connection. And that's for the good. Like our houses are much stronger because of it. But yeah, custom bracket solutions for shelves and counters and and floating vanities sit on something, right? They're supported by something. It used to be all custom angle iron that we would do. But now there's tons of like off-the-shelf online purchases that we make to support these things. And you know, th that makes our life a lot easier.
Adam: Yeah, I mean, and you and I, when we before we do our podcast, you know, we think of certain topics to talk about. And, you know, this is one that's come up today in our project, right? We're we've talked about a restaurant we're doing and there's there's a bar area, and we're gonna be utilizing these brackets for that, and we've got floating shells, we're gonna be getting custom brackets for that. And and by custom, like the the sites offer, you know, a whole slew of lengths and shapes and sizes. So handy stuff.
Pace: Yeah, and I think that if you go back, like over the last for forget it, like the since the beginning of our company, there's there's not a month that's gone by that you haven't ordered some sort of a bracket. Like you're our bracket guy. You're like, let's get a bracket. And there's not a month that you haven't ordered a bracket, am I right?
Adam: Come on, a not a month? What I'm ordering brackets by the month? If that were the case, I should start a bracket making company. I wouldn't say that. I have
Pace: Well, I th I'm pretty sure there's a bracket department in our shop, so yeah, I think that's right.
Adam: I I have gotten pretty good with the welder, I must say. But
Pace: Yeah.
Adam: you know, it's nice getting a powder coated black bracket online and it's easy enough and you can get them in a f in a few days. So
Pace: There's definitely a savings there, yeah. All right, switching gears, you know, we're gonna talk about subcontractors today for a minute. And specifically subcontractors that are, I'm gonna use the word provided by the homeowner. And what I mean is, you know, someone where the homeowner has contracted directly with them. So they're not under our meaning the general contractor purview. we're not managing them, like we're not marking them up. It's just whether it's a friend, family member, or some other direct contact that a homeowner has made. we typically don't do that. That's atypical for us, but sometimes it happens. And and we've we've had that happen just in the past week. And I think we want to talk about it just because it shows you why we want that to fall under our purview, under our management. They did substandard work. you know for our projects. And so, you know, we had to reach out. And even though they're not getting paid by us, they're not in contract with us, like their work wasn't good enough for our job site. And so we had to tell them that. You know, and and why that matters is we have an inspector. We have a round of inspections coming up. And the work that's there on the job site, it's reflective of us. And so we really care about that work and how it presents. And so it's important that it meets our standards, right? So that when the inspector walks through everything he sees, he's gonna he's gonna tie back to us as general contractors. And that's that's part of our brand, right? That's really important to us.
Adam: Yeah, look, what's the reason homeowners do this? Why do they hire somebody outside of the general contractor's purview? What's the reason?
Pace: Save money.
Adam: Save money. And sometimes at savings there's a downfall, right? Like, you have trust in the contractor that you've hired. And you're utilizing them because of their professional, because of their experience, because of their reputation, because of the relationships they've built over decades with subcontractors and whom they trust. And so, you know, the moment you you step out of that world, you're you're taking a chance,
Pace: When I hear you say relationships, what I hear, what that means to me is our system. When you introduce a new individual, a new company to our system, you're introducing risk. So you're saying we've got a trusted, you know, trusted relationships over decades, which is true, but that really is our system, We've set expectations to all of our partners, So they know what What we expect as far as quality, as far as timing and communication, and when you just go outside of that to save some money, you're introducing some risk to a proven system.
Adam: Yeah, and w and when you go outside of that system, like we're we're not getting paid to manage them, right? I mean, look, everybody knows, I think most homeowners and people that are hiring contractors is that they have pricing from subcontractors that get marked up and that that pays for salaries and operating ex costs and that sort of thing. even though we say, look, if you bring that person in, you know, we're we're not getting paid or we're not really in a position to manage them. The the the truth is we are. Like we have to. If we want to maintain the quality that we stand behind, we have to jump in. And so in a scenario like what you're talking about, Pace, is like we're definitely jumping in. And we're gonna make sure that it gets done right.
Pace: Well, I mean, I think the example here is what happens when you put a lion, a tiger, and a hippo in a cage together? Right? There's gonna be some carnage, right? I don't know what we are in this example. I think we are maybe partitions, right? We are somehow managing the wild animals inside of the cage, right? And
Adam: Yeah.
Pace: that makes makes for less carnage, right? I think that's what we are.
Adam: The are you the lion tamer? Is that what you're saying?
Pace: I mean that's what I was gonna start with, but I don't really like lion tamers. I'm not a big circus guy, so but yeah, I mean I think ultimately we are the lime lion tamer.
Adam: Yeah, I no disagreement there. sometimes you gotta step in and and you gotta do you gotta do what's right for your company and for your client, even though it might be out of your purview. And look, it's important to have these conversations with your client, right? If if they bring somebody in and, you know, you're they're not working to to your standards, that conversation needs to be had so that everybody's aware.
Pace: You know, this week we we kinda promised way, way back months ago, you know, I had work being done both at my father's house and upcoming on my house in Maine. So I think we're gonna we're gonna kinda do a little check in on how that's proceeding. My my father's house is wrapped up. The work ended up great. the performance of the house improved drastically and and it's gonna be a warm house next year. the same contractor has started some upgrades at my place, and that's insulation in the attic and redoing part of the exterior walls with out board insulation. So I'm gonna have R60 everywhere on the areas that we're touching, and I'm gonna slowly work my way around the house over the next probably three years or so so that I've got like a very, very airtight, efficient, well-insulated home. And things have been going great, right? I we've been testing along the way. I've been getting updates along the way and just seeing the layers come together, Just seeing the waterproofing and the the air barrier go up, The new windows go in and the layers of insulation outboard of the framing has been awesome. And it's it's it's all come together right on time, right? It's it's interesting because I'm not there, so I'm kind of the remote homeowner. but I've been getting my weekly check-ins and everything's proceeding just just as I would hope.
Adam: Yeah, you know, we talk a lot about building science and air tightness and that sort of thing. What are you doing blower door tests? Are you are you creating a tight envelope? Are you gonna be putting in ERVs to bring fresh air in? What are you doing over there?
Pace: I'm not going to that sort of lengths yet. I will be. I am I am doing blower door tests along the way, even though we're not tackling the whole house, A good way to think about it is I'm doing a quarter of the house right now. So like ultimately I'm not gonna get like super low blower door tests yet. but I am improving the performance bit by bit. So, this, you know, we've talked about in the past, like when you have the opportunity to hit one section of the house, you do it right. And then eventually, if you work your way around, right, you'll get to the system you want in the end. So in three or four years, yeah, I'm gonna, I'm gonna blow a great score and I'm gonna have like an R60 house, right? And my like all of my energy bills are gonna drop considerably. Everything's gonna be more comfortable, the house is gonna be more durable. All of that will happen. But I'm on step number one right now.
Adam: I'm curious, what what is that first blower door test score? Have you not done it yet?
Pace: I don't know what it is. There there was a benchmark set. I don't know what the score is. I I'll check back in on you. We're gonna be wrapping up here in probably the next few weeks. So I can have some numbers for you, sure. But I need,
Adam: Yeah. Nice. Yeah,
Pace: you know, as part of Efficiency Maine I've gotta submit the blur door test to get my rebates. So that's part of the requirement there.
Adam: Efficiency Maine. What and what what do they require in Maine? Make sure like you sp fill holes with chewing gum or saran wrap. What what's what do they really require there in Maine?
Pace: well you know any moose that walks by you just gotta keep them updated on on what you're doing. Like for me, I've got a lot of bald eagles on site, so just making sure that they're in the loop, that's pretty much what we're doing.
Adam: So not lion tamer, more of a moose tamer.
Pace: Yeah, sure.
Adam: Gotcha. Okay. Just like you, Pace, we talked many episodes ago about some remodel work I'm gonna be doing at my place and one of those that project revolved around an ADU that I'm gonna be doing over here. You know, look, I I I have the luxury of being a ch contractor and being able to understand what all the pricing is gonna be. And I guess I I kind of fall into that typical homeowner scenario, right? Where, you know, how far down the road have I gotten so far over the course of what did we start talking about this three months ago, four months ago?
Pace: How how far have you gotten?
Adam: Pretty much nowhere. Well, the truth is I I I made s some mild forward progress and realized this is outside of my budget. I need to scale back. and I did this early, right? I mean, we're talking very, very brush, broad stroke schematics, which is how you and I treat our pre-construction process, right? So I was able to kind of put all the numbers together, realizing okay, I need to scale back a little bit to achieve what I want to do. And ultimately after that conversation with the architect. He has now gone to the drawing board and kind of doing another broad brushstroke schematic on what it is that I can afford. So I actually have a meeting, my wife and I have a meeting with him on Friday, and we're gonna see what he's gotten done over the past seven days because we met with him a week ago or so and he's he's crushing it. He's moving along. So I don't know, we'll be interesting to see what he comes up with. And this is really like a a phase one, right? The next phase. after the schematic thing is really locking down the design and then him really hitting the paper hard and also solving for what the city requirements are and digging into that stuff. It's it's kind of like a five prong approach with the architectural plan process. So it's it's in depth and you know I I'm used to being on the contractor side of it and really thr understanding that our pre-construction process it takes it can take up to a year, right? And you know, you wonder what what all the what's causing these time constraints. And a lot of it comes down to the homeowner. It's me, right? Like I'm slowing the process down. My architect is is moving along at a pretty good clip, but it's it's I'm the client, and I can see it happening on the client side.
Pace: I mean when you're pruning the hedges, like what goes first? Is it the elevator? Is it the the car carousel? Is it the bowling alley? Which one do you chop off first?
Adam: the pickleball court. Had to go. Yeah, yeah.
Pace: Ooh, gone. Okay. Alright, well that's good stuff. We'll we'll do some more updates maybe in a few weeks when I wrap up mine and we'll we'll keep you updated on Adams as well. until next time guys, I'm Pace.
Adam: And I'm Adam.
Pace: See ya.
Adam: Thank you.