When a wasteful government program like the Yazoo Area Pump Project is killed, it oughta stay dead. But the US Army Corps of Engineers has this pet zombie hidden in the Mississippi backwater. Listen to find out how taxpayers could be on the hook for billions in an attempt to unnecessarily re-plumb the Mississippi River and its tributaries. An environmental and fiscal disaster that benefits only a handful of farmers who are growing subsidized commodities in the floodplain.
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
SPEAKER_02Welcome to All American Taxpayers in Common Sense. You've made it to the right place. For 30 years, TCS, that's Taxpayers for Common Sense, has served as an independent, nonpartisan budget watchdog group based in Washington, D.C. We believe in fiscal policy for America that is based on facts. We believe in transparency and accountability because no matter where you are on the political spectrum, no one wants to see their tax dollars wasted. Today, dear podcast listeners, we are once again face to face with one of our founding principles here at Taxpayers for Common Sense.
SPEAKER_02Once a wasteful government program is killed, it ought to stay dead. And to do that, we've learned over the decades that you have to kill, kill, kill till it's dead, dead, dead. Well, thanks to the Army Corps of Engineers, we have a backwater zombie to dispatch all over again. Joining me now to shine the spotlight and help us take aim is TCS Director of Research and Policy, Mr.
SPEAKER_01Josh Sewell. Hey, thanks, Steve. Happy to be here and happy to not talk just about the farm bill. Let's get to this budget boogeyman. All right, Josh, give us the mission briefing on the Yazoo Backwater Pumps. The Yazoo Backwater Pumps, this is a fiscally irresponsible boondoggle that would be built by the Army Corps of Engineers in northwest Mississippi. The Yazoo River and a few tributaries that go into it meet the Mississippi River, and especially at times of flooding or when the Mississippi is high, the water will back up into this area and it serves as a natural floodplain for this major river system that drains much of northern Mississippi.
SPEAKER_01So a lot of wetlands and a small area that flooded consistently year after year, sometimes more, sometimes sometimes less, but is a naturally occurring low-lined area that is a natural flood control area.
SPEAKER_02I assume then when you say we have pump assembly there, so the idea is then they're going to pump the water out of this uh area or to prevent it from backing up and pump it into the already high flood waters of the Mississippi, right?
SPEAKER_01Yeah. So if you know much about floodplains, they are also great places to uh farm. And so we have historically done a lot of projects to reduce flooding in places that frequently flooded because if you flooded for hundreds of years, you have great rich farmland. And so this is one of the many areas along the Mississippi River, and frankly, it's one of the last place that doesn't have a massive completed flood control project to basically prevent flooding all the time. Much of the Mississippi floodplain does have that, and it's going to take a significant event to flood areas.
SPEAKER_01And so what the what the actual Yazoo Pump Project would be is the Corps of Engineers is proposing a 25,000 cubic feet per second pumping plant to basically take some water out of this area, dump it into the downstream, and get it back into the Mississippi. And so the idea is to reduce some of the flooding, not eliminate, but to reduce the flood levels in this area at certain times. Uh but I say massive, we're talking bigger than anything the Corps has ever built.
SPEAKER_01Also bigger than any other pumping plant in the world. And how much is this going to cost, Josh? And who's putting the tab? Good question. It's 100% federally funded. The Corps of Engineers has not produced an updated economic and benefit analysis, so they're not telling us. But we can make a guess and basically looking at other projects. Uh, and when this project was proposed decades ago originally, uh, and we had an actual economic analysis uh and we're talking probably somewhere around$1.9 billion.
SPEAKER_01And who's gonna benefit from it? Not 100% federal, uh, that's for sure. So basically, this is this is really a flood control project for farming and for a small number of farmers. I don't have the exact number, but we did some analysis in the past, and the farmland in this area is like in many other places, consolidated amongst a small number of folks. And so disproportionate benefits are going to go towards agriculture with minimal benefits to a couple of small communities that are there, but in reality, uh that's pretty much smoke and mirrors.
SPEAKER_01It's just for farming.
SPEAKER_02So, you know, you mentioned how so much of the Mississippi has been closed off, um, the the uh the backwater areas, the floodplain. And this is an area where they were talking about doing this for 50 years, or since the 1950s, so even longer than that. But didn't this get stopped once before, Josh?
SPEAKER_01Yeah, it was stopped in 2008. The George W. Bush administration uh actually vetoed this project and said you cannot do this using what's known as a Clean Water Act veto. And so it's a fairly rare use. Um, it's an exercise where the EPA can say, no, this construction project is so bad, it would destroy so much, so many wetlands that you cannot do this. We're not gonna let it go forward. And that's what they did. And the George W. Bush administration wasn't known as the most environmentally friendly administration, yet even they said this is so destructive.
SPEAKER_01Talking 80,000, maybe 90,000 wetlands, um, eight eighty to ninety thousand acres of wetlands is what we is what it looks like would be destroyed by this or massively harmed, uh, that they said you can't do this.
SPEAKER_02So it is a big environmental disaster, 90,000 acres of wetlands. It is a fiscal disaster where it's going to cost upwards of more than a billion dollars, almost two billion dollars to build. And it benefits a handful of farmers that are growing subsidized commodities in the floodplain. So it's like a lose-lose-lose for the taxpayer, and it's been killed, and the core is resuscitating it.
SPEAKER_01Yeah, exactly. And it doesn't make sense. Uh why they're doing it, it's a great question. Uh, but I think it's mostly because, again, those concentrated benefits, the the people who could benefit from this would benefit substantially. And most of them don't live in the backwater. We're talking absentee landowners who live uh upstream somewhere else that aren't actually directly affected um by this, but their their economic interests are. And so when it's free money from the government, it's 100% again, 100%. So it doesn't matter what it costs. The those people benefiting from it will not have to pay any cost share for it.
SPEAKER_01So it's in their interest to keep pushing and pushing, and uh it you know it just gets into this this weird political environment, and it doesn't make any sense why any administration, let alone the current one, which claims to um be more environmentally friendly, and uh the the few people who do live in the backwater who who could benefit from different uh from a different project, from some smaller scale uh locally uh implemented projects, are disproportionately African American and economically disadvantaged.
SPEAKER_01So it just doesn't make sense on any level, um, at least for people out in the real world.
SPEAKER_02So back in the early uh or mid-2000s, um the Washington Post reported that a uh core official had called projects like this swine. And uh I think he uh got it right. Um and uh thankfully the George W. Bush administration vetoed it, and now here it is during the Biden administration, it's bringing bringing potentially bringing it back. Uh just just amazing. And so, you know, we're gonna be doing our best to stop this project. So while we're uh while I got you on the on the the pod, Josh, and uh we're talking Corps of Engineers, uh one of our favorite agencies.
SPEAKER_02Um what else is going on with the Corps these days?
SPEAKER_01Well, there's a couple uh new, well, I call them new, but one of them is something that's been happening forever, but there's a new iteration of it um going on with the Corps. So every couple years, the House and Senate try to pass something called the Water Resources Development Act, uh WERDA, as because that's easier to say. Uh and that is where the Congress would set priorities for the Army Corps of Engineers primarily, um, both authorizing projects, changing some of the rules around projects, uh, and also doing other things that are often not helpful, but at least have an opportunity to actually fix some of the mistakes of the past.
SPEAKER_01So there's two big things. The first thing um we should talk about is there's a push in the Senate to actually further bail out the barge industry from its responsibility to pay for the projects that actually make safe, reliable, consistent commercial navigation possible. And so what what's the what's the change there? So the change here is that currently for if you want to build a lock and dam, so as everyone probably knows, a dam is something that stops water in the river to create a reservoir.
SPEAKER_01A lock is basically the door that lets you get around that dam. So all the construction for this navigation infrastructure in the in in this country used to be shared 50-50. So we pay 50% of the cost, but the barge users, the owners, the people who use that river pay 50% of the cost through a fuel tax. Well, that was changed to 6535 two years ago. And now the navigation industry is saying is saying, well, that's we still have to pay something, so we don't like that.
SPEAKER_01So we actually want to make it 75.25. And so the Senate bill would actually permanently change the cost share responsibility. It would bail them out instead of doing 50% like they were just five years ago, down to 25% for construction costs. And this is only for the construction of those primarily locks now. The dams are are there with the locks. Newer, bigger, badder locks is what they want.
SPEAKER_02And just to be clear, it's 75% federal, 25% from the trust fund. Exactly. And uh and also just to be clear too, that operations and maintenance costs are 100% federal, right?
SPEAKER_01Yeah, 100% federal. And even major rehabilitation, which is fixing, which is essentially new construction, but it's fixing something that's already there. Uh if it's major rehabilitation, yeah, it's 50-50, but if it's minor rehabilitation, which is$7 million or less, and they're actually trying to push it even higher too, some are asking for$15 or$25 billion, or even$100 billion, excuse me,$100 million, that's 100% federal. So when you look at OM and you look at the existing cost share, they're getting a more than 90% subsidy.
SPEAKER_01So the cost of the system is 92, 95, depending on exactly percent paid by us. It's pennies on the dollar, is what they have to pay.
SPEAKER_02And just uh for our dear listeners, um just put this into uh perspective comparison. So the ports, which are, you know, we're talking, so this is just the inland waterways, is it Mississippi, Ohio, uh those rivers, um in the the ports, the coastal ports, they pay a hundred percent of the maintenance cost for dredging. And then most cases they chip in 65% of the construction costs of the uh of the ports facilities as well.
SPEAKER_02So in the end, I mean they they're actually a much bigger economic engine picking up the their share, whereas the Linwater industry, the barge industry, is just basically asking Uncle Sam to foot the entire bill for what they want and they are demanding and are not willing to pay for.
SPEAKER_01Exactly. And this is a this is nothing new to us who people who've been working on this for for a long time. The inland waterways, the barge industry, has opposed cost share since the dawn of civilization. I mean, I don't they've always opposed having a cost share until you finally it was 100% federally funded until 1980s, right? I think exactly 1986 Worta is is when you finally had cost share. And the whole point of having one of the major reasons to have cost share is because when you when things are 100% federally funded, people make different decisions.
SPEAKER_01Like if you are not contributing your own funds, your appetite for a project tends to be higher. They get flashier, they get you're not as focused on on getting a better design. And also, once you start constructing, all the cost overruns are paid for by taxpayers too. So you're not there's not as much of an interest in in narrowing the projects to things that are actually viable, that are more efficient, uh, and that are that have a better benefit for more people. So cost share is is a critical part of infrastructure. Honestly, it's a it's a critical part of most programs.
SPEAKER_02And just a highlight, too, in the fact that, you know, so especially because 100% of the operations and maintenance costs are borne by the taxpayer, there's no price signals, you know, to say, okay, this waterway is not really contributing, let's not try to maintain it anymore, let's leave it aside. That doesn't happen at all because there's no incentive, there's no cost. It's just like the Yazoo Pumps project. I mean, they want to bring it back because they don't have to pay for it. If they had to pay a share of that, you know, nearly$2 billion cost, even if it's like 10%, well, then that's nearly$200 million that they would have to contribute.
SPEAKER_02And maybe those landowners would say, well, it's not quite worth it for us now. But we don't have any of that that sense. And then again, the the inland waterway industry, of course, they want to have bigger locks because they're not going to have to pay for it, only have to pay for a small portion of it. And that's been one of the constraining things is that you know, all you ship on the inland waterway system, at least, you know, are commodities, because it's very slow. So it's, you know, bulk or large uh commodities, grain, coal, you know, but not anything, it's not like uh high-value commodities because it's it takes so long and have so much inventory tied up into it.
SPEAKER_02And so it's just this low-value, high volume commodities that we're shipping out, and they should be paying their fair share.
SPEAKER_01And the challenge here is we need navigation in certain areas. Like you it's there's there's an argument to be made that it's that it's a that it's in the public's interests. But the challenge with the Army Corps of Engineers is they have, we don't know exactly, and honestly, they don't know exactly, something like a hundred plus billion dollar backlog of projects. This is an agency that the whole thing in the fiscal year 2025 budget requested seven billion dollars. That's not all for construction. Two billion of that is operations and maintenance.
SPEAKER_011.9 or 1.5 billion of it was ecosystem was for ecosystem restoration or fixing things they broke. Um and so the actual construction budget on the inland waterways is is relatively small compared to that. But you're not gonna chip away at a hundred billion dollar backlog anytime soon under the current system. And so what you need to do is figure out what projects are the most important, what projects are the most uh effective, and you need to get more resources into the system. But you can't just do it on the backs of federal taxpayers.
SPEAKER_01It has to come from the people who are directly benefiting from the projects.
SPEAKER_02So so speaking of um adding to the backlog and uh adding more potential projects, uh that that brings me to the House bill, um, the House version of the Werda. You mentioned the Senate bill having this cost-sharing change for the inland waterways. What's the provision in the House bill that's catching it in our craw, Josh?
SPEAKER_01Yeah, so there's a provision in there that says we know you got a hundred billion dollar backlog, you got a lot of things on your plate, but we also want to have a study, study, which always becomes policy later. We have a study on making water supply a primary mission of the Army Corps of Engineers.
SPEAKER_02Aaron Powell And so the primary missions of the Corps of Engineers, right, are navigation, flood damage reduction, environmental restoration. So now you're saying water supply, which sometimes they would have water supply as uh uh secondary. You know, you you mentioned building dams, you know, you can build a dam for flood damage reduction, you can build a dam, as you pointed out, for navigation. Well, now you've got this little reservoir and that can provide some water supply. Um, but now you're saying they could just go out and build a project just, or they want to study having them go out and build a project just for water supply.
SPEAKER_01Yeah, building new projects and looking at existing projects and saying, oh, well, if we if we say now we make water supply a primary mission equivalent or in better than uh the other things that that project was originally justified for, is it economically justified? Uh and it's the reason there's a few reasons that we think this is a bad idea. One, again, they have they have a lot to do already. They have too much to do already. Uh so adding on more projects means you're gonna just reduce you're gonna have more mouths to feed.
SPEAKER_01But also, this is another way of expanding the core into areas where uh you already have other agencies like the Bureau of Rec who who who are in certain areas, the Bureau of Reclamation. Um, but also it's again, when you think about the potential universe of projects, who's going to benefit from these projects? In some places it's gonna be large landowners trying to farm, who are running out of water in certain areas, or it's people who just didn't want to pay the original costs, or if you looked at when before these projects, um they they just aren't in the national interest.
SPEAKER_01And that's another big thing here is water supply, and this is where we it gets iffy, but the water supply is not necessarily a federal interest, it's much more the benefits accrue locally uh and maybe regionally, but typically it's locally. And so to really expand and say providing water for which is primarily gonna be used for agricultural subsidies, excuse me, to to grow subsidized crops in these areas, the benefits are not gonna accrue nationally. They're gonna benefit to a small number of people, and it's just not something that we can afford to do or should be thinking about doing at a time when$35 trillion in debt and many other programs, not the core itself, and many other agencies, are on a trajectory of their spending is increasing uh at a rate that's not sustainable.
SPEAKER_01And so we should not be expanding. We should be thinking about prioritization uh and getting more bank fairbug on what we already have.
SPEAKER_02Yeah, you really know where this provision is coming from. It's from some of the water buffaloes that are out in the uh 17 Western reclamation states that are, you know, they they they're clamoring for more um construction of dams. And the dam is not a divining rod. It doesn't actually create uh new water. And essentially, in reality, every place there was a decent dam site has already been built in the West. And so it's it's really just about trying to get another agency and a pretty well-funded agency. I mean, that's let's be clear, the core has gotten a lot of funding, particularly in the post-Catrina, post-Sandy era, um, and then from some of these big uh, you know, the Infrastructure Investment and Jobs Act and and then other disaster-related extra funding.
SPEAKER_02And so I think that the these water buffaloes are looking and saying, well, the Bureau of Reclamation is, you know, just like about a billion dollar or a little more than a billion dollar agency, whereas the core not only is it more than a five billion dollar agency, it's just getting cash shoved on it by Congress. And so they see this as an opportunity to actually get another agency engaged and to get them to build this these dams for them.
SPEAKER_01Yeah, and that's a great point. And I talked about uh it had a the agency has a seven billion dollar request uh for this fiscal for the fiscal year 2025. But when you look back, uh you have to look at the exact years, but if you say about 10 years, last 10 years, uh two-thirds of the core's budget has come under emergency spending. So the idea basically there are years where instead of getting five, they actually there was, I think it was the Sandy supplemental, they got$15 billion in emergency spending. You know, and so that you triple their their one-year budget.
SPEAKER_01And oftentimes when you look at these supplementals, whether they're two billion, five billion, or ten billion dollars, it's also multi-year money. So that money sits there until it goes out the door. And so that is a huge pot of funds. And again, it's emergency spending, so it doesn't have to be offset by cuts somewhere else or revenue increases. So it's it's a very tantalizing target for folks who do want to have uh another way of getting projects that they're unwilling to pay for. And again, this is whether you're talking about navigation or agricultural um irrigation, and frankly, in other areas, including municipal water supply or anything that involves water, the benefits the people who benefit from it need to have some contribution, if not a hundred percent non-federal, at least some contribution because they're the ones who benefit.
SPEAKER_01There's always other people who can use that water. And so we're not currently advocating for some system where everybody in every instance has gets to uh have a bidding process, and so you know you the water goes to the highest bidder. That's not what we're saying. But we have to be rational and say, is this serving the most people that can? And are there are there better uses for this water? Um, or we can we at least have this debate and figure out uh what can we do and is it the federal government's role, what is the federal government's government's role here, and then how much of it do we really have to pay for?
SPEAKER_02Right. And you know, I mean the thing is is this is going to get not to get too wonky, but get into tricky issues about reclamation law. Water rights are are uh set at the state level, and you know, so under reclamation law, you know, the users, the beneficiaries are supposed to pay. Pay the whole project cost over time through the rates they pay for that water supply. Now there's a lot of fights up over who's the beneficiaries and trying to uh uh cut that and not actually pay it all back. But then under the cores, it's like you know, it's a user uh contribution kind of as the project's being built.
SPEAKER_02And so there's a lot of weird things that are going on that potentially go on here, but nevertheless, I mean it's pretty clear this is a this is a money grab to try to get more damn building um in the West.
SPEAKER_01Absolutely. And at a time when across our budget, uh we're having we're seeing in our work, I think we're seeing people in both chambers and on both sides of the aisle saying we have to start we can't spend like we used to. You know, it's not a majority yet. We're still working on that. Um but there is there's a push for this fiscal commission we've talked about before because because a lot of members are saying we have to make better decisions about spending, but also about revenue. Like we have to get more resources into our federal budget, and we need to pare down what we're spending on.
SPEAKER_01This is the polar opposite. This is a bicameral, bipartisan effort to say forget that part. We want more money for our special interests and our narrow and our narrow focus. And yeah, this is just the Corps of Engineers and the Bureau of Reclamation, and and people will argue, oh, it's a smaller part of the budget, and it's a lot of it's authorizations, it's not actually money going out the door. But that's where it begins. You have to start making these decisions, and when you're planning projects and when you're when you're talking to communities who who arguably do need some of these projects, it's not economically sustainable for us to pretend like the federal government is an unlimited resource that you can never have to pay the bill.
SPEAKER_01And so this is one of them when we say start everywhere, the only way to get sustainable spending is to look at every part of the budget. You have to start with these things like orders, which pass typically overwhelmingly. You're gonna have single digits of senators oppose a order typically, and you might come pretty close to a single digit number of House members voting against a order at times. But that's part of the problem because they're not actually making real decisions, the tough decisions in some of these. And I think that is a major place where you have to start saying we have to do something different.
SPEAKER_01Uh, and it does get wonky, it gets deep, but it's also pretty simple. People who benefit need to pay some of the costs.
SPEAKER_02So in summation, Josh, you have barge interests and the Senate going along with trying to uh push more of the costs of inland waterway projects onto taxpayers in excess of 90% of the cost of the inland waterways are already done that way. You've got other interests, Western interests, trying to get water supply in the house uh added to the core's plate, and you have the core itself trying to resurrect a zombie project that was killed more than a decade ago, that is really just about increasing agriculture product, subsidized agricultural production.
SPEAKER_01Absolutely. And I'm not going to say it's all about agriculture, although the common thread through a lot of those is the agriculture and the farm bill. But it really is the issue here is we need Congress to press the pause button, not just push these things through and actually think about what can we what can we afford and what do we need. And this is just the first of many bills that they have to do it on. And it's also an easy one to do if they would just take the time and look at it.
SPEAKER_02Aaron Powell You're actually though right, Josh. They all are agriculture related. I mean, because basically, you know, obviously uh the the Yazoo pumps is to drain land for more agricultural production. The water supply is really targeted out west, and that's also really about agricultural production. I mean, sure some of it could go to municipal and industrial use, but it really is about that. And the inland waterway system largely transports grain, uh corn and soybeans or fertilizer to grow those corn and soybeans.
SPEAKER_02And so it's about agriculture as well.
SPEAKER_01Your words not mine. Everything always comes back to agriculture. All right, Josh.
SPEAKER_02TCS Director of Research and Policy, your aim is true. Thanks for being on. I appreciate it, Steve. It's always fun. Well, there you have it, podcast listeners. When it comes to like the Yazoo pumps and it comes to wasteful programs, you gotta kill, kill, kill till it's dead, dead, dead. This is the frequency. Mark it on your dial, subscribe and share. And know this Taxpayers for Common Sense has your back, America. We read the bills, monitor the earmarks, and highlight those wasteful programs that poorly spend our money and ship long term risk to taxpayers.
SPEAKER_02We'll be back with a new episode soon. I hope you'll meet us right here to learn more.
Two lists. A short one for the Congress on its way out, and a longer one for the 120th Congress on its way in. Election Day was last Tuesday. Divided government is back, and the national debt is more than $40 trillion....
Here's the number to hang on to: 57 percent. That's the share of local emergency management offices in America that run on one full-time employee or less, according to a new census by Argonne National Laboratory....
Fiscal year 2026 is over, and the books are closed. The Congressional Budget Office puts the deficit just shy of $2 trillion: $218 billion more than the year before, in a year with no pandemic and no recession. Spending...
It's the last week of fiscal year 2026, and for once there's no shutdown drama. A continuing resolution runs through December 11. But late Friday, the White House sent Congress $810 million in "pocket rescissions."...
This week, three numbers, one fiscal year. The Congressional Budget Office projects $1.1 trillion in net interest on the national debt in fiscal year 2027. The Pentagon is asking for $1.5 trillion. And in Dallas on...