Speaker 1Welcome to Bismarck Insights with Mayor Mike Schmidz, a transparent and engaging conversational dive into meaningful topics impacting local government in Bismarck, North Dakota. Bismarck Insights is dedicated to removing barriers between the City of Bismarck and the citizens we serve every day.
Speaker 2Welcome to Bismarck Insights. I'm Bismarck Mayor Mike Schmidz, and today we're going to focus on twenty twenty five construction projects in the City of Bismarck, and with me, I have City Engineered Gabe Shell. Gabe, thank you for coming back. You know, we've got a lot of stuff going on in the last few years, and maybe we should just give a little wrap on what happened in twenty twenty four and then we'll dive into what we've got going this summer, which has already started because we're already into juneish. But let's talk with some of the things we accomplished in twenty four and what we got looking forward here
Speaker 2a little bit.
Speaker 3Yeah, So in twenty twenty four, obviously a very busy construction season, both from our perspective, as well as some of the other agencies that do work in our community. Come of our highlight projects would have been our South Washington Street reconstruction project from Burley Avenue north to the South Bismarck Drainage Ditch. That project was funded primarily by half sent sales tax for the arterial road construction reconstruction coverning that two lane roadway into a multi lane facility with also the ability to put roundabouts at the intersection of Burley Avenue and South Washington Street as well as a signal at along the corridor as well.
Speaker 2And that actually extended a little bit into Burley Avenue more east than west. But it was a big project. I drove it a lot.
Speaker 3Yeah. Another component of that was widening the two lane roadway that was Burley Avenue with ditches and put a three lane roadway still rural sense and still a roadway with high ditches to convey stormwater. But that was another component of that, just to kind of put a final touch on that area of town here for the next foreseeable future.
Speaker 2It did this the city itself have any other major projects in twenty four or because people always talk about construction and what's going on, and there are a lot of things that we really didn't control.
Speaker 3Sure, there's always products happening, and really what could be a minor project in our eyes could be a major project for that person who's being delayed for that week of time and in front of their house or that months of time in front of that quarter that they usually drive. On any given year, we'll do about three million dollars worth of water main replacements and that's usually something that really touches everywhere in the older parts of towns, the area south of Divide, north of Main Avenue at Primary those areas that we go in and replace those water means. So because that's in the middle of town, it might not affect you where you live, but it might affect you on your drive as you're making your
Speaker 3way across our community.
Speaker 2And then of course we know North Kota Dot's got a big project that started last year.
Speaker 3Yep, some DOT is instill in the second year of their multi year construction project of the Exit one to sixty one interchange replacement at Expressway, Bisark Expressway or Centennial Road, depending on which side of the theater that you're on. That's about a fifty million dollar project that the DOT is running and is leading. We have a coordination role to make sure that our fire trucks can get through, make sure our water mains and sermains still work, make sure our traffic signals work on either side of these interconnected corridors. But buying large the doots handling that one, and then they'll bring us in when there's city specific
Speaker 3questions they may have.
Speaker 2Sure, So now I'm moving forward or we're already like I said, we're already into construction season for twenty twenty five. But what do we got going on? And I know all of stuff, but citizens probably don't.
Speaker 3Sure, there's a whole smattering of things. We'll do. About ten million dollars a year of maintenance projects is what we have for our assphalt and concrete roadways. A project that the little a million of the commuter are probably seeing right now is on South third Street where we're doing a concrete payment repair on South third Street between Bismarck Expressway and Main Avenue. So it's a corridor that a lot of people drive. Thankfully, its five lanes, so we can use up a couple of those while the contractor makes repairs and still move a decent amount of traffic safety through the corridor, but we'll see delays because that's a corridor that might see traffic obviously impacts because of
Speaker 3the construction activities that are occurring on. Thankfully, with other roads in the court in the area that some of that traffic can get moved out to. We'll also do a fair amount of asphalt road replacements in those sorts of projects. Will replace the wearing course at the top couple of inches of asphalt if that's the right solution, but if that asphalt's all ry to the end of its useful life, will blend the entire asphalt and subgrade base into a new cement stabilized subgrade and then put a new surface and wearing course on top of that.
Speaker 3So find ourselves with a good solution that leaves the curve intact. And really we can get in and out of there in about a couple of weeks time, or should say our contractor can get in and out of there in a couple weeks time and move on to the next spot.
Speaker 2And so, how's that South third Street project funded?
Speaker 3So South third Street would be funded through two parts. The primary part would be through special assessments that we would bring in the adjacent properties along that corridor for that project, as well as any of the other maintenance type projects that we have in our community. There's also a city contribution that is presented in any of these maintenance projects. Will fund generally about twenty five percent through sales tax on maintenance activities such as a concrete payment repair project, and on the heavier and more expensive intensive reconstruction projects, we will contribute seventy percent of that cost so that it lowers the special assessment cost to those
Speaker 3adjacent landoders. All funded through the first penny of sales tax.
Speaker 2Okay, And besides Third Street, what else do we have going on?
Speaker 3Our big one that we have this summer is our East Century Avenue reconstruction project that starts at about Centennial Road and goes out to the east. So it might be a corridor that people don't use unless they're in that area, but it's definitely in our growth area in our community. Northeast Bismark is where we'll anticipate a lot of our future growth, so we felt real comfortable with the investment of increased infrastructure in that location. Taking that two lane ditch section roadway similar to what we've seen on some of these other corridors that we've converted into a multi lane urban facility. So when this project's done on eth Century Avenue, you'll find it very similar to
Speaker 3the other segments of Century from a Valley Forge to Centennial Road, where it's a flush five lane roadway with a trail on one side, sidewalk on the other, corridor, lighting and some street trees.
Speaker 2And again that is largely funded through sales tax, some state and federal funding.
Speaker 3As well, So on this project, it's funded primarily through the half sent sales tax for arterial road construction and reconstruction. We did also receive a two million dollar grant from the North Dakota Department of Transportation with state dollars through their Flexible Transportation program. And then the last aspect that we have is funded through our water utility. It's a good opportunity when we are digging up a corridor putting a new road, if there's any water main repairs that we need to make, or any extensions of those water lines, it's kind of the opportune time to do that while we have the corridor under construction. So that's funded through
Speaker 3both the water utility rates that our rate payers pay as well as a grant from the Department of Water Resources.
Speaker 2And speaking of water, I know there's another there's some replacements occurring as we talked already, and the core of town i'll call it, or the older part of town I've driven ply it, and it's the Custer Park area. There's there's water being replaced. There is there other utilities also being replaced at the same time.
Speaker 3So the product you're referring to is our cast iron water main replacement project, and that's the project that we'll do about three million dollars worth every year generally speaking, which gets us about two miles worth of water main, which is interesting to think of two miles seems like a really long stretch, but when you break it down by blocks, it might just be a couple of blocks worth or a neighborhood worth to kind of get up to that ten thousand feet of water main. So this is the areas where we have smaller diameter, older cast iron water mains and replace that through a technique that pulls in and bursts the existing pipe and kind of
Speaker 3bursts it out of the way and then it pulls in a brand new pipe behind it, and then all the excavation that we have to do is that the two bore pits to receive and inject that the trenching device, as well as then reconnect any of our utility service connections. So every how, every business that needs service, we'd have to dig a hole in that location to disconnect them, if you will, from the old line and reconnect them to now the new line that's in place.
Speaker 2We're not necessarily turning up the entire street to accomplish this, which saves some money.
Speaker 3Yep. We found this is a more cost efficient way to replace the water main to really just have a contractor that specialized in that activity get in there, do that work and get out of there. Subsequently, maybe the year or the following year after that is probably the time that we would look to replace the store or excub the pavement structure and maybe do a million overlay or a full reconstruct of the roadway if that's what's desired. So really, we'll work hand in hand with our utility public works utility operations folks in city here to make sure that whatever we're planning for the roads makes sense for what they're planning for the water main and if
Speaker 3we have to accelerate or decelerate maybe the timing of one of those projects, we do that in tandem.
Speaker 2Then okay, So do you have any other major projects that are planned for the rest of the summer of twenty twenty five into the fall that we haven't talked about it at the moment.
Speaker 3Yeah, i'd say any of the projects that we have, they might be under contract right now, but some of these in Particulart's say, our street maintenance project might have ten units, so it might be ten areas in town that will be impacted by this. And so if you're in the south part of town, that's where our contractor is working on Walker Avenue, that's where they started their work, and they really didn't do any of the work on the north side of town. So we'll likely see as the summer progresses, the work in the south side of town, you know, finish up, get buttoned up into the contractor move out to some of those other units. So if you see construction in front of your home, now, hopefully
Speaker 3that we'll be out of there and then move on to somewhere else and we'll push that impact on that activity to another place in our community, okay.
Speaker 2And looking to the future, we have a couple of things that are out there. Obviously, we always have you know, the arterial road type roadwork coming up. And we have a plan or a project that's scheduled to start next year probably or shortly thereafter, and that's Sherlott Parkway yep.
Speaker 3So our our next project that would be funded through that half sent sales tax program or arterial and for material reconstruction and construction would be our Tyler Parkway extension project that would take Tyler Parkway from its existing dead end at Valley Drive and connected across the Tyler Cooley to Cogburn Road over an elk Ridge area. So it's about four thousand or foot so connection of these two dead end segments of Tyler Parkway that would allow for increased connectivity for the community, increased or improved response time
Speaker 3for emergency services, and with that some additional parks and rec related facilities trails being constructed as well.
Speaker 2Okay, And that is huge because I think it will save us or delay the timeline for having to probably put a fire station in a quadrant and increase the traffic flow and hopefully not disrupt the neighborhood too much.
Speaker 3Yep. So anytime that the fire looks to respond to driving on the roads that we have, then the routes that are available to them, so the location of their fire station on Tyler Parkway currently, they can get more I guess depth into the community on that same response time by howing a more direct route to get to those locations. So instead of going through a bunch of neighborhoods and it's taking two miles to get to the location, this would be a more direct route for them to take maybe one mile to get to that same location.
Speaker 2Okay, and talking about the half set sales tax, when we're probably going to have to look at what needs to happen in the future as that goes. But do we have other projects that we can maybe still fund? Are we are we kind of going to the end of that funding stream yep.
Speaker 3So that the halfset sales tax was passed in twenty eighteen had a ten year sunset on it, so we would expect the last revenue if left untouched, in twenty twenty nine. So by our estimations, we would anticipate we'd still have about thirteen million dollars of that program that would be funded, but without a project identified for it. So we'll still have a commission decision of what to do with that remaining balance at this point in time, or if there's an extension or some other discussion on what to do with that program. But ultimately, we've invested so far about sixty seven million dollars by the end of twenty twenty five in these six to seven miles
Speaker 3worth of our tier road projects, so by and large, has been a very successful program for our community.
Speaker 2And we've been able to get some matching dollars to enhance those improvements from various other agencies correct yep.
Speaker 3So when we've taken our local dollars, we've pledged those with some of the federals and state dollars that we've been able to secure, something to the tune about eighteen million that we've secured in that realm too. So it's taken our local dollars and stretched them out even further without the need to use a special assessment of any of the adjacent properties for that improvement.
Speaker 2And I think it's important for people to understand that because that is actually a way for us to stretch those federal dollars some or state dollars. So as the case may be, we have other projects that at least we've talked about at the commission table, and certainly as a community, we know are out there and I'll bring it up and it may not be necessarily a topic we're ready for, but I'm a break up. It's flood control and protection. Where are we at with what we're trying to do is self Bismarck or just general flood protection for Bismarck.
Speaker 3Sure, So what happened in twenty twenty four is the city adopted a new floodplane that the FEMA in our state required us to do. So in the end, we took a lot of what was in South Bismarck that was protected by a gate structure on South Washington's drainage ditch. But because FEMA didn't recognize that as effective flood and certified flood protection, they really project the floodplane back into the heart of Bismarck. So we've developed projects and scenarios and alternatives that would be able to get FEMA certified
Speaker 3flood protection for South Bismarck and have received federal dollars from FEMA to enact those improvements. We're currently working on the design of what that would look like. We've approached the state and the previous biennian the state legislature and did receive dollars towards the construction of these improvements and are working towards finalizing that design so that we can then go back and either bid the project or go back to the state nows for additional resources before we commit fully to that activity.
Speaker 2And part of that discussion at the state level is haus this really fit and how do we how are we proven out to be flood protection and so a lot of work on your team's staff to actually probably prove to the state that this is flood protection.
Speaker 3Yeah, there's a lot of government oversight. To access those dollars, you need to prove to those agencies that this is for the intended purpose. So, whether it's the FEMA dollars or it's the state dollars, each of those will have requirements that will have to work through to prove that this is providing effective FEMA certified flood protection and if so, we'd be able to then effectively change that map at the conclusion of the project to remove much of the product, much of the property that was added in twenty twenty four and pull that out of the flood plan. But that would be a multiple years from now sort of discussion because the improvements would have to not only be
Speaker 3bid and designed, but actually constructed and surveyed before we could certify to FEMA that our citizens are now protected from that level of flood protection.
Speaker 2And the goal here is somewhere a thousand structures are more probably impacted, and that's why it's so important.
Speaker 3Yeah, we brought in a thousand structures into that flood play. I shouldn'tay we the Floodplaine brought those in. It wasn't necessarily the city Bismarck driven. But yeah, one thousand structures approximately. Many of those manufactured home park locations. We have some critical infrastructure facilities, some substations, education facilities, and medical facilities. So there's a lot of important property within that area that would be inundated in accordance to to FEMA's Floodplaine map. So that's one of the reasons that we're trying real hard to see what we could do to resolve that right.
Speaker 2And so skip back to roads because that's your one of your primary focuses what role projects do you see that we should need to be looking for to be prepared for. I guess beyond twenty twenty six that you've kind of already identified might be projects to look at.
Speaker 3Sure, So past twenty twenty six, I mean, we'll will continue to invest in our roadways. That's always our number one priority is taking care of our existing network, and to do that in a manner that keeps our roadway condition at the level that our citizens are accustomed to requires a significant investment. So we'll continue to use our long range planning tools that we have. Every five years or so, we will have an entire inventory of our community and its payment condition inventoried, and then we'll use that to help inform what our capital improvement plan should look like, so we can properly identify the projects and then budget for them accordingly. So really, at any given time,
Speaker 3we would expect to touch that roadway, every roadway with some sort of improvement. Hopefully it's a lower cost prevented maintenance, crack sailing, crack mitigation, surface coat sort of treatment, but other times it's a more expensive reconstruct sort of facility. But like I said, our main goal is always to repair the facilities that we have. It does provide some fun opportunities to take into account some of the other maybe planning documents that we have out there that we've produced or that have been produced in our behalf, to incorporate other improvements, whether it's a safety improvement around about
Speaker 3a new sidewalk here or there, that when we're already exploding that intersection and obliterating the entirety of it, it really doesn't matter the cost to put it back. It's going to cost the same to put it back. So we could put it back with maybe a curb line that's a little bit wider if that's the goal, or maybe a curb line is a little bit narrower if that's the goal. But we have a lot of sunk costs and we can kind of recreate the city in the image that we want it to be sure.
Speaker 2On the sunset setting sales tax, there were some additional roadways that were identified that have not been touched yet.
Speaker 3Is that correct? Correct? Some of the corridors that we haven't really improved or touched that we would be eligible for the half sent sales tax will be fifty seventh Avenue between Washington Street and State Street. Really the State Street corridor from Calgary Avenue north to eighteen oh four, the State High eighteen oh four or seventy first Avenue is an eligible corridor, and the Main Avenue corridor from I think twenty sixth Street or might be from Expressway to the east to sixty six. They're all eligible corridors that we could put investments on. And that's really the kind of the analysis that we'll be performing to understand
Speaker 3of those corridors, where's the most pressing need and where to invest those dollars.
Speaker 2And that's obviously one of the ways we fund it. What are the ways that we fund some of our roadway network improvements, repairs, maintenance and so on.
Speaker 3Sure when we get to the project level, I mean, the biggest funding sources that we use are one penny of sales tax that we have for infrastructure, and the City Commission so far as used those dollars to push that and subsidize the special assessments that would be used for those maintenance activities. So the accompanying the special assessments is a hefty dose of sales tax. We also look to our federal partners. When the State DOT has grant opportunities or even the allotment that might be given to the Bismarck Mandan area. We try to prioritize those maintenance activities and maintenance dollars first, so that we have taking
Speaker 3care of our network as the number one priority before we consider expanding to that network. So the combination of special assessments, sales tax, and then either federal or state aid is where we primarily make up our funding revenue sources.
Speaker 2So as we like to the future challenges opportunities for our city.
Speaker 3Streets, I think challenges opportunities are always the fact that it freezes and thaws here. So it pains me every single time we do a perfectly great project and then we have a winter, and it's not just the plow damage, is the fact that that ground is moving, it's freezing, its throwing. Anytime we have subsequent freezing and thawing events, it just ages that roadway to a higher degree than what you might find in Arizona or even in Alaska. So anywhere that you just have a lot of those free thaw cycles, you'll see a lot of road degradation. So unfortunately, anytime we do a product, we know we have to be back there again. So it's our goal to try to do as efficiently as we can and
Speaker 3make sure we're making the correct preventative maintenance activity at the right time of that pavement's life, so that we aren't ripping up perfectly good infrastructure, but we're also not waiting for that infrastructure to go bad and have to have an unnecessarily high improvement strategy. So that's always the challenge, is trying to find the right tool at the right time for that particular facility, and regardless of roads or water mains or sewers, whatever that facility is, that's always our goal.
Speaker 2So from your perspective as a city engineer, what things do we need to be looking forward? What things should the city be trying to figure out the best way to effectively, efficiently and cost benefit wise accomplish, whether it's for your own tools or measuring the roads, whatever it is.
Speaker 3Sure, I think the sustainable funding sources are always an important thing. If we knew every year that we would be getting a set amount of federal dollars to use, we would be able to better plan how to use those dollars. But it is subject to change, so those dollars aren't always assured. Sometimes the state partner transportation will come in and do a project in our community. That's great and we love it when they do that, but we don't have a guarantee that that will happen. So there's always that risk, that outstanding risk that's out there of we think that the Feds will come in and repair these things, but ultimately they are our roads. We
Speaker 3have to maintain them. If there's no federal money, that's our obligation. So for us to find ways to have a sustainable program, whether it's through a street utility fee or some other funding mechanism that would allow us to have a revenue source that's identified for those types of improvements that have some uncertainty in their funding. That is obviously a very interesting topic to have with the community and I'd have a lot of interest in that.
Speaker 2And that would there is sustainabile funding. I think it does help for a cost downpoint, easier plan and maybe even bid and when it's not urgent.
Speaker 3Yeah, there's definitely a cost savings component with that. We're able to plan the right tool at the right time. When we do use special assessments, there's cost to borrow, there's costs for the bonding that go into that process, and we pass those costs onto who's paying the special assessments, So some of those costs wouldn't have to happen the carrying costs for for that infrastructure project if we weren't using special assessment. So there's benefits and there's obviously cons with any of those funding sources, but from special assessments, that's definitely one of the challenges.
Speaker 2So, Gabe, how do citizens find out what's going on. What's the best way for them to know where street activity is happening that might cause them to have a delay in their commute.
Speaker 3Sure, we got we had a lot of different opportunities to discuss our activities with the public. We try to when we know it's coming, when we know what's happening, we try to get advanced notice out. So our street maintenance improvement districts, because they are funded through special assessments, we'll write every single landowner in that area a letter prior to the project even being bid or awarded, letting them know of this project and what to expect. We'll do the same things with our water main improvement projects because we will be setting them up for temporary water for period of time. We do some extra engagement letting them know we're doing this, this is what it looks like, this is what to expect, this is who to contact, etc.
Speaker 3For more of the general public, we'll use a couple of different methods, one being direct information on our website at Bismarck andd dot gov. Usually slash streets gets you all the headlines and news and all the information that we're promoting at the time, but we'll use our media partners to send out press releases that'll get picked up by the local media saying what that activity or that lane closure, that road closure might look like for the next a little bit of time. And then lastly, I think our final component is just on the roadway with the construction signing that we have. The sign that says road closed is obviously a very indicative message that that
Speaker 3road is closed in front of you and find another route. We try to put out digital message board signs before we get to that point, letting people know on that corridor that might commute that on a daily basis, but maybe don't live in the area that come xyz date, this road will be closed and you'll have to go a different way, or you have some lanes closed and expected to lay. So we try to get that information out before we do it so that the traveling public can make accommodations in their daily schedule.
Speaker 2And when they go to the website, the maps, I won't call it interactive, but there's a pretty good map that they can pull up and actually see, even if it's not going on yet, where that construction is going to be, so that they can start to plan ahead of time.
Speaker 3Yeah, we have two features that we would like to maintain an update on our website. The one is kind of all of our construction projects that we'll see in twenty twenty five. So it's just it's a five their construction type. So if it's a water main replacement, a street rehab, of fixing, a traffic signal, whatever the thing is, I have that just deospatially referenced so the citizen can go in and figure out what is it that's being done in this area. That's more of a global not up to the minute or even up to the second. That's everything that we plan on doing the summer for this construction season. Another tool we have on the same website just goes through our lane closures in our current
Speaker 3road restrictions that we have. So if someone's just curious about where do we have current lane restrictions, we have a map on our website that says on street we have a lane closure. On XYZ Street, you might have a full road closure, and here's the detwo route to get around this activity that's occurring somewhere.
Speaker 2Babe, Is there anything else we should share with our citizens?
Speaker 3I would say the final thing would just be as you make your way into those construction zones, to go safely through them. I know it might be a delay for you, but that's the work site. That's the job site for someone else, And we want to make sure everyone's safe, our workers, our citizens, our community, anyone who's in these constructions. Ell lude us want to make sure everyone's safe. And to do that, it's being alert and not get on your phone and paying attention to the signs and being paying attention to your surroundings.
Speaker 2And I'm gonna throw one last one in and it's not engineering related, but I do ask assistance. Please watch the speeds traffic signs. You know, there are pedestrians walking, there are cars that are trying to traverse through and I've come upon a couple accidents the last couple of weeks that I'm like, oh my gosh, those are pretty high speeds. So let's try to respect everybody else's property as well.
Speaker 3Please. That's a great, great thing to do is travel safely everywhere you Gabe.
Speaker 2Thank you for sharing a bit of an update on what's going on in our community from a road construction and water utility infrastructure rebuild.
Speaker 3Thanks for having me.
Speaker 1Thank you for watching Bismarck Insights with Mayor Mike Schmiz. If you have specific topics or questions you'd like addressed in future episodes, email m Schmidtz at Bismarck and d Duck of recall the City of Bismarck at seven oh one three five five one three zero zero. To learn more about the City of Bismarck, visit Bismarck and d Duck Gov, or follow us on a variety of social media channels by searching Bismarck and decov. Bismarck Insights is a collaboration between Dakota Media Access and the City of Bismarck.
Speaker 1You may find Bismarck Insights episodes on Government Access channels two and six oh two, as well as on Roco, Apple TV, Fire TV devices, on radio Access one oh two point five FM, and on demand at FreeTV dot org m
Nobody is credited on this episode yet.
Mayor Mike Schmitz talks to Matt Gardner.
Mayor Mike Schmitz talks to Christy Ames-Davis, City Forester.
Mayor Mike Schmitz talks to Christopher Holzer, Traffic Engineer.
Mayor Mike Schmitz talks to Noah Lindelow.
Mayor Mike Schmitz talks to Krista Rausch.