Speaker 1Welcome to Bismarck Insights with Mayor Mike Schmidz, a transparent and engaging conversational dive into meaningful topics impacting local government in Bismarck, North Dakota. Bismarck Insights is dedicated to removing barriers between the City of Bismarck and the citizens we serve every day.
Speaker 2Welcome to Bismarck Insights. I'm Mayor Mike Schmidtz, and today we're going to focus on some construction projects going on for the city within the city with one of our partners in the community, Jeff Ubel. Jeff, let's give people a little bit of background for them, because they may not all know who you are our viewers, So tell us a little bit about your background and what got you to the city of Bismarck and got you to be involved with what you're doing.
Speaker 3Sure, so I grew up in Minnesota. I went to in DSU where I met my wife who was from Bismarck. Her parents still live on Washington Street today, and so that was my introduction to Bismarck. I started working for Warren Twingey, who had started a firm here twenty years before. I arrived and he had been a longtime partner with City Bismarck along with all of the other political subdivisions, and so that was kind of the launching pad for me to get an introduction into the city. The very
Speaker 3first project that I worked on when I got to Warren's office was the Bismarck Event Center. The South edition was under construction at that time, and I was given the opportunity to complete that project. And then from that project, I went straight into having responsibility to lead the new what was new Public Works Building at that time, the relocation of the Public Works building to twenty sixth Street, And at the conclusion of that, I went right into the leading the the design and construction of the new
Speaker 3airport terminal, and then follow that up with the renovation of the Bismarck Police Department. And so really the entire beginning of my career was working with the City of Bismarck as a partner. And as warned, chose to retire back in the mid two thousands, I kept that tradition going on and continue to operate a small firm in the community today.
Speaker 2Sure, and so everybody understands not you do other work with sites for this the city business, you have to bid cement proposals and bids for the work.
Speaker 3Absolutely. Yeah, we do work for the school district, the park district, the county. We really focus our effort in the Bismarck area, but we do have a practice that stretches beyond even Bitmark Manday.
Speaker 2And it's more than just municipalities. Yes, we want people to understand that. But you have been a good partner for the city and some pretty critical buildings as we have gone forward and through life here as residents of the City of Bismarck and as the city has had his life and one of those that that we have you involved with is the capital improvement plan for the event center that his needs needs a little love. So let's let's talk about what we've got going there and
Speaker 2where we're at in the process, because some of the things are going to happen are not going to be visible, but they're going to help the the space the environment dramatically. Yeah.
Speaker 3Absolutely, the capital Improvement Plan was in my opinion, it was a big step forward for the event center. There was a lot of effort that you went that went into that. Of course, you know that as being a core member of the team. And what what made it unique I think versus some of the other efforts that have happened down there over the years, is that, along with looking at just the capital component of this, what needs to be done to move that facility forward, we set a list of priorities to try to establish what
Speaker 3that path looks like. You know, with a project or a facility is as big as the event center, and its complicated in the sense that it impacts a lot of people, whether it be the folks that work there or the folks that use it. You have to have this this this list of priorities to help identify the path moving forward, and I think that was what was unique to that. You know, we looked at of course, we looked at the economic impacts, you know, what are these projects going to cost, how are we going to how are we going to fund those? But we also
Speaker 3looked at at how can we develop projects that generate additional revenue for the city, how how what kind of projects can we develop that help improve operational efficiency. We looked at how projects might impact safety. You know, that's a big component when you have a lot of people coming together. We looked at projects that improved the workplace experience, the vendor experience, the people who utilize the building for their events, and then probably most importantly, we looked at
Speaker 3projects that created a better guest experience. That's what really impacts us here as users of the facility. And so the capital Improvement Plan took into consideration all of those and then we started to align projects that would create the biggest bang, if you will, that met all of those or the most of those criteria that we could. And so right now we have three projects in development.
Speaker 3Two of them are actually bidding in the next two weeks. The first one is we're looking at doing a lighting replacement and lighting controls project in the exhibit hall, one of those projects that impacts every event that happens in there, from volleyball to basketball, to convey events to weddings. That project will be bidding on Monday. We're following that up to following Monday with Phase one of the HVAC project,
Speaker 3and so this is a modernization of the heating, ventilating and air conditioning system for the arena. Phase two of that will focus on the event center that are the convention center. That will happen a little bit further down the road. Again, that's a project that's pretty easy to see that it really impacts all of those priorities. And then the third project is a small one, but it's really one that I think is going to have a subtle but important impact, and that's a signage of wayfinding project. So this is a project that will help guests navigate
Speaker 3through the building. And I think over the years, this is probably one of the biggest complaints that we've heard, is signage just isn't that great when you're trying to work your way through the building?
Speaker 2Consistent? Right now? Yeah and so and sometimes miss.
Speaker 3Yeah, absolutely absolutely, And that's one that's really if you think about that priority list that I mentioned, that's one that's really focused on that guest experience above all the other priorities.
Speaker 2And just before we get onto some of the other projects that will be coming down the road, I think it's important for people to understand that we have a great facility. The structure is solid, and people say, well, why don't you just build a brand new building, And they have to understand that, A, we have a very good building. It's located quite well when you look at where the airport is and some of the other establishments in town. And yes, there's certainly restaurants and hotels on the other side of Bismarck, but from an access for airport,
Speaker 2the Interstate Access Expressway Bismarck Expressway coming through. From the business loop standpoint, it's located very well when you have people coming in for conventions or if you have artists coming in for performances. But the bigger question became, Okay, if we want to build another facility of the same size or maybe bigger and put in all the bells and whistles, that price tag was enormous.
Speaker 3Yes, yeah, yeah.
Speaker 2So we need to take care of our buildings rather than rebuild them.
Speaker 3Yeah. I think you touched on a lot of really good points. You know, if you look at other comparable facilities throughout the country, multi use facilities like the event center, where you have conventions and you have entertainment, they're always looking to be in a downtown location. Part of it is, well, a big part of it is a lot of the other attractions that go along with it, whether it be hospitality, the hotels, or the restaurants and the bars. But part of that is is that that also creates the greatest
Speaker 3economic impact on a community being located where it is, and the event centers really has always been and I don't know if it was by chance or not, but it's always been really positioned well, you know, between the mall, between the vibrant part of downtown Bismarck. It's always been been positioned in a great spot in terms of the size and what it has to offer. With the way that the entertainment and the convention business goes now, a lot of that is driven by the demand and the need.
Speaker 3You know, as a community, we might want we might say we want this artist to come here, but we don't really get a choice in that the artists are the artists and the entertainers and the convention planners. They're making those decisions based on what you have to offer as a facility. And so yeah, we are fortunate that we have it. It is. It is a solid structure, it's a good building. I think, like you mentioned earlier, Mayor, it just needs a little bit of TLC.
Speaker 2And and you know, we can talk about it, and certainly I've been a part of what we've got going on in the authority board for the event center is active now and new management has come in, but you know, we're not going to have the big concerts that people we might think, like a Taylor Swift is not coming to Bismark, North Dakota for two reasons population based. Number one, not big enough and two we'd have to have a facility that can house twenty five plus thousand or more and that will get used one time in maybe twenty five years.
Speaker 3Yeah, the dynamic with artists has changed. You know, I attend a lot of the professional organizations that relate to the convention and arena business some of their business meetings, and that industry has changed so much where artists have gone more towards stadium series events where you're looking at seventy eighty one hundred thousand seat arenas, or they're going the other direction, which we're also fortunate to have, to a smaller venue like the size of the Bell where
Speaker 3they want, you know, eight nine hundred one thousand seats. And so it's really depends upon what that artist is looking for if we're on a route, you know, but to try to attract a big entertainer to our market is really dependent upon whether they want to come here and then you know, to that point, what are we willing to pay to have them here?
Speaker 2And we can still see nine to ten thousand people in our event center in the arena area.
Speaker 3Yeah, absolutely, And I think over the last a month or so, we're starting to see we are some really good entertainment coming.
Speaker 2We definitely are. So there's some other projects that are going to be coming down the road for the event center, and some of those are going to have probably that more guest experience impact when it comes to restrooms, for example, because we know we need some enhancements there and improvements, but what else do we have coming?
Speaker 3So we structured the Capital Improvement Plan, as you mentioned, Mare to take care of what we have now to really focus in on building up and maintaining that infrastructure. I've had a couple of questions from folks that have looked at the Capital Improvement Plan and they're looking forward to seeing some potential expansion and renovation projects down the road. We move those projects down the road so that we could handle this infrastructure stuff first not create problems where we've painted ourselves into a corner, and then also understand
Speaker 3it gives us a little bit better, a little bit better opportunity to understand how the needs might evolve with that building, the impact that Oakview Group might have on that building. So give us a little bit of a pause on those future projects. But what we would be looking at down the road primarily would be renovation of the convention center side of the facility. Some of those esthetic improvements. We'd be looking at improvements in the arena on the concourses you mentioned the restrooms. Some of that
Speaker 3has to do with accessibility, but some of it just simply has to do with the changing in the market and the demands on the facility. There have been multiple plans that have been put together over the years that have looked at expansion opportunities to support both the arena and the convention side of the building, and I don't think any of those needs have changed. They've been identified for years, and I think they would be good things to come back to. But I think the way we had our plan structured was to focus on the infrastructure,
Speaker 3get a sense of how the needs are going to evolve, and then take a little bit of a pause to see where we're at at that point, and then start planning the future.
Speaker 2Frankly, in my view, expansion was the last thing I needed to worry about. I think we needed to take care of the building itself first, and that had to actually probably not been addressed appropriately when it because we put expansions on first and we really had some mechanical issues within the building that should have been addressed years ago. Yeah.
Speaker 3I think that was a good a good strategy and a good departure that we took with that capital approvement plan.
Speaker 2Now and then once we have that facility back up and to the current age and state of art from a technology standpoint, then we can look at, Okay, what's the next thing to do and what do we need to expand because ten years from now, I mean, what we need is going to be different than what we are thinking it's going to be today.
Speaker 3Yes, absolutely so.
Speaker 2In addition to the events center, there's other synergies we need to worry about as we go forward. And you know part of what that would be is, you know what about hospitality related items, food, beverage, housing, hotels. How do we see that being so intimately involved with success, whether it's the airport or the event center from the city.
Speaker 3Standpoint, Yeah, it's a good discussion and it's as you know, it's been going on for a while, for a long time, a long time, I think, certainly going back to the early two thousands. It's an important component or the event center and for the community as a whole. You know, if we want to talk about it in terms of the event center first, whether it be convention business or entertainment business. If you go anywhere in the country, and it doesn't matter how big or how small the facility is, successful facilities have a hospitality component connected to it. You know,
Speaker 3if we talk about the convention side, traditionally that that market and that business happens from October, you know, through through the spring. In the summer months, in the case of the event center turns over to more of an entertainment focus, and so having a connected hospitality component to that becomes very valuable when you start talking about meeting planners on the entertainment side. It's a huge bonus. If you're looking at an artist coming in and we're trying to attract business from a region, which Bismarck really is
Speaker 3a regional regional hub, having that hospitality component just helps helps supplement that. It's piece that's been missing from the event center and really from that area for some time. We do have hotels down there, but if you look at at a lot of the conventions that that that come in or even some of the concerts. We talk about a concert that has ten thousand seats, and you know, if if even a third of those people are coming from outside the region, they're going to be losing utilizing
Speaker 3all of the hotels in the downtown area. And that's where people want to be, whether it's be a convention or an entertainment venue. You want to be able to go downtown, stay in a hotel, have a nice dinner, go to the venue, you know, hopefully go back out and enjoy downtown Bismarck, and then go back to your hotel and make it a really simple, seamless piece. And so it's been a component that that I think that area has been missing for a long time.
Speaker 2And we'll have to see what comes because it is you know, I think the study shows we need some rooms, some keys, no question about that. But they're also very difficult businesses financially.
Speaker 3Yeah, they are tough, especially with the increase in construction costs that we've had over the last really last twenty years. And it's just a tough market. Hospitality is a tough market.
Speaker 2And you know, in a facility, a hotel facility needs constant care and that's part of what drives that cost of operating them. And I mean, I think there's there's some hope for for something. I certainly would love to see it. I think it would help the community, especially since we are we are now the gateway to the Theodore Roosevelt Madora Library or the Theodore Roosevelt Presidential Library, and I do believe we're go to see traffic enhanced coming through Bismarck. And I'd love to have them stay here,
Speaker 2spend some dollars here in Bismarck before they before they get to Madora.
Speaker 3Yeah.
Speaker 4Absolutely, absolutely.
Speaker 3That's the thing that that's a piece of I think the event Center that over the years, as the conversations have gone on, that I don't think that the people fully appreciate, is that the event center is really an economic engine for our community. You know, the visitors, visitor money coming in creates a very broad and far reaching impact to all the corners of Bismark.
Speaker 2Yeah, all the retail doesn't matter where it's located. If we have visitors to the community, they're probably spending money in all corners of Bismarck and man absolutely. So one of the other things we just briefly touched on, but it's ongoing. Is we're doing. We're in the midst of it. Well, we're kind of beyond sort of the study portion of the terminal for the airport. Where are we at in that whole expansion discussion.
Speaker 3Yeah, so I gotta gotta shift my mindset now.
Speaker 2I'm sorry to.
Speaker 3Another project, but yeah. So the Bismarck Airport terminal is twenty years old, which is hard to believe now, which is kind of a milestone. It's a milestone not just for Bismarck, but it's a milestone that we've seen be consistent across all aviation systems, which is when airport terminals reached that twenty year horizon, they start you start to feel some challenges within the terminal. And back in twenty nineteen,
Speaker 3the Bismarck Airport had reached its record number of employments, so passengers moving through the terminal, which far exceeded what its capacity was, and you could feel it back then. You know, we had a little pause that happened in twenty twenty as a result of COVID, but following that, the airport started to take off again, and so that led to the process of going through and doing a terminal area study. TERMINARYA study is an important piece. It's
Speaker 3not just there to study the terminal to justify project. It's a requirement of the FA. So that means it's a requirement to access federal funding, which is one of the three stool, three legs of the stool that fund the airport. And as a result of that, the FA requires a very robust process that we have to go through. So we went through what ended up being about a twelve to fourteen month long process of study looking at
Speaker 3the airport. We look at everything from the existing systems and infrastructure. We go through and do a very comprehensive forecasting process that includes a variety of different models. There were six different forecasting models that were put together to identify what the growth might look like. We follow that up then by doing a study of what the airport needs, and then that rolls into us doing cost estimating. And
Speaker 3then another big component of that that's a little bit unique to the airport study was we did a financial plan. So not only this is what this project is going to build, we're going to go forward, we need to know what what the models are going to look like in order to fund this. Knowing that it's going to be a large project, it's going to be a require a big capital infusion, and we're going to need help from as a city, We're going to need help from the state, and we're going to need help from the federal government. And so we needed to show how that
Speaker 3would work and then how the airport would continue to be sustainable throughout that process. So we wrap that study, that that portion of the study up and right now we've been in what we're calling or what's called the project formulation period, which is a period where we start to align funding, identify what the federal funding opportunities might be, identify what the state funding opportunities might be, and then certainly after we get those sorted out, then start to
Speaker 3look at what the airport and the city's input is going to be in order to execute the project, and.
Speaker 2Then ultimately determine that the scope of what it might be. You mentioned how old our airport is, and it's it's not ironic, but it just happened to be that because of the age of our terminal and what happened in the world as that terminal was being built and the security enhancements that are required. One of the things that I notice every time I fly, and we certainly see it here in Bismarck, is what tse's requirements are, and that's causing us significant compression in the terminal itself from
Speaker 2the guest gathering or or loading area, I guess the lounge area.
Speaker 3Yeah, Yeah, that's a that's a big, a big component of what we're looking at. If you think about every visit that you make to the air that's really your first pinch point in the process. And like you mentioned, the airport opened up in two thousand and five, it was in the midst of design when the events of nine to eleven happened. TSA didn't exist then. Prior to that, anybody could just wander around the airport, and so at the time that the airport was being designed, we really
Speaker 3had to take a leap and make a lot of guesses on how this was all going to come together. And so since that time, over the last twenty years, TSA has matured. They've implemented a lot of technology, but they've really refined what that checkpoint process looks like, and for Bismarck, unfortunately that's turned into a significant bottleneck in the process, and as you mentioned, as a result of their expanding development, it's now started to take parts of
Speaker 3the departure lounges away, which are really starting to make it almost feel claustrophobic in there when we when we have all that air traffic. And so a big part of what we're looking at with this expansion is aligning what the TSA's objectives are and aligning that with passenger experience to try to make that process a lot more seamless and smooth and reduce the impact that it has on the departure areas.
Speaker 2And as we do that, we're also looking to for gate expansion because we know that in order to have additional airlines coming into the city of Bismarck, we need some gate expansion because they have to have gates available, and the airlines don't like sharing gates very much.
Speaker 3They don't. I mean, there's a that's that's really the second component of what we're looking at. The first are these security enhancements, which include passenger and baggage screening. The second part is expansion of the gatehold areas, and there's kind of two things that are happening there. One is airline the airline busines. This has evolved and so the airlines that we do have are bringing in larger aircraft, which is adding to the congestion in the terminal. So we need to upsize the gates that we have now
Speaker 3to accommodate those larger aircraft. And then we also are suggesting, or the study is suggesting that we add two additional gates. And to your comment adding the gates, it's a little bit of a chicken and egg situation where adding gates doesn't necessarily mean that we're going to get additional air service, but without it, we can't get more air service. The airlines, they definitely have they prefer preferential gates. There are movements
Speaker 3that are happening throughout the community that are looking at or not the community, but the country, that are looking at changing that. But really the challenge that Bismarck has right now is with with four gates and four airlines, we're out of space. And I think another piece to that that sometimes I don't think we realize is that the airlines get to make the call on whether they want to come to Bismarck, and they also make the call and when they arrive and when they depart from Bismarck.
Speaker 3And with the way the whole aviation system is structured around what they call a hub and spoke system, we're at the end of the spoke. And so typically what happens is they come in, they all want to come in at the same time, they all want to leave at the same time, and without having the additional gates, we just don't have anywhere to park any other aircraft, which is going to limit the growth of the airport.
Speaker 2And you've made the point the airlines choose when they're coming here, or really it's the route design out of the spoke, or when they can come and go, and we end up at times where all the gates are or three out of the four are occupied anyway, and if three of the four occupied, from a guest experience standpoint, in the lounge area, we're full. We're beyond full, absolutely, and we can't even expect another airline or another flight
Speaker 2to be able to come in. And and so I've heard it right from management of the airport that they're filling that compression. The probably have had inquiries, but we don't have a place to put that airline.
Speaker 3Yeah, I know that. You know, Matt and Greg work really hard with the airlines to try to expand service. There's a conference that Matt went to just a few weeks ago called Jumpstart, which is a conference it's it's like speed dating for airlines essentially, and there's there's interest in expanding service to Bismarck, but we've got to make some changes in order to get there.
Speaker 2So so as we look at the two facilities that you're intimately involved with for the city of Bismarck, one of the issues we have is rising costs and what that does for cost of construction to put equipment back into a building that's been here a while, so HVAC for the event center, what do we I don't even know if what we get now this plan that that's going to be like in a year or two years from now. But that's part of the issue that we're
Speaker 2trying to deal with with budgeting for those what can you tell people.
Speaker 3Yeap, So historically Bismarck has always had slightly higher costs than out east, you know, using Fargo as a comparison. Typically up to twenty twenty, we were seeing maybe a ten to twelve percent increase in cost over what you saw in the easter or part of the state. So we're already I had a little bit of a disadvantage. Once we reached twenty twenty, the entire construction industry just kind of blew up and a lot of things happened,
Speaker 3and we were seeing spikes in the more like thirty to thirty five percent range in cost. And ever since then, construction has continued to go up at what I would considered be almost an attenable rate. And you know, you know, one of the leaders of the city, you see those costs, whether it be vertical construction or whether it be roads and streets, we're seeing.
Speaker 2It across all segments.
Speaker 3Yes, exactly. And so so it's a really big challenge because it makes it not only harder to plan for those projects, but at some point we have to jump in and do these things, and you want to try to make the right decision on when to do that. But construction is just it's a very fickle industry. It's affected by so many things, global issues affected and of course we know we have all kinds of global issues going on right now, we're seeing really strange spikes and
Speaker 3different aspects of construction. You know, if you look at oil prices and how that affects asphalt right now. So those types of things impact But I think another one that's been impacting our region for some time is just access to labor, the labor markets. Some of that came from the oil boom that changed the dynamic. It reduced the amount of labor that we had in our area. Some of that was a result of the things that happened in twenty twenty during COVID, and honestly, I'm almost
Speaker 3expecting that we're going to see it again as a result of the new oil boom, which I'm referring to as the data centers. You know, we're seeing just the amount of electricians that are required on those projects. Just a couple of weeks ago, I was in Fargo and I was visiting with Sean Doverstream, the Fargo Airport manager, and he was talking about some of the challenges they have with their expansion because of the data set are going up in ourwood, you know, which is it's got
Speaker 3all kinds of positive benefits, but it does affect the cost of doing work. In our community, and so I see this reading the kind of an ongoing and challenge that we have to manage. And then of course the city has its challenges, whether it be from you know, restrictions if you want to call it that, that are being put down from the state, and you know, there's a lot of things that have to be balanced.
Speaker 2And I think one of the things I view it has caused some of the struggle is is we start playing a project today and it's probably not going to shovel ready for three to four years, and what's the you know, we know what the cost might be today. If we could go today, it's an easy decision, but we can't most of the time. And so that for forecasting in that inflationary number three to four years out
Speaker 2is really hard and we're trying to make the decisions and we have to make the best decision we can with the available information we have.
Speaker 3Yeah, absolutely, you did use the airport as a perfect project that when it was the current terminal was built, from the time that started in the study phase to construction was five years. And that's really what we're looking at for this terminal project.
Speaker 2Our study was.
Speaker 3Done, you know this this past winter, and we had cost estimates in there, and we had to try to calculate what's what's this project going to cost when the third phase of that gets done, you know, three years from now or four years from now, and so it is it's really difficult to plan for those things. We try to put contingencies in place, but in the end of the day, it's just you do the best you can with what you know at the time that you put those estimates together.
Speaker 2So well, Jeff, thank you for being with me today and visiting about a couple of topics. I think we probably could go on for a few few more minutes here, but or maybe half hour, but we hopefully we've got some information to our citizens to understand, you know what, what's all behind the scenes, a little bit of how we're getting to some improvements at the event center and what's going to take to get to some improvements at the airport.
Speaker 3Yeah. Absolutely, I appreciate you inviting me to be a part of this. This is a really cool thing that you do for the community and I look forward to to watching some of these in the future.
Speaker 4All right, Son, thank you, thank you.
Speaker 1For watching Bismarck Insights with Mayor Mike Schmidz. If you have specific topics or questions you'd like addressed in future episodes, email m Schmidz at Bismarck and d doc gov. Recall the City of Bismarck at seven oh one three five five one three zero zero. To learn more about the City of Bismarck, visit Bismarck and d Duck Gov, or follow us on a variety of social media channels by searching Bismarck and DCOV. Bismarck Insights is a collaboration between Dakota Media Access and the City of Bismarck. You may
Speaker 1find Bismarck Insights episodes on Government Access channels two and six oh two, as well as on Roco, Apple TV, and Fire TV devices, on Radio Access one oh two point five FM, and on demand at free dot org.
Nobody is credited on this episode yet.
Mayor Mike Schmitz talks to Matt Gardner.
Mayor Mike Schmitz talks to Christy Ames-Davis, City Forester.
Mayor Mike Schmitz talks to Christopher Holzer, Traffic Engineer.
Mayor Mike Schmitz talks to Noah Lindelow.
Mayor Mike Schmitz talks to Krista Rausch.