Speaker 1Welcome to Bismarck Insights with Mayor Mike Schmidtz, a transparent and engaging conversational dive into meaningful topics impacting local government in Bismarck, North Dakota. Bismarck Insights is dedicated to removing barriers between the City of Bismarck and the citizens we serve every day.
Speaker 2Hello and welcome to Bismarck Insights on Mayor Mike Schmidtz. And today we're focusing on Building Inspections and the division that is run by Brady Bolaskowski. I may have butchered that last name. I'm very sorry he did. Terrific Brady, thank you for joining me today and just tell everybody a little bit about yourself. How you came to where you are in Building Inspections and being the division manager and what led you to that.
Speaker 3Sure, yeah, thank you. So. I guess I got my start in the construction industry very very young, right out of high school. I guess my first job in the construction industry was as a concrete labor I finished a lot of concrete, did a lot of carpentry work working for that company. We traveled a lot, unfortunately, so I did want something that was a little bit more more stable as a career field. So I made the tough decision at changing my career path after several years of
Speaker 3working in that job and started an apprenticeship program as a plumber. So I worked in the plumbing industry for many years, got my journeyman license, and my wife and I moved to Bismarck. I got an opportunity with the city to work as the plumbing inspector after their inspector had retired, and then several years later our division grew, a plans examiner position was created and I applied for
Speaker 3that job and became the first plans examiner for the City of Bismark. So it's a great opportunity kind of thought that was going to be where I was for the rest of my career. And a two more years later, the building official, that current building official at that time, got an opportunity to work for the county as they're a director of their new department that they created for planning and zoning. So I worked as the interim building official in the city Bismark for a year before deciding
Speaker 3to apply for that position and obtained that more than ten years ago.
Speaker 2And somehow you're the building official. They have how many inspectors that you oversee?
Speaker 3So there's seven inspectors with our office, each that does various different inspections, but mainly they all have a discipline just dedicated to their background. So our plumbing inspectors have either a journeyman or a master license as a plumber. Electrical same they have a license with the State of North Dakota for that electrical part. So what is the role of building inspections? So, I mean just kind of kind of short and sweet. The role is just to
Speaker 3ensure that the buildings are being constructed in a safe manner so that their occupants of those buildings are are safe and those that are first responders are also safe when they're responding to incidents in those billoks.
Speaker 2And then at what point in time are inspect Well maybe I better ask you differently, at what point in time should a person make sure they're contacting the inspections department projects that should be inspected? Are you know, kind of give a kind of your general layout of what that might look like so people understand that there's a time and a place that it's appropriate.
Speaker 3So, you know, are our contractors generally know, you know, when to call, they've they've gone through the process many different times. But homeowners or you know, speaking in general to them, when they're doing alterations to a building, is changing the configuration of a of a space, that would be you know, one one main time to call, and you can reach out to our office to acquire permits, ask questions through the process of permitting. The other things would be on those specialized systems like you're electrical, you're
Speaker 3you're plumbing, you're heating, those kinds of things. You know, homeowners can do their own their own work in those disciplines if they if they own and live there in that home, but they would just need to reach out to us to acquire those permits before starting the project. And then you know, at certain times of phases during the project, so that we have access to look at for example, and the electrical our our staff has access to look at the wiring before it's concealed. And then also once the fixtures are installed, outlets are installed, they can test those outlets to make sure that they're working properly.
Speaker 3So let's give an example of a modification that would require a building permit, yeah, versus one that maybe does. And sure tell you know, I, like you said, the contractors probably know, but they have a lot of residents who do a lot of home improvements on their own. Yeah, for sure, that's a great question.
Speaker 2You know.
Speaker 3An example for a home improvement project would be if you're replacing the carpet or a tile floor, or even putting in new cabinets, countertops, those kind of things. Those don't not need a permit. But if you're reconfiguring your your kitchen or your bathroom, you're removing walls, you're moving you know, your kitchen from one location to another, there's going to be some modifications there, likely with electrical, with plumbing, and even possibly mechanical if there was certain elements that needed to be adjusted. So those would all be things
Speaker 3that need a permit and inspection.
Speaker 2So what about look I kind of a real life example myself at the helmet. I may have to replace my deck. Okay, we'll modify it. But is that something that needs to be inspected to permit for?
Speaker 3Yeah? So decks. Decks sometimes we always get into a little gray area with them because a lot of people maybe just want to you know, freshen it up and maybe put new deck boards on. You know, they're going to leave the substructure, the structure that's supporting everything alone, and they just want to you know, replace maybe some old you know deck boards with new uh no, more modern type type or those kind of things we we we wouldn't require a permit for. But if you do change any structural modifications like the joysts and beams, if
Speaker 3the railings are needing to be replaced, and it's a deck that's maybe you know, six eight feet off the ground, we're gonna want to make sure that those are supported properly, that the spaces between the spindles are narrow enough that a child's not going to get stuck in there, and that the stairs, you know, maybe those are going to be replaced, those have the correct rise and run to them. Okay, And I bring that up because I just have to have a situation. We we'll have to see if I have to go through the or not. But people don't
Speaker 3always think about that. And for sure, though that's a situation, is not like you're making it different, No, but safety becomes the concern. We don't want those those structures not being held in supported appropriately because the last thing we want is them to collapse and have someone hurt. Correct, So to really go through the inspection process, there's there's underlying rules and laws that we have to follow, and that's really our building codes, and that's the heart of
Speaker 3what what drives what you and your team have to manage to. I guess where do those codes come from? How what's the difference between the international and national local state? Yeah? No, great, great question. So there's a there's a model code industry out there, and I think the leader in that industry is the International Code Council. That's that's really where any law codes are going to be created. All fifty states currently have adopted some sort of version I should say,
Speaker 3of the model codes, depending on what year they're on. So that's where where it starts from there. Once code, once, once that industry or that Code Council creates those codes, each state has the opportunity to adopt those model codes, and each local jurisdiction also has the ability to adopt those codes.
Speaker 1Yeah.
Speaker 3I guess if you want me to elaborate on more of that, I mean, you're if you.
Speaker 2Can elaborate, and we are you know, Yeah, from there, what happens, I mean the state adopts the code, but then locally we have some choices to make sometimes too, and how do we go through that? How often do we go through sure that in addition to just sometimes fixing things.
Speaker 3Yeah, so, so model codes are created on a kind of a three year process, I kind of like to like to say it. It kind of starts and then and finishes at the same time, you know it, Once one code is finished being created, an ext version has started to be worked on. So every three years, the state of North Quota will take a look at it as well as local governments will take take a look at it. They're created through a process that's generally three stages,
Speaker 3I guess it's the easiest way to explain it. Where a first stage is the co council will create committees and also accept amendments. Those committees will then review those those amendments, and in the second phase of that process will host public hearings public comments, and the individuals that either support or don't support those post mems have opportunities to speak, provide comment and testimony. And then the third final phase in a three year process would be the
Speaker 3voting portion of it, where jurisdictions and eligible voting members would vote on those codes, either in person or online. And then once the code is is completed, the process is completed, co Council will publish those codes online, They'll start to provide continuing education to inspectors, to architects and engineers about the changes in those those codes. And again, like I said, in the next three years, they'll they'll start that process over really just to allow for you know,
Speaker 3change new technology. Maybe various incidents have occurred over time that created and be a need to add a new code for increased safety.
Speaker 2So once once that's completed, and then it goes to the state, the state adopts makes whatever changes they make to that. Then locally we look at it as well to see if we have any alterations or neat alterations made a bad word, but need to adopt it slightly differently, a variance to it. What how does that work and how much different are AREC Bismarck codes compared to maybe the state or the international colure.
Speaker 3Yeah, so locally we try to stay right in line with the state process. So actually next week the state will be going through a review process with what they call their Building Code Advisory Committee and they'll be reviewing the local or the excuse me, the state amendments. So we've already gotten the international codes published. They're there for us to review. Now our state is looking at them and wanting to adopt. So those are open public public meetings.
Speaker 3They can receive comments and then provide recommendation on, you know, whether they want to see that that particular amendment be passed. The next kind of point along that development cycle for the state will be in August when or excuse me, in September. September, when there is a voting meeting of eligible voting members throughout the state like they sell and other building officials throughout throughout the state, township board members if they have building codes that they've adopted, so they'll
Speaker 3they'll vote on that. Our local process, I guess I like to try to stay right in line with that. We did have meetings with our local home builders Association and other stakeholders just to kind of give them an idea of when the state process was going to be, you know, taking place in those those very specific dates of public hearings. Scienticipate we'll be doing some work, more work after next week's meeting, having a better understanding of kind of what amendments are being moved forward with a pass or or don't pass, and really reaching out to
Speaker 3our local builders to see what is it that we would like to change or if that we would like to adopt that specific to our area. I have to remember that the international codes are are just that they take into account all geographic regions you know, in the United States, and we may not many of the codes may not apply to our region. Also, we don't provide the same types of inspections all the time due to limited numbers of staff or just areas that we don't
Speaker 3you know, we don't cover with our inspection process, so we may want to remove those from the code or make modifications that it's clear that were this only applies to this certain type of constructions.
Speaker 2And and is like the City of Bismarck's building code similar dissimilar to Burley Counties Or are the variances if you can just high level identify some of those.
Speaker 3For sure, you know, I think the main differences are going to be with our like administrative section of the code, where it's what permise do we require? There's certain items where we'll go in probably a little bit more detail because we we will make amendments locally where I think Burley Kellnty and other parts of the state will just adopt the state code by reference, and it's the state building code process that determines those amendments. They won't go
Speaker 3through like a local amendment process themselves. The amendments that are generally made at the state level are very high level. We understand that we want to you know, they want to let the local jurisdictions have their own control right over things. So that's where you'll see the most difference between those two entities. But like another community like Mandan for example, they do allow or do make some changes to their organs when it comes to building codes. So you might see things like, for example, that door closers
Speaker 3on a garage door, the door between a house and your attached garage, whether the self closers are required to be on it or not. Egres window heights, so if you're standing in your basement threshold of that window, at what height is it? You know, certain things like that might be a little different. But yeah, nothing nothing major. I mean nothing that I think that any contractor would have a real issue with. But we'd like to be
Speaker 3the same. I mean, quite honestly, I mean not sure that's the goal. Is that, especially when you're dealing with you know, crossing the line that's in a point in the map, and you know what you want to be as similar as possible. That obviously, so people know. So Halla's technology impacted building inspections, gosh, I mean there's a lot there, right. I mean technology for us, just from our inspectors and how they do their jobs has changed. I mean everyone, everyone of our inspectors has a has
Speaker 3an iPhone and an iPad and they complete everything digitally. But also it's changed for the building industry as well. I mean, things continually evolve and continue to grow from a technology standpoint. New products come out almost almost every day. And another really good reason why we update codes every three years is so that those those those products, materials, technologies that aren't addressed in the codes can be addressed and we can allow them to be used in our community.
Speaker 2And obviously every three years may not be freaking enough for some code changes, and so do we occasionally have to modify our code or our ordinance of managing the code.
Speaker 3Yep, So we can do that, that is an option, but there's also some language in the code that we use that's just for alternate design materials. So the code doesn't come right out and say everything that's new is bad and you can't do it because we don't address it. It says there's other ways that you can do these things, as long as you have evidence that this has been tested. It's it's a listed applients or a listed material, it's going through a testing agency, and it's approved by other
Speaker 3industry professionals that it's equivalent to another type of product or material it can be used in that application. So the CO Council and other other Model Code standard organizations do have those listing agencies affiliated with them as well that provide that kind of research data for us to make a decision on whether we're going to accept something new. That meaning isn't specifically referenced in a code, so I'm sure and so, but we also may find a situation
Speaker 3where we had a certain expectation of foundations or whatever and realize how we we need to modify that. That would be something else that might happen, not just it may not even been addressed during the annual or three by the third year annual whatever we want to call it renewal, we do. We fix code when it comes to that if we if we find a need to do that, that's appropriate and our our stakeholders think it's right as well. Yeah, absolutely, that's that's definitely an option,
Speaker 3you know, any time to take a look at those things that that may change in between that, you know, more formal process of code, code adoption, code amendment in any there's a process for that. Taking that through the proper channels and getting the city Commission's approval to do those things is definitely option.
Speaker 2So just some people know that, you know, oh yeah, they identify something, they can have a conversation and wish and look at what needs to be done. So part of inspections is of course the permits and licensing. What what are the licensing situations that your department handles, Like you're licensing or providing an ability for certain contractors to do certain work. There's something that are required, and then of course what are the permitting processes like and what's the time frame to get those issued?
Speaker 3So well, like I mentioned earlier, the State Plumbing Board, state Electrical Board, they have licenses that are universal throughout the state. UH for for contractors in any any community, so they can work throughout the state in any anywhere get permit that sort of thing. The one piece that that the state doesn't have that we've started along with a few other communities like Fargo, Grand Forks and why Not, is mechanical licensing. So we do license our mechanical contractors there.
Speaker 3They hold a license with us and they renew that annually. I think the good thing about licensing is just it's it's really giving the consumer and and the citizens assurance that there's there's a certain level of knowledge that those individuals have. There's an expectation that with that knowledge, there there comes a responsibility, uh to do those things correctly and you know, certainly safety. Knowing that that they've gone through the proper channels to get become licensed. They and
Speaker 3they're getting permits through our office too to make sure that things are installed safely.
Speaker 2So just to help people understand mechanical every mechanicals, So let's define that for them. What what is a mechanical contract or what do they do?
Speaker 3Yeah, so mechanical contractor would be responsible for, you know, installing a furnace, modifying any doc torque, installing gas piping in your home, you know, really the the the heating and cooling of your you know, of your of your home or or commercial building would be under their scope.
Speaker 2For ok, I just want people to understand that, because I don't think everybody dows when you start mechanical or HVAC. How about on the permitting side, what what's the lead time so much should be applying for permits? What permits are reissuing uh through your department?
Speaker 3Anyway, So we have we have many different different types of permits and different review times for those permits. So in general, like a standard homeowners permitting for you know, a shed or a deck or a garage or something like that, is fairly fairly quick. Most of the time, it's within the same week that they apply for it. And generally, if it's someone that's applying for the first, you know time and maybe even the only time that they've ever worked with us, there's probably a lot of you know, back and forth, just just trying to make
Speaker 3sure that we understand credctly what they want to do, make sure that they're you know, putting that structure in the right place, They're not on an easement, you know that kind of thing. So our front office staff can can work through most of that with people, uh and we may end up getting our Residential Plans examiner involved if it is a more complicated project. But I would say generally speaking that that five to seven days, you know, will be the maximum that we would we would time, we would take and summer even just issued right over the counter if it's a simple enough project where you
Speaker 3could get that same day. More complex projects or brand new construction like a new home or new commercial building, those are those very in time frame just based on the complexity. I guess sure many of our home builders are very proficient in the process and they can get their permits very quickly, again, probably within that same week they apply time frame because they know exactly what they need to submit and you know, the time frames falling into place for them because they have everything that they
Speaker 3need with that application. Commercial projects take a little longer because we do have a site plan review process and some other departments that are involved in that process. It's not just Building Inspections Division, so those can take as far as the plan review can take, you know, several weeks to get through the building plan. But the other process with site plan can also take the same amount of time.
Speaker 2Okay, you already talked about the specialization of your planner or your inspectors throughout the department, but just roughly how many inspections are done in a year and how's that changed over the last ten years.
Speaker 3Yeah, that's a great question. I looked into that a little bit, just hoping we would talk about it, and I know, looking back probably over over a ten year time frame, with a lot of the data that I can find, we're averaging around four or five thousand permits a year and anywhere from you know, nine to fifteen thousand inspections. Obviously, the market, you know, changes each year, so those things can fluctuate. Outside of that ten year timeframe.
Speaker 3We did have, you know, the large oil boom out in the western part of the state that did create a lot of activity here as well, and we've now seen it flucture kind of normalized, you know, over the last five to ten years. So I think that that average is probably around that that mark of four to five thousand permits and you know, nine to fifteen thousand pretty regularly.
Speaker 2And what is it typical actually look like for someone who's never been through it. What what what what can they expect? I'm probably more you know, obviously commercial. That's one thing for most of our people here is probably what's a residential inspection? You have something done with you know, electrical or plumbing or or on somet of a major remodel. Yeah, what's going to happen? Often there's something going to show up out there.
Speaker 3Yeah, So most of the time that we're going to have like a like a homeowner get a permit from us on would be like a basement finished permit where you're going to also have you know, the plumbing, electrical and mechanical and all of that looked at. During a basement finished permit. Many homeowners want to do that work themselves or white subcontract that out to their contractors, so they may not always be at the job site or at their home during those hours, unless unless they've completed that work themselves. But we do a rough in inspection on
Speaker 3anything that we're doing, so prior to sheet rocking, prior to insulating, probably basically can sealing. Any of the work that we want to inspect, we would come in and take a look at it, and then we would want to come back once it has been sheet rocked. Once it's been insulated and those fixtures are now installed, whether it's plumbing, electrical, or mechanical, and we'll take a look around. If it's electrical inspector doing that work, he's going to plug into some outlets. Plumbers may run the water just to check for any kind of leaks, make sure thing's working properly. But really it's on a basement finished or
Speaker 3a homeowner project, there isn't too many inspections, maybe two, one or two inspections. Same for like a deck or a shed. We'll cite the location for a siting inspection. We'll come out and take a look at where you're planning to place it, and then come back again to take a look at the framing of it before anything's concealed, and then a final inspection just once everything's finished and complete.
Speaker 2Sure. So talked about inspections. Now let's talk about how we're engaging in the community, specifically you and the director for Community Development, which is your book also Ben Eric, who were meeting with How are we engaging with those people that you're probably having the most day to day contact with who are affecting SURE construction.
Speaker 3And the uranity. So you know, we since I've been with this with the city, which is you know, it's hard to believe, bit about eighteen years now. We we've always had meetings or informational meetings that we provided to two contractors, but I think maybe once or twice a year. But I think what we're trying to do is engage more with the development community in more of a conversation and more of a you know, a way that we
Speaker 3can generate some new ideas and some ways to basically deal with the challenges that we have in the construction industry. So we're creating basically, we create a communications plan. We're hosting meetings at our Public Works department. They've been a large meeting room that's that's really been useful and providing some presentations to them information about more recently about the code adoption. But I think moving forward looking at educational
Speaker 3opportunities as well, trying to find those gaps where maybe we are finding issues with inspections or with our processes, and having opportunities to bring in people to talk to them about how to improve a process or how to educate them about how to do things a certain way that maybe they're not aware of. So it's been really well received, I believe, But I think there's also opportunities to grow that as well, because many people get information
Speaker 3in different ways these days. On kind of old fashioned I like that one on one conversation or to be in the meeting room, but other people like things to be accessible to them, you know, themselves online and through websites and kind of finding their information for themselves, maybe just reaching out if they have a specific question about something after they've already done their own reason search.
Speaker 2So so, what do we have a regular cadence right now where those meetings with the homebuilders or the development community are happening.
Speaker 3We don't have like a like a set timeframe of how often we do it. I think we do have other meetings that we participate in that are quarterly meetings, but I think ours are more generated based on need. I think my goal would be to just continue to continue to provide more, continue to reach out to you know, our development community and ask is there another topic that we can try to address, But I'd certainly like to provide them quarterly as well, different from another type of
Speaker 3type of meeting that I think we're already having with some of our other stakeholders that are more broad overarching meetings, It would be more specific general topics that, like I say, more educational or more building building relationships if you will try to cooperate.
Speaker 2So when we're having these meetings right now, I'm pretty well aware that I know in the in the residential development community, the home builders and those and those builders around that, and probably developers or probably members of that that's happening. What about more commercial like the commercial contractors, is there any kind of opportunity that we have or we're engaging with them on a regular basis. There are fewer of them, Yeah, and they're probably more they may run in more unique things than a home builder.
Speaker 3Yeah. No, I mean this is a terrific, terrific topic to talk about because I know it's something that I have had kind of sidebar conversations with a few of our commercial contractors that we work with regularly, and I guess I'd like to have more meetings like that, you know, utilize a venue like our public works department to bring people in, and those meetings may only be ten or fifteen people because we may not have as many that are in that construction industry at the commercial side, but
Speaker 3certainly want to reach out to them and find out what is it that we can help with to try to make the you know, permitting process go smoother, the inspection process go smoother. Maybe there's things that are misunderstood or things that they want to have us take a look at that to change to make the process go a little smoother.
Speaker 2So I'm gonna encourage them to call you. Yeah for sure, Yeah, that'd be great. So what are the resources that you can provide to the building and industry from from your department?
Speaker 3You know, like I said, there's a ton of information I mean infinite amount of information out there on the internet. I know the International co Council does a terrific job of providing information out there too, you know, help people find the answers that they're looking for. I guess I would encourage people to research, you know, their website, the references that they that they sell and produce to to work with us, you know, so that we're kind of talking the same same language, if you will. But certainly
Speaker 3reaching out to our building inspectors, are you know, plan review staff, and even myself if they have questions, hopefully we're available to them. But if they can't get us on the on the phone right away. I know there there's a lot of a lot of activity this type of year. Yeah, certainly by email or emails are all on on the website as as well.
Speaker 2So what challenges do you feel face the building inspections to division or opportunities? Yeah, they're probably one of the same sometimes.
Speaker 3You know, I mean challenges for for building inspecial inspections specifically, you know, I guess I I don't know, I don't know if I have anything just specifically for that for the building industry itself. I mean, I think we've we've heard there's challenges with having skilled individuals wanting to get involved in the skilled trades. Obviously, there's there's instruction costs are increasing due to materials and labor costs and that sort of thing. So that then those are the big
Speaker 3challenges in the industry. Sure not, you know, we're we're aware of those challenges and certainly open for conversations with with Thurs stakeholders and contractor and developers to to try to find solutions to to that. But yeah, I don't know that that that there's a specific building inspections, uh, you know, issue or concerned, but I mean more just the industry itself as far as like solutions, technologies, things like that that are that are coming available. That's that's the biggest excitement for for me, is that we always
Speaker 3seem to focus on things that that are the problem and if we look back to how things were done years ago to how they're done today, Gosh, We've we've solved a lot of things through technology, through new products and materials being utilized that I'm hoping that that will just continue to continue to grow, continue to be available for people to use a solution.
Speaker 2So okay, perfect, well, Bratti, thank you for joining me today on Bismarck Insights. It's been delightful and hopefully we gave some information to our residents and citizens.
Speaker 3Yeah, thank you. I appreciate the opportunity.
Speaker 1Thank you for watching Bismarck Insights with Mayor Mike Schmiz. If you have specific topics or questions you'd like addressed in future episodes, email m Schmidz at Bismarck and d doc Gov. Recall the City of Bismarck at seven oh one three five five one three zero zero to learn more about the City of Bismarck. Visit Bismarck and dduk gov, or follow us on a variety of social media channels by searching Bismarck and decov Bismarck Insights is a collaboration between Dakota Media Access and the City of Bismarck. You
Speaker 1may find Bismarck Insights episodes on Government Access channels two and six o two, as well as on Broco, AppleTV and fire TV devices, on Radio Access one oh two point five FM, and on demand at FreeTV dot org.
Nobody is credited on this episode yet.
Mayor Mike Schmitz talks to Matt Gardner.
Mayor Mike Schmitz talks to Christy Ames-Davis, City Forester.
Mayor Mike Schmitz talks to Christopher Holzer, Traffic Engineer.
Mayor Mike Schmitz talks to Noah Lindelow.
Mayor Mike Schmitz talks to Krista Rausch.