030 - Project Closeout & Evaluation - Breaking Down CE Section 4
Substantial completion is the most important milestone in construction, and it triggers everything that happens during project closeout. This episode breaks down what substantial completion actually means, how it differs from final completion, and walks through the full closeout process. We cover the AIA G704 certificate, building commissioning, closeout documents, record drawings, the punch list process, and how to evaluate building performance after the owner moves in. If you're studying for the CE exam, project closeout is the smallest section but it completes the entire CE picture. 📝 Key topics covered: Substantial completion vs final completion AIA G704 Certificate of Substantial Completion Closeout documents and record drawings Final payment and retainage release The punch list process Building commissioning and seasonal testing ⏱️ Chapters: (0:00) Introduction (2:21) How the CE Exam Is Organized (5:13) What Is Project Closeout? (9:30) Substantial Completion and Closeout (14:56) Commissioning and POE (22:35) Project Closeout Study Mistakes (26:33) How to Study Project Closeout (33:12) Conclusion 📖 Read the full blog post 📝 Download the FREE 2-page CE study guide 🎯 Get access to all ARE study materials with the ARE 101 Membership 🎯 Join our 10-week ARE Boot Camp 📚 Individual ARE Exam Courses: CE 101 (Construction and Evaluation) AIA Contracts 101 CCCA 101 (Construction Contract Administration) CDT 101 (Construction Documents Technologist) PjM 101 (Project Management) PcM 101 (Practice Management) PA 101 (Programming and Analysis) PPD 101 (Project Planning and Design) PDD 101 (Construction Documents and Specs) Building Codes 101 Mechanical Systems 101
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.