Architect Exam Podcast

068 - Project Delivery Methods: DBB, Design-Build, CMAR, and More

May 26, 202639 minVideoEpisode 68
ShareXLinkedInFacebookWhatsAppEmail

Project delivery methods define who holds the contracts, who carries the risk, and how the architect's role changes on every construction project. This episode breaks down all six major methods so you know exactly how each one works. Emily walks through Design-Bid-Build, Design-Build, Construction Manager at Risk (CMAR), Construction Manager as Agent (CMa), Multiple Prime, and Integrated Project Delivery (IPD). You'll learn why the architect works for the owner in some methods and for the contractor in others, what a GMP contract actually does, and how to match the right delivery method to a project scenario on the ARE. This topic shows up on three different ARE exams and the CDT exam. If you invest the time to learn it now, it pays off on every exam you take. 📝 Key topics covered: Design-bid-build: the traditional sequential method Design-build: one team, one contract, architect works for the contractor CMAR and GMP contracts: how the CM shifts from advisor to constructor CM at risk vs CM as agent: who holds the subcontracts Fast-tracking: a scheduling technique, not a delivery method Progressive design-build, design assist, and bridging ⏱️ Chapters: (0:00) What Are Project Delivery Methods (2:48) How Delivery Methods Hit the ARE (4:39) Design-Bid-Build Explained (6:16) DBB Pros and Cons (7:22) Who Holds the Risk in DBB (8:24) Design-Build Explained (9:36) Architect's Role in Design-Build (10:18) Fast-Tracking in Design-Build (12:33) DB Pros and Cons (13:32) Progressive Design-Build (14:11) Design Assist and Bridging (16:03) Construction Manager at Risk (16:55) What Is a GMP Contract (17:38) CMAR Phase Shift Explained (19:54) CMAR Pros and Cons (22:05) CM at Risk vs CM as Agent (23:11) Construction Manager as Agent (27:44) Multiple Prime Contracts (30:28) Integrated Project Delivery (IPD) (33:18) How to Choose a Delivery Method (36:12) ARE Study Resources 📖 Read the full blog post 📝 Download the FREE Project Delivery Methods study notes 🎯 Get access to all ARE study materials with the ARE 101 Membership 🎯 Join our 10-week ARE Boot Camp 📚 Individual courses: PcM 101 (Practice Management) PjM 101 (Project Management) CE 101 (Construction and Evaluation) AIA Contracts 101 CDT 101 (Construction Documents Technologist)

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. 089.5 - Young Architect Black Friday 2026: ARE Exam Prep Deals

    Nov 17, 202620 minVideo

    The Young Architect Black Friday sale runs November 17 through December 1, and this episode walks through every deal. Two weeks, four offers, no promo codes on any of it. We only sell two things for the architect exam,...

    Credit the people on this episode

  2. 089 - Active Reading Strategies for Exam Prep

    Nov 9, 202621 minVideo

    Active reading strategies that actually work for exam prep, whether you're studying for the architect exam or any professional licensing test. Reading is the second biggest challenge of the ARE, right behind time...

    Credit the people on this episode

  3. 088 - The Spearin Doctrine: Who Pays When the Drawings Are Wrong

    Nov 2, 202634 minVideo

    The Spearin doctrine decides who pays when work is built exactly as drawn, inspected, approved, and it fails anyway. Most people in construction already understand this rule without knowing it has a name. If the owner...

    Credit the people on this episode

  4. 087 - Engineered Wood: From Glulam Beams to CLT Panels

    Oct 26, 202623 minVideo

    Engineered wood products are how we build 18-story buildings out of wood. This episode covers every major product in the family, from glulam beams and CLT panels to LVL, PSL, LSL, OSB, and I-joists. You will learn the...

    Credit the people on this episode

  5. 086 - Asbestos in Buildings: What It Looks Like and What to Do

    Oct 19, 202631 minVideo

    Asbestos in buildings is hiding in more places than you think, and you cannot identify it by looking at it. This episode walks through what asbestos actually is, what it looks like in a real building, and what a...

    Credit the people on this episode