Bill C-39 and Canada’s Regulatory Alphabet Soup: Former CER CEO Gitane De Silva Explains

Oct 6, 202643 minAudio
ShareXLinkedInFacebookWhatsAppEmail

This podcast is also available as a video on YouTube The federal government introduced Bill C-39 (Building Canada Strong Act) on September 21, 2026. The bill aims to complete project reviews in one year, with a single window for proponents, rather than requiring them to deal with multiple federal and provincial agencies. Business stakeholders have responded positively to the draft legislation. This week on the podcast, our guest is Gitane De Silva, Founder & President of GDStrategic, Executive Director of the Peter Lougheed School of Politics and Democracy at the University of Alberta, and former CEO of the Canada Energy Regulator (CER). Gitane helps us understand the proposed regulatory process, how it compares with the fast-track process under Bill C-5 (which the new Pacific Link, formerly known as the West Coast Oil Pipeline, will follow), and the process established under Bill C-69, famously called the “No New Pipelines Bill.” She also explains the roles of the various agencies involved, depending on the type of project being reviewed. Content referenced in this podcast: The Alberta Government’s website on the Pacific Link oil pipeline (formerly known as West Coast Oil Pipeline) The Government of Canada's background document on Bill C-39 The full text of Bill C-39 The Hub.com article by Sean Speer “Carney’s moves on building and labour are an outright rejection of Trudeau economics” (Sept 26) CBC “Facing criticism, Carney says he has a 'very clear mandate' to push through major economic changes (Sept 22) Please review our disclaimer at: https://www.arcenergyinstitute.com/disclaimer/ Check us out on social media: X (Twitter): @arcenergyinst LinkedIn: @ARC Energy Research Institute Subscribe to ARC Energy Ideas Podcast Apple Podcasts Amazon Music Spotify YouTube YouTube Music

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

SPEAKER_03The information and opinions presented in this Arc Energy Ideas podcast are provided for informational purposes only and are subject to the disclaimer link in the show notes.

SPEAKER_00This is the Arc Energy Ideas Podcast with Peter Turzakian and Jackie Forrest, exploring trends that influence the energy business.

SPEAKER_02Welcome to the Arc Energy Ideas Podcast. I'm Jackie Forrest.

SPEAKER_03And I'm Peter Turzakian. Welcome back. Well, as you can see on our studio table, I have a lot of paper. And Jackie over there was trying to convince me to get an iPad, but I am resisting because there's something fundamentally human about writing things on paper. Or 10,000 years ago, we used to paint on rocks. So I think that the uh relationship between thinking and writing is fundamentally obscured if you use an iPad, even though you can write on an iPad, but you know what I mean.

SPEAKER_02Yeah. No, I know. We're going we're gonna go old school here. I'm going old school. I feel like you used to have one of those like digital like things. Didn't you talk about how great it was? But now you're back to paper.

SPEAKER_03I'm back to paper. And you know, I love the flow of a fountain pen. So that's kind of old school too. And it's not because it's retro or anything like that, because a lot of people are you know doing retro things these days. I just have always liked the feel of a fountain pen.

SPEAKER_02Okay. Well, maybe I'll I'll I'll try to do the fountain pen thing. We'll stick with the paper for now.

SPEAKER_03You know, it is it is messy, so I can kind of see the appeal of going, you know, digital ink and storing things. But you know, that's the other thing because I just feel like I can put it in the notebooks, I can kind of flip back, but it it forces you to have better recall as well.

SPEAKER_02Yeah, and AI can't tell us what to say. This is legit, like coming right from us. Old school, no AI.

SPEAKER_03Scattered so that we um try and keep focused.

SPEAKER_02Okay, well, we got big news this week. Uh LNG news.

SPEAKER_03LNG is this sort of the announcement train has started.

SPEAKER_02It really has. Like the last two weeks started out with the C39, which we're gonna talk to and get to, but also the investment summit, the news of the accelerated cost allowance, super productivity. I keep forgetting the name. Yeah, the tax deduction. Yep, yeah.

SPEAKER_03That's all important. But now we're actually hearing about projects, which is not surprising because the major projects office, which is sanctioning some of these, has been around for a year now. And a lot of the work that they've put into it is now coming to pass. And then, of course, in conjunction with the productivity super mega deduction, whatever it's called, it's all starting to come together.

SPEAKER_02Yeah, so it's a big, big investment. Ottawa says it's a$32 billion private investment. This is phase two of LNG Canada. It would go double the facility from 14 million tons to 28 million tons, which is the equivalent of another 1.8 BCF per day of additional takeaway. And just to put that in perspective, it's about 10% of the production of the basin now. So 10% more that's going out to international markets as opposed to being as you know in this very saturated North American market.

SPEAKER_03And the target's 50 million tons per year per annum, which is, I think, by 2030. Is that the target?

SPEAKER_02Yes.

SPEAKER_03Yeah, I think potentially a few more announcements coming.

SPEAKER_02Yeah. Well, we've got uh we're halfway there. And actually, some good news on Salisms, which is the other large-scale project that has not yet reached FID. But we have got over the last several weeks a number of new off-take agreements. One from Centrica out of a UK company and Santos, an Australian company. And so that is great. I mean, they're 12 million tons is the total size of that phase, that project that they're working on. And from my count, they're well over half contracted. Well, so hey, maybe we're not too far off by having uh another big chunk of LNG, you know, final investment decision under construction.

SPEAKER_02So it's pretty exciting. Uh, Chris Cooper, who was a former guest, talked about this LNG Canada decision alone, the phase two would put Canada towards becoming one of the world's top five LNG exporting nations. And so solisms would would contribute even more to that.

SPEAKER_03Canada goes global, and there was other big news.

SPEAKER_02Yeah, well, the C39 is a big one, and we want to talk about that on the podcast today. So the feds introduced this uh Building Canada Strong Act, not to be confused with the C5 one, which is similar name. I think there's one word different in it, but basically speed up environmental ruse, not just for the projects that are designated as projects of national interest, but for all the projects. And so we want to talk about that today. It's been getting some good response from industry groups like Business Council of Alberta, Alberta government. We've had the CEO of Enbridge, Greg Abel, uh, Vern Yu, just a few examples of CEOs coming out supporting it.

SPEAKER_02So we'll talk a little bit more about that. And uh, you know, we also had an article that I want to mention from Sean Spear in the hub talking about how this is really great news and shows that the liberals have moved beyond sort of the anti-business policies of the past, where they were, you know, loading up these projects with not just their technical requirements and environmental requirements, but also like social requirements and broader things that were being layered onto the project. So we're getting back to the basics of just evaluating these projects and his view on technical merits.

SPEAKER_03Technical merits and regulatory reform. And of course, there's the other big announcement with the West Coast Oil Pipeline.

SPEAKER_02Right. So West Coast Oil Pipeline deemed a project that will go under the C5 process, uh, which is the fast track process. We're gonna try to explain all of this and what the difference is. You know, while the C39 is taking the existing process and making it faster, there's even a faster process if you follow the C5 track. And so the oil pipeline getting that will accelerate its ability to get through the approval process, I think.

SPEAKER_03So to get us through all this, phone a friend, which we have done. So we're delighted to have with us Gitan DeSilva, former founder and president of GD Strategic and the executive director of the Peter Wallaheed School of Politics and Democracy. She is also notably the former CEO of the Canada Energy Regulator. So who best to talk to and Gitan about regulations?

SPEAKER_01Thanks for having me on. I also came with paper. So I feel like I'm part of the paper club. Yeah, good.

SPEAKER_02We're all old school. So let's just start. You know, you're the perfect guest for this moment in time. Um, but maybe just explain a bit about your time at the Canada Energy Regulator, just to give people that context. And then we're gonna kind of like try to understand the difference between C39 and C5 and all these different bills. And the old C69.

SPEAKER_01So I started as CEO of the regulator in August of 2020, so full COVID. So a big part of the focus then was just ensuring that the regulator continued in its safety mandate because we were trying to continue to oversee the construction of Trans Mountain Pipeline, but it was still very much a transition period between the NEB and the CER. So also bringing the legislation to life in terms of making sure that we were acting on all the social measures that were in there. It was the first piece of legislation federally that included implementation of the UN Declaration on the Rights of Indigenous People. So that was also a big shift for the organization, becoming the crown in terms of the projects that were before the regulator.

SPEAKER_01So there was just a lot of still change management happening and a lot of working with industry to help them understand how this process would be different and hopefully it would still be workable for them.

SPEAKER_02Okay. And then I guess you were starting to work with the impact assessment group, which would have just been set up under the C69, the I think Jason Kenny called that the no pipeline bill. Yeah. So that group would have been just getting formed at that time too.

SPEAKER_01That's right. And we never had a single application come forward because one of the things that Bill C69 changed was any pipeline over 75 kilometers was a designated project that had to undergo a joint review by the CER and the Impact Assessment Agency. And we had that Gazaduke project that was talked about, but it never actually came forward. So we had lots of conversations with the impact assessment agency, but we never actually undertook a joint review of a project.

SPEAKER_03Yeah, 75 kilometers doesn't get us very far.

SPEAKER_01It's a very low bar.

SPEAKER_03Yeah. Well, first of all, with the West Coast Oil Pipeline that will qualify as a project of national interest, the C5 process. So, what is the advantage of being a national interest project? Can you explain that to our audience?

SPEAKER_01I think the big advantage is that when you've got that political decision right at the outset, that this project will go ahead. So it's just a question of how. And the second part is that that legislation empowers cabinet to exempt the project from certain pieces of legislation. So we've seen with these amendments that are coming through Bill C39, we've changed the regulatory process, but there's still a bar that needs to be met. If you're designated under Bill C5, then the government could just decide that, with the exception of Indigenous Treaty Rights, Section 35, and the Constitution, a few other things, you could be exempted from an element of the Fisheries Act or navigable waters or something under the species at risk ads.

SPEAKER_01Then you're not having to mitigate that. You're now just exempt from it entirely. So it could potentially really speed up the process and make construction a bit easier. Okay.

SPEAKER_02So you don't have to worry about species at risk, or it's just that if there's something that's deemed to be really kind of like changing the economics or the timeline, they'll be more flexible around species at risk.

SPEAKER_01It gives cabinet the ability to exempt so that it'll explicitly state that, you know, this project is approved with the following conditions, and this project is not required to meet X. So if it were, for example, West Coast pipeline and we had an issue with hummingbirds on Trans Mountain Pipeline, then it may be that falls under species at risk, that the federal government, the cabinet, could decide that they were going to make a decision that was favoring economics over another element. So that would be one example, or some things under Navajo Waters is always a tricky one as well for projects.

SPEAKER_01So it'll be that sort of thing where they would explicitly exempt the project from certain federal requirements. So it wouldn't be that that requirement would be modified. It would be that the requirement would not apply.

SPEAKER_02Well, let's actually just take that example then for those that forgot this part of the story. Trans Mountain had many times during its construction where the construction was delayed or halted or slowed because someone found a bird nest or someone found an ant hill, or I think they were like moving like salamanders and snails and frogs and things like that. So, you know, in this case, could construction be more predictable and smooth because they decide that, you know, because of the economics and the timeline considerations, that the project timeline is sort of the most important thing.

SPEAKER_01They could absolutely decide that, but you have to remember as well that a regulator and a project still needs social license. You still need the approval and the acceptance of the communities that you're moving through. So I don't foresee this would be used as a hammer. And I think that if you did go down that road, you would likely see a scenario whereby the company would say, okay, we're not required to fulfill X requirement under the legislation. So instead, we're going to make a donation to a wetland or do something as well that would deem to be an offset. Because if the project moves too quickly, then you have the risk of protests and people in communities that just aren't happy.

SPEAKER_01So there still is that requirement for industry and the regulator to make sure that they're bringing people along.

SPEAKER_03Yeah, I mean, I think that's where historically, you know, I say certainly 15, 20 years ago, the industry had shortcomings in terms of dealing with community consultations, indigenous consultations, and so on and so forth, which is predictably why there was uh so much friction. But speak about maybe the indigenous part of it, because is the indigenous consultation now separate from all of this, or where does it fit into the whole picture?

SPEAKER_01The indigenous consultation is still required. There's no exemption from section 35 of the constitution. And actually, the amended legislation states that the process can be delayed if more time is required for consultation. But I think the important change, if we talk about Bill C39, it's a bit alphabet soup, but Bill C39 and the changes to the regulatory system that are not these projects of national interest, there's actually a crown consultation function now that's taking place. So they're actually going to have the impact assessment agency lead, which I think is really important because you one, you have the advantage there that you have one single federal government department that is consulting with a nation or a community.

SPEAKER_01Previously, if it was a fisheries permit and then a like a species at risk permit, and then a Canadian energy regulator project, you'd have three separate government departments coming to one community. So now that will all be done by one part of government. And the other advantage to that is that presumably, if that one department is leading, they'll have existing relationships with those communities. So oftentimes, you know, people come in and they have to build that relationship. So hopefully now they're starting with a strong relationship and then they can actually talk about the project.

SPEAKER_03I guess I want to get back to the also the alphabet soup thing, which you just mentioned because in terms of the bill numbers, but also the agencies. And again, for clarification, not only for our audience, but also for me, there's the Canadian Energy Regulator.

SPEAKER_01Correct.

SPEAKER_03And there's also this impact assessment agency, the IAA. How do they differ with different agencies?

SPEAKER_01So the Canadian Energy Regulator is the national regulator for interprovincial and international pipelines and power lines. So if you're proposing, for example, a new pipeline to the West Coast, that would from Alberta, that would fall under the Canadian Energy Regulation.

SPEAKER_03Because it crosses the border.

SPEAKER_01Crosses the border, right?

SPEAKER_03Right.

SPEAKER_01Uh the impact assessment agency still is responsible for mines and ports. So they're typically responsible for things that are static, right? A big industrial facility, that's where the impact assessment agency is responsible. And then the Canadian Nuclear Safety Commission now has full authority over nuclear projects. So that is no longer shared with the impact assessment agency. They run the entire process for nuclear projects.

SPEAKER_02But Peter, you bring up a good point. Well, I think this is much improved, but you know, figuring out which category your where your project fits and how it, what regulator you fit in, it's always been confusing. And maybe it's more confusing because we talked about it a few podcasts ago, but there's also like now a change because before pipelines would have gone under a joint assessment and now they're just CER. And so there's there's things that are changing. Because C39 is kind of the new thing. The goal of it is to improve both the CER process, impact assessment process, and even the nuclear process, right?

SPEAKER_02And to make it more streamlined. I wanted to bring back Sean Spears' article, which we will put a link to his op-ed. There was a term in the bill that says that ministers must consider the technical, economic, and practical feasibility. And, you know, he takes from that that this is very big change, that the Trudeau era C69 actually burdened projects with much more than that. You know, suddenly they were worrying about gender-based analysis, social issues, health issues, even heritage factors. The project was burdened with this like wide set of issues that were really outside of the core thing that the business would be thinking about.

SPEAKER_02And it burdened these projects not only with longer timelines, but you know, more conditions and higher costs. Do you think that like the spirit of what you read in C39, do you agree with that?

SPEAKER_01Yeah, I think it's really important. I think it is important to make clear that if you're actually approving a project, then you want it to be buildable. And sometimes the conditions that were established in the past, I think to a lot of people felt like they were really extreme. And also, it's just important to point out that a regulator is a political construct. Like the regulator is only implementing the legislation that's been passed in the House of Commons. And so at that time, if we go back to, you know, 2015, 2016, 2017, when that debate was happening, if you look at what was on people's minds, it was much more focused on things like sustainability and social issues than today where we're focused on affordability.

SPEAKER_01So I think the intent at the time was to enable that social license and make clear that one regulator had that authority, but in practical application, it made things very difficult. So this is an important change that you can't just impose a condition unless you can actually affect it.

SPEAKER_03Okay. So further to C39, it's a draft legislation and the prime minister's announcement at the Canada Investment Summit of one year, one review, one project, which is really quite substantial. So if I wanted to put forth a proposal to build a railroad or a pipeline or power lines, am I going to get an answer back, yay or nay, in a year? Is that how this works?

SPEAKER_01Yes, this is how it's meant to work. Once your application is complete, then the regulator has 300 days by and large to review the project. And then the politicians have 65 days if it needs a cabinet decision, which also is a really important change. That cabinet process used to be extendable, and that often is where the delivery is. Right.

SPEAKER_03And where is the trigger point where cabinet approval is required?

SPEAKER_01It depends on the project. So it used to be under old Bill C69, any pipeline over 40 kilometers required cabinet approval. Any pipeline over 75 kilometers required that joint process between the two agencies? Every pipeline now falls under the CER, clearly, full stop. And it's only a pipeline over 300 kilometers that requires cabinet approval. And the way those longer pipelines work is that initially it goes into the CER, they provide an assessment. Is this a doable project? Then it goes to cabinet for a thumbs up, thumbs down, then it comes back to the CRM conditions.

SPEAKER_03Are pipelines the only category of infrastructure that have this potential thumbs up, thumbs down from the political branch of our governance? Or is it a power line would also need to go to cabinet, like transmission lines? You know, historically, pipelines have been really burdened with a lot of rules that other types of infrastructures have not. Has that been more equalized now?

SPEAKER_01I think it remains to be seen because usually transmission lines are governed by the provinces. And then it's really just the federal regulator that does the bit that crosses the border. So if you were to actually try to build an east-west grid, presumably the federal government would need to lead in there to actually make it happen. And then it would be a question would you have the CER review that entire thing, or would it be this collection of provincial processes from start to finish?

SPEAKER_02But before, I think most of these processes did have a political decision at the end. And one of the complaints with C69 is, you know, as a proponent, you have to spend hundreds of millions of dollars for five years and then find out oh, well, the politician of the day, five years in the future, they decide that they don't want your project and it's a political decision. Maybe there's an election coming, and that's a huge risk. You know, it was talked about at one point that maybe this political decision should happen right at time zero. And now it looks like in one year, you're gonna get this political decision behind you.

SPEAKER_02Do you think that's still a risk for proponents? Or do you think that like it's a much more reasonable risk than the previous process?

SPEAKER_01Well, I think the magnitude of the project now going for cabinet approval has changed dramatically. So it's not 40 kilometers, it's 300 kilometers for a pipeline. And even in that process, the political decision is much quicker. So I think that is important. I think that it's always a balance when you're regulating between empowering expert regulators to actually do their job, like the NEB used to do, and people's desire that their elected officials have some control over the infrastructure that's being built. So I think that's the balance they're trying to strike. But I think by and large, they've moved the decision up sooner, which I think is a positive.

SPEAKER_02Well, when you think about it, like if they just made the decision before there was any review, it doesn't look like they really reviewed there's no information yet. So it kind of to me, for credibility reasons, it does make sense they make the decision after there's some regulator that's done some work. Some assessment.

SPEAKER_01Yeah.

SPEAKER_02Because you need your regulator to be credible.

SPEAKER_01That's also important for investment attractions.

SPEAKER_03Okay. And if we can also explore for our audience another subtlety, or maybe it's not so subtle, this concept of one review. Because historically there had to be like a federal departmental review and then the same kind of review provincially, right? And now it's being collapsed into one review. And correct me if I'm wrong, but the federal government then would defer to the province to conduct the review if it's within the province or like how does that work? Am I right? Like it collapses a lot.

SPEAKER_01Well, yeah, if you take the example of an OS Sands facility, for example, in Alberta. So explicitly, the federal government has said the impact assessment agency is no longer involved in those, those are solely under provincial purview. And that comes from that MOU sign between the federal government and Alberta. And as a result of that MOU, the federal government has been signing agreements with all provinces across Canada to make clear who is responsible for what on a project. But the other point that's really important is now one federal government agency is responsible for coordinating all of the permits.

SPEAKER_01So even before, if you're applying for a pipeline that was regulated by the CER, you still had to go to Environment Canada for one permit and fisheries for another permit and transport for another. Now CR oversees all of that. The other departments are still issuing those permits, but so one window thing, which also is a huge.

SPEAKER_03So how is they, do you know? I mean, you were obviously the CEO of the CER. Have they reorganized their organization to be able to undertake this?

SPEAKER_01Well, the capacity existed before. It's just one of the challenges in a Westminster parliamentary system is everyone reports to their minister to parliament. So now what they're doing is I'm sure they'll be signing more letters of agreement between the CR and other agencies to make clear legally, right, who's doing what, but the capacity existed before. Now they just have the authority.

SPEAKER_02Yeah, it's important too. This is draft legislation. So I guess it would have to be passed and see what it looks like after it's passed. Everything we're talking about could change, although I kind of don't expect it to change too much. But let's go back to climate. So one of the things that C69 did was it it added this idea that your project had to be consistent with the goals of the government. And I noticed the new legislation still has that wording and almost the same repetition. I actually counted how many times climate was in C69 and this one, it was five times in this new 250-page bill and it was seven times in C69.

SPEAKER_02So what does that mean? I mean, what are the government's goals around climate? Like, you know, before with the Trudeau government, they had made the net zero by 2050 and they had the 2030 goal. But this government has acknowledged that they're not going to meet at least the 2030 goal. So, how does a project that admits CO2, how is this gonna be judged under the climate criteria?

SPEAKER_01I think that's a question that remains to be seen. And I think that this legislation needs to be taken in combination. Cabinet directive that was issued with it, which gives a very fair, clear focus on prioritizing, you know, speed in the economy. So I think, you know, this government has not said a whole lot about their 2050 goal. So that'll have to be considered. But then they're also moving to these regions of national interest, right? This sort of cumulative effects approach to a particular region and kind of almost pre-approving projects in that area.

SPEAKER_01So presumably the climate considerations will fall under those designations. But I think it really remains to be seen how they apply this realistically and whether they take a more global view. You know, if the view is that natural gas is better than coal and climate is a global issue, then maybe they push hard on Article Six of the Paris Agreement to try and actually get those trade-offs in place. We haven't heard as much from them on their 2050 goals as we had, of course, from the past government.

SPEAKER_02Okay, well, let's come to that. That you just talked about that regional, I think they call it regions of national interest. This is why I need notes to remember all this stuff.

SPEAKER_03So yeah, and paper is good.

SPEAKER_02So C39 had this concept. And it seems that if you're in that region, you would automatically be a C5 type project. And maybe we could back up a little bit like what's the advantage of being a C5 project over this new C39? I think you did that at the beginning. But does that mean like anybody that has any kind of project now will get this like national interest fast track if they're in that region? And what are some examples of regions that might qualify for that?

SPEAKER_01Well, I think we've seen many different projects go to the major projects office for um consideration, right? We've got everything from a highway in the north, the Mackenzie Valley Highway, to the deep geological repository for nuclear waste in Ontario and now a pipeline. So any major infrastructure project, I think, can be considered under Bill C5. I think, again, the advantage is you get that political decision and you have the potential that you're exempted from elements of federal legislation. You also get the advantage of the major projects office putting their weight behind, you know, making sure that all the government is moving quickly and doing that coordination for you.

SPEAKER_01So that's a tremendous advantage. I think if you were to look at a region, probably BC is a great example. And if you look at the first projects that were referred to the major projects office, where you had a transmission line, you had new electrical generation, you had a critical mineral mine. So sort of that whole combination of things, like the whole system that would be required to actually extract those critical minerals and process them and then get them to market. So I think, you know, if you look at those like Ring of Fire in Ontario, could be one example potentially where you have a region where it's deemed in the national interest to actually get moving on these things.

SPEAKER_01And then I think the real advantage there is that you could take a systems approach and understand you're gonna need a road to build the transmission lines that are needed to fire whatever industrial process, and then you're gonna need the rail or the port to get those to market.

SPEAKER_02So could you have like 10 projects in like let's say the ring of fire? There's lots of mining projects that could be taken forward there. Could you have like 10 projects? And is there the capacity, I guess, to do that if they all automatically qualify for this fast tracking?

SPEAKER_01I think that's the question is not only is there the capacity within government to fulfill the regulatory requirements, but are you going to have the supply chains and the skilled tradespeople that you need to build all of these things? So there's gonna have to be some degree of prioritization to actually get this stuff done. You can't do it all at once.

SPEAKER_03So with the regulatory system having been improved with Bill C39 and all the other initiatives, so that presumably will go much smoother. But historically, if the regulatory system wasn't used by opponents of a project to add friction, then the default was to go to the courts. And so do you have any sort of views on what the improvements to the regulatory system mean in terms of opposition, whether it's individuals or groups, go to the courts?

SPEAKER_03How do we play this out?

SPEAKER_01This is why I think Bill C39 is important, because Bill C5 initially was a signal, like a signal that we actually want to build things and we want to build things quickly. But to say that cabinet's gonna make a decision and then you're just gonna build it without clarifying to people the steps, I think that is exposing you to potential litigation. So I think the use of Bill C five will become the exception. And falling under Bill C39, where the process is clarified and it's shortened and it's really focused on these expert regulators. I think that's what's important.

SPEAKER_01So it's clear to people what the bar is and it's clear which entity is enforcing that bar. I think that actually decreases really.

SPEAKER_03Exactly what's going on.

SPEAKER_02Yeah. So do you think if you go under the C5 process and you're exempt from some of these things like Fisheries Act and navigable waters, that maybe that exposes you to more risk of a court challenge? That you might prefer to go under the C39, where there's still, you know, requirements made, even though they may be made in the interest of like practicality and economics in terms of what the requirements are.

SPEAKER_01I think anytime you're first under a process is kind of like that first pancake, right? Like there's the potential that some kinks need to be worked out. Now I give full credit to Don Ferrell and the team at the major projects office. I think they're doing tremendous work. My former colleagues at the CER, but I think that we have to see like, is there even a desire? I don't think that they'll be just exempting projects left, right, and center. I think that they will be looking to as much as possible to try and have them meet that bar. And then presumably, if someone disagrees with the decision, whether it's for environmental reasons or landowner rights or whatever it is, it would be the minister or the prime minister they'd be taken to court.

SPEAKER_02Okay, well, let's come back to the C39 process. But this might actually be an issue with C5. One of the historic issues we've had is that a project gets approved. For one example, the Pacific Northwest LNG project, but that was that Petrinos project. 190 legally binding conditions uh came with this approval. And there wasn't a lot of consideration, in my view, of the economics. Like some of these requirements added a lot to the cost of the project. And I believe that ultimately these conditions were part of the reason the project didn't go forward, right?

SPEAKER_02They said the economics didn't work. Well, yeah, you burdened this project with all of these expensive requirements that really were in addition to, in my view, like the kind of standard regulatory requirements. Do you think under this new C39 process that we're gonna see less of these conditions? You know, because we're thinking about economics. What is the word? We're looking at like if it's feasible and practical and economic. And I think if you looked at a lot of those conditions through that lens, they wouldn't meet that bar.

SPEAKER_01Yeah, I think that's a really, really important change in this legislation because it's again a clear signal that we're prioritizing, you know, the economic benefit and the ability to move quickly. And it also protects the regulator from litigation and having their decision overturned, because then the minister is gonna have to say, yes, in an ideal world, we would do all of these things, but for now, we're gonna go for good and not perfect.

SPEAKER_03Yeah, it's the same with the conditions. So what you're saying is, okay, you've got one year and you get an answer back. Will the answer be a black and white yay or nay, you can go ahead, or will the answer be, okay, you can go ahead, but you have to fulfill 109 conditions.

SPEAKER_01So, I mean, it depends again on the magnitude of the project.

SPEAKER_03Right.

SPEAKER_01But if you are a major project, then you will get your political decision. Then it's a question of how, whether it's Bill C5 or Bill C39.

SPEAKER_03Yeah.

SPEAKER_01And I think under no scenario does the project get approved with no conditions.

SPEAKER_03Yeah.

SPEAKER_01Right. There's always going to be things to be mitigated or things that are economic benefit to communities. There's a whole like we're fixating on the Ant-Le type of scenario, but sometimes those conditions are, you know, you'll make sure that you have X number of contracts with Indigenous communities, right? There's all kinds of things there that I think people expect as a way of doing business. So it's just minimizing those numbers that are very impractical and focusing on those that are providing maximum benefits to communities.

SPEAKER_03Well, it would be nice if not aspirational, if the proponent and the regulator can be working together over the course of 12 months to identify what potential conditions are going to be so that those conditions are understood and remedied before you get the yay or the nay to minimize the number of potential conditions.

SPEAKER_01Yeah. And I think if the proponent has done her research, they will know ahead of time, sort of the deep geological repository. Like we haven't built a facility in Canada to store nuclear waste forever before, but most of the other things that we're looking to do are things that have been done before. So you know, you can look to see what is the trend here and then make sure that you're mitigating that, you're having conversations with and what is your sense?

SPEAKER_03Like earlier, you talked about oil sands facilities being approved provincially. And is your sense that the provincial regulatory process has also improved in terms of the expeditious need to get these things done?

SPEAKER_01Well, they've also made changes there provincially with the setting up of this cabinet committee and saying that they will approve projects in 120 days. So a much shorter timeline than federally. And then again, presumably the decision is that yes, this project will go ahead and then it goes to the Alberta Energy Regulator, the other relevant regulator to actually determine the hat.

SPEAKER_03Right, right.

SPEAKER_02And I just want to come back to these like conditions. And I'm not even sure if this was a condition, but I just come back to that Petros Pacific Northwest project. Like they had a requirement to do like a suspension bridge with the pipe between the mainland and this island to protect some eelgrass. You know, there's like there were things that were put in these requirements for these projects that added so much to the cost of the project. And um, are we going to look at it like, we'll make you do this? But well, by the way, the project's now no longer economic. So we have to think about like, is protecting that eelgrass really enough to want to shut down a$30 billion project and the potential to export, you know, yeah, two BCF of gas or four BCF of gas more to Asian markets.

SPEAKER_03I guess if you want my opinion on the eelgrass, and I don't even know what eelgras is, to be honest with you. Well, it was a spawning ground for some salmon. Okay, I am not opposed to restrictions on eelgrass. I am opposed to having differential rules for different projects. So if pipeline companies have to abide by protecting eelgrass, then somebody who's going to build a condominium over eelgrass also has to be mindful of that. And this is, I think, the big thing that is maybe changing, is that building all types of infrastructure under this act, it's just sort of a more equitable treatment, whether it's pipelines or say nuclear or power lines, railroads, ports, maybe even urban buildings.

SPEAKER_03I don't know, that they all follow a more homogeneous set of rules, to be fair.

SPEAKER_01Absolutely. And I think that's really important for investment. People don't want to believe that their investment is only viable if it's in a certain category or has a certain minister's approval. So I think clarity and certainty is critical.

SPEAKER_02I mean, I think that's still gonna be an example. Here's an example I've heard. I just kinda be interested in your view of it. You know, like we've got Trans Mountain being slowed down because there's a bird nest, you know, and we need to like not continue. But meanwhile, 10, 20 kilometers away, forestry company is cutting down all the trees.

SPEAKER_03It's not engagable.

SPEAKER_02There's like some things that just don't make sense, right? You know, and uh are they stopping cutting down the trees, even though there may be bird nests in them?

SPEAKER_01Well, technically they should be. If it's an endangered species and the same rule applies, so it comes back to enforcement. That's where these projects are gonna get hard, right? Is that the people that are passionate about protecting the hummingbirds or the southern resident orca whales are gonna be very fixated on that impact. Whereas Cabinet is looking at what is in the national interest, what is important for Canada's place in the world. And so there's going to be trade-offs for sure. And that's where there's going to have to be some political capital spent to convince people that this project is actually worth the consequence.

SPEAKER_02Okay, let's come back to the fast timelines. And you said, was it 120 days under the provincial Alberta provincial system? And now we're talking one year under the C39. But there have been people that have said, you know, they both say you need a complete application. And so, well, maybe it takes you two years to get what is a complete application? And does a proponent actually spend, you know, many years getting to whatever the green light is to start this one-year time clock?

SPEAKER_01I think for those proponents for major projects, they're pretty sophisticated. And the CER, for example, has a filing guidelines online. It's very transparent. And with most regulators in Canada, you can have something called a pre-application meeting where you can go through and ask all those questions to make sure that you actually know what is required. You know, in some instances, if it's a newer entity or a joint venture or something, it may take them a little longer to work those kinks out. But I think by and large, you know, as long as those filing guidelines remain clear and transparent and you're having those conversations, then there may be some requirements in there that companies don't like, or maybe they're required to conduct a study.

SPEAKER_01And sometimes that takes a bit of time. You know, if there's an engineering study or some other type of study that is required. But I think that, again, you have to go back to pairing this legislation with the cabinet directive, which makes very clear that the government wants to move quickly. And you need to remember that the CEO of the Canada Energy Regulator, the commissioners, they're all appointed by cabinet. They're GIC appointees, so they understand what their role is at the end of the day, is to try to fulfill the obligation that's been set out for them by cabinet, understanding that that's where the buck stops ultimately is with the elected officials.

SPEAKER_02Right. Well, that guidance has really changed between C69 and this new bill, C39. Very much so.

SPEAKER_03So this term national interest, and I know the Prime Minister has spoken to uh his critics. I think there's a CBC article. We can put a link to that too, as well, Jackie. So Prime Minister Carney says his government received a clear mandate from voters in the last general election and in subsequent elections to build Canada strong. And it is the Build Canada Strong Act, and he's pressing ahead with changes to federal project approvals and the labor code, despite criticisms from some circles. So, national interest, build Canada strong, that are kind of synonymous, and the voters have given the prime minister a clear mandate.

SPEAKER_03How does this term national interest now come down into the uh I'm gonna call it the bureaucracy in the civil service? Is that mentality of build Canada strong, national interest? Is that percolating, I'll call it, down into the system?

SPEAKER_01Absolutely, expectations have been raised. And if you think about the fact when the prime minister first came in, he said it would be a two-year approval for major projects. And now he's saying one year. Yeah. So I think that, you know, the public service has gotten the message. You've seen changes throughout senior levels, senior ranks of the public service as well, to making sure that departments are moving at speed. Um, and now that ministers also have these marching orders, I mean, they're going to be putting pressure on their departments as well to really keep things moving.

SPEAKER_02I mean, it's a good point though, Peter, because you hear these stories. You know, someone at Department of Fisheries, far down in the organization, is almost holding up a project, right? Like they're just continuing to ask for more information, do another study. And these proponents are just like, you know, I have no power in this system, right? This bureaucrat at kind of a lower level is just making delays and there's just no end to the requirements that they're asking for. Is there a way for them, do you think, to escalate that in this new construct more than they had in the past?

SPEAKER_02Because a lot of projects have gotten stuck with that kind of thing.

SPEAKER_01And that was the real problem in the past because you didn't have a lifecycle regulator overseeing the entire process. But that's one of the important changes now, right? If it's a pipeline or a power line, it's going to the CER and they will be the ones that will be putting pressure on transport and fisheries and environment Canada to issue their permits in a timely way. And then again, that cabinet directive, which clearly states there'll be no more sort of analysis paralysis. There's no more never-ending information requests. It's now we need to get going and we need to make decisions. And so we need to make decisions based on the best information available and keep going.

unknownYeah.

SPEAKER_03And now major projects that will have to come under scrutiny of Bill C39, they're filed and they're made public on the CER website. So people can go look.

SPEAKER_01Absolutely. Okay.

SPEAKER_03So we'll put a link to that as well. Are you expecting a surge of projects, do you think, as a common consequence of this?

SPEAKER_01Well, I think that people will wait until this legislation is passed.

SPEAKER_03Right.

SPEAKER_01Right. And then typically what you do is you have the option to move forward under the if you submit it under the old legislation, you can continue or switch to the new one. So I think that once the legislation is passed, you'll likely see some projects come forward.

SPEAKER_03What is what is the I'm not privy to the parliamentary calendar. When is the expectation that this thing is going to be passed? Do you know?

SPEAKER_01Well, I mean, the House is back. That's when the legislation was introduced. So it's going to have to go through committee and that whole process sent to the Senate. Right. And ultimately Royal Assent. So I mean, Bill C5 was passed in a matter of days. I think the government will want to give a bit more time here. They're getting some pushback on the labor provisions in particular.

SPEAKER_03It's not going to be one bill, one year.

SPEAKER_01Well, I think it'll be passed before Christmas. Like I'd be surprised if not, just given you a lot of people.

SPEAKER_02I mean, they do have a majority. I can't imagine that the conservatives would object to a faster environmental review position.

SPEAKER_03I just don't know a complete timeline of process of something like this. Yeah, me either.

SPEAKER_02But before Christmas, probably.

SPEAKER_01That would be my guess because they have to go to committee. They have to do first, second, third reading. It has to go to the Senate. But if this is a priority, which it is, was the first thing they did when they came back. Yeah. Then I anticipate it'll be passed in fairly short order.

SPEAKER_02There's a lot of criticism, of course, with all of these things. And I'm actually sometimes frustrated at the mainstream media is covering the criticism more than the positives. So I really appreciate you, you know, sharing your view on this and that there's a lot of positives here. But one other criticism is that it does revise the Bill C5. We keep talking about the super fast tracking, the one that the oil pipeline is going to get, that it no longer has a sunset clause. When it first came out, was it like over a year ago? It was just going to be a temporary thing because of the situation Canada was in and it was only going to be available for five years.

SPEAKER_02And I think that's being changed. Critics are saying, oh, well, now it's forever and that's not great. What's your view on that?

SPEAKER_01I think that we have to be careful with pieces of legislation that give cabinet unfettered power. I think that the way our system is meant to work is they're supposed to be checks and balances. And so it's interesting that they're choosing to do this because I think that's what gave some people comfort before was that five-year sunset clause. And I always ask elected officials, you know, it's great if you want to have this power, but assuming you don't win the next election, how confident would you be with another party having that power? So we'll have to see. You know, sometimes government include things in bills that they know they can amend.

SPEAKER_01It's sort of like in any negotiation, right? You start with your best offer plus some, and then so maybe this is something they put on the table knowing they'll get pushed back. I mean, we have to see.

SPEAKER_03Yeah, great, wonderful. Well, we've been talking with Jatan DeSilva. She's the founder and president of GD Strategic. We'll put the coordinates on website up on the podcast notes here. She was also the former CEO of the Canada Energy Regulator. So, Jatan, thanks so much. I mean, we've talked about this not alphabet soup, but alpha numeric soup of C5, C39, C E R, IAA, et cetera, et cetera. And I must say, I mean, I come out much clearer and in an understanding.

SPEAKER_01I'm so glad.

SPEAKER_03Yeah, no, in terms of the some of the process, I hope you as our audience uh do as well. We're gonna have to follow this even more closely because, as I said, I think we're on an announcement train of major projects and not just pipelines. I think we're on an announcement train of power lines, nuclear power plants. So it's just really great to get your perspectives on how the system works in terms of the approvals because it's so vital. As they say, time is money, and to shorten the processes and get things built to build Canada strong again, I think is really fundamentally important.

SPEAKER_03So thanks for joining us.

SPEAKER_01Thank you so much for having me on.

SPEAKER_02Yeah, thanks for adding some clarity to a difficult topic and a little challenging to understand. And thanks to our listeners. If you enjoyed this podcast, please rate us on the app that you listen to and tell someone else about us.

SPEAKER_00For more ideas and insights, visit Archenergy Institute.com.

Open the transcript file

Hosts and Guests

Guests

  • Gitane De Silva Guest Feed-stated

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Canadian Heavy Oil Price Discount: What’s Next for Venezuela?

    Nov 17, 202642 minAudio

    This episode is also available as a video on YouTube. US imports of Venezuelan crude oil rose from nearly 100,000 B/d before this year’s US intervention to almost 700,000 B/d in August. This influx into the US Gulf...

    Credit the people on this episode

  2. US Midterms and Canada’s Federal Budget

    Nov 10, 202634 minAudio

    This episode is also available as a video on YouTube. This week on the podcast, Peter and Jackie cover the US midterm election results and their potential implications for energy policy and Canada. They discuss why...

    Credit the people on this episode

  3. BC’s Energy Superpower Plan

    Nov 3, 202635 minAudio

    This episode is also available as a video on YouTube. British Columbia has seen a major political shift with the election of a majority Conservative government led by Premier-designate Lorne Doerkson after nine years of...

    Credit the people on this episode

  4. Election Updates and a Conversation with Jigar Shah at ETC

    Oct 27, 202642 minAudio

    This episode is also available as a video on YouTube. This week on the podcast, Peter and Jackie review the latest election news, including the BC election, which produced a Conservative majority government over the...

    Credit the people on this episode

  5. Oil Markets, Diesel, Canadian Heavy Discounts and Pipelines

    Oct 20, 202635 minAudio

    In this week's podcast, Peter and Jackie discuss global oil and diesel markets, the government’s role in major infrastructure projects, including the Pacific Link pipeline, and widening Canadian heavy oil discounts....

    Credit the people on this episode