WISDOT's Tom Buchholz season-ender, 11-13-25

Nov 21, 20259 minAudio
ShareXLinkedInFacebookWhatsAppEmail

It's always a pleasure to welcome Tom to our studios. Honestly, some of the projects are not quite done for the season. Tom gives us a snapshot of how 2025's construction has gone, and what's left to finish. We get a good read on the 2026 I-41 to-do list as well. Tom wraps it up by mentioning a few of the other big projects on the docket for next year as well.

Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.

Transcript

From the show. Tap a time to play from there.

Speaker 1On hby.

Speaker 2I'm David Ward's always great to welcome in from the Wisconsin Dot. The project manager for this whole district of the state of Wisconsin, Tom Bucols, is joining me. How are you doing this morning, horn glad here, Yeah, smile on the face, but a little stress in the in the it brings these days construction at the end of the year, raise a rush to get it done and what's going to get done? And they all seem to get done, and the stress along the way because I'm looking at the calendar November thirteenth and we're still working. We should have had a lot of this done, haven't we.

Speaker 3Yeah, a lot of it was planned to be done earlier. But just due to the you know, workforce that's there and a lot of work that has to be done, it's going to get done. A goal is to have a ballid road opened by Thanksgiving. Highway fifteen all open by Thanksgiving. The one change the drivers are going to see come Saturday morning when you're heading self bound, the self bone exit to Highway fifteen will be open, but it'll be open rate over where the traffic sort of switches over to the other lanes.

Speaker 1Uh huh.

Speaker 3So it'll be a big long ramp all the way to get fifteen. To say that is with the holiday shoppers, if you're coming from the north, rather than get used Wisconsin Avenue, they may want to use Highway fifteen to cast a moment to get to the mall area shopping or.

Speaker 2Had loook there fifteen. That was a huge project.

Speaker 1Yeah, it's it's.

Speaker 3It's been a lot of comments of positive the diverging diamonds. The one thing I'd mentioned too is we're getting a lot of comments of signal timing.

Speaker 1Hey, I'm waiting a long time.

Speaker 3And the one thing to understand is, you know we don't have all the ramps open there yet. So what we do we kind of put the signal timing in. Our traffic engineers do that, and then we make tweaks. Once it fully opens, we'll go back and tweak things and adjust things. So you know, they're if they're waiting forty five seconds more than they think they should, just be patient.

Speaker 1When we get this.

Speaker 3All open here, hopefully by Thanksgiving, they'll tweak make some tweaks in early December.

Speaker 2Tom, I usually don't throw you a scale of one to ten, but how's twenty twenty five.

Speaker 3Going uh, I would say seven. Yeah, I mean the weather has been great. You know, usually construction business it's all about weather, and this year we've had very little rain.

Speaker 1It's been a mild fall.

Speaker 3So from that respective, people have been able to continue to work. When you get big, huge rain years, the stress level goes up really really high and there's lots of work to get done. It's a big project, lots of impacts. Yeah, things going all in all this right at the end to get rushed. We were hoping we've done a little earlier at Ballard and all that, but we're gonna, you know, looking back when it gets opened by Thanksgiving, hopefully it'll be good.

Speaker 2Twenty twenty five as we look back on it, not a lot done on the mainline, but there have been a whole bunch of overpasses done.

Speaker 4Yeah, Holland Road Vandenbrook has been done.

Speaker 1County J. J.

Speaker 3Jay Interchange was done, So a lot of positives there. Yeah, it's all piecemeal and really the next overpasses are going to start next year. Our French Road and Buchanan and those had Buchanan and Holland and Vanbrook had those piers that were in the way the shoulder widening or the mainline widening, So that's kind of the whole reason behind it. So yeah, sort of that prep work to get ready, and now you're going to see in twenty six, twenty seven beyond just a lot more mainline work. And the one thing you'll see hopefully here by Thanksgiving southbound traffic

Speaker 3down you know, from Lyndale back to ninety six.

Speaker 1We'll be back on the southbound lane. That'd be good. Yeah, So that'll be on the new lanes. You'll be on some new pavement and okay, this is we've been kind of weaving it right.

Speaker 3And the next spring then they'll go to the traffic northbound will be on the new southbone.

Speaker 1Lanes so they can work on northbound.

Speaker 4So yeah, there's going to be a lot of work continued.

Speaker 2Okay, so where have we paved as far as mainline right now?

Speaker 3Pretty much to stop by the stadium from Wendale down to ninety six.

Speaker 1Yeah, that's it.

Speaker 2So next year that's we're going to see a lot.

Speaker 3Yeah, and then up the other places up by the U interchange or some work going on in the bridges right now, and we'll continue here. You'll see some mainline work in that stretcher on the you interchange.

Speaker 2There's been a lot of work right there that you weave and then the next week you're kind of doing a different weave, and then the next week you're doing a different weave. What's going on.

Speaker 3Yeah, they're doing temporary widening on the bridges because the whole thing is to give the contractor as much room. So we got to widen those bridges to get the four lanes of traffic on that side. So that's the temporary widening that's going to go on here, probably through January, and then they'll get done and then next.

Speaker 4Spring switch the traffic over so the mainline work can be in.

Speaker 2I noticed is the frontage road even going to be used there somewhat?

Speaker 1Because I noticed they were even repaving part of that too. Yeah.

Speaker 3So yeah, that frontage road was rebuilt on the east side of the road, so then we can put traffic over there, and then we can rebuild the bridge over Apple Creek there so you don't have to do it in stages. That a little campground there, yep, you can allow the That just allows the contractor get in to do the work a lot quicker. End up with a better quality product that lasts longer versus building it in stages.

Speaker 2Tom Buco is joining us Wisconsin DOTO. We're talking about what is and what will be coming up in twenty twenty six.

Speaker 1The south Bridge.

Speaker 2I even saw a piece on it this morning that we're talking is there still people that are concerned about the way things are working out there there?

Speaker 3Brown County is working on the south Bridge corridor, further designs to the east as it crosses the Fox River and that corridor, so they're still working on the design phase of that, and that was what the public meeting was last night. From our perspective, you can see our contractor working on the pier in the media now. So it'll be the pier will be going up and then next spring the abutments and the bridge building and the rest of the interchange. So the plan is to have that self Bridge interchange open at this time next year.

Speaker 2Okay, So you were saying that was kind of soupy ground right around there.

Speaker 1Yeah, it's yeah.

Speaker 2I always toothpaste past so how do you work that through?

Speaker 1So how do you make it work?

Speaker 2We?

Speaker 3Uh, what when you have toothpaste and you put all these big fills on there that compresses that fill. So they put wictrines in and it's just basically a material that helps the moisture wick to the surface. And then if when we're building it, they put a sand layer in there, so that moisture comes up to that sand layer and then can get out to the ditches.

Speaker 1Sooner or later it we'll pack in. Yeah. Yeah, consolidates because it looks great.

Speaker 2It looks like, okay, all we need is a span here, but it's not quite that.

Speaker 1Yeah.

Speaker 3No, So what we do is we put all those fills in and we're monitorious fills and how much settlement to see how much that toothpaste style is compressing. And you know, we are our geotechnical engineers sort of predict how much that's going to go down, and we're monitoring is it going as fast as it is?

Speaker 1And it is.

Speaker 3So that's a good thing because what we don't want to do is also put brand new pavement in and then it settles an engine and.

Speaker 2Then we got on a bat again. Is everything House four to forty one going now? Is that kind of finished?

Speaker 3The pay markings are in, there's some punchless stuff, but if you know to the traveling public.

Speaker 1I drove through it. It looks we're back.

Speaker 3In the normal lank infiguration, normal pavement markings. There's simil some drums and that's just punchless stuff. There's some bridge deck work that we have to do to put a protective surface on, but that needs some warmer temperatures and I don't think we're going to get those here, So that get wrapped up in twenty six.

Speaker 2Let me go back real quick to the South Bridge again. When are they going to start braining excuse me, building the bridge over the river itself? A year or two out yet?

Speaker 1Yeah, so well, yeah, the goal is to have that all.

Speaker 3Open in the late earth twenty thirty, so I think it's twenty twenty seven is the one they want to start. But they got they're still in the design phase. They're still going along. They got to buy real estate, so there's some progress has to get going.

Speaker 1On forty one itself.

Speaker 2We kind of almost halfway are we in that ballpark?

Speaker 3Would you say thirty on construction? I think it's like thirty some percent. Okay, so we found it all. It's good question.

Speaker 1Twenty six will be about halfway.

Speaker 3Oh yeah, yeah, okay, yeah, and we're hopefully everything done by twenty thirty.

Speaker 2Okay, we have about a minute or two more. You go here, let's talk about anything that is in forty one. What are we looking at next year?

Speaker 3Next year, Wisconsin Avenue is going to get a resurfacing. If you're traveling in Wisconsin from from Northland Avenue or from Castloma to Badger, some of that section we've had it patch Oh my god, I've been since two thousand and seven or eight last time we were in there. So that's a research thing that's going to happen. There's going to be a reconstruction of Highway seventy six in the village of Greenville with a roundabout at JJ got it so that that's going to be detoured down in Ashcosh and Highway twenty one from city of Omro going east all the way to basically there Oral hospital in there.

Speaker 3We're going to build three roundabouts at Nurse inductions, at Leonard's Point Road, Sandpit Road, and County Ff. We've had safety concerns and some serious crashes there. Then the other one to mention is Highway ten down in the four line from Highway one fourteen to Coney End. There's some you know, repaving, resurfacing, upgrading the road. So those are some of the bigger ones in the area that'll be going in twenty twenty six.

Speaker 2So something just a quick recap. What are we looking at to try to finish up here by Thanksgiving?

Speaker 3Yeah, just getting traffic over to the new South Bone, getting all the fifteen open and Ballad.

Speaker 4Road open to so you can go make all the movements.

Speaker 2What Ballad Road just every time I look at it, I go, it's not done. It's not done. It's not done. It looks like there's still a lot of work. Now we're getting close, but we're not quite.

Speaker 1There, are we.

Speaker 3Yeah, if you look, the sign bridges are up now, and then we need the traffic signals up and you know, so it's just a lot of incidental and then all the pavement markings got to go in and the signs.

Speaker 4It'll get done.

Speaker 1It'll be a rat racer.

Speaker 2I know a lot of them are major corridors, but that's a major cord.

Speaker 1Yeah, that's probably the number one.

Speaker 3When people go, well, and you're gonna open that bridge over Valor, that's probably the number one I've heard.

Speaker 1So far okay, So anything else time we should know about. No.

Speaker 3Just again, I would say people going to the mall area with that at ninety six, just you know, think about.

Speaker 1Which way you go.

Speaker 3We'd have had some backups on South Bone in the area with the construction because of the ninety six ramps.

Speaker 4So if you want to use that fifteen ramp, but just.

Speaker 1Plan ahead and be alert.

Speaker 3And then again from safety drivers, keep off your phones, stay alert, and then we have all that information on our website at I forty one Project wisconsindot dot go.

Speaker 2Beautiful Tom, thanks got to run, appreciate it and we'll see you soon downline.

Speaker 1Thank you.

Open the transcript file

Hosts and Guests

Nobody is credited on this episode yet.

Credit the people on this episode

Be the first to rate this episode

More episodes

All episodes
  1. Dave Edwards and The List in 6!

    Oct 23, 20264 minAudio

    That's my prediction for the World Series---Crew in 6! We dive into mid-term election news. The Green & Gold have a key player back....maybe not the one you most want to see! Gas prices are zooming up with little relief...

    Credit the people on this episode

  2. Dave Edwards & AM Fox Valley Live from Miron Construction

    Sep 24, 20261 hrAudio

    0:00 - Dan Voss 4:49 - David G. Voss & Kevin Beauchamp 14:24 - David Voss III & Lisa Kogan-Praska 21:22 - Tim Kippenhan & Nick Kippenhan 29:38 - Jason Fuhrmann & Mike Voss 38:07 - Corey Brumbaugh & Eric Siudzinski 48:27...

    Credit the people on this episode

  3. The List previews Labor Day, 9-4-26

    Sep 9, 20264 minAudio

    Labor Day is upon us. Enjoy you day off since someone thinks you get too many holidays! We'll get ready for the NFL season. Tiger Woods is ordered to park it. We still have yet to see a breathing Mitch McConnell. And,...

    Credit the people on this episode

  4. Dave Edwards and The List hides in a food cart, 8-14-26

    Aug 14, 20263 minAudio

    Yes, it's the new way to travel...in fourth class. This week, we scold the storm scammers. Also, the NFL pre-season is really underway now. Some election day thoughts about Wisconsin's gubenatorial race. And, a...

    Credit the people on this episode

  5. Dave Edwards and The List after the storm, 7-31-26

    Aug 1, 20263 minAudio

    We've all been rocked by Monday's storm. Some, much more than others. We will pick up the peices and cherish the fact that no one perished. We also take a look at mail in ballots, football and more. The List wishes...

    Credit the people on this episode