Please enjoy my chat with Andy, taling about the recent busy months for Playa Verde.
Thanks for reading A Whisky with Charles! Subscribe for free to receive new posts and support my work.
We covered the Article 17 No. 1 mining permit, which authorises dredging at Chañaral beach, including within the urban zone, with MINVU raising no objection. We also discussed the Environmental Tribunal’s decision to reject the challenge to the RCA in its entirety, and what that judicial validation means for lenders and the wider community.
Andy walked me through the arsenic commitment of 47 mg/kg in the return sands, and why he sees the project as improving the beach rather than just avoiding harm.
We then turned to the resource and the numbers. We talked about the 5.4% increase in the Ore Reserve to 33.94 Mt, and what that says about how conservative the original estimate was.
We explored EMI’s view that reserves could grow by a further 25 to 30 percent in the short term, and how CAPEX savings and a long-term acid contract could push the project towards an NPV of around $300 million.
Next, we considered the path to a final investment decision. We covered the BIOS MI Class 3 update, the third-party dredging model, and the lender-grade data room that is now populated and in use.
Andy outlined the financing options on the table, from project debt to streaming, royalties and offtake prepayments, and why a ticket under $100 million keeps any dilution manageable.
We also touched on offtake, the route to good-delivery premiums, and what it will take to hold the October 2028 start-up timetable.
Finally, we looked ahead to the near-term and multi-year plan.
Tune in!
Thanks for reading A Whisky with Charles! Subscribe for free to receive new posts and support my work.
This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit thatstocksguy.substack.com
Audio and video play straight from the show's own hosting. PodSubs stores and serves no media.
Transcript
From the show. Tap a time to play from there.
[music]
SPEAKER_02Okay. Good morning, ladies and gentlemen. My name is Charles Archer, and I'm delighted to say I'm joined today again by Andy Denham, the CEO of Halo Minerals. Andy, how are you? I'm very well. Thank you, Charles. Thanks for having me. Hope you're well. I'm very well. Last weekend, we had the last heat wave of the summer down in Devon. It was boiling hot. It was barbecues. It was alcohols from last days of Rome. Now we have a storm and there are trees falling over outside my house a week later.
SPEAKER_02It's all over the place. What have you been up to?
SPEAKER_01Well, it's been a busy week for us, obviously with the industry in town for LME Metals Week. So walking the streets of London, lots of busy meetings. As you've probably seen, we've had a couple of announcements out as we're Ticking off the milestones on our way towards RFID and begin the construction phase of the project. So all systems go and no rest for the wicked, as they say.
SPEAKER_02No rest for the wicked. Indeed. Right. Well, let's talk about permitting and de-risking to start with. Article 17, number one mining permit, you know, now covers dredging within the urban zone. No objections being raised. You know, does this put the can we actually dredge in front of the town question straight to bed now?
SPEAKER_01I think that's exactly what it does. So you probably recall that we've previously had the EIA or RCA, as it's referred to in Chile, approved. That's obviously the major big permit. And once you've got that, additional permits can then be submitted. This is one of those. This is effectively... Almost akin to what would be a regional EIA insofar as it approves the use of the industrial mining equipment, in our case, the dredge, to be situated on the beach to recover the minerals,
SPEAKER_01to reprocess the minerals and to then put the clean tails or the clean sands back onto the beach, which is obviously fundamental to our operations. So it's great to get that approved and in place. It's another milestone ticked off on that journey towards FID. And I think earlier in the month, we were expecting that perhaps this might be done by the end of the year. So to have this before the end of October is really helpful.
SPEAKER_02Good, good, good. And there was a challenge, right? But then the Environmental Tribunal rejected it in its entirety not so long ago. The RCA now judicially validated. So obviously, there are going to be lenders in the data room right now. That's going to help them out enormously, right, from a comfort perspective.
SPEAKER_01Yeah, and I think the other news that we've recently announced was an updated CPR, which obviously has increased the reserves of the project. So we've got 34 million tons there or thereabouts of all reserves at 0.25% copper. We've still got the full resource base of just shy of 53.5 million tons. And we updated with bankable feasibility study level CAPEX and OPEX numbers, I think, a month prior. So all of this now has come together to effectively put in that lender-grade ready information suite for them to make their decisions
SPEAKER_01on is this something to support or otherwise. That's obviously what we're working on now. Key management sort of focuses on value engineering, optimization studies, and that BFS report really served as the sort of right-hand bracket of the cost basis, so $92.8 million. But it did also observe that there's realistic six to ten million dollars in capex savings to be realized through that value engineering program and the competitive procurement tender process. So we're expecting it to come in sort of mid 80s all in all.
SPEAKER_01And the new CPR sort of wraps around the base case, which is just the all reserves alone with an MPV8 of about one hundred and ninety six million dollars. The management case, which includes retreating the full beach resource, is just over $330 million. So significant value for the project. And obviously with a CapEx requirement of order of magnitude $90 million, it's way below the sort of 70% loan-to-value thresholds that a lot of lenders look
SPEAKER_01at. I think from the management perspective, what our focus is in terms of putting that funding stack together is to really leverage the cash generative profile of the project once it's in production. I think the new CPR that we've announced the highlights of said annual free cash flows order a magnitude about $56 million per annum. So obviously using those new of those healthy free cash flows to service credit style agreements, which will obviously minimize any equity participation that we may need to consider
SPEAKER_01at any future point in time. And obviously we don't have any royalties or any streams on the ore body at the moment as well. So all of that is retained. And obviously you've got the prepayments and sort of working capital facilities from traders as we're also engaging with that community with regards to the commercial agreements for offtake.
SPEAKER_02Yeah, yeah. And it's interesting, isn't it? Because your reserve rose 5.4% to nearly 34 million tonnes. But EMI thinks those reserves could rise by another 30% to, you know, close to 45 million tonnes in the short term. So what work do you need to do to convert that? And when did that happen?
SPEAKER_01Yeah, so just to take a step back from that. So as you might recall, when we originally caught up, Charles, the ore that has deposited to form this beach, and it's effectively an inorganic, it's an artificial beach. Unbelievably, the Puerto Vallios and El Salvador mines dumped some 250 million tons of tailings in a dry riverbed between the 1930s to 1960s. And then over the decades, they've now washed 120 kilometers downstream to form this beach where we have that 53 million tonne jork-compliant resource.
SPEAKER_01And just orders of magnitude, this is sort of five to five and a half kilometers of shoreline and between one to one and a half kilometers from the shoreline to the back of the beach and a sort of average volumetric depth of about 9.5 meters. So within that formation, we have this jork resource. One of the benefits of this tragic situation is that on that 120km journey downstream, that ore has all been effectively jumbled up. And so while it's now deposited itself on the beach, we have a very homogeneous ore body with a lot of great continuity across it,
SPEAKER_01which obviously lends itself very well to processing operations. So in terms of the EMI observation that there is a near-term opportunity to increase reserves by up to 30%, Effectively, that's some small infill drilling to be done between the larger drill areas where the reserves are mostly categorized. Now, that's something that's obviously nice to do. Increasing the reserves is always a healthy thing for a resource business to be doing. But I think, you know, there's a lot of understanding of that ore body and the continuous nature of it
SPEAKER_01that it's probably not a prerequisite for us to have to spin the drill bit to bump those reserves up. So I think from our perspective, You know, we've already got a very economic project just based on the existing oil reserves that we have. Obviously, management case does include those additional resources, which just by their definition have less confidence according to the Jork standards. But sort of internally, our confidence remains high. The investor community and the strategics that we're speaking to with regards to putting the FID funding stack together, I think, are singing from that same song sheet.
SPEAKER_01So it's not a prerequisite for us to need to get after. It will be something that we'll visit at the appropriate point in time. But it's basically just doing a bit of infill drilling just to work those sort of channels between the main blocks up to the same standard. And then obviously we can see that bump in reserve. So it's to get round to. Don't think it needs to be immediately. And I'd be hopeful that we can take FID before we have to do that. So from our perspective, obviously it's about Commercialization and getting some revenue recognition as soon
SPEAKER_01as possible. So going to put in the drill program where we're spending money on things that perhaps we don't need, it becomes then in the category of a nice to have. It's probably moving timetables away from our ultimate end goal, which is getting into production. And at the moment, it doesn't seem to be a requirement. So it's something for us to visit, but I don't think in the immediate term in terms of our personal desires.
SPEAKER_02Yeah, fair enough then. I mean, obviously it is a bit of a, not your angle, but the previous operators who mined this stuff and then created this deposit, a bit of an ESG disaster. Obviously, you're cutting arsenic in the return sands to below 50 milligrams per kilogram. That's probably the strongest ESG story here, right?
SPEAKER_01Yeah, I mean, as you rightly point out, this is very much what was described as a toxic beach. You know, UNESCO visited the site way back in the 80s and said it was one of the Pacific's largest industrial pollutions. One of the former presidents went for a swim in the bay in the early 2000s and came out in a skin rash. So it's not for
SPEAKER_02recreational use. It's like something out of The Simpsons. But yeah, continue.
SPEAKER_01I remember that episode. Yeah. So obviously what we're doing here, and we've signed MOUs with the local community, and in fact, we've got local stakeholder community engagement groups ongoing. We've done about three sessions over the last three or four weeks. The last one's on Friday. So this is part of obviously being a socially responsible operator and maintaining your social license. You've obviously got to be active and available and be able to address any concerns before they manifest themselves into something further worse.
SPEAKER_01Or becomes harder to address. But part of what we've agreed here is that we're going to be obviously reprocessing these tales, recovering the commercial metals for commercial sale, but then also reducing the heavy metals and, as you rightly point out, specifically the arsenic in the return sands. Such that on completion of these operations, we expect to return that beach back to the municipality in a state suitable for recreational use once again. And as part of our EIA, all of the standards that we adopted were in accordance with the Australian beach standard.
SPEAKER_01So we take these things seriously. We want to obviously continue to maintain our operating and social licences. And part of what we're doing here is that sustainability angle and that remediation angle where we will be detoxifying the beach. So hopefully the restriction of access can further be lifted.
SPEAKER_02Yeah. And then, you know, on top of that, all of what we have already, the offshore surf and bay zones can hold another 100 million tons of very similar material. So given that the plant is already sized and permitted, you know, a lot of the upside is basically free optionality, isn't it?
SPEAKER_01Well, I mean, it's hugely strategic for us, right? It's contained within the footprint of our existing licences, which extend about one, one and a half kilometres out into the bay. And as you rightly point out, there is potentially an estimated 100 million tonnes there or thereabouts of the same materials at the bottom of the seabed. Now, that's currently a non-jort compliant estimate. It's based on much fewer drilling holes than what we've got on the onshore. Obviously, it is a bigger beast. It would involve probably modifying the EIA because we wouldn't use
SPEAKER_01the onshore single wheel electric suction dredge, which we're using for the beach. You probably lease sort of an offshore dredging ship. Part of that pathway to unlocking that journey is the maritime concession application, which we're sort of on with progressing. And obviously, when we do modify that EIA, I think there would be good reason to suggest that we should probably actually be doubling the plant's capacity on the premise that it's probably unhelpful for us to be there for 30 years.
SPEAKER_01And there's probably a great deal more benefit if we can actually process that material quicker and be on and off site within 15 or so years. And obviously also the benefits of that are if you do treat that offshore, you give marine life the opportunity of returning back to the area sooner as well. And obviously that's important for the fishing community and the general ecosystem there as well. So that is an ongoing process at the moment. It's hugely strategic. It's highly synergistical and it's very complementary to the operations
SPEAKER_01that we're doing onshore. But let's not get confused with that. You know, that is... A huge prize for us to land, but it doesn't distract from the fact that we already have a very economic project onshore, which we're permitted for and which we're getting on with as we advance towards FID, which we hope to take in the coming weeks or months. Indeed.
SPEAKER_02Well, the thing you were mentioning a second ago, obviously the CapEx is $92.8 million, but by us and I, we were talking $6 million of potential CapEx savings, but they said up to $10 million of savings, which would be a pretty significant chunk for value engineering, competitive tendering. How confident are you we could capture the high end of that?
SPEAKER_01I think the six million is very attainable. So we kind of know what configurations would be changed there and effectively that's replacing some filters with some pressure washers. It's a study that we've already done. So we're highly confident in that and our metallurgist Colin Hunter has worked on that quite extensively. So we think that's a very reasonable expectation for us to achieve. Those additional savings come from that competitive process. You may recall we previously already done about 860 requests for quotation over
SPEAKER_01the summer as we put that BFS study together. But obviously that's just simple. Give me your quote for this piece of this and the freight or this piece of equipment and the freight to get it to site. When you're actually going out to say I've got the money and now I want to place an order, you're going to get a more competitive engagement from that. And also, obviously, we did that exercise over the summer months really at the sort of height of the Iranian situation and the stresses that that's put on the world as well.
SPEAKER_01So, you know, we think there's some trimmings to be made in some of the freight and transport costs that we were exposed to back then. Certainly, if things can improve over in the Middle East further by the time we come to requiring those items. So, yeah, the number from the men who have the calculators and have been pouring their pencil over it is an expectation of up to 10 million. So, you know, we have every reasonable expectation that it could be that level. But, you know, I think six is very, very attainable and sort of up to 10 subject to the macro picture continuing
SPEAKER_01to improve.
SPEAKER_02Yeah.
SPEAKER_01I mean, the flip side of that, sulfuric acid is
SPEAKER_02the largest reagent cost. And obviously that's come down a fair bit from its peaks, you know, after Hormer's closed. But do you think getting a long-term supply is something that's relatively attainable right now in Chile?
SPEAKER_01Yeah, well, that was one of the optimizations that's been identified by the Biosme guys when we did the BFS level study. Obviously, sulfuric acid has been under pressure in the near term, mostly in the spot price markets, because if you need it, it's expensive to get today. Good news is we don't need it till the second half of 2028, so that does give us a runway for that picture to improve. More sulfuric acid plants will ultimately end up being built if the sulfuric acid price remains high because there's an economic opportunity
SPEAKER_01for someone to make money by entering the market there. Also, if sulfuric acid prices stay high, it's a further reason for copper to remain high.
SPEAKER_02So it just feeds into the price, isn't it? So input cost comes output cost.
SPEAKER_01It's not all part of the ecosystem. A number of the conversations that we've been having this week at LME Week has been in relation to long-term sulfuric acid supply. Two or three of those guys have said for what our needs are, the timing that we need it. 150 per tonne is probably a very likely number. So that's the number that we use in our optimized case. In our base case, we're using, I think it's $200 per tonne. So there's a cost saving that we can recognize from achieving that.
SPEAKER_01And still actually the long-term consensus in Chile for 2030 onwards is in the orders of magnitudes of $100 per tonne. So yes, we are in a bit of a shock market at the moment. The good news is we don't need the sulfuric acid today. And like I say, there does seem to be pathways to us to be able to attain long-term supply at prices notably cheaper than what the current spot price would lead you to believe you'd be exposed to.
SPEAKER_02Indeed. And obviously in that same study, the operating costs, you're talking $2.20 per pound. Where does Playa Verde sit on the cost curve, looking at $2.20?
SPEAKER_01Yeah, so $2.20 is a really attractive number for us to be operating under. I believe that puts us at the sort of lower end of the second cost quartile. This is bearing in mind that we're using a lease dredging solution. The reasons behind that are for the financing of the CapEx and to get into business sooner and quicker. It's obviously helpful for us to reduce the CapEx number. And for lenders, I think it lowers the perceived execution risk of delivering the business,
SPEAKER_01that you're bringing in a lease operator who has the team, who has the spares, who has the knowledge and know-how of that specific piece of equipment. I think long term, and this is probably year two after production, spending the money to go and buy your own dredge is probably desirable because you can do that out of cash flows. I think if you buy your own dredge, you can drop down to between $1.75 to $1.90 per pound of copper produced,
SPEAKER_01which then puts you in that lowest cost quartile producer bracket. And then, you know, you're in a very defensible world moving forward. So that's a sort of dual prong strategy. Let's lower execution risk. Let's lower upfront capex. Let's get into business sooner and move more conviction. And then we'll look to optimize that once we're into production.
SPEAKER_02You're targeting FID by the end of this year. Are there any remaining gating items or do you think we're there now?
SPEAKER_01I think we've had a really good run of delivery on things probably ahead of schedule, certainly in relation to that mining permit. A lot of the conversations this week at LME Week have been suggesting that we want to be progressing now towards that final home straight run. So I'd be hopeful that we can start converting concepts and discussions of interest into LOIs, heads of terms on that pathway. Obviously towards effectively ultimate binding documents.
SPEAKER_01So we're heavily working on that. It feels that the timing for projects like ours that are permitted, that have a near term pathway, that aren't technically complicated and the technical risk has actually been de-risked by significant studies. Are in a very unique position to gain interest, especially when you are seeing declining copper production, certainly in Chile. That's been one of the key themes of LME Week. So new inventory coming online,
SPEAKER_01I think, certainly has its place to garner people's interest and investors' interests. And like I say, we're not exposing financial investors to Conventional mining risk. We're not opening up a new underground mire. We're not opening up a pit. The material's there. It's at surface. It's already been blasted, crushed and processed. And it's all sitting there to be re-picked up off the beach and processed and then cleaned and re-deposited again. So I think the management team are confident
SPEAKER_01that we can achieve what we're setting out to achieve. And as I say, it's really focused on leveraging The cash generative profile of the production. So focusing on credit, private credit, debt style instruments, possibility to also introduce prepayment alongside the commercial offtake rights. We haven't got any royalties or streams over that all bodies.
SPEAKER_02That's something else you can sell. Yeah.
SPEAKER_01And typically those guys probably historically or usually maybe not be interested in their tailings because they like the blue sky, but we do have that blue sky as we're obviously, as we spoke about.
SPEAKER_02There's quite a few operators now who haven't looked at tailings who now are doing so because the options are forward. But we're looking at a startup in October 2028, which would be roughly a year and a half after FID. Obviously, at LME Week, off-take talks possibly progressing, both cathode and concentrate. Maybe there's a route to LME good delivery premium. And the data room is open, right? And you said it's lender-grade and populated. So what kind of interest are you looking at right now?
SPEAKER_01Yeah, well, we can't say too much as this is a work in progress at the moment.
SPEAKER_02Indeed, I'm not...
SPEAKER_01What I can tell you is that we've had a lot of positive feedback on the caliber and sort of user-friendly nature of the VDR. Obviously, that's important that you're able to actually convey this to these people and give them the information that they need. And with nearly sort of $10 million of sunk costs in PFS, DFS, BFS, Jork Resource Reserve Reports, and I think there's five of them over the last 12 years that obviously all build on each other. Obviously, financial modelling, EIA permitting,
SPEAKER_01this new permit that we've just got this week, all the community stakeholder work, all the human health work. You know, we've got a huge encyclopedia of project knowledge, which is obviously very helpful for industry partners to pick and choose the information that they're sensitive to. And as I say, with so robust project economics, you know, nearly 200, well, base case project economics in the order of magnitude of 200 million dollars. When a sort of after tax IRR of 50%, you know, it's sort of less than 50% loan to value that you're ultimately looking for
SPEAKER_01to financial capex needs. So it seems to be well within the sort of realms of what the cookie cutter for those types of lending universes would draw the line at. So obviously we need to continue to build on this positive momentum. We need to take advantage of the way that the world is viewing copper and And near term production, we need to convert our hopes and expectations into deliverable success. We're on that journey. We're obviously doing the value engineering studies in the background alongside that.
SPEAKER_01They're not a prerequisite to us closing FID. But also, you know, we don't want to be sharpening the pencil after we've got the money. We kind of want to be working forward in tandem. So it feels as though the wind's in our sails is driving us forward with momentum. And hopefully within a near term passage of time, these hopes and expectations and positive conversations materialize into contracts and definitive agreements and drawdowns of development funding.
SPEAKER_01And then obviously we enter the construction phase, about 18 months time. And as you rightly point out, the sort of BIOSME development planning schedule the moment would suggest we're sort of on track for October 2028. So it feels like it could be, you know, it feels if you say 2028 was nearly two years away. But in terms of copper developments, that really is just sort of around the corner. So that's great.
SPEAKER_02Yeah, I mean, there's copper mines in America that have taken 40 years and still haven't got developed. So two years, we can live with that. Last question for you, sir. We've seen a pretty positive run of news flow that we've talked about throughout the interview. Obviously, you had the AIM admission, the RCA, the Tribunal win, Class 3 costs, the CPR, now the permit, all ahead of schedule. You're talking about kind of the blue sky, you know, and we talked in the last interview about potentially more tailings project we could go after. But for the investor looking at the stock today,
SPEAKER_02what's the number one most important catalyst in the near term that we can look forward to?
SPEAKER_01It's a good question. I think from speaking with existing shareholders and meeting prospective new shareholders, a lot of expectation from that audience seems to be around the next value driver really being FID and removing the financing risk or at least putting markers in the sand that allow people to understand the equity story upside. And I think the one thing that I would say is that obviously our focus is on preserving shareholder value, shareholder equity story value to the upside of the project,
SPEAKER_01which is why a lot of our focus and attention is on these sort of debt credit style instruments at the moment. We really view equity as the sort of bookend right at the end of that process, if perhaps even at all required. And I think we would probably put prepay and probably even put royalty and stream financing ahead of wanting to do equity. Just because, you know, we want to preserve the equity value and not dilute at PLC level unless we absolutely have to. But we're not focused on that today.
SPEAKER_01But obviously the AIM market for probably justified reasons as an aggregate basket has some cynicism around companies achieving certain ambitions. And, you know, a lot of feedback I get is a sort of 10, 11 million pound market cap. How are you going to raise 90 million dollars? I think when you speak to industry players, they don't view it through that lens. Your share market price is a secondary factor for them. They're looking at project MPV. They're looking at what the project's going to deliver
SPEAKER_01because that's ultimately what they're investing into. And as I say, the project economics are hugely robust. But the markets are troublesome. I don't think any of the new issues that have come to market this year are above their IPO price.
SPEAKER_02There's a couple, but they're breaking the mould. Yeah.
SPEAKER_01Yeah. So I don't feel we're alone. So from our perspective, we don't need to raise equity today. It's frustrating to see the share price where it is today, but we have to focus on delivering what we said we're going to do. We're ticking off those milestones in the news announcements that you've seen. And really the next one for us now is sort of progressing towards FID and taking that decision and beginning the construction phase of the project. As you point out, we do have an eye on inorganic growth. There's a number of opportunities that we could do.
SPEAKER_01It's always about timing, right? So, you know, our immediate focus is on our prize possession, which is the Playa Verde project and getting that financed. Then we can turn our attention and maybe start to expand our wings out to bring something else under them. Those conversations and technical review and diligence and counterparty engagement are continuing. But that's, again, not for tomorrow, probably not for next week, but beginning of next year,
SPEAKER_01once we're through FID, then we can probably spend a little bit more time and energy on what we're doing next. But we need to be successful in what we already have. So we're sort of all hands on deck to that main objective.
SPEAKER_02Beautiful, Andy. Lovely to chat to you, sir. And we will speak again in the near future, potentially when that FID decision has been taken. Thank you very much for your time, sir. Bye-bye. [music]
Good Morning Team. Today Rupert joined me for a follow-up conversation after a busy few weeks. We start with Wudinna, where the 5 November diagnostics showed one Boland Pidinga sample pulling 88% TREY and Narlaby...
Good Morning Team. Please listen in to my most recent conversation with Andrew, considering the future of Defence Holdings. Thanks for reading A Whisky with Charles! Subscribe for free to receive new posts and support...
Good Morning Team. I am pleased to place another interview with Paul for your entertainment. Thanks for reading A Whisky with Charles! Subscribe for free to receive new posts and support my work. We talked about how...
*figures quoted during this podcast were off the cuff estimates. Please check official sources. Good Morning Team. Please listen in to my chat with Alex, where we talked about Verkhuba, which has now passed 4,800 metres...
Good Morning Team. Please enjoy my chat with Sam and Nick, talking all things GCSU. Thanks for reading A Whisky with Charles! Subscribe for free to receive new posts and support my work. We first chatted about how the...